TABLE OF CONTENTS
Background of the Project
Project Location and
Programme
Purpose of the Manual
Project Organization
Introduction
Air Quality Parameters
Monitoring Requirement
and Equipment
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Event and Action Plan
Mitigation Measures
Introduction
Noise Parameters
Monitoring Equipment
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Event and Action Plan for
Construction Noise
Mitigation Measures
Introduction
Mitigation Measures
Introduction
Mitigation Measures
7
LANDSCAPE AND VISUAL IMPACTS ASSESSMENT
Introduction
Baseline Monitoring
Mitigation Measures
8
SITE ENVIRONMENTAL AUDIT & ENVIRONMENTAL COMPLAINTS
Introduction
Compliance with Legal and
Contractual Requirements
Environmental Complaints
General
Baseline Monitoring
Report
Monthly EM&A Reports
Quarterly EM&A
Summary Reports
Final EM&A Review
Report
Data Keeping
Interim Notifications of
Environmental Quality Limit Exceedances
List of Tables
Table 2.1 Proposed
Dust Monitoring Station During Construction Phase
Table 2.2 Proposed
Odour Monitoring Station During Operation Phase
Table 2.3 Operational
Phase H2S Monitoring Programme
Table 2.4 Action
and Limit Levels for Air Quality
Table 2.5 Event
and Action Plan for Air Quality (Dust)
Table 2.6 Event/Action
Plan for Air Quality Monitoring (Operational Phase)
Table 3.1 Noise
Monitoring Stations during Construction Phase
Table 3.2 Action
and Limit Levels for Construction Noise
Table 3.3 Event/Action
Plan for Construction Noise
Table 7.1 Event
and Action Plan for Landscape and Visual Impact - Construction Phase
Table 7.2 Proposed
Landscape Mitigation Measures for Construction Phase
Table 7.3 Proposed
Landscape Mitigation Measures for Operation Phase
List of
Figures
Figure 1.1 Location
of Proposed Tuen Mun Area 54 Sewage Pumping Station
Figure 1.2 Location
of Proposed Tuen Mun Area 54 Sewage Pumping Station at Site 4A
Figure
1.3 Tentative Construction
Programme
Figure 1.4 Project
Organization
Figure 2.1 Locations
of Proposed Air Monitoring Stations
Figure 3.1 Locations
of Proposed Noise Monitoring Stations
Figure 8.1 Environmental
Complaint Flow Diagram
Appendices
Appendix A Implementation
Schedule of Proposed Mitigation Measures
Appendix B Sample
Data Sheets for Air Quality and Noise Monitoring
Appendix C Sample
of Odour Complaint Registration Form
Appendix D Sample
Template for the Interim Notification