8 Sewerage
Impact and Sewage Treatment Implications
8.2 Development
Proposals and Future Population
8.3 Design
Criteria and Assumptions
List
of Tables
Table 8.2 Minimum Pipe Gradients for Sewer Design
Table 8.3 Flow Estimate for New Developments
Table 8.4 Wdii Flows to Deep Trunk Sewer
8
Sewerage Impact and Sewage Treatment
Implications
8.1.1
This
section describes the assessment of the impacts on the existing sewerage system
in the study area resulting from the planned development, and recommends
appropriate mitigation measures where adverse impacts are identified. The new sewerage network within the
study area arising from the proposed development is also presented. The guidelines for evaluating and
assessing the sewerage impact of the Project on the public sewerage and sewage
treatment as given in Section
8.2.1
Assessment
of new sewerage system requirements for the WDII development is based on the
proposed land uses as presented in RODP. Population
estimates based on the land uses presented in the RODP should be reviewed and,
if necessary, updated in the later detailed design stage of the proposed
sewerage works for WDII when more detailed planning information is made
available from the concerned parties by that time.
8.2.2
In
order to collect the sewage flows from all the new developments, each of these
areas will be provided with a terminal manhole connecting to the proposed
sewerage networks. For those
developments with designated access or service roads, the terminal manholes
will be located within the development area fronting the entrance point. Where the access to some development
areas is unknown at this stage, the location of the terminal manhole will be
subject to change when more information is available in the detailed design
stage or appropriate tapping points to be provided for future connections.
8.3.1
The
major population patterns within the study area are commercial and
residential. The unit flow factors
to be adopted for these two categories follow the suggested value from the DSD
Sewerage Manual Part 1 as below:
Commercial:
Employed
population = 0.06m3/head/day
Commercial
activities = 0.29m3/head/day
0.35m3/head/day
Residential =
8.3.2
Peaking
factors to be adopted are given in Table
8.1. They follow the suggested
values from the DSD Sewerage Manual Part 1, with the allowance for stormwater
flow.
|
Peaking Factor (including Stormwater Allowance) |
Peaking Factor (excluding Stormwater Allowance) |
<1,000 |
8 |
6 |
1,000 to 5,000 |
6 |
5 |
5,000 to 10,000 |
5 |
4 |
10,000 to 50,000 |
4 |
3 |
>50,000 |
7.3 N0.165 |
5.2 N0.165 |
Design Parameters and
Constraints
8.3.3
Pipe
material: vitrified
clay pipes to BS EN295 will be used for sewer smaller than 900mm in diameter
while precast concrete pipes to BS 5911 will be used for pipe diameters greater
than or equal to 900mm. Other
suitable pipe materials in accordance with the Sewerage Manual could be used
where appropriate to take account of different site conditions such as the
expected occurrence of differential settlement etc. Protective lining such as
bitumen or epoxy should
be provided for precast concrete pipe to be used in sewage works.
8.3.4
The
roughness coefficient (ks) to be adopted for different pipes and conditions are
as follows:
(i) Surface
roughness (ks) for all existing pipes : 3.0mm
(ii) Surface
roughness of proposed pipes (Vitrified Clay) : 0.6mm
(iii) Surface
roughness of proposed pipes (Precast Concrete) : 1.5mm
8.3.5
The
sewers are designed based on the following limiting conditions:
Table 8.2 Minimum
Pipe Gradients for Sewer Design
Pipe
Diameter (mm) |
Minimum
Gradient (1 in - ) |
Capacity (l/s) |
Velocity (m/s) |
150 225 300 375 450 525 600 675 750 825 900 |
175
(101) 295 (170) 430 (244) 570 (324) 717 (407) 869 (494) 828 (468) 962 (544) 1,099 (621) 1,208 (701) 1,188 (782) |
13.3 (17.7) 30.0 (39.8) 53.0 (70.7) 82.8 (110.4) 119.3 (159.0) 162.4 (216.4) 212.0 (282.6) 268.4 (357.7) 331.4 (441.6) 406.3 (534.4) 515.3 (636.0) |
0.75 (1.0) 0.75 (1.0) 0.75 (1.0) 0.75 (1.0) 0.75 (1.0) 0.75 (1.0) 0.75 (1.0) 0.75 (1.0) 0.75 (1.0) 0.76 (1.0) 0.81 (1.0) |
(Values for new sewers in
brackets.)
8.3.6
BS
8005 recommends the laying of sewers to a gradient giving a full-bore velocity
of 1m/s at least daily. At such a
gradient, 0.75m/s will be exceeded with any flow rate more than 20% of the
full-bore flow. To avoid
unnecessary expense and disruption to the community, existing sewers will be
checked against the criterion of whether 0.75m/s can be exceeded at least daily
when deciding on the need for replacement. No siltation has been allowed for the sewers in the assessment as
self-cleansing velocities could be established to enable the sewage flow to
self-cleanse the nominal amount of silt. This is a prevalent practice in other
similar assessment to government authorities.
