Agreement No. CE 35/2006(CE)
Kai Tak Development Engineering Study
cum Design and Construction of Advance Works
– Investigation, Design and Construction
Kai Tak Development
Environmental Impact Assessment Report
Volume 2 - Figures
Figure 1.1a Recommended Outline Development Plan (Dated May 2008)
Figure 1.1a-A Recommended Outline Development Plan (Dated May 2008) (Sheet 1 of 7)
Figure 1.1a-B Recommended Outline Development Plan (Dated May 2008) (Sheet 2 of 7)
Figure 1.1a-C Recommended Outline Development Plan (Dated May 2008) (Sheet 3 of 7)
Figure 1.1a-D Recommended Outline Development Plan (Dated May 2008) (Sheet 4 of 7)
Figure 1.1a-E Recommended Outline Development Plan (Dated May 2008) (Sheet 5 of 7)
Figure 1.1a-F Recommended Outline Development Plan (Dated May 2008) (Sheet 6 of 7)
Figure 1.1a-G Recommended Outline Development Plan (Dated May 2008) (Sheet 7 of 7)
Figure 1.1b Final Preliminary Outline Development Plan
Figure 1.1c Kowloon Planning Area No. 22 - Kai Tak - Outline Zoning Plan
Figure 1.2 Designated Projects
Figure 1.3 Designated Projects in this EIA Study
Figure 2.1 Outline Concept Plan Concept Plan 1: City in the Park
Figure 2.2 Outline Concept Plan Concept Plan 2: Kai Tak Glamour
Figure 2.3 Outline Concept Plan Concept Plan 3: Sports by the Harbour
Figure 2.4 Options for CKR/T2 Interchange (Sheet 1 of 3)
Figure 2.5 Options for CKR/T2 Interchange (Sheet 2 of 3)
Figure 2.6 Options for CKR/T2 Interchange (Sheet 3 of 3)
Figure 2.8 Design Options for 600m Opening at Runway
Figure 2.9 Design Options for Trunk Road T2
Figure 2.10 Alignment and Vertical Profile of Refined Trunk Road T2 (Sheet 1 of 3)
Figure 2.11 Alignment and Vertical Profile of Refined Trunk Road T2 (Sheet 2 of 3)
Figure 2.12 Alignment and Vertical Profile of Refined Trunk Road T2 (Sheet 3 of 3)
Figure 2.13 Proposed Road Hierarchy in Kai Tak Development
Figure 2.14 Route Options of EFTS
Figure 2.15 Possible Forms of EFTS
Figure 2.16a Proposed Kai Tak River (Sheet 1 of 3)
Figure 2.16b Proposed Kai Tak River (Sheet 2 of 3)
Figure 2.16c Proposed Kai Tak River (Sheet 3 of 3)
Figure 2.16d Cross Sections of Proposed Kai Tak River
Figure 2.17 Alternative Arrangement of Road L3
Figure 2.18 Kai Tak Development – Development Area and Development Packages
Figure 2.19 Package A – Cruise Terminal Development (Phase 1 Berth) and Related Advance Works
Figure 2.21 Package C – Kai Tak Channel Improvement Works
Figure 2.22 Package D – Kai Tak Nullah Modification Works
Figure 2.23 Package E - Infrastructure Works at Runway and Metro Park
Figure 2.24 Package F - Infrastructure Works at North Apron, Phase 2
Figure 2.25 Package G - Trunk Road T2 and Infrastructure Works at South Apron
Figure 2.26 Proposed Landscape Deck on Road D3
Figure 2.27 General Arrangement of Landscaped Elevated Deck above Road D2 (Sheet 1 of 2)
Figure 2.28 General Arrangement of Landscaped Elevated Deck above Road D2 (Sheet 2 of 2)
Figure 2.29 Proposed Facilities Underneath the Landscaped Deck within MPSC
Figure 3.0.2 General Layout of New Distributor Roads Serving The Planned KTD (Sheet 1 of 11)
Figure 3.0.3 General Layout of New Distributor Roads Serving The Planned KTD (Sheet 2 of 11)
Figure 3.0.4 General Layout of New Distributor Roads Serving The Planned KTD (Sheet 3 of 11)
