8. water quality
8.1
This
section presents the assessment of the potential water quality impacts
associated with the proposed Project.
The key water quality issues and concerns arising from the Project have been identified and
assessed. Recommendations for
possible mitigation measures have been made, where necessary, to reduce the
identified water quality impacts to an acceptable level.
Environmental Legislation, Policies, Plans,
Standards and Criteria
Water Pollution Control Ordinance (WPCO)
8.2
The Water Pollution Control
Ordinance (Cap. 358),
in existence since 1980, is the major legislation relating to the protection
and control of water quality in
Table 8.1 Summary of Water Quality
Objectives for the Eastern Buffer WCZ
Parameters |
Objectives |
Sub-Zone |
Offensive odour, tints |
Not to be present |
Whole zone |
Visible foam, oil scum, litter |
Not to be present |
Whole zone |
Dissolved oxygen (DO) within 2 m of the seabed |
Not less than 2.0 mg/l for 90% of samples |
Marine waters |
Depth-averaged DO |
Not less than 4.0 mg/l for 90% of samples |
Marine waters excepting fish culture subzones |
Not less than 5.0 mg/l for 90% of samples |
Fish culture subzones |
|
Not less than 4.0 mg/l |
Water gathering ground subzone and other Inland waters |
|
5-Bay biochemical oxygen demand (BOD5) |
Change due to waste discharges not to exceed 3 mg/l |
Water gathering ground subzones |
Change due to waste discharges not to exceed 5 mg/l |
Inland waters |
|
Chemical oxygen demand (COD) |
Change due to waste discharges not to exceed 15 mg/l |
Water gathering ground subzones |
Change due to waste discharges not to exceed 30 mg/l |
Inland waters |
|
pH |
To be in the range of 6.5 – 8.5, change due to waste discharges not to
exceed 0.2 |
Marine waters |
To be in the range of 6.5 – 8.5 |
Water gathering ground subzones |
|
To be in the range of 6.0 – 9.0 |
Inland waters |
|
Salinity |
Change due to waste discharges not to exceed 10% of ambient |
Whole zone |
Temperature |
Change due to waste discharges not to exceed 2 oC |
Whole zone |
Suspended solids (SS) |
Not to raise the ambient level by 30% caused by waste discharges and
shall not affect aquatic communities |
Marine waters |
Change due to waste discharges not to exceed 20 mg/l of annual median |
Water gathering ground subzones |
|
Change due to waste discharges not to exceed 25 mg/l of annual median |
Inland waters |
|
Unionized ammonia (UIA) |
Annual mean not to exceed 0.021 mg(N)/l as unionized form |
Whole zone |
Nutrients |
Shall not cause excessive algal growth |
Marine waters |
Total inorganic nitrogen (TIN) |
Annual mean depth-averaged inorganic nitrogen not to exceed 0.4
mg(N)/l |
Marine waters |
Dangerous substances |
Should not attain such levels as to produce significant toxic effects
in humans, fish or any other aquatic organisms |
Whole zone |
Waste discharges should not cause a risk to any beneficial use of the
aquatic environment |
Whole zone |
|
E.coli |
Not exceed 610 per 100 ml, calculated as the geometric mean of all
samples collected in one calendar year |
Fish culture subzones |
Less than 1 per 100 ml, calculated as the geometric mean of the most
recent 5 consecutive samples taken at intervals of between 7 and 21 days |
Water gathering ground subzones |
|
Not exceed 1000 per 100 ml, calculated as the geometric mean of the
most recent 5 consecutive samples taken at intervals of between 7 and 21 days |
Inland waters |
|
Colour |
Change due to waste discharges not to exceed 30 Hazen units |
Water gathering ground |
Change due to waste discharges not to exceed 50 Hazen units |
Inland waters |
Source: Statement of Water Quality Objectives
(Eastern Buffer Water Control Zone).
Technical Memorandum
8.3
Besides
setting the WQOs, the WPCO controls effluent discharging into the WCZs through
a licensing system. Guidance on the
permissible effluent discharges based on the type of receiving waters (foul sewers,
storm water drains, inland and coastal waters) is provided in the Technical Memorandum on Standards for
Effluents Discharged into Drainage and Sewerage Systems, Inland and Coastal
Waters (TM-DSS). The limits given in the TM-DSS cover the physical,
chemical and microbial quality of effluents. Any effluent discharge during the
construction works should comply with the standards specified in the TM-DSS.
