Agreement No. CE 35/2006(CE)
Kai Tak Development Engineering Study
cum Design and Construction of Advance Works
– Investigation, Design and Construction
Kai Tak Development
Environmental Impact Assessment Report
Volume 6
Appendix 11.2.3 Derivation of Failure Frequencies
Appendix 11.2.5 Sample Calculation for Aircraft Accident Rate
Appendix 11.3.3 Derivation of Failure frequencies
Appendix 11.3.5 Hazard Distances for
Representative Cases
Appendix 11.4.1 Future Population at the Vicinity of the Existing Kerry DG Warehouse
Appendix 11.4.2 Derivation of Failure frequencies
Appendix 11.4.3 Results for Indoor Fatality Probability in Smoke Ingress Calculation
Appendix 11.4.4 Hazard Distances
Appendix 11.5.4 Fault Tree Diagram
Appendix 11.5.6 Results of Incident Review
Appendix 11.5.7 Consequence results of significant LPG and petrol release events
Appendix 11.5.8 Derivation of failure frequencies of petrol cum LPG filling stations
Appendix 12.1 Archaeological Watching Brief for Kai Tak Dredging
Appendix 12.2 Built Heritage Resources Record
Appendix 12.3 Archaeological Impact Assessment Report
Appendix 14.1 Representative Photographs of Habitat Types Identified within the Assessment Area
Appendix 14.2 Plant Species Recorded within the Assessment Area
Appendix 14.3 Fauna Recorded Within the Assessment Area During Survey, February 2007
Appendix 14.4 Fauna Recorded Within the Assessment Area During Survey, May 2007
Appendix 14.5 Representative Photographs of Marine Environment in the Project area
Appendix 14.6 Benthos Survey Report
Appendix 14.7 Representative Photographs of Intertidal Habitats at Each Survey Location
Appendix 14.8 List of Intertidal Fauna Recorded during Recent Surveys
Appendix 14.9 Dive Survey Report
Appendix 16.1 Development Schedule of Kai Tak Development
Appendix 16.2 Breakdowns for Flow Projection
Appendix 16.3 Modelling Results for Hydraulic Assessment of Existing Trunk along Hoi Bun Road
Appendix 16.4 Modelling Results of Hydraulic Assessment of New Sewer in Kai Tak Development