Figure 3.0.5 General Layout of New Distributor Roads Serving The Planned KTD (Sheet 4 of 11)
Figure 3.0.6 General Layout of New Distributor Roads Serving The Planned KTD (Sheet 5 of 11)
Figure 3.0.7 General Layout of New Distributor Roads Serving The Planned KTD (Sheet 6 of 11)
Figure 3.0.8 General Layout of New Distributor Roads Serving The Planned KTD (Sheet 7 of 11)
Figure 3.0.9 General Layout of New Distributor Roads Serving The Planned KTD (Sheet 8 of 11)
Figure 3.0.10 General Layout of New Distributor Roads Serving The Planned KTD (Sheet 9 of 11)
Figure 3.0.11 General Layout of New Distributor Roads Serving The Planned KTD (Sheet 10 of 11)
Figure 3.0.12 General Layout of New Distributor Roads Serving The Planned KTD (Sheet 11 of 11)
Figure 3.0.13 Cross section of New Distributor Roads Serving The Planned KTD (Sheet 1 of 2)
Figure 3.0.14 Cross section of New Distributor Roads Serving The Planned KTD (Sheet 2 of 2)
Figure 3.0.15 General Arrangement of Landscaped Elevated Deck Above Road D2 (Sheet 1 of 2)
Figure 3.0.16 General Arrangement of Landscaped Elevated Deck Above Road D2 (Sheet 2 of 2)
Figure 3.0.17 General Arrangement of Landscaped Elevated Deck Above Road D3 (Sheet 1 of 2)
Figure 3.0.18 General Arrangement of Landscaped Elevated Deck Above Road D3 (Sheet 2 of 2)
Figure 3.0.19 Cross Section of Road D3 And Pedestrian Deck Above (Sheet 1 of 2)
Figure 3.0.20 Cross Section of Road D3 And Pedestrian Deck Above (Sheet 2 of 2)
Figure 3.1 Locations of Air Sensitive Receivers
Figure 3.2 Locations of Portals and Ventilation Buildings Emissions
Figure 3.12 Locations of Noise Sensitive Receivers
Figure 3.13 Sketch of typical temporary noise barrier and enclosure
Figure 3.14 Locations of Direct Noise Mitigation Measures
Figure 3.15 Traffic Noise Mitigation Measures at Site 2B6, Site 5A4 & ex-San Po Kong Flatted Factory
Figure 3.21A Baseline Landscape Resources with DP1 – Distributor Road Overlaid During Construction
Figure 3.21B Baseline Landscape Resources with DP1 – Distributor Road Overlaid During Operation
Figure 4.0.2 General Layout of Sewage Pumping Station PS1
Figure 4.0.3 General Layout of Sewage Pumping Station PS1A
Figure 4.0.4 General Layout of Sewage Pumping Station PS2
Figure 4.0.5 General Layout of Sewage Pumping Station PS3
Figure 4.0.6 General Layout of Sewage Pumping Station NPS
Figure 4.2 Geology Map showing the Approximate Location of Proposed Pumping Stations
Figure 4.11A Baseline Landscape Resources with DP2 – Pumping Station During Construction
Figure 4.11B Baseline Landscape Resources with DP2 – Pumping Station During Operation
Figure 4.12B Baseline Landscape Character Areas with DP2 – Pumping Station Overlaid During Operation
Figure 5.2 As-Built Sampling Locations at ex-GFS building and Radar Station
Figure 5.3 As-Built Sampling Locations with Soil Contamination at ex-GFS building and Radar Station
Figure 5.4a Locations of Proposed Contaminated Zones for Excavation (A-C)
Figure 5.4b Locations of Proposed Contaminated Zones for Excavation (D-H)
Figure 5.5 Proposed Remediation Strategy for Contaminated Soil
Figure 5.6 Location of Decontamination Works Area
Figure 5.7 Schematic of a typical single Biopile
