Contents
Appendices
Appendix
9A1 Construction
Sequence and Construction Programme – HKBCF (Sequence A)
Appendix
9A2 Construction
Sequence and Construction Programme – HKBCF (Sequence B)
Appendix
9B Comparison of Sediment Loss Rate of Sequence A and Sequence B
Appendix
9C Construction Sequence and Construction Programme – HKLR Reclamation
Appendix
9D1 Sediment
Testing Results for TM-CLKL
Appendix
9D3 Calculation
of Loss Coefficients for Bridge Piers
Appendix
9D4 Pollution
Loading Inventory
Appendix
9D5 Cumulative
Dredging and Sediment Loss Rates
Appendix
9D6 Water
Quality Mitigation – Silt Curtain Application
Appendix
9D7 2026
Quality Modelling Results
Appendix
9D8 2011
Construction Plumes Modelling Results
Appendix
9D9 2012 Construction
Plumes Modelling Results
Appendix
9D10 2013 Construction
Plumes Modelling Results
Appendix
9D11 Mitigated Scenario for
(2+1) Silt Curtain System
Appendix 9D12 Sensitivity Test for TSHD High Overflow
Scenario in PRD
Appendix
9E1 Modelling
Verification Plots - Grid Refinement
Appendix
9E2 Modelling
Verification Plots - Baseline
Appendix
9E3 Modelling
Verification Plots - Sequence B
Appendix
9F Modelling
Results for HKBCF Sequence B
Figures
Figure
9.1 Location Plan for HKBCF, TMCLKL and HKLR
Figure
9.3 Management Frameworks for Dredged/Excavated
Sediment
Figure
9.4 Key Areas of Seabed Disturbance
Figure 9.5
Location of Water Quality and
Ecological Sensitive Receivers
Figure
9.7 Sediment Sampling Locations for TMCLKL, HZMB
and others (Indicative)
Figure
9.8 Coverage of Western Harbour Model
Figure 9.9
Comparison of Original and
Refined Model Grids
Figure 9.10
Assumed Ultimate Coastline when
HKBCF+HKLR+TMCLKL is completed (2026)
Figure
9.11 Main Flow Channel in Western Harbour
Figure 9.12
Indicative Location of Box
Culverts for Discharges of Storm Waters from TMCLKL
Figure
9.14 Location Plan for the Proposed Pits to Receive
Mf sediment in HKBCF
Figure
9.15 Proposed Details and Mitigation measures for
the Pits to Receive Mf sediment in HKBCF
Figure
9.16 Location Plan for the Proposed Pits to Receive
Mf sediment in HKLR
Figure
9.17 Proposed Details and Mitigation measures for
the Pits to Receive Mf sediment in HKLR