Practice Notes
8.4
A
practice note (PN) for professional persons was issued by the EPD to provide
environmental guidelines for handling and disposal of construction site
discharges. The ProPECC PN 1/94 “Construction
Site Drainage” provides good practice guidelines for dealing with
various types of discharge from a construction site. Practices outlined in the
PN should be followed as far as possible during construction to minimize the
water quality impact due to construction site drainage.
8.5
There are no natural streams or
rivers within or in close proximity to the proposed land-based works areas. The water or
stream courses identified closest to the Project site are at least 100 m away
from the Project site boundary. No other
existing or planned water sensitive receiver (WSR) was identified.
8.6
Potential
sources of water quality impact that may arise during the Project works were
described. All the identified
sources of potential water quality impact were then evaluated and
their impact significance determined.
The need for mitigation measures to reduce any identified adverse
impacts on water quality to acceptable levels was determined.
Identification of Environmental Impacts
Construction
Phase
Demolition and Construction Works
8.7
All
the proposed Project works will be land-based and would include demolition of
the existing cremators and construction of new cremators and ancillary
facilities. The key concern from demolition/construction works will be surface
runoff and site effluent.
8.8
Surface
runoff may cause potential water quality impact during the demolition and
construction activities. Precipitation that falls on unpaved lands and areas
with the topsoil exposed during the demolition would wash away soil particles.
Potential sources of water pollution from site runoff may also come from the
release of bentonite slurries and other grouting materials with construction
run-off or stormwater. Such
surface runoff and stormwater overflows with high levels of suspended solids if
directly discharged into the water bodies or via the drainage channel could
lead to a water quality impact.
8.9
Effluent
discharge from temporary site facilities will be controlled to prevent direct
discharge to the neighbouring marine waters and storm drains. Such wastewater
may include wastewater resulting from wheel washing of site vehicles at site
entrances.
Sewage from Workforce
8.10 Sewage will arise from the on-site workforce. It is characterized by high level of BOD, NH3-N and E.coli counts and may adversely affect the water quality, if not proper controlled.
Accumulation of Solid Waste and Accidental
Spillage
8.11
Accumulation of solid waste
(such as debris, rubbish and demolition materials), and spillage of oil, diesel
or solvents by vessels and vehicles involved with the construction works, if
uncontrolled, could also lead to deterioration in water quality.
Operation Phase
8.12
Potential water pollution
sources during operation of the Project include sewage from visitors and
workers as well as other site effluent generated from the Project, which may
affect the water quality, if not proper controlled.
Prediction and Evaluation of Environmental Impacts
Construction
Phase
Demolition and Construction Works
8.13
As
a good site practice, mitigation measures should be implemented to control site
runoff and drainage and site effluent from the works areas, and to prevent
runoff and drainage water with high levels of suspended solids from entering the adjacent
watercourses. With the
implementation of adequate site drainage and provision of sediment removal
facilities as described in Sections 8.20 to 8.46 below, it is anticipated
that unacceptable water quality impacts will not arise. Surface runoff will be
collected by the temporary drainage system and then treated or desilted on-site
before discharging to the storm water drain. Effluent from wheel washing
will also be treated or desilted on-site before discharged. A license should be
obtained from EPD for discharge to the public drainage system.
Sewage from Workforce
8.14
Domestic
sewage will be generated from the workforce during the construction works. Portable chemical toilets can
be installed within the site. The chemical toilets should be properly
maintained, and licensed contractors should be employed to collect and dispose
of the waste off-site at approved locations. Therefore, adverse water quality impacts
associated with sewage from workforce would not be expected.
Accumulation of Solid Waste and Accidental
Spillage
8.15
On-site
construction and demolition activities may cause water pollution from the
following:
l
Uncontrolled discharge of debris and rubbish such as
demolition materials and refuse
l
Spillages of liquids stored on-site, such as oil,
diesel and solvents etc.
8.16
Good
construction and site management practices should be observed, as detailed in
Sections 8.20 to 8.46 below, to ensure that litter, fuels and solvents do not
enter into the adjacent water system.
Operation
Phase
Wastewater from Air Pollution Control Equipment
8.17
No effluent will be discharged
from the Air Pollution Control equipment in the new crematorium as “dry” process
will be adopted. Hence, adverse water quality impact is not expected.
Sewage from Public and General Cleaning
Activities
8.18 Only small amount of sewage will be generated by visitors and workers, as well as wastewater from cleaning activities, at the new crematorium.
Sewage from Visitors and Workers
8.19 The sewage from visitors and workers generated within the Project site during the operational phase was estimated based on the guideline set out in the DSM, Sewerage Manual (SM) Part 1 (DSD, 1995) and the design information as given below.