Figure 5.8 Geology Map showing the Approximate Location of Ex-GFS Building and Radar Station
Figure 5.11 Baseline Landscape Resources with DP3a Overlaid During Construction
Figure 5.12 Baseline Landscape Character Areas with DP3a Overlaid During Construction
Figure 5.13 Baseline Key VSRs and Viewpoints at Local Level with DP3a Overlaid During Construction
Figure 6.1 Representative ASRs selected for Odour Impact Assessment
Figure 6.3 Plan of Odour Source Sampling Locations
Figure 6.4 Existing Odour Strength of KTN, KTAC and KTTS
Figure 6.5 Sampling Grids within KTAC and KTTS with Water Depth Less than 3.5m
Figure 6.6 Areas Proposed for In-situ Bioremediation
Figure 6.7 Odour Contour Plot for Existing (Unmitigated) Scenario
Figure 6.8 Odour Contour Plot for Mitigated Scenario A1
Figure 6.9 Odour Contour Plot for Mitigated Scenario B1
Figure 6.10 Odour Contour Plot for Mitigated Scenario A2
Figure 6.11 Odour Contour Plot for Mitigated Scenario B2
Figure 7.1 SCL Construction Method
Figure 7.2 Alignment of Environmental Friendly Transportation System
Figure 7.3 Locations of Typhoon shelters
Figure 8.1 Locations of Water Control Zones
Figure 8.2 Locations of Water Quality Sensitive Receivers
Figure 8.3 Locations of Monitoring Stations
Figure 8.4 Contribution of Existing Pollution Loading by Storm Outfalls
Figure 8.5 Proposed Intake and Outfall of the District Cooling System at Kai Tak Development
Figure 8.6 Location of Inaccessible Water Area – No Scavenging Services Provided
Figure 9.1 Location / Extent of Proposed Dredging Works
Figure 10.2 As-Built Sampling Locations at HKAC Area
Figure 10.3 Potential Contaminative Landuses around Kai Tak Airport.
Figure 11.1.1 Locations of Identified Hazardous Facilities
Figure 11.1.2 Societal Risk Guideline
Figure 11.2.1 Location of Ma Tau Kok Gas Works North Plant and Associated Gas Facilities
Figure 11.2.2 Details of Existing HKCG Gas Facilities
Figure 11.2.3 Layout Plan for the Ma Tau Kok Gas Works North Plant
Figure 11.2.4 Location of Existing and New Submarine Gas Pipelines
Figure 11.2.5 Population Groups adjacent to Ma Tau Kok
Figure 11.2.6 Location of facilities development of KTD near MTKGWNP
Figure 11.2.7 Individual Risk Contour of HKCG MTKGWNP
Figure 11.2.8 FN Curves for HKCG MTKGWNP & Gas Facilities
Figure 11.3.1 Location of Dangerous Goods Vehicular Ferry Pier within Kai Tak Development Boundary
Figure 11.3.2 Population Groups adjacent to Kwun Tong DGVFP
Figure 11.3.3 Kwun Tong Transportation Link (Feasible Option)
Figure 11.3.4 Layout of Kwun Tong Dangerous Goods Vehicular Ferry Pier
Figure 11.3.5 Individual Risk Contour of DGVFP for All Study Years
Figure 11.3.6 FN Curves for DGVFP
Figure 11.4.1 Location of Kerry DG Warehouse
Figure 11.4.2 Adjacent Property of Kerry DG Godown
Figure
11.4.3 Individual Risk Contours of Kerry DG
Godown for All Study Years
Figure
11.4.4 FN Curves for Kerry DG Godown
Figure 11.5.1 Locations of Petrol cum LPG filling stations and dedicated LPG filling stations
Figure 11.5.2 Population Groups adjacent to LPG Stations 1-5
Figure 11.5.3 Population Groups adjacent to LPG Station 6
Figure 11.5.4 Population Groups adjacent to LPG Station 7
Figure 11.5.5 Individual Risk Contour of LPG Station 1