8.3.7
It
is recommended to design the newly laid pipes to a higher standard. As such, the minimum self-cleansing
velocity of 1m/s is to be adopted.
While for new pipe to be laid in reclamation area, an even higher
self-cleansing velocity (e.g. >1.5m/s) will be achieved as far as
practicable to compensate for possible decrease in pipe gradient as a result of
differential settlement. Allowance
shall be made for initial gradient to take into account the occurrence of
differential settlement. Reference
shall also be made to CIRIA Report 141, “Design of Sewers to Control Sediment
Problems”.
8.4.1
The
key components of the existing sewerage system in the study area are as
follows:
·
local
sewerage networks
·
deep
trunk sewers constructed under contract no. DC/95/05 of CW3
·
upgraded
Wan Chai East Sewage Screening Plant
·
existing
submarine sewage outfall from the Wan Chai East Sewage Screening Plant
8.4.2
The
local sewerage networks which will collect the sewage flow from WDII comprise
pipe sizes ranging from 150mm to 750mm in diameter was upgraded by Contract No.
DC/95/08 and DC/95/09 of CW3. Upon
completion of these two contracts, the local sewerage networks will be able to
cope with the sewage flow in the year 2011. Contract DC/95/08 and DC/95/09 were
completed in 2002 and end of 2004 respectively.
8.4.3
The
deep trunk sewers constructed under contract No. DC/95/05 of CW3 was
commissioned in early 2002. Sewage
flows will be diverted to the deep trunk sewers through the connection works
carried out by contract DC/95/09, which was completed by end of 2004.
8.4.4
The
necessary sewerage works to facilitate the decommissioning of the Wan Chai West
Sewage Screening Plant was included in contract DC/95/09.
8.4.5
The
deep trunk sewer under contract no. DC/95/05 has been designed to allow
considerable flows from the WDII development; it has been assumed that 176.4
l/s ADWF will be generated from WDII development. This
higher flow estimate was based on the previous development scenario of WDII
under which the extent of reclamation is larger. The updated sewage flow based on the latest and current development scenario of WDII under which
the extent of the proposed reclamation has been reduced is detailed in Table 8.3.
8.4.6
The
Wan Chai East Sewage Screening Plant was upgraded under Contract No.
DC/95/06. The capacity of the
upgraded plant can accommodate a flow of
8.4.7
The
Wan Chai East sewage outfall comprises twin 1,200mm diameter pipelines which
extend northwards from the Wan Chai East Sewage Screening Plant. During the detailed design of CW3
Sewerage, the capacity of the outfall has been assessed to be 2,280 l/s.
Estimation of New Sewage Flows
8.4.8
Based
on the latest WDII land use proposals as described in Section 2, the main
developments affecting the sewage loading in the study area are shown below in Table 8.3. Using the appropriate unit flow factors
and peaking factors, with an extra 10% contingency to account for the
sewage discharges from
the visitors and public toilets due to uncertainty of
development types because of the limited of available data, the peak flow generated from each
development is also presented.
Table 8.3 Flow
Estimate for New Developments
Site Reference |
Proposed Use |
Population |
ADWF (l/s) |
Peak Flow (l/s) |
WDII/3 |
HKAPA Extension |
255 |
1.03 |
9.09 |
WDII/4 |
HK Visual Arts Education Centre |
51 |
0.21 |
1.82 |
WDII/5 |
|
2 |
0.01 |
0.06 |
WDII/7 |
Helipad |
5 |
0.02 |
0.16 |
WDII/8 |
|
2 |
0.01 |
0.06 |
WDII/11 |
Ferry Pier |
30 |
0.12 |
0.97 |
WDII/12 |
Waterfront Related Commercial and Leisure
Uses |
31 |
0.13 |
1.11 |
WDII/13 |
Waterfront Related Commercial and Leisure
Uses |
34 |
0.14 |
1.21 |
WDII/14 |
Waterfront Related Commercial and Leisure
Uses |
53 |
0.21 |
1.89 |
WDII/15 |
Indoor Games Hall and Leisure Uses |
35 |
0.14 |
1.25 |
WDII/16 |
Wan Chai North PTI |
20 |
0.08 |
0.71 |
WDII/18 |
Salt Water Pumping Station |
5 |
0.02 |
0.16 |
WDII/19 |
Public Promenade and Water Recreation
Centre |
20 |
0.08 |
0.71 |
WDII/23 |
|
5 |
0.02 |
0.16 |
WDII/26 |
|
2 |
0.01 |
0.06 |
WDII/29 |
|
30 |
0.12 |
0.97 |
Total |
20.41 |
Impacts to Existing Sewerage System
Local
Sewerage Network
8.4.9
The
sewer from WDII/16 will be connected directly to the deep trunk sewer. Other sewers are intended to be
connected to the local sewerage network, through which most flows will
eventually be conveyed to the Wan Chai East Sewage Screening Plant.
