This study covers the details of the
Quantitative Risk Assessment (QRA) for the Gas Receiving Stations (GRSs) at the
Black Point Power Station (BPPS) which will receive natural gas through two
subsea pipelines from the Mainland.
Detailed information of the study methodology is presented here whilst
the results and conclusions are given in the Section 12 of the EIA Report.
The two pipelines to BPPS will terminate
at two Gas Receiving Stations (GRSs), one for each submarine pipeline. The first GRS (GRS ‘A’) will be located
adjacent to the existing GRS for the Yacheng pipeline, while the second (GRS
‘B’) will be located on reclaimed land on the north side of BPPS (Figure 12B.1). The first GRS will be constructed in
2011 with operations beginning in late 2011. The second GRS is expected to be
constructed in around 2014. From a
risk perspective, construction at different times represents the worst case and
this is considered in the analysis.
The analysis considers a single GRS
operating in 2011 as the base case, the Second Phase construction in 2014 and a
future year 2021 when both GRSs will be operational.
Figure
12B.1 GRS Locations
Black Point Power Station Existing GRS GRS on Reclamation (GRS ‘B’) Co-located GRS (GRS ‘A’) |
12B.2
Design Details
Each GRS will comprise the following
facilities:
·
2
emergency shutdown (ESD) valves;
·
1 pig
receiver, with associated service piping;
·
Station
inlet header;
·
2
inlet filter-separators (plus 1 standby);
·
2
metering runs (plus 1 standby);
·
3-7
water bath gas heaters (3 to 4 large water bath heaters, or 6 to 7 smaller
units);
·
2
pressure control runs (plus 1 standby); and
·
Station
export header.
A process flow diagram is shown in Figure
12B.2. The two GRSs are
essentially similar. Gas will be
received via the two offshore pipelines and the first major piece of equipment
in the station will be an Emergency Shutdown (ESD) valve, which can be closed
by means of the station ESD system in the event of an emergency, isolating the
station from the source of gas. For
emergency depressurization of the GRS facilities, a vent stack will be
provided.
Downstream of the ESD valves will be the
pig receiver. This enables the
running of cleaning and inspection pigs in the pipeline. Following the pig receiver are the inlet
filter units, metering runs, heaters and pressure letdown section where the
pressure is reduced to about 38 barg.
The gas is then sent out to distribution headers to supply the power
station. The headers from GRS A and
GRS B are combined at the mixing station.
The existing vent stack will provide a
common vent for all 3 GRSs to allow depressurisation of equipment. The stack, however, will be relocated
further northeast to make space for the co-located GRS.
Design details are yet to be
finalised. Where there is
uncertainty in the design, this analysis has erred on the conservative
side. For example, there may be 3
or 4 large water bath heaters, or 6 or 7 smaller units. While the total heating capacity will be
the same, a larger number of heaters creates a higher
failure frequency and hence 7 heaters are assumed in the analysis as a
conservative measure. Adopting such
an approach ensures this QRA will remain valid, even if minor design changes
are introduced during the detailed design stage. The layout for the two GRSs is shown in Figure 12B.3.
Figure
12B.2 Gas
Receiving Station Process Flow Diagram
Figure
12B.3 GRS
Layout
The BPPS area is generally remote with very low
population in the vicinity. Both
land and marine populations are considered in the analysis, for the year 2011
(the expected year of completion of the 1st GRS), the phase 2 construction period in 2014 and a future year 2021. The consequence analysis (Section 12B.6) demonstrates that the
maximum extent of hazard effects reach about 335 m. The population assessment therefore
considered all offsite population within about 500 m of the proposed GRS. The population at the GRS sites, such as
workers, are considered onsite population and therefore outside the scope of
this QRA.
Land Population
There is no land based population within 500 m of the
proposed GRSs.
The security entrance to BPPS is more than 600 m from
the GRS facilities. The nearest
industrial facilities in Lung Kwu Sheung Tan are about 1.4 km away and
Black Point is situated near
Vessel Population
The vessel population used in this study are as given
in Table 12B.1. The figures are based on BMT’s Marine
Impact Assessment report [3] except those for fast ferries. The maximum population of fast ferries
is assumed to be 450, based on the maximum capacity of the largest ferry
operating in the area. However, the
average load factor for fast ferries to
Table 12B.1 Vessel
Population
Type
of Vessel |
Average
Population per Vessel |
%
of Trips |
Ocean-Going Vessel Rivertrade Coastal vessel Fast Ferries Tug and Tow Others |
21 5 450 (largest ferries with
max population) 350 (typical ferry with
max population) 280 (typical ferry at 80%
capacity) 175 (typical ferry at 50%
capacity) 105 (typical ferry at 30%
capacity) 35 (typical ferry at 10%
capacity) 5 5 |
3.75 3.75 22.5 52.5 12.5 5.0 |
Marine Vessel Protection Factors
The population on marine vessels is assumed to be
provided with some protection from the vessel structure. The degree of protection offered depends
on factors such as:
·
Size
of vessel;
·
Construction
material and likelihood of secondary fires;
·
Speed
of vessel and hence its exposure time to the flammable cloud;
·
The
proportion of passengers likely to be on deck or in the interior of the vessel;
and
·
The
ability of gas to penetrate into the interior of the vessel and achieve a
flammable mixture.
Small vessels such as fishing boats will provide
little protection but larger vessels such as ocean-going vessels will provide
greater protection. Fast ferries
are air conditioned and have a limited rate of air exchange with the
outside. Based on these
considerations, the fatality probabilities assumed for each type of vessel are
as given in Table 12B.2.
Table 12B.2 Population
at Risk
Marine
Vessel Type |
Population |
Fatality
Probability |
Population
at Risk |
Ocean-Going Vessel Rivertrade Coastal Vessel Fast Ferries Tug and Tow Others |
21 5 450 350 280 175 105 35 5 5 |
0.1 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.9 0.9 |
2 2 135 105 84 53 32 11 5 5 |
Methodology
In this study, the marine traffic population in the vicinity
of Black Point has been considered as both point receptors and average density
values. The population of all
vessels are treated as an area average density except for fast ferries which
are treated as point receptors.
The marine area around Black Point was
divided into 12.67 km2 grid cells, each grid being approximately 3.6
km ´ 3.6km.
The transit time for a vessel to traverse a grid is calculated based on
the travel distance divided by the vessel’s average speed. The average speed [2] and transit time for different vessel types are
presented in Table 12B.3.
Table 12B.3 Average
Speed and Transit Time of Different Vessel Type [2]
Type of Vessel |
Assumed Speed (m/s) |
Transit
Time (min) |
Ocean-going
vessel |
6.0 |
9.9 |
Rivertrade
Coastal vessel |
6.0 |
9.9 |
Fast Ferries |
15.0 |
4.0 |
Tug and Tow |
2.5 |
23.7 |
Others |
6.0 |
9.9 |
The number of vessels traversing each grid daily was
provided by a previous marine study [2]. These
are given in Table 12B.4, where the
grid cell reference numbers are defined according to Figure 12B.4. The marine
study was based on 2003 data, extrapolated to years 2011 and 2021.
The number of marine vessels present within each grid
cell at any instant in time is then calculated from:
Number of vessels = No. of vessels per day × grid length / 86400
/ Speed (1)
This was calculated for each type of vessel, for each
grid and for years 2011 and 2021.
The values obtained represent the number of vessels present within a
grid cell at any instant in time.
Values of less than one are interpreted as the probability of a vessel
being present.
Figure 12B.4 Grid
Cell Numbering Scheme
3 1 2 4 |
Table 12B.4 Number
of Marine Vessels per Day
Grid
No. |
Average Number of Vessels Per Day |
|||||||||
|
2011 |
2021 |
||||||||
|
OG |
RT |
TT |
FF(*) |
OTH |
OG |
RT |
TT |
FF(*) |
OTH |
1 2 3 4 |
19 0 19 0 |
788 0 557 368 |
368 21 263 168 |
44 0 77 11 |
567 84 294 294 |
23 0 23 0 |
863 0 610 403 |
503 23 288 184 |
52 0 91 13 |
621 92 322 322 |
OG = Ocean-going vessels
RT = Rivertrade coastal vessels
TT = Tug & tow vessels
FF = Fast ferries
OTH = others
(*) Fast
ferries are treated separately
Average Density Approach
The average marine population for each grid is
calculated by combining the number of vessels in each grid (from Equation 1) with the population at risk
for each vessel (Table 12B.2). The results are shown in Figures 12B.5 and 12B.6. This grid
population is assumed to apply to all time periods. As can be seen, the growth in marine
population from 2011 to 2021 is only marginal. Intermediate values are applied to the
phase 2 construction in 2014. Note
however that fast ferries are excluded since ferries are treated separately in
the analysis (see below).
When simulating a possible release scenario, the
impact area is calculated from dispersion modelling. In general, only a fraction of a grid
area is affected and hence the number of fatalities within the grid is
calculated from:
Number of fatalities = grid
population × impact area / grid area (2)
Figure 12B.5 Marine
Population at Risk by Grid, Year 2011
89.4 60.2 41.1 5.2
Figure 12B.6 Marine
Population at Risk by Grid, Year 2021
66.3 98.2 45.0 5.7
Point Receptor Approach
The average density approach, described above,
effectively dilutes the population over the area of the grid. Given that ferries have a much higher
population than other classes of vessel, combined with a relatively low
presence factor due to their higher speed, the average density approach would
not adequately highlight the impact of fast ferries on the FN curves. Fast ferries are therefore treated a
little differently in the analysis.
In reality, if a fast ferry is affected by an
accident scenario, the whole ferry will likely be affected. The likelihood that the ferry is
affected, however, depends on the size of the hazard area and the density of
ferry vessels. To model this, the
population is treated as a concentrated point receptor i.e. the entire population
of the ferry is assumed to remain focused at the ferry location. The ferry density is calculated the same
way as described above (Equation 1),
giving the number of ferries per grid at any instant in time, or equivalently a
“presence factor”. A hazard
scenario, however, will not affect a whole grid, but some fraction determined
by the area ratio of the hazard footprint area and the grid area. The presence factor, corrected by this
area ratio is then used to modify the frequency of the hazard scenario:
Prob. that ferry is affected = presence
factor × impact area / grid area (3)
The fast ferry population distribution adopted was
described in Table 12B.1. Information from the main ferry
operators suggests that 25% of ferry trips take place at night time (between
7pm and 7am), while 75% occur during daytime. Day and night ferries are therefore
assessed separately in the analysis.
The distribution assumed is given in Table
12B.5.
Table 12B.5 Fast
Ferry Population Distribution for Day and Night Time Periods
Population |
Population
at Risk |
% of Day
Trips |
% of
Night Trips |
% of All
Trips (= 0.75
× day + 0.25 × night) |
450 350 280 175 105 35 |
135 105 84 53 32 11 |
5 5 30 60 - - |
- - - 30 50 20 |
3.75 3.75 22.5 52.5 12.5 5.0 |
The ferry presence factor (Equation 1) and probability that a ferry is affected by a release
scenario (Equation 2) are calculated
for each ferry occupancy category and each time period.
Stationary Marine Population
Other stationary marine population such as that for
the
12B.3.2
Meteorological Data
Data on local meteorological conditions such as wind speed,
wind direction, atmospheric stability class, ambient temperature and humidity
was obtained from the Hong Kong Observatory [20], [21].