Figure 11.5.6 Individual Risk Contour of LPG Station 2
Figure 11.5.7 Individual Risk Contour of LPG Station 3
Figure 11.5.8 Individual Risk Contour of LPG Station 4
Figure 11.5.9 Individual Risk Contour of LPG Station 5
Figure 11.5.10 Individual Risk Contour of LPG Station 6
Figure 11.5.11 Individual Risk Contour of LPG Station 7
Figure 11.5.12 FN Curves for Station 1
Figure 11.5.13 FN Curves for Station 2
Figure 11.5.14 FN Curves for Station 3
Figure 11.5.15 FN Curves for Station 4
Figure 11.5.16 FN Curves for Station 5
Figure 11.5.17 FN Curves for Station 6
Figure 11.5.18 FN Curves for Station 7
Figure 11.5.19 Location of facilities development of KTD near Station 7
Figure 11.6.1 Combined Individual Risk Contour
Figure 12.1 Areas covered by previous mai & existing utilities
Figure 12.6 1969 map with site of the former Sacred Hill hand sketched
Figure 12.7a Predicted Location of the Former Kowloon City Execution Ground
Figure 12.8 Map from 1902-03 showing the area between Hung Hom and Kowloon City
Figure 12.10 1:1000 scale map showing the location of Fire Station A
Figure 12.11 1:1000 scale map showing the location of Fire Station B and Adjacent Pier
Figure 12.12 1:1000 scale map showing the location of Fire Station C and Adjacent Wind Pole
Figure 12.13 Plan of the Runway
Figure 12.14 1:1000 scale map showing the location of Wind Pole 1 and the Airport Pier
Figure 12.15 Not Used
Figure 12.17 1:1000 scale map showing the location of Hoi Shan Park and Fish Tail Rock
Figure 12.18 1:1000 scale map showing the location of Kowloon Rock
Figure 12.19 Geological Map of the Kai Tak Area
Figure 12.20 Locations of Archaeological Investigation Trenches
Figure 12.21 Extensions of Archaeological Excavation at Trench AA5
Figure 12.22 Locations of 1924 Seawall Discovered in ERM 2002 Investigation
Figure 12.23 Proposed Further Archaeological Investigation around Trench AA3
Figure 12.24 Locations of Built Heritage
Figure 13.1 Landscape and Visual Impact Study Area
Figure 13.1A Review of Major Revisions from PODP to RODP
Figure 13.2 Baseline Landscape Resources with Development Proposal Overlaid
Figure 13.2.1 Baseline Landscape Resources Photos (sheet 1 of 10)
Figure 13.2.2 Baseline Landscape Resources Photos (sheet 2 of 10)
Figure 13.2.3 Baseline Landscape Resources Photos (sheet 3 of 10)
Figure 13.2.4 Baseline Landscape Resources Photos (sheet 4 of 10)
Figure 13.2.5 Baseline Landscape Resources Photos (sheet 5 of 10)
Figure 13.2.6 Baseline Landscape Resources Photos (sheet 6 of 10)
Figure 13.2.7 Baseline Landscape Resources Photos (sheet 7 of 10)
Figure 13.2.8 Baseline Landscape Resources Photos (sheet 8 of 10)
Figure 13.2.9 Baseline Landscape Resources Photos (sheet 9 of 10)
Figure 13.2.10 Baseline Landscape Resources Photos (sheet 10 of 10)
Figure 13.2A Broad Tree Survey Plan
Figure 13.3 Baseline Landscape Character Areas with Development Proposal Overlaid
Figure 13.3.1 Baseline Landscape Character Areas Photos (sheet 1 of 3)
Figure 13.3.2 Baseline Landscape Character Areas Photos (sheet 2 of 3)
Figure 13.3.3 Baseline Landscape Character Areas Photos (sheet 3 of 3)
Figure 13.4A Baseline Key VSRs and Viewpoints at Local Level with Development Proposal Overlaid
