SA1
to Agreement No. CE54/2001 (CE)
WAN
CHAI DEVELOPMENT PHASE II
PLANNING
AND ENGINEERING REVIEW
ENVIRONMENTAL
IMPACT ASSESSMENT
FOR
WAN
CHAI DEVELOPMENT PHASE II AND CENTRAL-WAN CHAI BYPASS
ENVIRONMENTAL
MONITORING AND AUDIT MANUAL
CONTENTS
Page
1.1 Purpose of the Manual....................................................................................... 1-1
1.2 Project Description............................................................................................ 1-1
1.3 Environmental Monitoring and Audit Requirements.............................................. 1-6
1.4 Project Organisation.......................................................................................... 1-9
2.1 Introduction....................................................................................................... 2-1
2.2 Air Quality Parameters...................................................................................... 2-1
2.3 Monitoring Equipment........................................................................................ 2-2
2.4 Laboratory Measurement / Analysis................................................................... 2-3
2.5 Monitoring Locations......................................................................................... 2-4
2.6 Baseline Monitoring........................................................................................... 2-4
2.7 Impact Monitoring of Construction Air Quality Impact......................................... 2-5
2.8 Impact Monitoring of Operation Air Quality Impact............................................. 2-5
2.9 Environmental Quality Performance Limits.......................................................... 2-7
2.10 Event and Action Plan....................................................................................... 2-7
2.11 Mitigation Measures......................................................................................... 2-10
3.1 Introduction....................................................................................................... 3-1
3.2 Noise Parameters.............................................................................................. 3-1
3.3 Monitoring Equipment........................................................................................ 3-1
3.4 Monitoring Locations......................................................................................... 3-2
3.5 Baseline Monitoring........................................................................................... 3-2
3.6 Impact Monitoring ............................................................................................ 3-2
3.7 Event and Action Plan ...................................................................................... 3-3
3.8 Noise Mitigation Measures................................................................................. 3-4
4.1 Water Quality Parameters.................................................................................. 4-1
4.2 Monitoring Equipment........................................................................................ 4-1
4.3 Laboratory Measurement / Analysis................................................................... 4-2
4.4 Monitoring Locations......................................................................................... 4-3
4.5 Baseline Monitoring........................................................................................... 4-3
4.6 Impact Monitoring............................................................................................. 4-4
4.7 Post-construction Monitoring.............................................................................. 4-5
4.8 Field Log........................................................................................................... 4-5
4.9 Construction Site Audits..................................................................................... 4-5
4.10 Event and Action Plan for Construction Water
Quality......................................... 4-6
4.11 Mitigation of Adverse Environmental
Impacts...................................................... 4-7
5.1 Introduction....................................................................................................... 5-1
5.2 Waste Control and Mitigation Measures.............................................................. 5-1
6.1 Introduction....................................................................................................... 6-1
6.2 Remedial Action................................................................................................ 6-1
6.3 Mitigation Measures during Construction Phase................................................... 6-5
7.1 Introduction....................................................................................................... 7-1
7.2 Mitigation measures for corals............................................................................ 7-1
7.3 Monitoring requirement...................................................................................... 7-3
8.1 Introduction....................................................................................................... 8-1
8.2 Monitoring Details............................................................................................. 8-1
8.3 Baseline Monitoring........................................................................................... 8-2
8.4 Event/Action Plan for Landscape and Visual Works............................................ 8-2
8.5 Mitigation Measures.......................................................................................... 8-4
9.1 Site Inspection................................................................................................... 9-1
9.2 Compliance with Legal and Contractual Requirements......................................... 9-2
9.3 Environmental Complaints.................................................................................. 9-2
10.1 General........................................................................................................... 10-1
10.2 Baseline Monitoring Report.............................................................................. 10-1
10.3 Monthly EM&A Reports.................................................................................. 10-2
10.4 Quarterly EM&A Summary Reports................................................................. 10-7
10.5 Final EM&A Review Reports........................................................................... 10-8
10.6 Reporting for Post-construction /
Post-Translocation Monitoring of Coral........... 10-10
10.7 Operation Phase EM&A Report..................................................................... 10-10
10.8 Data Keeping................................................................................................ 10-10
10.9 Interim Notifications of Environmental
Quality Limit Exceedances.................... 10-10
LIST OF FIGURES
Figure 1.1 Wan Chai Development Phase II and
Central-Wan Chai Bypass – Site Plan
Figure 1.2 Designated
Projects
Figure 1.2c Designated
Project 3:
Reclamation works including associated Dredging Works
Figure 1.2d Designated
Project 4:
Temporary Typhoon Shelter
Figure 1.2e Designated
Project 5:
Wan Chai East Sewage Outfall
Figure 1.3 Project Organisation
Figure 2.1 Locations of Representative Air
Sensitive Receivers
Figure 2.2 Proposed Monitoring Locations
During Construction Phase
Figure 2.3 Proposed Odour Monitoring Location
During Operation Phase
Figure 3.1 Locations
of Representative Noise Sensitive Receivers
Figure 3.2 Locations
of Construction Noise Monitoring Stations
Figure 3.3 Locations
of Traffic Noise Monitoring Stations
Figure
3.4 Location of Temporary
Noise Barriers during Construction Phase (NPR2W, NPR1 & NPR2E)
Figure
3.6 Locations of Direct Noise
Mitigation Measures
Figure
4.1a Locations of Water Quality
Monitoring Stations (Sheet 1 of 2)
Figure
4.1b Locations of Water Quality
Monitoring Stations (Sheet 2 of 2)
Figure 6.1 Estimated
Extent of Soil Contamination
Figure
6.2 Remediation Method of
Contaminated Soil
Figure
7.1 Spot-check Dive Sites and
REA Transects (Sheet 1 of 2)
Figure
7.2 Spot-check Dive Sites and
REA Transects (Sheet 2 of 2)
Figure
7.3 Proposed Coral Recipient
Site at Junk Bay
Figure
8.1a Baseline Landscape
Resources During Construction
Figure
8.1b Baseline Landscape
Resources During Operation
Figure
8.2a Baseline Landscape
Character Areas During Construction
Figure
8.2b Baseline Landscape
Character Areas During Operation
Figure
8.3a Key VSRs and Primary Zone
of Visual Influence During Construction
Figure
8.3b Key VSRs and Primary Zone
of Visual Influence During Operation
Figure
8.3c Key VSRs and Secondary
Zone of Visual Influence
LIST OF
APPENDICES
Appendix A Implementation
Schedule
Appendix B Sample Data Sheets for Air Quality, Noise
and Water Quality Monitoring
Appendix C Sample Template for the Interim
Notifications
Appendix G Specific
EM&A Requirements for Schedule 2 DP4: Temporary typhoon shelter
Appendix H Specific
EM&A Requirements for Schedule 2 DP5: Wan Chai East Sewage Outfall
Appendix
J Essential Steps for the