The location of weather stations in the vicinity of
the GRS is shown in Figure 12B.7. Data from the Sha Chau weather station
was adopted for the GRS study as it is closest to the site and also the most
relevant based on the topography.
The meteorological data used in this study is based on the data recorded
by the stations over a five year period from 2004 to 2008.
Figure 12B.7 Weather
Stations in Vicinity of Black Point
|
The raw data from the Observatory is a series of readings
taken hourly over the 5-year period.
This data was rationalized into four combinations of wind speed and
atmospheric stability class, denoted as 2.5B, 3D, 7D and 2F where 2F for
example refers to a wind speed of 2m/s and atmospheric stability class F. The data is then further sorted in 12
wind directions. This sorting of
meteorological data is performed for the two time periods, day and night.
The fraction of occurrence for each combination of
wind direction, speed and atmospheric stability for each time period is
presented in Table 12B.6.
Wind directions, such as 90°, refer to the direction of the prevailing
wind. For example, 90° refer to an easterly wind, 0° is northerly, 180° is southerly and
270° is westerly.
Table 12B.6 Data
from Sha Chau Weather Station (2004-2008)
|
Day |
Night |
||||||
Wind Speed
(m/s) |
2.5 |
3 |
7 |
2 |
2.5 |
3 |
7 |
2 |
Atmospheric
Stability |
B |
D |
D |
F |
B |
D |
D |
F |
Wind Direction |
Fraction of Occurrence |
|||||||
0° |
0.052 |
0.006 |
0.140 |
0.005 |
0.000 |
0.005 |
0.114 |
0.010 |
30° |
0.009 |
0.005 |
0.050 |
0.003 |
0.000 |
0.004 |
0.092 |
0.008 |
60° |
0.005 |
0.004 |
0.009 |
0.002 |
0.000 |
0.006 |
0.021 |
0.010 |
90° |
0.040 |
0.012 |
0.064 |
0.007 |
0.000 |
0.016 |
0.139 |
0.029 |
120° |
0.053 |
0.007 |
0.136 |
0.005 |
0.000 |
0.009 |
0.228 |
0.023 |
150° |
0.014 |
0.003 |
0.023 |
0.003 |
0.000 |
0.003 |
0.039 |
0.015 |
180° |
0.029 |
0.004 |
0.032 |
0.004 |
0.000 |
0.003 |
0.048 |
0.012 |
210° |
0.074 |
0.007 |
0.083 |
0.004 |
0.000 |
0.004 |
0.100 |
0.014 |
240° |
0.000 |
0.001 |
0.000 |
0.000 |
0.000 |
0.000 |
0.000 |
0.001 |
270° |
0.000 |
0.000 |
0.000 |
0.000 |
0.000 |
0.000 |
0.000 |
0.001 |
300° |
0.008 |
0.001 |
0.001 |
0.001 |
0.000 |
0.000 |
0.001 |
0.003 |
330° |
0.043 |
0.004 |
0.040 |
0.003 |
0.000 |
0.004 |
0.027 |
0.007 |
Note on Atmospheric Stability
The Pasquill-Gifford atmosphere stability classes
range from A through F.
A: Turbulent
B: Very
unstable
C: Unstable
D: Neutral
E: Stable
F: Very
stable
Wind speed and solar radiation interact to determine
the level of atmospheric stability, which in turn suppresses or enhances the
vertical element of turbulent motion.
The latter is a function of the vertical temperature profile in the
atmosphere; the greater the rate of decrease in temperature with height, the
greater the level of turbulence.
Class A represents extremely unstable conditions,
which typically occur under conditions of strong daytime insolation. Category D is neutral and neither
enhances nor suppresses atmospheric turbulence. Class F on the other hand represents
moderately stable conditions, which typically arise on clear nights with little
wind.
The annual average temperature for Black Point is
23.9 °C.
Temperature data was not available from the Sha Chau station and so
temperature readings were taken from the
Table 12B.7 Temperature
Statistics for Black Point
|
|
Min. |
Max. |
Average |
Ambient air (T°C)1 |
BP |
6.7 |
35.1 |
23.9 |
Surface (T°C)1 |
|
20.9 |
25.7 |
23 |
Seawater (T°C)2 |
BP |
16.2 |
27.8 |
23.9 |
Humidity (%)1 |
|
65 |
82 |
77 |
Source: 1. Hong Kong
Observatory, “The Year’s Weather – 2003”
2. HK EPD, “Summary water quality
statistics of the
The hazard identification process is a formal review
to identify all hazards for the Gas Receiving station. This consisted of a review of the
hazardous properties of natural gas, a review of
accidents that have happened at similar facilities worldwide and a HAZID
workshop (see Section 12B.4.4). Hazards identified from these studies
are then carried forward for further consideration in the QRA.
For all hazards assessed as having a frequency of
less than 10-9 per year, the frequency assessment will be documented
but no quantification of consequences will be performed.
All scenarios with a frequency greater than 10-9
per year and potential to cause fatalities have the consequences of the event
quantified.
Hazard scenarios are excluded from the risk assessment
if one of the following conditions is satisfied:
·
The
frequency is below 1×10-9 per year.
·
The
frequency of a particular event is significantly smaller than other causes of
failure considered in the generic frequency.
·
If
the generic failure frequency is judged to include events of such kind, then
such events are not assessed separately.
·
If
there are no consequences. If an
event can be shown not to cause a loss of containment then the event is not
considered further.
12B.4.1
Hazards from Natural Gas
Hazards associated with natural gas (NG) have been
identified based on a review of known incident records worldwide and experience
gained from operations at similar facilities. The details are included below.
The main hazards associated with natural gas arise
from its flammability and the risk of fire. If NG is accidentally released, it will
mix with air to form a flammable mixture.
The plume will only ignite if it encounters an ignition source while
concentrated within its flammability range. In some cases, static discharges may
also cause immediate ignition of a release.
The characteristics of the possible hazardous effects
are described below.
Jet Fire
Jet fires result from ignited releases of pressurised
flammable gas. The
momentum of the release carries the materials forwards in a long plume
entraining air to give a flammable mixture. Jet fires only occur where the NG is
being handled under pressure. Since
the GRS will have NG at between 40 and 100 bar, jet fires are expected to be
the main hazard.
Fireball
Immediate ignition of releases caused by a rupture of
equipment/piping may give rise to a fireball upon ignition. Fireballs have very high thermal
radiation, similar to jet fires although the duration of the event is short.
Flash Fire
Following a NG release, if the cloud is not ignited
immediately, it will move with the wind and be diluted as a result of air
entrainment. The dispersing cloud
may subsequently come in contact with an ignition source and burn rapidly with
a sudden flash. Direct contact with
the burning gas may cause fatalities but the short duration of the flash fire
means that thermal radiation effects are not significant outside the cloud and
thus no fatalities are expected outside of the flash fire envelope.
Vapour Cloud Explosions
If a dispersing gas cloud accumulates in a confined
or congested area and is subsequently ignited, significant overpressures (an
explosion) may be generated. The
GRS, however, will be located in an open area without such confinement and an
unconfined cloud of natural gas is known not to produce damaging
overpressures. Vapour cloud
explosions are therefore not considered in this assessment; the worst effects
from a delayed ignition of a release will be a flash fire.
12B.4.2
Main Hazards from the Gas
Receiving Station
The main hazard from the GRS is loss of containment
from piping and equipment leading to a gas leak and fire.
Loss of Containment Incidents
The principal causes for loss of containment are:
·
corrosion
- internal and external;
·
third
party interference due to work in adjoining areas, etc;
·
material
defect;
·
construction
defect;
·
improper
operations;
·
defect
caused by pressure cycling; and
·
external - flooding, subsidence etc.
Review of Industry Incidents
A review of industry incidents at gas receiving
stations was carried out. Incident
records over the last few decades show releases and fires. These were associated with leaks from
valves and process equipment.
Based on the accident databases (MARS, ARIA) and
other information, some incidents examples are provided in Table 12B.8.
Table 12B.8 Incident
Review
Date, place |
Cause |
Description |
Source |
15/11/2007, |
Unknown |
An explosion occurred
at around 11.30 am in a natural gas treatment facility. It resulted in 4 injuries, two of them
severe. |
ARIA |
23/09/2002, |
Unknown |
In a natural
gas treatment facility, a flash fire like event occurred in the central part where
the raw natural gas is washed to remove impurities. Four of the nearby employees are
injured: 3 suffered severe burns and intoxication. |
ARIA |
28/12/2000, |
Unknown |
Explosion at a natural
gas pumping station rattled windows 1.5 miles away. There was no rupture of the pipeline
itself and the cause of the incident remains unknown. One man severely injured and gas
pressure to customers affected |
MHIDAS |
28/05/2000, |
Overpressure |
A 42” pipe
transporting natural gas ruptured during a pressure test. Authorities indicated that the gas
inlet was promptly shut down; environmental effects were therefore assumed to
be zero. |
ARIA |
04/01/1999, |
Unknown |
In a sub station
of a natural gas pipeline, a leakage led to an explosion and a fire
destroying a house and workshop.
The incident, visible from 30 km was taken care of by firemen and
controlled within 4 hours. Two
firemen suffered mild injuries. |
ARIA |
14/08/1998, |
External events |
Lightning
strike set fire to a natural gas compressor station. The resulting explosions sent a
fireball 600ft into the air. 5
people were injured. Gas supplies
to the whole of the |
MHIDAS |
02/04/1998, |
Unknown |
The metering
unit of the natural gas distribution station was rocked by an explosion. A fire also occurred. |
MHIDAS |
25/06/2001, |
Corrosion |
Six metres of a
one metre diameter pipe was thrown 40 metres in the blast. Corrosion of the pipeline is thought
to have led to the leak that caused the blast. Fire quickly extinguished and supplies
resumed through an alternative pipe after three hours. |
MHIDAS |
10/04/2001, |
Mechanical
failure |
Residents were
evacuated for about three hours after a volatile gas cloud formed over a
natural gas facility. The source
of the leak was tracked down to a section of pipe, which was repaired. |
MHIDAS |
28/05/2000, |
Mechanical
failure |
A section of
the 42" pipeline ruptured during pressure-testing of the pipe. |
MHIDAS |
18/11/1998, |
Impact |
Workmen caused
a main gas pipeline to fracture, sending a 30ft plume of gas into the
air. Local residents were
evacuated and roads sealed off.
It was several hours before the pressure had dropped enough for the
pipe to be sealed off. No one was
injured. |
MHIDAS |
27/06/1997, |
Human factor |
Gas escaped from
a pipeline when equipment being used to take a metering station out of
commission fractured a valve. No
injuries were reported. People
within a mile of the rupture were evacuated. No fire or explosion occurred. |
MHIDAS |
08/02/1997, |
Unknown |
A leakage
occured on a natural gas pipeline of 660 mm diameter. The gas cloud exploded and a 100m high
flame occurred. Nearby houses
were shaken by the deflagration. |
ARIA |
01/01/1997, |
Human error |
A natural gas
leak occured on a badly closed valve on a pipe (pressure= 20 bar). This incident led to death by
asphyxiation of the two employees who entered in the room, one equipped with
an inappropriate mask and the other without equipment |
ARIA |
18/12/1995, |
Mechanical
failure |
Section of
pipeline exploded due to high pressure in pipe. |
MHIDAS |
22/11/1995, |
Corrosion |
An explosion
followed by a fire occurred on a 0.5m diameter natural gas pipe. Corrosion is at the origin of the
accident. 240 m of pipes were
destroyed. |
ARIA |
19/03/1995, |
Unknown |
36" gas
pipe ruptured. Leak caught fire
& damaged reported 300ft section.