(a) Population (visitors and workers):
(i) Services Halls - 256 persons
(ii) Office - 41 persons
(b) Sewage flow factors:
(i) Services Halls - 0.025m3/person/day
(ii) Office - 0.290m3/person/day
(c) Daily Discharge Flow:
Qd1 = 256*0.025 + 41*0.290
= 18.29m3/d
Wastewater from Cleaning Activities
8.20 Wastewater would also be generated from the general floor cleaning and sand filter cleaning activities. Locations of these wastewater generating activities are given below:
General Cleaning
· Potable and flushing room, water pumps & tank room
· FS pump room
· Cremator plant room
· Filtration plant room
· Cleaner’s store
· A/C room
· Gardener’s room
Sand Filter Cleaning
· Potable and flushing room, water pumps & tank room
· Water feature plant room
8.21 The designed wastewater discharge quantity generated from the Project site was estimated based on the following design information:
(a) General Floor Cleaning:
(i) no. of cleansing points - 9 nos.
(ii) water flow rate of each cleansing point - 0.3 l/s
(iii) duration of use - 5 mins
(iv) frequency of use/day - 2/day
(v) Daily Discharge Flow:
Qd2 = 9*(0.3/1000)*(5*60)*2
= 1.62m3/d
(b) Sand Filter Cleaning:
(vi) no. of sand filter - 3 nos.
(vii) water flow rate for filter cleaning - 3 l/s
(viii) duration of filter cleaning - 5 mins
(ix) frequency of use/day - 1/day
(x) Daily Discharge Flow:
Qd3 = 3*(3/1000)*(5*60)*1
= 2.70m3/d
Total Sewage / Wastewater Flow
8.22 The designed wastewater discharge quantity generated from the Project site was estimated as follows.
Total estimated quantity of sewerage discharge, Q average = Qd1+ Qd2+Qd3
=18.29+1.62+2.70
= 22.61m3/d
8.23 Based on a peaking factor of 6 and operational period of 8 hours per day, the discharge peak flow, Q p, from the Project was estimated to be:
Discharge flow, Q p = Q average x 6 / (8*3600)
= 0.0047 m3/s (or 4.7 L/s)
8.1 All wastewater generated from the Project site will be collected and discharged to the public foul sewer through connection to the existing government foul water manhole, namely FMH7025323, as shown in Appendix 8.1.
Sewerage Impact Assessment
8.2
It is proposed that the Project
effluent would be connected to the existing government sewers serving the
existing Cape Collinson Crematorium and ultimately discharged to the Chai Wan
Preliminary Treatment Works (PTW) under Stage 1 of Harbour Area Treatment
Scheme (HATS).
8.3
Appendix
8.2 presents
the capacity performance of the existing sewers downstream
of the Project site
under the ultimate conditions with and without the Project discharge. The existing sewers under assessment are shown in
Appendix 8.3. The baseline sewage flow in the
government sewers (without the Project discharge) is based on the latest flow
projection available from the “Review of Hong Kong Island Sewerage Master
Plans”, which has taken account of the cumulative effects of any potential future developments
in catchment of the concerned sewer system.
As shown in Appendix
8.2, no sewers are identified as hydraulic inadequate in the existing
sewers assessed.
8.4
With
regard to the capacity performance of the existing Chai Wan PTW, reference is
made to the latest flow projection available from the “Environmental Impact
Assessment Study for HATS Stage 2”, where the projected ultimate peak flow for
Chai Wan PTW was estimated to be 2.07m3/s as compared to its
existing design capacity of 2.61m3/s. Therefore, the Chai Wan PTW is capable
of handling the Project effluent flow of only about 0.0047m3/s.
8.5 Based on the sewerage impact assessment, the Project effluent would not cause any adverse impacts to the existing sewers as well as the sewage treatment facilities, and therefore mitigation measures would not be required.
Mitigation of Adverse Environmental Impacts
Construction Phase
Demolition and Construction Works
8.6
The
following measures as outlined in the ProPECC PN 1/94 should be followed where applicable.
Surface Run-off
8.7
Surface run-off from
construction sites should be discharged into storm drains via adequately
designed sand/silt removal facilities such as sand traps, silt traps and
sedimentation basins. Channels or
earth bunds or sand bag barriers should be provided on site to properly direct
stormwater to such silt removal facilities. Perimeter channels at site boundaries
should be provided where necessary to intercept storm run-off from outside the
site so that it will not wash across the site. Catchpits and perimeter channels should
be constructed in advance of site formation works and earthworks.
