Agreement No. CE 35/2006(CE)

Kai Tak Development Engineering Study

cum Design and Construction of Advance Works

– Investigation, Design and Construction

 

 

Kai Tak Development

Environmental Impact Assessment Report

 

 

Volume 5

 

List of Appendices

 

Appendix 6.1         Detailed Chimney Emission Inventory

Appendix 6.2         Detailed Emission Calculation of Proposed Heliport

Appendix 6.3         Sensitivity Test for Evaluate the Dominant Sources

Appendix 6.4         Detailed Calculation of Cruise Emission

Appendix 6.5         Sensitivity Test Results for Cruise Emission Impact

Appendix 6.6         Detailed Calculation of Emission from Typhoon Shelters

 

Appendix 7.1         Prevailing noise levels at selected representative NSRs

Appendix 7.2         Calculation of Maximum Sound Power Levels

Appendix 7.3         Predicted Noise Level from Stadium (Sport Activity)

Appendix 7.4         Predicted Noise Level from Stadium (Open Air Entertainment Activities)

 

Appendix 8.1         Marine Works within KTD

Appendix 8.2         Methodology for Compiling the Pollution Loading Inventory

Appendix 8.3         Derivation of Heat Re-circulation Factor

Appendix 8.4         Flow Vector Plots

Appendix 8.5         Time Series Plots for Current Speeds

Appendix 8.6         Water Quality Contour Plots (Close Up at KTD Area) – Scenarios 1A, 1B and 1C

Appendix 8.7         Water Quality Contour Plots (Close Up at KTD Area) – Scenario 1D

Appendix 8.8         Water Quality Contour Plots (Overview in Victoria Harbour)

Appendix 8.9         Model Results for Emergency Sewage Discharge from HATS

Appendix 8.10a      Predicted Surface Temperature Elevations at Different Tide Conditions – Dry Season

Appendix 8.10b      Predicted Surface Temperature Elevations at Different Tide Conditions – Wet Season

Appendix 8.11        Predicted Tidal and Depth-averaged Chlorine Concentrations

Appendix 8.12        SEKD CFS Sediment Sampling Stations

Appendix 8.13        Locations of Monitoring Stations in KTN

 

Appendix 9.1         Agreement of Marine Fill Committee on Dredging Rationale for Dredging Works for the Proposed Cruise Terminal

Appendix 9.2         Agreement of Marine Fill Committee on Dredging Rationale for Kai Tak Development

Appendix 9.3         Sediment Chemical Testing Laboratory Results for VC1 and VC2

 

Appendix 10.1        Approved Contamination Assessment Plan (CAP) for the Hong Kong Aviation Club

Appendix 10.2        Contamination Assessment Report (CAR) for the Hong Kong Aviation Club