Gas rerouted to two parallel lines |
MHIDAS |
29/07/1993, |
Impact |
1000 workers were
evacuated as building contractors ruptured a mains pipe sending 40ft gas into
the air. Roads were sealed off
for about an hour while the leak was brought under control. |
MHIDAS |
18/05/1989, |
General
maintenance |
Repairs to product
pipeline possibly caused explosions/fires which destroyed refinery
pumping/mixing station. Blaze
burned for 4hrs as fire fed by 100te of fuel leaking from broken pipe system. |
MHIDAS |
Operation of pig receivers poses a significant
hazard. There have been a few
incidents in the past relating to pig launcher/receiver operations. Usually it relates to the launcher and
receiver not being properly depressurised.
With pressure behind the pig, it launches like a cannon out the end of
the launcher or receiver when the operator opens the hatch.
Reasons that the receiver may not depressurise
properly include the following:
·
Vent/
drain valves are prone to plugging.
These are often small valves and can be plugged because of the dirty
material that has been scraped from the pipeline by the pig;
·
Stuck
pig trap. The pig could be stuck if
there is a restriction, probably a partially open valve, and there could be a trapped
pocket of high pressure gas;
·
Poor
pressure indication;
·
Human
errors, e.g. opening the trap door while the vessel is under pressure.
Pigging is generally performed infrequently. It is conservatively assumed in this
analysis that pigging operations will be performed once every 5 years. Therefore the risk contributed by the
pigging facilities to the whole system is relatively low. However, the risk per pigging operation
still remains high. Procedures and
devices are available to avoid accidents during pigging, and the human error is
therefore a major reason for pigging accidents. This issue is investigated further in
the frequency analysis, Section 12B.5.
A review of industry incidents related to pig
facilities was carried out.
There are a number of well established international
accident databases that were considered for identification of hazards and
estimation of frequency of loss of containment incidents. The relevant accident databases are:
·
MHIDAS,
AEA
·
IChemE
Accident Database [19]
·
MARS
(Major Accident Reporting System)
Based on the above accident databases and other
information, incidents associated with pigging are summarised below:
a)
At a
location in the
b)
Somewhere
in
c)
An
incident occurred in 2001 during pre-commissioning when a contractor was
dewatering a 10 mile section after a hydrostatic test. They were pushing a foam pig with air to
displace the water. The pig got
stuck somewhere in the pipe and they began pressuring up the section to
approximately 400 psig. The water
was being removed from a 12” bypass line.
They decided that the restriction was not allowing the pig to move
freely so they opened the end of the temporary trap. At this point, the pig had a downstream
pressure of ambient and upstream pressure of 400psig. In order to catch the pig, a large front
end loader was placed in front of the open trap. However, the pig shot out of the trap,
completely flipped the loader and continued to fly approximately 150 yards in
the air, destroying a wooden platform along the way.
d)
Two
workers were attempting to remove a pig from a line that was launched the
previous day. They found the pig was
stuck in the reducer section but cleared the block valve so the valve could be
closed. After depressurising pig
receiver and opening it to atmosphere, both workers believed the pig can be
removed. The pig had to be pulled
into the receiver through the reducer to remove it so they fashioned a hook
from some SS tubing. When worker
hooked onto pig, the pig shot out and struck him in the face resulting in major
injuries. Apparently, part of the
pig had created a seal with a weld in the reducer section, which created a
pressure trap behind the pig.
(source : www.offshoreman.com)
e)
There
is also an incident reported to have occurred in the
f)
During
a pigging operation, a 30" pipeline, bringing natural gas on-shore, failed
between the emergency shut-down (ESD) valve and the pig trap. The intervention of the ESD valve from
the control room failed and it had to be closed locally. Released natural gas did not ignite, but
was a serious risk to personnel.
(source: MARS database)
The above list of incidents shows the potential for
misoperation leading to the barrel cover or the pig shooting out of the trap
and causing damage to nearby equipment and buildings in addition to causing
operator injury.
Vent Stack Related Hazards
A common vent stack will be provided for emergency
depressurization of the existing and new GRS facilities. The vent will be designed according to
appropriate standards such as API 521.
This ensures that the concentration of gases at ground level or on any
elevated structures will not reach the lower flammability limit. Also, in the event of an ignited
release, thermal radiation at ground level and on elevated structures will meet
the standards. As such, there is no
consequence from emergency venting and the vent stack is not considered further
in the analysis.
12B.4.3
External
and Natural Hazards
Seismic Hazard
An earthquake has the potential to cause damage to
pipework and process vessels.
Damage to pipework could be due to ground movement/vibration, with guillotine
failure of pipes.
Studies by the Geotechnical Engineering Office
conducted in the last decades indicate that Hong Kong SAR is a region of low
seismicity (e.g., GCO, 1991 [8]; GEO, 2002-2004 [9]). The
seismicity in the vicinity of Hong Kong is considered similar to that of areas
of Central Europe and the Eastern areas of the
Subsidence
For subsidence which would result in failure of
pipework or vessels, the ground movement must be relatively sudden and
severe. Normal subsidence events
occur gradually over a period of months and thus appropriate mitigating action
can be taken to prevent failures. In
the worst cases, the plant would be shut down and the relevant equipment
isolated and depressurised. The GRS
will be built on coastal land with solid foundation. No undue risk from subsidence is
therefore expected and failures due to this are deemed to be included in
generic failure frequencies.
Lightning
Lightning strikes have led to a number of major
accidents world-wide. For example,
a contributory cause towards the major fire at the Texaco refinery in the
The installation will be protected with lightning
conductors to safety earth direct lightning strikes. The grounding will be inspected
regularly. The potential for a lightning
strike to hit the facility and cause a release event is therefore deemed to be
unlikely. Failures due to lightning
strikes are taken to be covered by generic frequencies.
Storm Surges and Flooding
If the piping become
submerged under water, it is possible for buoyancy forces to lift the
pipes/tanks, causing damage and possible loss of containment.
Flooding from heavy
rainfall is not possible due to the coastal location of the site. The slopes of the natural terrain will
channel water to the sea. The
primary hazard from typhoons is the storm surge. Winds, and to a lesser extent pressure,
cause a rise in sea level in coastal areas. In general, storm surges are limited to
several metres.
The GRS facilities,
located +6mPD above sea level are therefore protected against any risk from
storm surges, waves and other causes of flooding.
Tsunami
Similar to storm surges,
the main hazard from tsunamis is the rise in sea level and possible floatation
of piping and tanks. The highest
rise in sea level ever recorded in Hong Kong due to a tsunami was 0.3m [15], and occurred as a result of the 1960 earthquake in
The reason for the low
impact of tsunamis on Hong Kong may be explained by the extended continental
shelf in the
Seismic activity with the
Summary of Natural Hazards
The GRS site and design of the facility are such that
there will be no special risks from natural hazards. Natural hazards are therefore not
treated separately in the analysis but are included in the generic failure
frequencies.
Aircraft Crash
The Black Point site does not lie within the flight
path of Chek Lap Kok (Figure 12B.8),
being about 10km from the nearest runway.
Figure 12B.8 Flight
Paths at
|
The frequency of aircraft crash was estimated using
the methodology of the HSE [11]. The
model takes into account specific factors such as the target area of the
proposed hazard site and its longitudinal (x)
and perpendicular (y) distances from
the runway threshold (Figure 12B.9). The crash frequency per unit ground area
(per km2) is calculated as:
(4)
Where N is
the number of runway movements per year and R
is the probability of an accident per movement (landing or take-off). F(x,y) gives the spatial distribution of crashes and is given
by:
Landings
(5)
for km
Take-off
(6)
for km
Equations 5 and 6
are valid only for the specified range of x
values. If x lies outside this range, the impact probability is zero.
Figure 12B.9 Aircraft
Crash Coordinate System
|
NTSB data [12] for fatal accidents in the U.S. involving scheduled
airline flights during the period 1986-2005 are given in Table 12B.9. The
10-year moving average suggests a downward trend with recent years showing a
rate of about 2×10-7 per flight. However, only 13.5% of accidents are
associated with the approach to landing, 15.8% are associated with take-off and
4.2% are related to the climb phase of the flight [13]. The
accident frequency for the approach to landings hence becomes 2.7×10-8
per flight and for take-off/climb 4.0×10-8 per flight. The number of flights at Chep Lap Kok
for year 2011 is conservatively estimated at 394,000 (a 50% increase over
2005).
Table 12B.9 U.S
Scheduled Airline Accident Rate [12]
Year |
Accident
rate per 1,000,000 flights for accidents involving fatalities |
10-year
moving average accident rate per 1,000,000 flights |
|||||||||||
1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 |
0.14 0.41 0.27 1.10 0.77 0.53 0.53 0.13 0.51 0.12 0.38 0.30 0.09 0.18 0.18 0.19 0.00 0.2 0.09 0.27 |
- - - - - - - -
|
Considering landings on runway 25R for example, the
values for x and y according to Figure 12B.8
are 0.6 and 10.7km respectively.
Applying Equation 5 gives FL=
8.1×10-5 km-2.
Substituting this into Equation 4
gives:
/year/km2
The number of plane movements has been divided by 8
to take into account that half of movements are take-offs and only a quarter of
landings use runway 07R. This
effectively assumes that each runway is used equally.
The target area is estimated at 12,000m2
or 0.012km2. This gives
a frequency for crashes on the site associated with landings on runway 07R as
2.2×10-9 per year.
Repeating the calculation for landings and take-offs from all runways
gives the results shown in Table 12B.10.
Table 12B.10 Aircraft
Crash Frequency onto the GRS
Runway |
Landing (per year) |
Take-off (per year) |
07R 07L 25L 25R |
0 0 1.3×10-9 8.6×10-9 |
1.3×10-11 2.6×10-12 0 0 |
Total |
2.2×10-9 |
1.6×10-11 |
The combined frequency of all take-off and
landing crashes onto the GRS from activities on all runways is less than 2.2×10-9
per year. This frequency is small
compared to the generic frequencies used in the study. Aircraft crash is therefore neglected from
the analysis.
Helicopter Crash
Helipad Activity
The Black Point Power Station site is provided with a
helicopter landing pad although the frequency of use is expected to be low with
perhaps one landing/take-off per week.
The approach, landing and take-off stages of an aircraft flight are
associated with the highest risk and therefore the possible impact of
helicopter crashes on the facility were assessed.
Data from offshore helicopter activities [14] gives a helipad related helicopter crash frequency of
2.9×10-6 per flight stage (i.e. per take-off and landing). However, most of these incidents are
minor such as heavy landings. For a
helicopter incident to damage the facility, it must be a serious, uncontrolled
impact. Only accidents involving
fatalities were therefore considered in the analysis. 4% of incidents resulted in one or more
fatalities and so the frequency of uncontrolled crashes was calculated as
2.9×10-6 × 0.04 = 1.2×10-7 per flight stage. For one flight per week using the
helipad, the annual crash frequency becomes 1.2×10-7 × 52 = 6.0×10-6
/year.
Helicopter accidents during take-off and landing are
confined to a small area around the helipad [11]. 93% of
accidents occur within 100m of the helipad. The remaining 7% occur between 100 and
200m of the helipad. There have
been no serious helipad related incidents resulting in a crash beyond 200m of
the helipad.