Figure 13.4A1 Baseline Key VSRs Photo at Local Level (Sheet 1 of 7)
Figure 13.4A2 Baseline Key VSRs Photo at Local Level (Sheet 2 of 7)
Figure 13.4A3 Baseline Key VSRs Photo at Local Level (Sheet 3 of 7)
Figure 13.4A4 Baseline Key VSRs Photo at Local Level (Sheet 4 of 7)
Figure 13.4A5 Baseline Key VSRs Photo at Local Level (Sheet 5 of 7)
Figure 13.4A5.1 Baseline Key VSRs Photo at Local Level (Sheet 6 of 7)
Figure 13.4A5.2 Baseline Key VSRs Photo at Local Level (Sheet 7 of 7)
Figure 13.4A6 Baseline Viewpoints from VSRs at Local Level (Sheet 1 of 5)
Figure 13.4A7 Baseline Viewpoints from VSRs at Local Level (Sheet 2 of 5)
Figure 13.4A8 Baseline Viewpoints from VSRs at Local Level (Sheet 3 of 5)
Figure 13.4A9 Baseline Viewpoints from VSRs at Local Level (Sheet 4 of 5)
Figure 13.4A10 Baseline Viewpoints from VSRs at Local Level (Sheet 5 of 5)
Figure 13.4B1 Baseline Viewpoints from Key VSRs at Strategic and District Level (Sheet 1 of 2)
Figure 13.4B2 Baseline Viewpoints from Key VSRs at Strategic and District Level (Sheet 2 of 2)
Figure 13.5.1 KTD – Urban Design and Landscape Master Plan
Figure 13.5.2 KTD – Sub-District Plan
Figure 13.5.3 KTD – Open Space Framework Plan
Figure 13.5.4 KTD – Visual Connections and Breezeways Plan
Figure 13.5.5 KTD – Building Height Plan
Figure 13.6 Mitigation Measures and Key Plan for DP1 – Distributor Roads
Figure 13.6.1 Mitigation Measures for Distributor Road D1&D2
Figure 13.6.2 Mitigation Measures for Distributor Road D3
Figure 13.6.3 Mitigation Measures for Distributor Road D4
Figure 13.7 Mitigation Measures and Key Plan for DP2 – Sewage Pumping Stations
Figure 13.7.1 Mitigation Measures for Sewage Pumping Station (PS1)
Figure 13.7.2 Mitigation Measures for Sewage Pumping Station (PS1A)
Figure 13.7.3 Mitigation Measures for Sewage Pumping Station (PS2)
Figure 13.7.4 Mitigation Measures for Sewage Pumping Station (PS3)
Figure 13.7.5 Mitigation Measures for Sewage Pumping Station (NPS)
Figure 13.8A Key Plan for Photomontage and Model View Viewpoints
Figure 13.8A1 Viewpoints No.1 Photomontage from Kwun Tong Public Pier
Figure 13.8A2 Viewpoints No.2 Photomontage from Richland Gardens
Figure 13.8A3 Viewpoints No.3 Photomontage from Chi Lin Nunnery
Figure 13.8A4 Viewpoints No.4 Photomontage from Nga Tsin Wai Road
Figure 13.8A5 Viewpoints No.5 Photomontage from Hoi Sham Park (Sheet 1 of 2)
Figure 13.8A6 Viewpoints No.5 Photomontage from Hoi Sham Park (Sheet 2 of 2)
Figure 13.8A7 Viewpoints No.6 Photomontage from Mount Cameron
Figure 13.8A8 Viewpoints No.7 Photomontage Hong Kong Convention & Exhibition Centre New Wing
Figure 13.8A9 Viewpoints No.8 Photomontage from North Point Pier
Figure 13.8A10 Viewpoints No.9 Photomontage from Quarry Bay (Sheet 1 of 2)
Figure 13.8A11 Viewpoints No.9 Photomontage from Quarry Bay (Sheet 2 of 2)
Figure 13.8A12 Viewpoints No.10 Photomontage from Kowloon Peak
Figure 13.8A13 Viewpoints No.11 Photomontage from Lung Cheung Road lookout
Figure 13.8A14 Viewpoints No.12 Photomontage from Yau Tong Bay
Figure 13.8A15 Viewpoints No.13 Photomontage from Rhythm Garden
Figure 13.8A16 Viewpoints No.14 Photomontage from Tung Tau Estate
Figure 13.8A17 Viewpoints No.15 Photomontage from Sung Wong Toi Playground
Figure 13.8A18 Viewpoints No.16 Photomontage from VSR 14 at Mok Cheong Street
