Supplemental
Agreement No. 1
to
Agreement No. CE
54/2001 (CE)
WAN CHAI
DEVELOPMENT PHASE II PLANNING AND ENGINEERING REVIEW
ENVIRONMENTAL
IMPACT ASSESSMENT REPORT
for
WAN CHAI DEVELOPMENT PHASE II AND CENTRAL-WAN CHAI
BYPASS
Volume
4 – Figures
LIST OF Figures
Figure
1.1 Wan Chai Development Phase
II and Central-Wan Chai Bypass – Site Plan
Figure
1.2 Designated Projects
Figure 1.2b Designated
Project 2 - Road P2 and Other Roads which are classified as Primary/District Distributor
Roads
Figure
1.2c Designated Project 3 -
Reclamation works including associated Dredging Works
Figure
1.2d Designated Project 4 -
Temporary Typhoon Shelter
Figure
1.2e Designated Project 5 - Wan
Chai East Sewage Outfall
Figure
1.3 General Layout of The CWB
From Central to North Point
Figure
2.1 Trunk Road Tunnel Variation
1
Figure
2.2 Trunk Road Tunnel Variation
2
Figure
2.3 Trunk Road Tunnel Variation
3
Figure
2.5a Recommended Outline
Development Plan
Figure
2.6 Proposed Dredged Areas
Figure
2.8 Construction Stages (Sheet 1
of 12)
Figure
2.9 Construction Stages (Sheet 2
of 12)
Figure
2.10 Construction Stages (Sheet 3
of 12)
Figure
2.11 Construction Stages (Sheet 4
of 12)
Figure 2.12 Construction
Stages (Sheet 5 of 12)
Figure 2.13 Construction
Stages (Sheet 6 of 12)
Figure 2.14 Construction
Stages (Sheet 7 of 12)
Figure 2.15 Construction
Stages (Sheet 8 of 12)
Figure 2.16 Construction
Stages (Sheet 9 of 12)
Figure 2.17 Construction
Stages (Sheet 10 of 12)
Figure 2.18 Construction
Stages (Sheet 11 of 12)
Figure 2.19 Construction
Stages (Sheet 12 of 12)
Figure 3.1 Study
Area of Air Quality Assessment
Figure
3.2 Locations of Representative
Air Sensitive Receivers (Causeway Bay & IECL section)
Figure 3.3 Locations
of Representative Air Sensitive Receivers (Wan Chai section)
Figure 3.4 Locations
of the Different Reclamation Sites
Figure
3.5 Locations of Portals and
Ventilation Buildings Emissions
Figure 3.21 Proposed
Dredging Area for Mitigation of Odour
Figure 4.1 Extent
of ‘New’ Roads under the Project (Sheet 1 of 6)
Figure 4.2 Extent
of ‘New’ Roads under the Project (Sheet 2 of 6)
Figure 4.3 Extent
of ‘New’ Roads under the Project (Sheet 3 of 6)
Figure 4.4 Extent
of ‘New’ Roads under the Project (Sheet 4 of 6)
Figure 4.5 Extent
of ‘New’ Roads under the Project (Sheet 5 of 6)
Figure 4.6 Extent
of ‘New’ Roads under the Project (Sheet 6 of 6)
Figure 4.7 Locations
of Representative Noise Sensitive Receivers
Figure 4.8 Extent
of Low Noise Road Surface on Existing Island Eastern Corridor within Study Area
Figure 4.9 Location
of Temporary Noise Barriers During Construction Phase (NPR2W, NPR1 & NPR2E)
Figure 4.10 Corresponding
Noise Impact Section in Demolition Works along IECL
Figure 4.10a Corresponding Noise Impact Section in Construction of
Superstructure along IECL
Figure 4.11 Locations
of Direct Noise Mitigation Measures
Figure 4.12 Section
of Direct Noise Mitigation Measures (Sheet 1 of 3)
Figure 4.13 Section
of Direct Noise Mitigation Measures (Sheet 2 of 3)
Figure 4.14 Section
of Direct Noise Mitigation Measures (Sheet 3 of 3)
Figure 4.15 Indicative
Layout of Re-provisioned Tin Hau Temple
Figure 5.1 Locations
of Water Quality Sensitive Receivers (Sheet 1 of 2)
Figure 5.2 Locations
of Water Quality Sensitive Receivers (Sheet 2 of 2)
Figure 5.3A Locations of Cooling Water Discharges
Figure 5.3B Locations of Existing Stormwater Outfalls
Figure 5.4 (Not In
Use)
Figure 5.5 Temporary
Typhoon Shelter
Figure 5.6 Details
of Temporary Breakwater and Piled Wave Wall
Figure 5.7 Construction
Phase Modelling Scenario 2A (Sheet 1 of 2)
Figure 5.7a Construction Phase Modelling Scenario 2A (Sheet 2 of 2)
Figure 5.8 Construction
Phase Modelling Scenario 2B
Figure 5.9 Construction
Phase Modelling Scenario 2C
Figure 5.10 Temporary
Embayment under Construction Scenario 3B
Figure 5.11 Temporary Embayment under Construction Scenario 3C