The distance of Gas Receiving Station to the helipad
is more than 400 metres. Helicopter
crash is therefore not considered further in this study.
Passing Helicopters
There are no helicopter flight paths near BPPS. The possibility of a passing helicopter
crashing into the GRS facility is therefore much smaller than the generic
failure frequencies used in this study.
Helicopter crashes are therefore not considered separately but are
deemed to be included in the generic failure frequencies.
12B.4.4
HAZID Study
A Hazard Identification (HAZID) Study was conducted
in September 2009. The potential
hazards posed by the facility were identified based on the HAZID team’s expert
opinion, past accidents, lessons learnt and checklists. The details of the HAZID study can be
found in Table 12B.11.
A systematic approach was adopted, whereby the facility was divided into a
number of “subsystems” based on the layout and the process; guidewords from the
checklist were then applied to each
subsystem as relevant.
Table 12B.11 HAZID
Worksheets
System: 2. GRS |
||||
Subsystem: 1. General/Process |
||||
Hazards/
Keywords |
Description/
Causes |
Consequences |
Safeguards |
Recommendations |
1. Leak from tappings, flanges and piping |
1. Corrosion, mechanical failure, etc |
1. Potential loss of containment |
1. Gas and fire detection |
|
2. Mal operation during maintenance
(including dropped object), pigging |
2. Ignition and fire |
2. Shutdown system |
||
3. Leaks reaching the heaters leading to
explosion |
3. Operating and maintenance procedures |
|||
4. Area classification |
||||
5. Layout has positioned heating station
upwind from process facilities |
||||
6. Heater design: - Flame arrestor on air intakes - Gas detectors - Shutdown system |
||||
2. Fugitive emission |
1. Leaks from seals / valves / analysers,
operational losses |
1. Environmental emission, potential
ignition and fire |
1. Area classification |
|
2. Gas and fire detection |
||||
3. Overpressure downstream of letdown
valve |
1. Control valve malfunction |
1. Potential overpressurization and loss
of containment |
1. Active/monitor and slam shut system |
|
2. HIPPS provided |
||||
4. Pigging operations |
1. Pig stuck in the pipeline |
1. Operational interruption |
1. Operating procedures |
|
2. Possible damage to facility |
2. Pigging is not a frequent operation, 1
in 5 years |
|||
5. Ignition of gases from vent / PSVs |
1. Due to lightning |
1. Fire and / or explosion |
1. Stack height will be determined based
on thermal radiation threshold on adjoining equipment |
|
2. |
2. Potential thermal radiation effects on
adjoining equipment |
2. All PSV releases are routed to vent
stack |
||
3. Snuffing system |
||||
4. Area classification |
||||
5. Enforcement of protocol (no smoking on
site) |
||||
6. Stack designed such that concentration
of flammables will be below 25% of LFL at ground level. |
||||
6. Air ingress into vent header |
1. Air ingress into vent stack |
1. Potential for flame flashback upon
ignition of vent vapours |
1. Dynamic seal on the vent tip |
|
7. Filter maintenance |
1. Mal operation |
1. Potential loss of containment |
1. Operating procedures |
|
2. Severe injury |
2. Mechanical interlock on closure |
|||
3. Damage to the facility |
||||
8. Metering section including Gas
Chromatography (GC) |
1. Regular discharge of small quantity of
gas |
1. Potential fire and/ or explosion |
1. Area classification |
|
2. Well ventilated area |
||||
3. Piping design vent to safe locations /
vent header |
||||
4. Fire and gas detection |
||||
9. N2 purging of GC |
1. Changing N2 bottles |
1. Damage to facility |
1. Operating procedures |
|
2. Injury |
2. Designed to standards |
|||
10. CO2 for vent snuffing system |
1. Changing CO2 bottles |
1. Damage to facility |
1. Operating procedures |
|
2. Injury |
2. Designed to standards |
|||
11. Water bath heaters |
1. Burner mal function (explosion) |
1. Damage to facility and possible
escalation |
1. Burner management system |
|
2. Injury |
2. Fire and gas detection |
|||
3. Environmental emission |
||||
12. Water bath heaters |
1. Burner flame-out |
1. Possible low temperature and icing in
the pressure let down section - personnel injury |
1. Process temperature alarm |
|
2. Standby unit available |
||||
3. Under normal operating condition no
icing expected |
||||
4. Burner management system |
||||
13. Water bath heaters |
1. Loss of water due to evaporation |
1. Heater shutdown on low water level;
possible low temperature and icing in the pressure let down section -
personnel injury |
1. Under normal operating condition no
icing expected |
|
2. Standby unit available |
||||
3. Process alarms |
||||
14. Pressure letdown |
1. Fugitive emissions |
1. Fire and / or explosion |
1. Area classification |
|
2. Well ventilated area |
||||
3. Piping design, vent to safe locations
/ vent header |
||||
4. Fire and gas detection |
||||
15. Mixing station |
1. Fugitive emission |
1. Fire and / or explosion |
1. Area classification |
|
2. Well ventilated area |
||||
3. Piping design, vent to safe locations
/ vent header |
||||
4. Fire and gas detection |
||||
16. Commissioning |
1. Unplanned events |
1. Fire |
1. Commissioning procedures |
|
2. Toolbox / Briefings |
||||
17. Instrument enclosure |
1. Loss of instrument enclosure due to
external event |
1. Loss of control of GRS |
1. GRS is designed to fail safe |
|
System: 2. GRS |
||||
Subsystem: 2. Natural hazards |
||||
Hazards/
Keywords |
Description/
Causes |
Consequences |
Safeguards |
Recommendations |
1. Earthquake |
1. Damage to piping and equipment |
1. Fire and / or explosion |
1. Area of low seismic activity |
|
2. Fire and gas detection |
||||
2. Waves |
1. Damage to piping and equipment |
1. Fire and / or explosion |
1. Site at +6mPD |
|
2. Fire and gas detection |
||||
3. Tsunami |
1. Waves higher than predicted |
1. Possible damage to structures / facilities
due to high wave and associated flooding |
1. Black Point not susceptible to tsunami |
|
2. Site at +6mPD |
||||
3. Storm water drainage system |
||||
4. Storm / flooding |
1. Waves higher than predicted |
1. Fire and / or explosion due to damage
to piping and equipment |
1. Site at +6mPD |
|
2. Fire and gas detection |
||||
5. High wind - typhoon |
1. No issue |
|
|
|
6. Subsidence / movement |
1. Damage to piping and equipment |
1. Fire and / or explosion |
1. Fire and gas detection |
|
7. Extreme weather - temperature |
1. No issue |
|
|
|
8. Lightning |
1. Damage to piping and equipment |
1. Ignition of fugitive emissions |
1. Lightning conductors |
|
2. Fire and / or explosion |
||||
3. Damage to equipment |
||||
9. Landslide |
1. No issue |
|
|
|
10. Hill fire |
1. Source of ignition from suspended ash |
1. Ignition of vented / leaking gas |
1. Procedures to maintain equipment and
prevent leaks |
|
2. Station emergency procedures |
||||
3. Separation distances and control of
combustibles on site |
System: 2. GRS |
||||
Subsystem: 3. External hazards |
||||
Hazards/
Keywords |
Description/
Causes |
Consequences |
Safeguards |
Recommendations |
1. Fuel oil tank on fire or fuel oil tank
rupture at BPPS |
1. Fuel oil stored as emergency back up
fuel for gas turbine |
1. Facility is about 500m away and hence
impact due to fire not likely |
|
|
2. H2 fire/ explosion at BPPS |
1. H2 stored at BPPS for generator
cooling |
1. Potential for projectiles causing
damage to the facility |
1. Trailer bay located in a concrete
compound with ventilation, leak/fire detection |
|
2. No. of cylinders in a trailer limited
to 12 or 26 and max 2 trailers |
||||
3. Trailer house about 200m from GRS |
||||
3. Projectiles from turbine accidents at
BPPS |
1. Mechanical failure of turbine or lube
oil failure |
1. Potential for projectiles causing
damage to the facility |
1. Periodic inspection of the turbine |
|
2. Turbine located in a housing and
turbine housing is within a structure |
||||
4. Gas leaks at BPPS |
1. Leak in the open or in the gas turbine
enclosure |
1. Fire or explosion in the BPPS; impact
on GRS considered less likely due to the separation distance of more than
200m |
1. Gas leak detection and shutdown system
at BPPS |
|
5. Boiler explosion |
1. High pressure (100 bar) steam boiler |
1. Potential for projectiles causing
damage to the facility |
1. Boiler controls/ inspection and
maintenance |
|
6. Pipeline leak from BPPS to CPPS |
1. Pipe at about 38barg, 6km long and
600mm dia. |
1. Possible impact on the access road to
BPPS and GRS; impact on the GRS is considered less likely due to the
separation distance |
1. Pipeline is buried with shutdown valve
at either end |
|
2. Pipeline inspection and maintenance |
||||
7. Aircraft crash |
1. During take-off / landing / approach |
1. Damage to the facility and fire |
1. Black Point site not in the flight
path; site about 20km away from airport |
|
8. Helicopter crash |
1. Helipad at BPPS and at the radar
station |
1. Damage to the facility and fire |
1. Helipad at the radar station near BPPS
used for specific purpose and not frequent (about once per week) |
|
2. Helipad about 500m away from the GRS |
||||
9. Vessel crash |
1. No issue |
|
|
|
10. Dropped objects |
1. Lifting of objects over operational
equipment |
1. Damage to existing equipment.
Potential fire and explosion hazard. |
1. Lifting plans need to comply with
operating plant procedures and guidelines (eg weight limits for lifting over
operational plant) |
|
2. Procedures (Brownfield and
constructability workshops) |
||||
11. Neighbouring facilities - ash lagoon |
1. Ash lagoon to be developed in future
(landfill site). Any development at this site has to take into account the
risk to the existing facilities at BPPS/GRS |
|
|
|
12. Neighbouring facilities - Yacheng
system |
1. Gas leak from the Yacheng system |
1. Fire and /or explosion; possible
escalation to GRS/Yacheng |
1. Adequate separation distance |
|
2. Gas leak from the GRS impacting
Yacheng |
2. Fire and gas detection |
|||
13. HV cables |
1. No issue |
|
|
|
14. Sabotage/Security |
1. Intentional acts by access from the
sea |
1. Damage to facilities |
1. Security system / perimeter fence |
|
System: 2. GRS |
||||
Subsystem: 4. Material hazards |
||||
Hazards/
Keywords |
Description/
Causes |
Consequences |
Safeguards |
Recommendations |
1. Pressurized air |
1. Generated onsite for process and instrument
requirements |
1. Pressure system hazards |
1. Design procedures |
|
2. Operating and safety procedures |
||||
2. Dry chemical powders |
1. Used for fire fighting |
1. Personnel hazards (inhalation) while
handling |
1. Operating and safety procedures |
|
System: 2. GRS |
||||
Subsystem: 5. Loss of utilities |
||||
Hazards/
Keywords |
Description/
Causes |
Consequences |
Safeguards |
Recommendations |
1. Loss of Power supply |
1. Power will be supplied from BPPS |
1. GRS will shutdown in safe mode |