8.8 Silt removal facilities, channels and manholes should be maintained and the deposited silt and grit should be removed regularly, at the onset of and after each rainstorm. Any practical options for the diversion and re-alignment of drainage should comply with both engineering and environmental requirements in order to provide adequate hydraulic capacity of all drains.
8.9 Construction works should be programmed to minimize soil excavation works in rainy seasons (April to September). If excavation in soil could not be avoided in these months or at any time of year when rainstorms are likely, for the purpose of preventing soil erosion, temporary exposed slope surfaces should be covered e.g. by tarpaulin, and temporary access roads should be protected by crushed stone or gravel, as excavation proceeds. Intercepting channels should be provided (e.g. along the crest / edge of excavation) to prevent storm runoff from washing across exposed soil surfaces. Arrangements should always be in place in such a way that adequate surface protection measures can be safely carried out well before the arrival of a rainstorm.
8.10 Earthworks final surfaces should be well compacted and the subsequent permanent work or surface protection should be carried out immediately after the final surfaces are formed to prevent erosion caused by rainstorms. Appropriate drainage like intercepting channels should be provided where necessary.
8.11 Measures should be taken to minimize the ingress of rainwater into trenches. If excavation of trenches in wet seasons is necessary, they should be dug and backfilled in short sections. Rainwater pumped out from trenches or foundation excavations should be discharged into storm drains via silt removal facilities.
8.12 Open stockpiles of construction materials (e.g. aggregates, sand and fill material) on sites should be covered with tarpaulin or similar fabric during rainstorms.
8.13 Manholes (including newly constructed ones) should always be adequately covered and temporarily sealed so as to prevent silt, construction materials or debris from getting into the drainage system, and to prevent storm run-off from getting into foul sewers. Discharge of surface run-off into foul sewers must always be prevented in order not to unduly overload the foul sewerage system.
Groundwater
8.14
Groundwater pumped out of
wells, etc. for the lowering of ground water level in basement or foundation
construction should be discharged into storm drains after the removal of silt
in silt removal facilities.
Boring and Drilling Water
8.15
Water used in ground boring and
drilling for site investigation or rock / soil anchoring should as far as
practicable be recirculated after sedimentation. When there is a need for final disposal,
the wastewater should be discharged into storm drains via silt removal
facilities.
Wastewater from Concrete
Batching and Precast Concrete Casting
8.16
Wastewater generated from the
washing down of mixing trucks and drum mixers and similar equipment should
whenever practicable be used for other site activities. The discharge of wastewater should be
kept to a minimum and should be treated to meet the appropriate standard as
specified in the TM-DSS (refer to Section 8.3) before discharging.
8.17 To prevent pollution from wastewater overflow, the pump sump of any wastewater system should be provided with an on-line standby pump of adequate capacity and with automatic alternating devices.
8.18 Under normal circumstances, surplus wastewater may be discharged into foul sewers after treatment in silt removal and pH adjustment facilities (to within the pH range of 6 to 10). Disposal of wastewater into storm drains will require more elaborate treatment.
Wheel Washing Water
8.19
All vehicles and plant should
be cleaned before they leave a construction site to minimize the deposition of
earth, mud, debris on roads. A
wheel washing bay should be provided at every site exit if practicable and
wash-water should have sand and silt settled out or removed before discharging
into storm drains. The section of
construction road between the wheel washing bay and the public road should be
paved with backfall to reduce vehicle tracking of soil and to prevent site
run-off from entering public road drains.
Bentonite Slurries
8.20
Bentonite slurries used in construction
works should be reconditioned and used again wherever practicable. If the disposal of a certain residual
quantity cannot be avoided, the used slurry may be disposed of at the marine
spoil grounds subject to obtaining a marine dumping licence from EPD on a
case-by-case basis.
8.21 If the used bentonite slurry is intended to be disposed of through the public drainage system, it should be treated to the respective effluent standards applicable to foul sewer, storm drains or the receiving waters as set out in the TM-DSS (refer to Section 8.3).
Water for Testing &
Sterilization of Water Retaining Structures and Water Pipes
8.22
Water used in water testing to
check leakage of structures and pipes should be used for other purposes as far
as practicable. Surplus unpolluted water could be discharged into storm drains.
8.23 Sterilization is commonly accomplished by chlorination. Specific advice from EPD should be sought during the design stage of the works with regard to the disposal of the sterilizing water. The sterilizing water should be used again wherever practicable.
Wastewater from Building
Construction
8.24
Before commencing any
demolition works, all sewer and drainage connections should be sealed to
prevent building debris, soil, sand etc. from entering public sewers/drains.