Figure 5.12 Coastline
Configuration for 2011
Figure 5.13 Coastline Configuration for 2016
Figure 5.14a Locations of Monitoring Stations and Cross Sections
Figure 5.15 Typical
Configuration of Silt Curtains and Screens
Figure 6.1 Marine
Sediment Sampling Locations
Figure 7.1 Potential
Contaminative Land Uses within Study Area
Figure 7.3 Estimated
Extent of Soil Contamination
Figure 8.1 Proposed
Sewerage Works (Sheet 1 of 3)
Figure 8.2 Proposed
Sewerage Works (Sheet 2 of 3)
Figure 8.3 Proposed
Sewerage Works (Sheet 3 of 3)
Figure 9.2 Proposed
Coral Recipient Site in Junk Bay
Figure 10.1 Landscape
and Visual Impact Study Area
Figure 10.1.1 Review of Planning framework Plan (Sheet 1 of 3)
Figure 10.1.2 Review of Planning framework Plan (Sheet 2 of 3)
Figure 10.1.3 Review of Planning framework Plan (Sheet 3 of 3)
Figure 10.2 Baseline
Landscape Resources during Construction
Figure 10.2A Baseline Landscape Resources during Operation
Figure 10.2.1 Baseline Landscape Resources Photos (Sheet 1 of 6)
Figure 10.2.2 Baseline Landscape Resources Photos (Sheet 2 of 6)
Figure 10.2.3 Baseline Landscape Resources Photos (Sheet 3 of 6)
Figure 10.2.4 Baseline Landscape Resources Photos (Sheet 4 of 6)
Figure 10.2.5 Baseline Landscape Resources Photos (Sheet 5 of 6)
Figure 10.2.6 Baseline Landscape Resources Photos (Sheet 6 of 6)
Figure 10.3 Baseline
Landscape Character Areas during Construction
Figure 10.3A Baseline Landscape Character Areas during Operation
Figure 10.4 Key
VSRs and Primary Zone of Visual Influence during Construction
Figure 10.4A Key VSRs and Primary Zone of Visual Influence during
Operation
Figure 10.4B Key VSRs and Secondary Zone of Visual Influence
Figure 10.4.1 VSRs Photos (Sheet 1 of 10)
Figure 10.4.2 VSRs Photos (Sheet 2 of 10)
Figure 10.4.3 VSRs Photos (Sheet 3 of 10)
Figure 10.4.4 VSRs Photos (Sheet 4 of 10)
Figure 10.4.5 VSRs Photos (Sheet 5 of 10)
Figure 10.4.6 VSRs Photos (Sheet 6 of 10)
Figure 10.4.7 VSRs Photos (Sheet 7 of 10)
Figure 10.4.8 VSRs Photos (Sheet 8 of 10)
Figure 10.4.9 VSRs Photos (Sheet 9 of 10)
Figure 10.4.10 VSRs Photos (Sheet 10 of 10)
Figure 10.5 Landscape
Master Plan
Figure 10.5A Proposed Landscape Mitigation Measures
Figure 10.5.1 Section (Sheet 1 of 5)
Figure 10.5.2 Section (Sheet 2 of 5)
Figure 10.5.3 Section (Sheet 3 of 5)
Figure 10.5.4 Section (Sheet 4 of 5)
Figure 10.5.5 Section (Sheet 5 of 5)
Figure 10.6.1 Residual Impacts on Landscape Resources during Construction
Figure 10.6.2 Residual Impacts on Landscape Character Areas during
Construction
Figure 10.6.3 Residual Impacts on Landscape Resources during Operation
Figure 10.6.4 Residual Impacts on Landscape Character Areas during
Operation
Figure 10.6.5 Residual Visual Impacts within Primary ZVI during
Construction
Figure 10.6.6 Residual Visual Impacts within Secondary ZVI during
Construction
Figure 10.6.7 Residual Visual Impacts within Primary ZVI during Operation
Figure 10.6.8 Residual Visual Impacts within Secondary ZVI during
Operation
Figure
10.7 Key Plan for Photomontage
Viewpoint
Figure
10.7A Key Plan for Photomontage
Viewpoint from the Hinterland
Figure
10.7.1 Viewpoint No. 1
Photomontage (Sheet 1 of 2)
Figure
10.7.2 Viewpoint No. 1
Photomontage (Sheet 2 of 2)
Figure
10.7.3 Viewpoint No. 2
Photomontage
Figure
10.7.4 Viewpoint No. 3
Photomontage
Figure
10.7.5 Viewpoint No. 4
Photomontage
Figure
10.7.6 Viewpoint No. 5
Photomontage
Figure
10.7.7 Viewpoint No. 6
Photomontage
Figure
10.7.7a Viewpoint No. 6a
Photomontage
Figure
10.7.8 Viewpoint No. 7
Photomontage
Figure
10.7.9 Viewpoint No. 8
Photomontage
Figure
10.7.10 Viewpoint No. 9
Photomontage
Figure
10.7.11 Viewpoint No. 10
Photomontage
Figure
10.7.12 Viewpoint No. 11
Photomontage
Figure
10.7.13 Viewpoint No. 12
Photomontage
Figure
10.7.14 Illustrations showing Views
within the Proposed Open Spaces