1. UPS for critical users/systems
including lighting, controls and other safety critical systems |
|
2. Double cables supply |
||||
2. Loss of Instrument air supply |
|
1. System designed to go to safe shutdown
mode |
1. Redundant air compressors; air
receiver; emergency power supply |
|
System: 2. GRS |
||||
Subsystem: 6. Layout |
||||
Hazards/
Keywords |
Description/
Causes |
Consequences |
Safeguards |
Recommendations |
1. Layout |
1. Layout review has been carried out and
will be reviewed to address separation distances, access and emergency egress
issues |
|
|
3. Review recommendations from layout
review for any relevance to the HAZID study |
System: 2. GRS |
||||
Subsystem: 7. Interface with existing
facility |
||||
Hazards/
Keywords |
Description/
Causes |
Consequences |
Safeguards |
Recommendations |
1. Tie-ins |
1. Unplanned events during tie-in |
1. Loss of containment; fire and explosion |
1. Procedures and emergency response plan
(Brownfield and constructability workshops) |
|
2. Control |
1. Impact on GRS from process upsets in
BPPS and vice versa |
1. Operational inconvenience |
|
4. Control and ESD interfaces with existing
facility to be established |
System: 2. GRS |
||||
Subsystem: 8. Construction / future
developments |
||||
Hazards/
Keywords |
Description/
Causes |
Consequences |
Safeguards |
Recommendations |
1. Access for installation / construction |
1. Possible interference with existing
equipment |
1. Damage to existing equipment.
Potential leaks and fire. |
1. Procedures (Brownfield and
constructability workshops) |
|
2. Access from both sides of the site for
each GRS |
||||
2. Dropped objects |
1. Lifting of objects over operational
equipment |
1. Damage to existing equipment.
Potential fire and explosion hazard. |
1. Lifting plans need to comply with operating
plant procedures and guidelines (eg weight limits for lifting over
operational plant) |
|
2. Procedures (Brownfield and
constructability workshops) |
||||
3. General construction hazards |
1. Welding, cutting, excavation,
hydrotesting, etc. |
1. Possible damage to operational
equipment and personnel injuries. |
1. Procedures (Brownfield and
constructability workshops) |
|
2. Permit to work, procedures need to
comply with operating plant procedures and guidelines |
||||
3. Construction safety plan (PPE,
training, briefings, etc.) |
12B.4.5
Scenarios for the QRA Study
Scenarios for the QRA study were identified based on
the HAZID Study as well as a review of incident records. The GRS facility was broken down into
sections for further analysis (Table
12B.12 and Figure 12B.10). For each section, a range in leak sizes
was considered from small 10mm leaks to full ruptures.
Table 12B.12
Scenarios for QRA Study
Code |
Plant Section |
Initiating Event |
No. of items |
Potential Outcome Scenarios |
Length of section (m) |
Pipe diameter (mm) |
Operating Pressure |
Design
Pressure* |
Temperature |
|
|
(for each train) |
GRS A |
GRS B |
|||||||
G01 |
Above
ground piping from shore end to pig receiver |
Leak,
rupture |
1 |
Jet fire,
Gas dispersion/Flash fire, Fireball |
38 |
205 |
1067 |
91bara |
100bara |
12-30°C |
G02 |
Piping from
receiver to gas filter |
Leak,
rupture |
1 |
Jet fire,
Gas dispersion/Flash fire, Fireball |
77 |
20 |
700 |
91bara |
100bara |
12-30°C |
G03 |
Filter
& inlet/outlet piping |
Leak,
rupture |
3 |
Jet fire,
Gas dispersion/Flash fire, Fireball |
17 |
17 |
400 |
91bara |
100bara |
12-30°C |
G04 |
Piping
from filter to metering station |
Leak,
rupture |
1 |
Jet fire,
Gas dispersion/Flash fire, Fireball |
72 |
36 |
700 |
91bara |
100bara |
12-30°C |
G05 |
Piping from
metering station to heaters, including metering runs |
Leak,
rupture |
1 |
Jet fire,
Gas dispersion/Flash fire, Fireball |
160 |
175 |
700 |
91bara |
100bara |
12-30°C |
G06 |
Heater
Piping |
Leak,
rupture |
7 |
Jet fire,
Gas dispersion/Flash fire, Fireball |
11 |
11 |
350 |
91bara |
100bara |
12-30°C |
G07 |
Piping
from heater to PRS, including PRS |
Leak,
rupture |
1 |
Jet fire,
Gas dispersion/Flash fire, Fireball |
122 |
129 |
700 |
89bara |
100bara |
12-78°C |
G08 |
Piping
from PRS to mixing station |
Leak,
rupture |
1 |
Jet fire,
Gas dispersion/Flash fire, Fireball |
320 |
226 |
700 |
39bara |
40bara |
12-78°C |
G09 |
Pig
receiver |
Leak,
rupture |
1 |
Jet fire,
Gas dispersion/Flash fire, Fireball, Projectile hazard |
8710mm |
914.4 |
91bara |
100bara |
12-30°C |
* The assessment used design pressures as a basis for
the calculations
Figure
12B.10 Plant Sections for QRA study
12B.5.1
Base Frequency Estimation
Table 12B.13 lists the failure frequencies adopted for
the various release scenarios used in the GRS study. Section G09 is considered separately in
later sections.
Table 12B.13 Gas
Release Event Frequencies
Piping Diameter (mm) |
Hole Size (mm) |
Initiating Event Frequency |
Unit |
Reference |
|
G01 |
1067 |
10 25 50 100 FB |
1.00E-07 1.00E-07 7.00E-08 7.00E-08 3.00E-08 |
per metre per year |
Hawksley [5] |
G02 |
700 |
10 25 50 100 FB |
1.00E-07 1.00E-07 7.00E-08 7.00E-08 3.00E-08 |
per metre per year |
Hawksley [5] |
G03 |
400 |
10 25 50 100 FB |
3.00E-07 3.00E-07 1.00E-07 1.00E-07 5.00E-08 |
per metre per year |
Hawksley [5] |
G04 |
700 |
10 |
1.00E-07 |
per metre per year |
Hawksley [5] |
|
25 |
1.00E-07 |
|||
|
50 |
7.00E-08 |
|||
|
100 |
7.00E-08 |
|||
|
FB |
3.00E-08 |
|||
G05 |
700 |
10 |
1.00E-07 |
per metre per year |
Hawksley [5] |
25 |
1.00E-07 |
||||
50 |
7.00E-08 |
||||
100 |
7.00E-08 |
||||
FB |
3.00E-08 |
||||
G06 |
350 |
10 |
3.00E-07 |
per metre per year |
Hawksley [5] |
25 |
3.00E-07 |
||||
50 |
1.00E-07 |
||||
100 |
1.00E-07 |
||||
FB |
5.00E-08 |
||||
G07 |
700 |
10 |
1.00E-07 |
per metre per year |
Hawksley [5] |
25 |
1.00E-07 |
||||
50 |
7.00E-08 |
||||
100 |
7.00E-08 |
||||
FB |
3.00E-08 |
||||
G08 |
700 |
10 |
1.00E-07 |
per metre per year |
Hawksley [5] |
25 |
1.00E-07 |
||||
50 |
7.00E-08 |
||||
100 |
7.00E-08 |
||||
FB |
3.00E-08 |
12B.5.2
Scenario Development
Event Tree Analysis (ETA) is used to model the
development of a scenario from its initial leak through to the final outcome
such as jet fire or flash fire. A
generic event tree is shown in Figure
12B.11 and the branch probabilities are discussed below.
Figure
12B.11 Generic
Event Tree
Nomenclature:
IS = Isolation Success
IF = Isolation Failure
FF1 = Flash Fire over the Plant Area
FF2 = Flash Fire, Full Extent
EF = Escalation Effect
JTF = Jet Fire
FBL = Fire Ball
NE = No Effect
Detection and Shutdown
For loss of containment events from piping and
equipment, it is assumed that detection and shutdown would occur 90% of the
time (based on safety integrity level 1 for emergency shutdown systems which
has an associated probability of failure on demand of 0.1).
If the release is detected and the process is
shutdown, it is assumed that the duration of a release will be limited and will
not lead to escalation. Escalation
is, however, considered if isolation fails and if the hazard effects of a jet
fire are able to reach and impinge on neighbouring equipment.
Gas releases are all pressurised releases and
ignition would result in a jet fire.
For rupture scenarios, a short duration fireball is assumed to occur if
isolation is successful, else a long duration jet fire
is assumed to occur if isolation fails.
Ignition Probabilities
Table 12B.14 summarises the ignition probabilities
used in the study. The total
ignition probability is 0.07 for small leaks (considered to be 10mm and 25mm
leaks) and 0.32 for large leaks and ruptures. These ignition probabilities are
consistent with the model of Cox, Lees and Ang [6].
The ignition probabilities are distributed between
immediate ignition and delayed ignition.
Delayed ignition is further divided between delayed 1 and delayed 2 to
take into account that a dispersing gas cloud may ignite at different points
during its dispersion. Delayed
ignition 1 results in a flash fire and takes into account the possibility that
ignition could occur within the plant area due to the presence of ignition
sources on site. Delayed ignition 2
gives a flash fire after the gas cloud has expanded to its maximum (steady
state) extent.
If delayed ignition does not occur, the gas cloud disperses
with no effect.
Table 12B.14 Ignition
Probabilities Assumed
|
Immediate
Ignition |
Delayed
Ignition 1 |
Delayed
Ignition 2 |
Delayed
Ignition Probability |
Total
Ignition Probability |
Small leak |
0.02 |
0.045 |
0.005 |
0.05 |
0.07 |
Large
leak/rupture |
0.1 |
0.2 |
0.02 |
0.22 |
0.32 |
For isolation failure scenarios,
the delayed ignition probabilities given in Table 12B.14 are doubled.
The longer duration and larger inventory release from a non-isolated
release is assumed to make it more likely that ignition takes place.
Escalation
An initially small release may escalate into a larger,
more serious event if a jet fire impinges on neighbouring equipment for an
extended time (more than about 10 minutes). This is taken into account in the
modelling for the isolation fail branch of the event tree. If neighbouring piping is within range
of the flame zone of a jet fire, an escalation probability of 1/8 is taken to
conservatively estimate the directional probability and chance of
impingement. Escalation is assumed
to cause a rupture of the affected piping.
Outcome Frequencies
A summary of outcome frequencies for the events
considered in the GRS study are listed in Table
12B.15.
Table 12B.15 Outcome
Frequency Summary
Release
Event |
Release Scenario (*) |
|||||
|
10mm |
25mm |
50mm |
100mm |
IS_FB |
IF_FB |
G01/ G02/ G04/ G05/
G07/G08_FF2 |
5.50E-10 |
5.50E-10 |
1.54E-09 |
1.54E-09 |
5.4E-10 |
1.20E-10 |
G01/ G02/ G04/ G05/
G07/G08_FF1 |
4.95E-09 |
4.95E-09 |
1.54E-08 |
1.54E-08 |
5.40E-09 |
1.20E-09 |
G01/ G02/ G04/ G05/ G07/G08_JTF |
1.95E-09 |
1.95E-09 |
6.83E-09 |
6.83E-09 |
|
3.00E-10 |
G01/ G02/ G04/ G05/
G07/G08_FBL |
|
|
|
|
2.70E-09 |
|
G03/G06_FF2 |
1.65E-09 |
1.65E-09 |
2.20E-09 |
2.20E-09 |
9.00E-10 |
2.00E-10 |
G03/G06_FF1 |
1.49E-08 |
1.49E-08 |
2.20E-08 |
2.20E-08 |
9.00E-09 |
2.00E-09 |
G03/G06_JTF |
5.85E-09 |
5.85E-09 |
9.75E-09 |
9.75E-09 |
|
5.00E-10 |
G03/G06_FBL |
|
|
|
|
4.50E-09 |
|
(*) Frequencies are per metre per year
12B.5.3
Pig Receiver Failure Scenarios
The pig barrel is normally not in operation, and the
pipeline will be pigged on average once every 5 years. During pigging operations, the operator
will need to strictly follow procedures; however, there is chance of pig barrel
failure if the operator fails to follow these procedures. In order to assess the probability of
human error, a HEART analysis (Human Error Assessment and Reduction Technique,
from Lees) [7] is performed and a value of 4´10-4 per operation is assumed
for a highly trained operator working under a non-stress situation. This gives a frequency of 8´10-5 per year per pig receiver
due to misoperation for pigging operations performed once in 5 years.