Figure 13.8A19 Viewpoints No.17 Photomontage from Laguna Verde
Figure 13.8A20 View point No. 18 model view from Road D1
Figure 13.8A21 View point No. 19 model view from Road D2
Figure 13.8A22 View point No. 20 model view from Road D3
Figure 13.8A23 View point No. 21 model view from Road D4
Figure 13.8B Key Plan for Perspective Views with KTD
Figure 13.8B1 Perspective Views with KTD (Sheet 1 of 2)
Figure 13.8B2 Perspective Views with KTD (Sheet 2 of 2)
Figure 13.9.1 Residual Impact on Landscape Resources with Mitigation Measures in Year 10
Figure 13.9.2 Residual Impact on Landscape Character with Mitigation Measures in Year 10
Figure 13.9.3 Residual Impact on VSRs at Local Level with Mitigation Measures in Year 10
Figure 14.1a Project Area and Assessment Area of the Project
Figure 14.2 Marine Ecological Surveys Locations
Figure 14.3 Location of Hard Substrata Sea Area within Dredging Sites
Figure 14.4 Proposed Coral Recipient Sites in Junk Bay
Figure 16.1 Sewage Sub-Catchments and Pumping Stations of Kai Tak Development
Figure 16.2 Site Reference Plan
Figure 16.3 Intake of Development Sites in Kai Tak Development
Figure 16.5 Sewerage Networks of Kai Tak Development
Figure 16.10 Performance Assessment of Trunk Sewer along Hoi Bun Road for Year 2016 Scenario
Figure 16.11 Performance Assessment of Trunk Sewer along Hoi Bun Road for Ultimate Scenario
Figure 16.15 Schematic Diagram for Pumping Stations Scheme (Integrated With PS1) to TKW PTW
Figure 16.16 Proposed Sewerage Network (Interim Scheme) – Key Plan
Figure 16.17 Proposed Sewerage Network (Interim Scheme) (Sheet 1 of 9)
Figure 16.18 Proposed Sewerage Network (Interim Scheme) (Sheet 2 of 9)
Figure 16.19 Proposed Sewerage Network (Interim Scheme) (Sheet 3 of 9)
Figure 16.20 Proposed Sewerage Network (Interim Scheme) (Sheet 4 of 9)
Figure 16.21 Proposed Sewerage Network (Interim Scheme) (Sheet 5 of 9)
Figure 16.22 Proposed Sewerage Network (Interim Scheme) (Sheet 6 of 9)
Figure 16.23 Proposed Sewerage Network (Interim Scheme) (Sheet 7 of 9)
Figure 16.24 Proposed Sewerage Network (Interim Scheme) (Sheet 8 of 9)
Figure 16.25 Proposed Sewerage Network (Interim Scheme) (Sheet 9 of 9)
Figure 16.26 Proposed Sewerage Network (Ultimate Scheme) – Key Plan
Figure 16.27 Proposed Sewerage Network (Ultimate Scheme) (Sheet 1 of 13)
Figure 16.28 Proposed Sewerage Network (Ultimate Scheme) (Sheet 2 of 13)
Figure 16.29 Proposed Sewerage Network (Ultimate Scheme) (Sheet 3 of 13)
Figure 16.30 Proposed Sewerage Network (Ultimate Scheme) (Sheet 4 of 13)
Figure 16.31 Proposed Sewerage Network (Ultimate Scheme) (Sheet 5 of 13)
Figure 16.32 Proposed Sewerage Network (Ultimate Scheme) (Sheet 6 of 13)
Figure 16.33 Proposed Sewerage Network (Ultimate Scheme) (Sheet 7 of 13)
Figure 16.34 Proposed Sewerage Network (Ultimate Scheme) (Sheet 8 of 13)
Figure 16.35 Proposed Sewerage Network (Ultimate Scheme) (Sheet 9 of 13)
Figure 16.36 Proposed Sewerage Network (Ultimate Scheme) (Sheet 10 of 13)
Figure 16.37 Proposed Sewerage Network (Ultimate Scheme) (Sheet 11 of 13)
Figure 16.38 Proposed Sewerage Network (Ultimate Scheme) (Sheet 12 of 13)
Figure 16.39 Proposed Sewerage Network (Ultimate Scheme) (Sheet 13 of 13)