Environmental Monitoring and Audit (EM&A) Manual
Contents
1.1...... Background of the Project
1.2...... Project Location and Programme
1.3...... Purpose of the Manual
1.4...... Project Organization
2.1...... Introduction
2.2...... Air Quality Parameters
2.3...... Monitoring Requirement and Equipment
2.4...... Monitoring Locations
2.5...... Baseline Monitoring
2.6...... Impact Monitoring
2.7...... Event and Action Plan
2.8...... Mitigation Measures During Construction Phase
3.1...... Introduction
3.2...... Noise Parameters
3.3...... Monitoring Requirement and Equipment
3.4...... Monitoring Locations for Construction Noise
3.5...... Baseline Monitoring for Construction Noise
3.6...... Impact Monitoring for Construction Noise
3.7...... Event and Action Plan for Construction Noise
3.8...... Construction Noise Mitigation Measures
3.9...... Operational Traffic Noise Monitoring
4.1...... Introduction
4.2...... Site Inspection
4.3...... Mitigation Measures
5.1...... Introduction
5.2...... Mitigation Measures
6.1...... Introduction
6.2...... Measures During Construction Phase
7.1...... Introduction
7.2...... Mitigation Measures During Construction Phase
8.1...... Introduction
8.2...... Baseline Monitoring
8.3...... Event and Action Plan
8.4...... Mitigation Measures
9 SITE
ENVIRONMENTAL AUDIT AND ENVIRONMENTAL COMPLAINTS
9.1...... Introduction
9.2...... Compliance with Legal and Contractual Requirements
9.3...... Environmental Complaints
10.1.... General
10.2.... Baseline Monitoring Report
10.3.... Monthly EM&A Reports
10.4.... Quarterly EM&A Summary Reports
10.5.... Final EM&A Review Report
10.6.... Data Keeping
10.7.... Interim Notifications of Environmental Quality Limit Exceedances
List of Tables
Table 2.1 Proposed Dust Monitoring Station
Table 2.2 Action and Limit Levels for Air Quality
Table 2.3 Event and Action Plan for Air Quality (Dust)
Table 3.1 Noise Monitoring Stations during Construction Phase
Table 3.2 Action and Limit Levels for Construction Noise
Table 3.3 Event/Action Plan for Construction Noise
Table 3.4 Noise Monitoring Stations during Operational Phase
Table 8.1 Event and Action Plan for Landscape and Visual Impact - Construction Phase
Table 8.2 Construction Phase Landscape and Visual Mitigation Measures
Table 8.3 Operation Phase Landscape and Visual Mitigation Measures
List of Figures
Figure 1.2 Project Organisation and Line of Communication
Figure 2.1 Locations of Dust Monitoring Stations
Figure 3.1 Locations of Noise Monitoring Stations
Figure 9.1 Environmental Complaint Flow Diagram
List of Appendices
Appendix A Implementation Schedule of Mitigation Measures
Appendix B Sample Data Sheet for Air Quality Monitoring
Appendix C Sample Data Sheet for Construction Noise Monitoring
Appendix D Sample Data Sheet for Operational Traffic Noise Monitoring
Appendix E Sample Template for Complaint Log
Appendix F Sample Template for the Interim Notifications of Exceedances