Two potential failure
scenarios are assessed for the pig barrel:
G09-1: Opening of pig
trap door
During pigging operations,
the operator could mistakenly try to open the pig trap door when the barrel is
still pressurised. This could lead
to a small leak, the pig being projected from the barrel, or in the worst case
a continuous release of high pressure gas from the pipeline end. An event tree for this case is shown in Figure 12B.12. The relevant intermediate events and
their probabilities are described in the following paragraphs.
Pressure Interlock
The pig trap door is
fitted with a mechanical interlock to prevent its opening when
pressurised. It is assumed that the
possibility for this interlock to fail is 0.1, which is a standard probability of
failure on demand.
Size of Release
As per all
equipment/piping failures, most releases are of minor nature affecting only its
immediate surroundings. 90% of the
releases are assumed to be minor and are modelled as a 25mm hole. 10% assumed to be major failures,
modelled as a full rupture.
Ignition
The remainder of the event
tree uses the same ignition probabilities as discussed earlier for the generic
ETA.
For large leaks and
ejection of the pig, the direction of the release is assumed to be aligned to
the orientation of the pig receiver.
G09-2: Misoperation leading to pig impact on
the barrel cover
The pig trap door may get
blown off during pigging due to human error e.g. due to valve or
flow misalignment etc. leading to an impact of the pig on the barrel
cover. The relevant events and
their probabilities are similar to G09-1
except that the pressure interlock will not prevent this event from
happening. Figure 12B.13 shows the event tree for this case.
The total frequency of a pig being blow
away is 8.8´10-6/year
for each pig receiver. Due to the
orientation of the pig receivers, if a pig is blown away, it will be launched
across the sea or unpopulated areas.
Taking the ship density in the nearest grid cell for future year 2021
(see Section 12B.3), and the size of
each type of marine vessel, the probability of a pig striking a ship is
estimated at 7´10-6.
With a launch frequency of 8.8´10-6/year, the
frequency of a ship being struck by a pig is estimated at 6´10-11/year. This is below 10-9 per year
and is therefore not considered further.
Figure 12B.12 Misoperation to Open Pig Barrel Door
Figure 12B.13 Misoperation Leading
to Pig Impact on the Barrel Cover
12B.5.4
Construction Activities
The GRS construction may present an
increase in risk due to construction activities from the GRS impacting on
existing facilities.
The project has taken this into
consideration with the following safeguards:
·
Safety
management system and procedures will be developed for the new GRSs. Details of the system and procedures
will be given in the safety case study for the new GRSs. Systems relating to construction
activities, such as Fire and Safe Work Permit System, risk assessment, and
emergency response procedure, will be in place and enforced before commencement
of work. Recommendations in
accordance with best practice have also been given to protect the workers at
the sites (see section 12.3.2);
·
Good
access is provided to construction areas with access roads from at least 2
sides of the site;
·
The
reclamation itself will be formed mostly by accessing from the sea.
The Gas Production & Supply Code of
Practice [17] provides a practical guidance in respect of the
requirements of the Gas Safety Ordinance Cap 51 and the Gas Safety (Gas Supply)
Regulations. Article 23A of these
regulations requires that:
·
No
person shall carry out, or permit to be carried out, any works in the vicinity
of a gas pipe unless he or the person carrying out the works has before
commencing the works, taken all reasonable steps to ascertain the location and
position of the gas pipe; and
·
A
person who carries out, or who permits to be carried out, any works in the
vicinity of a gas pipe shall ensure that all reasonable measures are taken to
protect the gas pipe from damage arising out of the works that would be likely
to prejudice safety.
Work, ‘in the vicinity’ of gas pipes is
defined according to Table 12B.16. Although many of the activities listed
are not directly relevant to the GRS, Table
12B.16 serves to indicate typical effects distances for different types of
work and when special precautions are warranted. The GRS separation distances mostly
exceed those listed in Table 12B.16. However, some of the minimum separation
distances specified in Table 12B.16
are not met. These activities
include but not limited to the following:
·
Construction
of the pre-heaters and pressure reduction station for Phase 1 close to the
existing underground high pressure gas pipe line (~10 m)
·
Construction
of new pipe racks adjacent to the existing pipe rack
·
Construction
of the inlet pipeline for Second Phase close to the existing pre-heaters (~20
m)
Special consideration may be given to the
underground high pressure pipe line since the external load on the ground by
the crane and the drilling operation may pose additional risk of damage. However, with the implementation of
safety procedures, the risk is not expected to be significantly higher than the
generic failure frequencies adopted. Nevertheless, a Job Safety Study will be
conducted to assess the potential risk and failure modes of such construction
operations and special precautions will be included in the procedure.
Based on the above, the likelihood of
damage to the operational facilities from construction activities will be
low. This is therefore not
considered further in this study.
Table
12B.16 Works
in the Vicinity of Gas Pipes
Type of Work |
Distance |
Trench or other excavation up to 1.5m in depth in
stable ground |
10m |
Trench or other excavation over 1.5m and up to 5m in
depth |
15m |
Trench or other excavation in stable ground over 5m
in depth |
20m |
Welding or hot works near exposed gas pipes or
above ground installations |
10m |
Piling,
percussion moling or pipe bursting |
15m |
Works
near high pressure pipelines |
20m |
Ground
investigation and any kind of drilling or core sampling |
30m |
Use
of explosives |
60m |
12B.6.1
Source Term Modelling
The process facility was divided into 9 isolatable
sections. Table 12B.12 listed the process details adopted for each process
section. Discharge rates for each
given leak size were modelled using standard orifice type calculations
contained within the PHAST suite of models. Design pressures were used as a conservative
approach in the consequence modelling.
Table 12B.17 shows the list of release scenarios along
with the corresponding consequence model used in PHAST.
Table
12B.17 Release
Scenarios and Consequence Models Applied
Release
Scenario |
Release Type |
Model
Applied in PHAST |
10mm leak |
Leak |
Leak |
25mm leak |
Leak |
Leak |
50mm leak |
Leak |
Leak |
100mm leak |
Leak |
Leak |
Full bore
rupture |
Rupture |
Catastrophic Rupture |
The consequence modelling parameters for PHAST are
listed in Table 12B.18.
Table
12B.18 Consequence
Modelling Parameters
BLEVE Parameters |
|
|
|
|
|
Maximum SEP for a BLEVE |
|
400.00 |
kW/m2 |
|
Fireball radiation intensity level 1 |
7.00 |
kW/m2 |
|
|
Fireball radiation intensity level 2 |
14.00 |
kW/m2 |
|
|
Fireball radiation intensity level 3 |
21.00 |
kW/m2 |
|
|
Mass Modification Factor |
|
3.00 |
|
|
Fireball Maximum Exposure Duration |
30.00 |
s |
|
|
Ground Reflection |
|
Ground Burst |
|
|
Ideal Gas Modelling |
|
Model as real gas |
|
|
|
|
|
|
Discharge Parameters |
|
|
|
|
|
Continuous Critical Weber number |
12.50 |
|
|
|
Instantaneous Critical Weber number |
12.50 |
|
|
|
Venting equation constant |
|
24.82 |
|
|
Relief valve safety factor |
|
1.20 |
|
|
Minimum RV diameter ratio |
|
1.00 |
|
|
Critical pressure greater than flow phase |
0.34 |
bar |
|
|
Maximum release velocity |
|
500.00 |
m/s |
|
Minimum drop size allowed |
|
0.00 |
mm |
|
Maximum drop size allowed |
|
10.00 |
mm |
|
Default Liquid Fraction |
|
1.00 |
fraction |
|
Continuous Drop Slip factor |
|
1.00 |
|
|
Instantaneous Drop Slip factor |
|
1.00 |
|
|
Pipe-Fluid Thermal Coupling |
|
0.00 |
|
|
Number of Time Steps |
|
100.00 |
|
|
Maximum Number of Data Points |
|
1,000.00 |
|
|
Non-Return Valve velocity head losses |
0.00 |
|
|
|
Pipe roughness |
|
0.046 |
mm |
|
Shut-Off Valve velocity head losses |
0.00 |
|
|
|
Excess Flow Valve velocity head losses |
0.00 |
|
|
|
Default volume changes |
|
3.00 |
/hr |
|
Line length |
|
10.00 |
m |
|
Elevation |
|
1.00 |
m |
|
Atmospheric Expansion Method |
|
Closest to Initial Conditions |
|
|
Tank Roof Failure Model Effects |
|
Instantaneous Effects |
|
|
Outdoor Release Direction |
|
Horizontal |
|
|
|
|
|
|
Dispersion Parameters |
|
|
|
|
|
Dense cloud parameter gamma (continuous) |
0.00 |
|
|
|
Dense cloud parameter gamma (instant) |
0.30 |
|
|
|
Dense cloud parameter k (continuous) |
1.15 |
|
|
|
Dense cloud parameter k (instantaneous) |
1.15 |
|
|
|
Jet entrainment coefficient alpha1 |
0.17 |
|
|
|
Jet entrainment coefficient alpha2 |
0.35 |
|
|
|
Ratio instantaneous/continuous sigma-y |
1.00 |
|
|
|
Ratio instantaneous/continuous sigma-z |
1.00 |
|
|
|
Distance multiple for full passive entrainment |
2.00 |
|
|
|
Quasi-instantaneous transition parameter |
0.80 |
|
|
|
Impact parameter - plume/ground |
0.80 |
|
|
|
Expansion zone length/source diameter ratio |
0.01 |
|
|
|
Drop/expansion velocity for inst.