8.25 Wastewater generated from building construction activities including concreting, plastering, internal decoration, cleaning of works and similar activities should not be discharged into the stormwater drainage system. If the wastewater is to be discharged into foul sewers, it should undergo the removal of settleable solids in a silt removal facility, and pH adjustment as necessary.
Acid Cleaning, Etching and
Pickling Wastewater
8.26
Acidic wastewater generated
from acid cleaning, etching, pickling and similar activities should be
neutralized to within the pH range of 6 to 10 before discharging into foul
sewers. If there is no public foul
sewer in the vicinity, the neutralized wastewater should be tinkered off site
for disposal into foul sewers or treated to a standard acceptable to storm
drains and the receiving waters.
Wastewater from Site
Facilities
8.27
Wastewater collected from
canteen kitchens, including that from basins, sinks and floor drains, should be
discharged into foul sewer via grease traps capable of providing at least 20
minutes retention during peak flow.
8.28 Drainage serving an open oil filling point should be connected to storm drains via a petrol interceptors with peak storm bypass.
8.29 Vehicle and plant servicing areas, vehicle wash bays and lubrication bays should as far as possible be located within roofed areas. The drainage in these covered areas should be connected to foul sewers via a petrol interceptor. Waste oil should be collected and stored for recycling or disposal in accordance with the Waste Disposal Ordinance.
Effluent Discharge
8.30
There
is a need to apply to EPD for a discharge licence under the WPCO for
discharging effluent from the construction site. The discharge quality is
required to meet the requirements specified in the discharge licence. All
the runoff, wastewater or extracted groundwater generated from the works areas
should be treated as necessary so that it satisfies all the standards listed in
the TM-DSS (see Section 8.3). It is
anticipated that the wastewater generated from the works areas would be of
small quantity. Monitoring of the construction site effluent quality should be
carried out in accordance with the WPCO license which is under the ambit of
regional office (RO) of EPD.
Sewage from Workforce
8.31
Temporary
sanitary facilities, such as portable chemical toilets, should be
employed on-site where necessary to handle sewage from the workforce. A
licensed contractor would be responsible for appropriate disposal of waste
matter and maintenance of these facilities.
Accumulation of Solid Waste and Accidental
Spillage
8.32
Good site practices should be
adopted to remove rubbish and litter from construction sites so as to prevent
the rubbish and litter from spreading from the site area. It is recommended to clean the
construction sites on a regular basis. Stockpiles of cement and other construction
materials should be kept covered when not being used.
8.33
Oils
and fuels should only be used and stored in designated areas which have
pollution prevention facilities. To
prevent spillage of fuels and solvents to the nearby watercourse, all fuel
tanks and storage areas should be provided with locks and be sited on sealed
areas, within bunds of a capacity equal to 110% of the storage capacity of the
largest tank. The bund should be
drained of rainwater after a rain event. Oil leakage or
spillage should be contained and cleaned up immediately.
Operation
Phase
8.34
Sewerage impact assessment has
been conducted for the Project. Assessment results indicated that the
additional sewage / wastewater generated from the Project would not cause any
adverse impacts to the existing sewerage systems, and therefore mitigation
measures would not be required. For handling and
disposal of other operation stage effluent (such as for the storm drainage),
the practices outlined in ProPECC PN 5/93 should be adopted where applicable.
Evaluation of Residual Impacts
8.35
Provided
that all the recommended mitigation measures are implemented properly, no
unacceptable residual water quality impacts would be expected.
Environmental Monitoring and Audit
8.36
No
off-site water quality impact will be expected from the proposed construction
and demolition activities, marine water quality monitoring is not considered
necessary. It is recommended that
regular site inspections be undertaken to inspect the construction activities
and works areas in order to ensure that the recommended mitigation measures are
properly implemented. Monitoring of
the construction site effluent should be carried out in accordance with the WPCO
license which is under the ambit of regional office (RO) of EPD.
Construction Phase
8.37
Water
quality impacts from the land-based construction and demolition works can be
controlled to acceptable levels by implementing the recommended mitigation measures. No unacceptable water quality impacts
would be expected from the land-based construction and demolition activities.
Site inspections should be undertaken routinely to inspect the works areas in
order to ensure the recommended mitigation measures are properly implemented.
Operation Phase
8.38
No effluent will be discharged
from the Air Pollution Control equipment in the new crematorium as “dry” process
will be adopted. Sewage generated by visitors and workers, as well as
wastewater from cleaning activities will be connected to the sewerage
system. Sewerage impact assessment
has been conducted for the Project. Assessment results indicated that the
additional sewage / wastewater generated from the Project would not cause any
adverse impacts to the existing sewerage systems. Hence, adverse water quality impact is
not expected.