8.4.10
For
the development in WDII/3, WDII/4 and WDII/5, the proposed connection point is
made at manhole no. HK35154801 which will be upgraded under CW3 sewerage
project and finally collected by Manhole W13 of the trunk sewer. It is found that the capacity of the
sewerage network between manhole no. HK35154801 and the trunk sewer manhole is
sufficient to cater for the additional flow.
8.4.11
For
the other developments, since the estimated peak flows are relatively small, no
adverse impact will be introduced to the existing local sewerage system.
8.4.12
The
sewage flows resulting from the WDII developments to be discharged to the deep
trunk sewer manholes are summarised in the following table.
Table 8.4 WDII
Flows to Deep Trunk Sewer
Site Reference |
Population |
ADWF (l/s) |
Peak Flow (l/s) |
CW3 trunk sewer manholes |
WDII/3 |
255 |
1.03 |
9.09 |
W13 |
WDII/4 |
51 |
0.21 |
1.82 |
|
WDII/5 |
2 |
0.01 |
0.06 |
|
WDII/7 |
5 |
0.02 |
0.16 |
W21* |
WDII/8 |
2 |
0.01 |
0.06 |
|
WDII/11 |
30 |
0.12 |
0.97 |
|
WDII/12 |
31 |
0.13 |
1.11 |
|
WDII/13 |
34 |
0.14 |
1.21 |
|
WDII/14 |
53 |
0.21 |
1.89 |
|
WDII/15 |
35 |
0.14 |
1.25 |
|
WDII/16 |
20 |
0.08 |
0.71 |
W18 |
WDII/18 |
5 |
0.02 |
0.16 |
W21* |
* W21 represents the upgraded
WCE PTW
8.4.13
The
assessment of additional sewage flows arising from the WDII developments shows
that the additional flows will not have any adverse impact on the trunk sewer
system. In fact, sufficient
allowance has been made in the detailed design of trunk sewer to accommodate
the sewage inflow from WDII in manholes W13 and W18.
8.4.14
Manhole
W18 of the trunk sewer system has been constructed with plug ends reserved for
the connections from WDII. Thus, no
modification to the existing manhole is required.
Wan Chai East Sewage Screening Plant
8.4.15
As
noted above, the Wan Chai East Sewage Screening Plant has been designed to
handle sewage flows of
8.4.16
As
reviewed under the HATS Stage
8.4.17
The
capacity of the existing submarine sewage outfall had been assessed during the
detailed design of CW3 Sewerage as 2,280 l/s.
8.4.18
It
is therefore apparent that the existing twin 1,200mm diameter submarine outfall
at Wan Chai East will not have adequate capacity to cope with the design flow
of 4,613 l/s and will require upgrading.
Proposed New Sewers and Connections
8.5.1
To
accommodate the WDII development, new sewers will be required to connect the
development areas to the existing sewerage system. Figures 8.1, 8.2 and 8.3 indicate the proposed
sewerage system and sewer connections for the WDII development.
8.5.2
For
the connections to the trunk sewer, as there have been special features such as
vortex drops and temporary plug ends allowed for the future connections from
WDII, no modification work is required to these existing manholes.
New Sewage Outfall
8.5.3
Reprovisioning
of the existing Wan Chai East Sewage Outfall will be required as a result of
the WDII reclamation. A section of
the existing outfall, approximately 40m long, will lie underneath the new
reclamation and a new diversion will be needed to replace this section before
reclamation works are undertaken in the vicinity.
8.5.4
Moreover,
whilst the existing submarine outfall has sufficient capacity to cope with the
present operating conditions, based on operating flow predictions up to 2008,
the outfall will need to be upgraded to handle the projected design flows in
2011 and beyond. Consequently, it
has been agreed that a new sewage outfall should be provided to meet the future
demand. The provision of this new
outfall under the WDII project will avoid unnecessarily abortive reprovisioning
works and minimise project interfacing problems. In addition, the
new outfalls shall be completed and operated prior to the decommissioning of
Wan Chai West sewage screening plant, that should be taken into account in the
detailed design and construction stages.
8.5.5
The
configuration of the new sewage outfall will comprise a landfall section of
2,250mm diameter pipe with approximate length of 180m, and a marine section of
twin 1,600mm diameter submarine pipelines of some 500m length. Based on preliminary assessment, this
configuration will have capacity to cater for a design peak flow of 4,613 l/s.
8.5.6
The
preliminary analysis has been based on the new outfall having similar
configuration to the existing, with similar diffuser arrangements. The hydraulic performance of the new
outfall, and the efficiency of the diffusers, will be assessed more thoroughly
in the detailed design stage.