TABLE OF CONTENTS

 

 

 

1               INTRODUCTION

         

Background of the Project 

Project Location and Programme       

Purpose of the Manual       

Project Organization 

 

2               AIR QUALITY   

 

Introduction       

Air Quality Parameters      

Monitoring Requirement and Equipment     

Monitoring Locations

Baseline Monitoring 

Impact Monitoring     

Event and Action Plan        

Mitigation Measures 

 

3               NOISE IMPACT         

 

Introduction       

Noise Parameters    

Monitoring Equipment       

Monitoring Locations

Baseline Monitoring 

Impact Monitoring     

Event and Action Plan for Construction Noise      

Mitigation Measures 

 

4               WATER QUALITY     

 

Introduction       

Mitigation Measures 

 

5               WASTE MANAGEMENT  

 

Introduction       

Mitigation Measures 

 

6               CULTURAL HERITAGE   

 

7               LANDSCAPE AND VISUAL IMPACTS ASSESSMENT      

 

Introduction       

Baseline Monitoring 

Mitigation Measures 

 

8               SITE ENVIRONMENTAL AUDIT & ENVIRONMENTAL COMPLAINTS       

 

Introduction       

Compliance with Legal and Contractual Requirements

Environmental Complaints

 

9               REPORTING    

 

General   

Baseline Monitoring Report        

Monthly EM&A Reports     

Quarterly EM&A Summary Reports    

Final EM&A Review Report        

Data Keeping

Interim Notifications of Environmental Quality Limit Exceedances 

 

 

 

 

 

List of Tables

 

Table 2.1             Proposed Dust Monitoring Station During Construction Phase

Table 2.2             Proposed Odour Monitoring Station During Operation Phase

Table 2.3             Operational Phase H2S Monitoring Programme

Table 2.4             Action and Limit Levels for Air Quality

Table 2.5             Event and Action Plan for Air Quality (Dust)

Table 2.6             Event/Action Plan for Air Quality Monitoring (Operational Phase)

Table 3.1             Noise Monitoring Stations during Construction Phase

Table 3.2             Action and Limit Levels for Construction Noise

Table 3.3             Event/Action Plan for Construction Noise

Table 7.1             Event and Action Plan for Landscape and Visual Impact - Construction Phase

Table 7.2             Proposed Landscape Mitigation Measures for Construction Phase

Table 7.3             Proposed Landscape Mitigation Measures for Operation Phase

 

 

List of Figures

 

Figure 1.1           Location of Proposed Tuen Mun Area 54 Sewage Pumping Station

Figure 1.2           Location of Proposed Tuen Mun Area 54 Sewage Pumping Station at Site 4A

Figure 1.3           Tentative Construction Programme

Figure 1.4           Project Organization

Figure 2.1           Locations of Proposed Air Monitoring Stations

Figure 3.1           Locations of Proposed Noise Monitoring Stations

Figure 8.1           Environmental Complaint Flow Diagram

 

 

Appendices

 

Appendix A         Implementation Schedule of Proposed Mitigation Measures

Appendix B         Sample Data Sheets for Air Quality and Noise Monitoring

Appendix C        Sample of Odour Complaint Registration Form

Appendix D        Sample Template for the Interim Notification