release |
0.80 |
|
|
|
Drag coefficient between plume and ground |
1.50 |
|
|
|
Drag coefficient between plume and air |
0.00 |
|
|
|
Default bund height |
|
0.00 |
m |
|
Maximum temperature allowed |
|
626.85 |
degC |
|
Minimum temperature allowed |
|
-263.15 |
degC |
|
Minimum release velocity for cont. release |
0.10 |
m/s |
|
|
Minimum integration step size (Instantaneous) |
0.10 |
s |
|
|
Maximum integration step size (Instantaneous) |
1,000.00 |
s |
|
|
Minimum integration step size (Continuous) |
0.10 |
m |
|
|
Maximum integration step size (Continuous) |
100.00 |
m |
|
|
Maximum distance for dispersion |
50,000.00 |
m |
|
|
Maximum height for dispersion |
|
1,000.00 |
m |
|
Minimum cloud depth |
|
0.02 |
m |
|
Expansion energy cutoff for droplet angle |
0.69 |
kJ/kg |
|
|
Droplet evaporation thermodynamics model |
Rainout, Non-equilibrium |
|
|
|
Flag for mixing height |
|
Constrained |
|
|
Accuracy for integration of dispersion |
0.00 |
|
|
|
Accuracy for droplet integration |
|
0.00 |
|
|
|
-20.00 |
|
|
|
Flag to reset rainout position |
|
Do not reset rainout position |
|
|
Surface over which the dispersion occurs |
Water |
|
|
|
Minimum Vapor Fraction for Convection |
0.00 |
fraction |
|
|
Coefficient of Initial Rainout |
|
0.00 |
|
|
Minimum Continuous Release Height |
0.00 |
m |
|
|
Flag for finite duration correction |
Finite Duration Correction |
|
|
|
Near Field Passive Entrainment Parameter |
1.00 |
|
|
|
Jet Model |
|
Morton et.al. |
|
|
Maximum Cloud/Ambient Velocity Difference |
0.10 |
|
|
|
Maximum Cloud/Ambient Density Difference |
0.02 |
|
|
|
Maximum Non-passive entrainment fraction |
0.30 |
|
|
|
Maximum |
|
15.00 |
|
|
Core Averaging Time |
|
18.75 |
s |
|
Ground Drag Model |
|
New (Recommended) |
|
|
Flag for Heat/Water vapor transfer |
Heat and Water |
|
|
|
Richardson Number for passive transition above pool |
0.02 |
|
|
|
Pool Vaporization entrainment parameter |
1.50 |
|
|
|
Modeling of instantaneous expansion |
Standard Method |
|
|
|
Minimum concentration of interest |
0.00 |
fraction |
|
|
Maximum distance of interest |
|
10,000.00 |
m |
|
Model In Use |
|
Best Estimate |
|
|
Maximum Initial Step Size |
|
10.00 |
m |
|
Minimum Number of Steps per Zone |
5.00 |
|
|
|
Factor for Step Increase |
|
1.20 |
|
|
Maximum Number of Output Steps |
1,000.00 |
|
|
|
|
|
|
|
Flammables Parameters |
|
|
|
|
|
Height for calculation of flammable effects |
0.00 |
m |
|
|
Flammable result grid step in X-direction |
10.00 |
m |
|
|
LFL fraction to finish |
|
0.85 |
|
|
Flammable angle of inclination |
|
0.00 |
deg |
|
Flammable inclination |
|
Variable |
|
|
Flammable mass calculation method |
Mass between LFL and UFL |
|
|
|
Flammable Base averaging time |
|
18.75 |
s |
|
Cut Off Time for Short Continuous Releases |
20.00 |
s |
|
|
Observer type radiation modelling flag |
Planar |
|
|
|
Probit A Value |
|
-36.38 |
|
|
Probit B Value |
|
2.56 |
|
|
Probit N Value |
|
1.33 |
|
|
Height for reports |
|
Centreline Height |
|
|
Angle of orientation |
|
0.00 |
deg |
|
Relative tolerance for radiation calculations |
0.02 |
fraction |
|
|
|
|
|
|
General Parameters |
|
|
|
|
|
Maximum release duration |
|
3,600.00 |
s |
|
Height for concentration output |
|
0.00 |
m |
|
|
|
|
|
Jet Fire Parameters |
|
|
|
|
|
Maximum SEP for a Jet Fire |
|
400.00 |
kW/m2 |
|
Jet Fire Averaging Time |
|
20.00 |
s |
|
Jet fire radiation intensity level 1 |
|
7.00 |
kW/m2 |
|
Jet fire radiation intensity level 2 |
|
14.00 |
kW/m2 |
|
Jet fire radiation intensity level 3 |
|
21.00 |
kW/m2 |
|
Rate Modification Factor |
|
3.00 |
|
|
Jet Fire Maximum Exposure Duration |
30.00 |
s |
|
|
Model Correlation Type |
|
Shell |
|
|
|
|
|
|
Weather Parameters |
|
|
|
|
|
Atmospheric pressure |
|
1.01 |
bar |
|
Atmospheric molecular weight |
|
28.97 |
|
|
Atmospheric specific heat at constant pressure |
1.00 |
kJ/kg.degK |
|
|
Wind speed reference height (m) |
|
10.00 |
m |
|
Temperature reference height (m) |
0.00 |
m |
|
|
Cut-off height for wind speed profile (m) |
1.00 |
m |
|
|
Wind speed profile |
|
Power Law |
|
|
Atmospheric Temperature and Pressure Profile |
Temp.Logarithmic; Pres.Linear |
|
|
|
Atmospheric temperature |
|
23.00 |
degC |
|
Relative humidity |
|
0.77 |
fraction |
|
Surface Roughness Parameter |
|
0.043 |
|
|
Surface Roughness Length |
|
0.912 |
mm |
|
Roughness or Parameter |
|
Parameter |
|
|
Dispersing surface temperature |
|
23.00 |
degC |
|
Default surface temperature of bund |
23.00 |
degC |
|
|
Solar radiation flux |
|
0.50 |
kW/m2 |
|
Building Exchange Rate |
|
4.00 |
/hr |
|
Tail Time |
|
1,800.00 |
s |
12B.6.3
Consequence End-Point Criteria
The end-point criteria are
used to define the impact level at which a fatality could result.
Thermal Radiation
The following probit equation [1] is used to determine impacts of thermal radiation
from jet fires to persons unprotected by clothing.
Y = -36.38 + 2.56 ln (t I 4/3) (1)
where I
is the radiant thermal flux (W/m2) and Y is the probit function which is related to the probability of
fatality. This equation gives the
data points presented in Table
12B.19, assuming a 30-second exposure time. For areas lying between any two
radiation flux contours, the equivalent fatality level
is estimated as follows:
·
For areas beyond the 50% fatality contour, the
equivalent fatality is calculated using a 2/3 weighting towards the lower
contour. For example, the
equivalent fatality between the 1% and 50% contours is calculated as 2/3 x 1 +
1/3 x 50 = 17%;
·
For areas within the 50% contour, the equivalent
fatality is calculated with a 2/3 weighting towards the upper contour. For example, the equivalent fatality
between the 90% and 50% contours is calculated as 2/3 x 90 + 1/3 x 50 = 77%.
The different approach
above and below the 50% fatality contour is due to the sigmoid shape of the
probit function.
Table
12B.19 Levels
of Harm for 30s Exposure to Heat Fluxes
Incident
Thermal Flux (kW/m2) |
Fatality Probability
for 30s Exposure |
Equivalent
Fatality Probability for Area between Radiation Flux Contours |
|
7.3 |
1% |
} } } |
17% |
14.4 |
50% |
77% |
|
20.9 35.5 |
90% 99.9% |
97% |
Fireballs are modelled in a similar manner as jet fires,
using the same probit equation.
However, fireballs are generally of shorter duration than 30 seconds and
hence the actual duration of the fireball was used to determine harm
probabilities.
Flash Fire
With regard to flash fires, the criterion chosen is
that a 100% fatality is assumed for any person outdoors within the flash fire
envelope. In this study, the extent
of the flash fire is assumed to be the dispersion distance to 85% of the LFL
for a conservative evaluation.
A complete list of hazard distances obtained from the
consequence modelling is provided in Table
12B.20.
Table 12B.20 Consequence Results
Section |
Phase |
Leak
size |
Hazard
effects |
End
point |
Hazard extent (m) |
||||||||
Weather
conditions |
|||||||||||||
F, 2 m/s |
D, 3 m/s |
D, 7 m/s |
B, 2.5
m/s |
||||||||||
G01 |
Above ground gas piping from offshore pipeline
to pig receiver |
G |
10 |
Jet fire |
35.5 kW/m2 |
13 |
14 |
15 |
14 |
||||
|
|
|
|
20.9 kW/m2 |
15 |
15 |
16 |
15 |
|||||
|
|
|
|
14.4 kW/m2 |
16 |
16 |
17 |
16 |
|||||
|
|
|
|
7.3 kW/m2 |
19 |
19 |
19 |
19 |
|||||
|
|
|
|
Flash fire |
0.85 LFL |
13 |
13 |
11 |
12 |
||||
|
|
|
25 |
Jet fire |
35.5 kW/m2 |
33 |
34 |
38 |
33 |
||||
|
|
|
|
|
20.9 kW/m2 |
38 |
38 |
41 |
38 |
||||
|
|
|
|
|
14.4 kW/m2 |
41 |
41 |
44 |
41 |
||||
|
|
|
|
|
7.3 kW/m2 |
47 |
47 |
49 |
47 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
37 |
37 |
37 |
37 |
||||
|
|
|
50 |
Jet fire |
35.5 kW/m2 |
61 |
62 |
70 |
61 |
||||
|
|
|
|
|
20.9 kW/m2 |
69 |
71 |
76 |
70 |
||||
|
|
|
|
|
14.4 kW/m2 |
76 |
77 |
81 |
77 |
||||
|
|
|
|
|
7.3 kW/m2 |
89 |
90 |
92 |
90 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
84 |
84 |
90 |
82 |
||||
|
|
|
100 |
Jet fire |
35.5 kW/m2 |
107 |
109 |
120 |
108 |
||||
|
|
|
|
|
20.9 kW/m2 |
122 |
125 |
133 |
123 |
||||
|
|
|
|
|
14.4 kW/m2 |
136 |
138 |
143 |
137 |
||||
|
|
|
|
|
7.3 kW/m2 |
165 |
165 |
166 |
164 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
180 |
