Annex B4-1
Anticipated PME Plant Inventory during Operational Phase - Landfilling Operation
No. Activities Sub-activities Plant CNP /BS 5228 ref. No. of PME Barrier Unit SWL, dB(A) SWL, dB(A) SWL for each Sub-activities, dB(A)
Operation - Phases 1 to 6
6a Deposition and compaction of waste Bulldozer CNP 030 1 115 115 117 ########
Dump truck, 5.5 tonne < gross vehicle weight < 38 tonne note (1) 1 105 105 ########
Lorry, 5.5 tonne < gross vehicle weight < 38 tonne note (1) 1 105 105 ########
Compactor, vibratory CNP 050 3 105 110 ########
6b Placement of intermediate cover Excavator/loader, wheeled/tracked CNP 081 1 112 112 118 ########
Bulldozer CNP 030 1 115 115 ########
Dump truck, 5.5 tonne < gross vehicle weight < 38 tonne note (1) 1 105 105 ########
Roller, vibratory CNP 186 1 108 108 ########
Loader BS C3 3 1 102 102 ########
6c Removal of intermediate cover Excavator/loader, wheeled/tracked CNP 081 1 112 112 117 ########
Dump truck, 5.5 tonne < gross vehicle weight < 38 tonne note (1) 1 105 105 ########
Bulldozer CNP 030 1 115 115 ########
Common Plant Items
7a All over construction, operation & restoration Site housekeeping Road sweeper note (1) 1 107 107 109 ########
Lorry, 5.5 tonne < gross vehicle weight < 38 tonne note (1) 1 105 105 ########
7b Vehicle maintenance Air Compressor, air flow > 10m3/min and < 30m3/min CNP 002 1 102 102 102 ########
Hand-held drill note (1) 1 89 89 ########
Operation after 2300 hours
8 Placement of daily cover after 2300 hours Bulldozer CNP 030 1 115 115 116 ########
Compactor, vibratory CNP 050 2 105 108 ########
Dump truck, 5.5 tonne < gross vehicle weight < 38 tonne note (1) 1 105 105 ########
Note (1)  SWL refer to the document prepared by the Noise Control Authority (http://www.epd.gov.hk/epd/english/application_for_licences/guidance/files/OtherSWLe.pdf )