180 |
195 |
180 |
||||
|
|
|
Full bore (isoln. succ.) |
Fireball |
35.5 kW/m2 |
137 |
137 |
137 |
137 |
||||
|
|
|
|
|
20.9 kW/m2 |
180 |
180 |
180 |
180 |
||||
|
|
|
|
|
14.4 kW/m2 |
216 |
216 |
216 |
216 |
||||
|
|
|
|
|
7.3 kW/m2 |
300 |
300 |
300 |
300 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
38 |
38 |
55 |
38 |
||||
|
|
|
Full bore (isoln. fail.) |
Jet fire |
35.5 kW/m2 |
147 |
148 |
160 |
147 |
||||
|
|
|
|
|
20.9 kW/m2 |
165 |
169 |
179 |
167 |
||||
|
|
|
|
|
14.4 kW/m2 |
185 |
187 |
194 |
186 |
||||
|
|
|
|
|
7.3 kW/m2 |
226 |
227 |
227 |
226 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
260 |
260 |
287 |
260 |
||||
G02 |
Gas piping from receiver to gas filter |
G |
10 |
Jet fire |
35.5 kW/m2 |
13 |
14 |
15 |
14 |
||||
|
|
|
|
20.9 kW/m2 |
15 |
15 |
16 |
15 |
|||||
|
|
|
|
14.4 kW/m2 |
16 |
16 |
17 |
16 |
|||||
|
|
|
|
7.3 kW/m2 |
19 |
19 |
19 |
19 |
|||||
|
|
|
10 |
Flash fire |
0.85 LFL |
13 |
13 |
11 |
12 |
||||
|
|
|
25 |
Jet fire |
35.5 kW/m2 |
33 |
34 |
38 |
33 |
||||
|
|
|
|
|
20.9 kW/m2 |
38 |
38 |
41 |
38 |
||||
|
|
|
|
|
14.4 kW/m2 |
41 |
41 |
44 |
41 |
||||
|
|
|
|
|
7.3 kW/m2 |
47 |
47 |
49 |
47 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
37 |
37 |
37 |
37 |
||||
|
|
|
50 |
Jet fire |
35.5 kW/m2 |
61 |
62 |
70 |
61 |
||||
|
|
|
|
|
20.9 kW/m2 |
69 |
71 |
76 |
70 |
||||
|
|
|
|
|
14.4 kW/m2 |
76 |
77 |
81 |
77 |
||||
|
|
|
|
|
7.3 kW/m2 |
89 |
90 |
92 |
90 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
84 |
84 |
90 |
82 |
||||
|
|
|
100 |
Jet fire |
35.5 kW/m2 |
107 |
109 |
120 |
108 |
||||
|
|
|
|
|
20.9 kW/m2 |
122 |
125 |
133 |
123 |
||||
|
|
|
|
|
14.4 kW/m2 |
136 |
138 |
143 |
137 |
||||
|
|
|
|
|
7.3 kW/m2 |
165 |
165 |
166 |
164 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
180 |
180 |
195 |
180 |
||||
|
|
|
Full bore (isoln. succ.) |
Fireball |
35.5 kW/m2 |
70 |
70 |
70 |
70 |
||||
|
|
|
|
|
20.9 kW/m2 |
93 |
93 |
93 |
93 |
||||
|
|
|
|
|
14.4 kW/m2 |
112 |
112 |
112 |
112 |
||||
|
|
|
|
|
7.3 kW/m2 |
155 |
155 |
155 |
155 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
19 |
19 |
26 |
19 |
||||
|
|
|
Full bore (isoln. fail.) |
Jet fire |
35.5 kW/m2 |
147 |
148 |
160 |
147 |
||||
|
|
|
|
|
20.9 kW/m2 |
165 |
169 |
179 |
167 |
||||
|
|
|
|
|
14.4 kW/m2 |
185 |
187 |
194 |
186 |
||||
|
|
|
|
|
7.3 kW/m2 |
226 |
227 |
227 |
226 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
260 |
260 |
287 |
260 |
||||
G03 |
Filter piping |
G |
10 |
Jet fire |
35.5 kW/m2 |
13 |
14 |
15 |
14 |
||||
|
|
|
|
|
20.9 kW/m2 |
15 |
15 |
16 |
15 |
||||
|
|
|
|
|
14.4 kW/m2 |
16 |
16 |
17 |
16 |
||||
|
|
|
|
|
7.3 kW/m2 |
19 |
19 |
19 |
19 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
13 |
13 |
11 |
12 |
||||
|
|
|
25 |
Jet fire |
35.5 kW/m2 |
33 |
34 |
38 |
33 |
||||
|
|
|
|
|
20.9 kW/m2 |
38 |
38 |
41 |
38 |
||||
|
|
|
|
|
14.4 kW/m2 |
41 |
41 |
44 |
41 |
||||
|
|
|
|
|
7.3 kW/m2 |
47 |
47 |
49 |
47 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
37 |
37 |
37 |
37 |
||||
|
|
|
50 |
Jet fire |
35.5 kW/m2 |
61 |
62 |
70 |
61 |
||||
|
|
|
|
|
20.9 kW/m2 |
69 |
71 |
76 |
70 |
||||
|
|
|
|
|
14.4 kW/m2 |
76 |
77 |
81 |
77 |
||||
|
|
|
|
|
7.3 kW/m2 |
89 |
90 |
92 |
90 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
84 |
84 |
90 |
82 |
||||
|
|
|
100 |
Jet fire |
35.5 kW/m2 |
107 |
109 |
120 |
108 |
||||
|
|
|
|
|
20.9 kW/m2 |
122 |
125 |
133 |
123 |
||||
|
|
|
|
|
14.4 kW/m2 |
136 |
138 |
143 |
137 |
||||
|
|
|
|
|
7.3 kW/m2 |
165 |
165 |
166 |
164 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
180 |
180 |
195 |
180 |
||||
|
|
|
Full bore (isoln. succ.) |
Fireball |
35.5 kW/m2 |
45 |
45 |
45 |
45 |
||||
|
|
|
|
|
20.9 kW/m2 |
60 |
60 |
60 |
60 |
||||
|
|
|
|
|
14.4 kW/m2 |
72 |
72 |
72 |
72 |
||||
|
|
|
|
|
7.3 kW/m2 |
101 |
101 |
101 |
101 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
11 |
11 |
16 |
11 |
||||
|
|
|
Full bore (isoln. fail.) |
Jet fire |
35.5 kW/m2 |
147 |
148 |
160 |
147 |
||||
|
|
|
|
|
20.9 kW/m2 |
165 |
169 |
179 |
167 |
||||
|
|
|
|
|
14.4 kW/m2 |
185 |
187 |
194 |
186 |
||||
|
|
|
|
|
7.3 kW/m2 |
226 |
227 |
227 |
226 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
260 |
260 |
287 |
260 |
||||
G04 |
Gas piping from filter to metering
station |
G |
10 |
Jet fire |
35.5 kW/m2 |
13 |
14 |
15 |
14 |
||||
|
|
|
|
20.9 kW/m2 |
15 |
15 |
16 |
15 |
|||||
|
|
|
|
14.4 kW/m2 |
16 |
16 |
17 |
16 |
|||||
|
|
|
|
7.3 kW/m2 |
19 |
19 |
19 |
19 |
|||||
|
|
|
|
Flash fire |
0.85 LFL |
13 |
13 |
11 |
12 |
||||
|
|
|
25 |
Jet fire |
35.5 kW/m2 |
33 |
34 |
38 |
33 |
||||
|
|
|
|
|
20.9 kW/m2 |
38 |
38 |
41 |
38 |
||||
|
|
|
|
|
14.4 kW/m2 |
41 |
41 |
44 |
41 |
||||
|
|
|
|
|
7.3 kW/m2 |
47 |
47 |
49 |
47 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
37 |
37 |
37 |
37 |
||||
|
|
|
50 |
Jet fire |
35.5 kW/m2 |
61 |
62 |
70 |
61 |
||||
|
|
|
|
|
20.9 kW/m2 |
69 |
71 |
76 |
70 |
||||
|
|
|
|
|
14.4 kW/m2 |
76 |
77 |
81 |
77 |
||||
|
|
|
|
|
7.3 kW/m2 |
89 |
90 |
92 |
90 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
84 |
84 |
90 |
82 |
||||
|
|
|
100 |
Jet fire |
35.5 kW/m2 |
107 |
109 |
120 |
108 |
||||
|
|
|
|
|
20.9 kW/m2 |
122 |
125 |
133 |
123 |
||||
|
|
|
|
|
14.4 kW/m2 |
136 |
138 |
143 |
137 |
||||
|
|
|
|
|
7.3 kW/m2 |
165 |
165 |
166 |
164 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
180 |
180 |
195 |
180 |
||||
|
|
|
Full bore (isoln. succ.) |
Fireball |
35.5 kW/m2 |
153 |
153 |
153 |
153 |
||||
|
|
|
|
|
20.9 kW/m2 |
201 |
201 |
201 |
201 |
||||
|
|
|
|
|
14.4 kW/m2 |
242 |
242 |
242 |
242 |
||||
|
|
|
|
|
7.3 kW/m2 |
335 |
335 |
335 |
335 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
43 |
43 |
63 |
43 |
||||
|
|
|
Full bore (isoln. fail.) |
Jet fire |
35.5 kW/m2 |
147 |
148 |
160 |
147 |
||||
|
|
|
|
|
20.9 kW/m2 |
165 |
169 |
179 |
167 |
||||
|
|
|
|
|
14.4 kW/m2 |
185 |
187 |
194 |
186 |
||||
|
|
|
|
|
7.3 kW/m2 |
226 |
227 |
227 |
226 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
260 |
260 |
287 |
260 |
||||
G05 |
Gas piping from metering station to
heaters, including metering runs |
G |
10 |
Jet fire |
35.5 kW/m2 |
13 |
14 |
15 |
14 |
||||
|
|
|
|
20.9 kW/m2 |
|
15 |
15 |
16 |
15 |
||||
|
|
|
|
14.4 kW/m2 |
|
16 |
16 |
17 |
16 |
||||
|
|
|
|
|
7.3 kW/m2 |
|
19 |
19 |
19 |
19 |
|||
|
|
|
|
Flash fire |
0.85 LFL |
|
13 |
13 |
11 |
12 |
|||
|
|
|
25 |
Jet fire |
35.5 kW/m2 |
|
33 |
34 |
38 |
33 |
|||
|
|
|
|
|
20.9 kW/m2 |
|
38 |
38 |
41 |
38 |
|||
|
|
|
|
|
14.4 kW/m2 |
|
41 |
41 |
44 |
41 |
|||
|
|
|
|
|
7.3 kW/m2 |
|
47 |
47 |
49 |
47 |
|||
|
|
|
|
Flash fire |
0.85 LFL |
|
37 |
37 |
37 |
37 |
|||
|
|
|
50 |
Jet fire |
35.5 kW/m2 |
|
61 |
62 |
70 |
61 |
|||
|
|
|
|
|
20.9 kW/m2 |
|
69 |
71 |
76 |
70 |
|||
|
|
|
|
|
14.4 kW/m2 |
|
76 |
77 |
81 |
77 |
|||
|
|
|
|
|
7.3 kW/m2 |
|
89 |
90 |
92 |
90 |
|||
|
|
|
|
Flash fire |
0.85 LFL |
|
84 |
84 |
90 |
82 |
|||
|
|
|
100 |
Jet fire |
35.5 kW/m2 |
|
107 |
109 |
120 |
108 |
|||
|
|
|
|
|
20.9 kW/m2 |
|
122 |
125 |
133 |
123 |
|||
|
|
|
|
|
14.4 kW/m2 |
|
136 |
138 |
143 |
137 |
|||
|
|
|
|
|
7.3 kW/m2 |
|
165 |
165 |
166 |
164 |
|||
|
|
|
|
Flash fire |
0.85 LFL |
|
180 |
180 |
195 |
180 |
|||
|
|
|
Full bore (isoln. succ.) |
Fireball |
35.5 kW/m2 |
135 |
135 |
135 |
135 |
||||
|
|
|
|
|
20.9 kW/m2 |
177 |
177 |
177 |
177 |
||||
|
|
|
|
|
14.4 kW/m2 |
213 |
213 |
213 |
213 |
||||
|
|
|
|
|
7.3 kW/m2 |
295 |
295 |
295 |
295 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
38 |
38 |
54 |
38 |
||||
|
|
|
Full bore (isoln. fail.) |
Jet fire |
35.5 kW/m2 |
147 |
148 |
160 |
147 |
||||
|
|
|
|
|
20.9 kW/m2 |
165 |
169 |
179 |
167 |
||||
|
|
|
|
|
14.4 kW/m2 |
185 |
187 |
194 |
186 |
||||
|
|
|
|
|
7.3 kW/m2 |
226 |
227 |
227 |
226 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
260 |
260 |
287 |
260 |
||||
G6 |
Gas Heater Piping |
G |
10 |
Jet fire |
35.5 kW/m2 |
13 |
14 |
15 |
14 |
||||
|
|
|
|
|
20.9 kW/m2 |
15 |
15 |
16 |
15 |
||||
|
|
|
|
|
14.4 kW/m2 |
16 |
16 |
17 |
16 |
||||
|
|
|
|
|
7.3 kW/m2 |
19 |
19 |
19 |
19 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
13 |
13 |
11 |
12 |
||||
|
|
|
25 |
Jet fire |
35.5 kW/m2 |
33 |
34 |
38 |
33 |
||||
|
|
|
|
|
20.9 kW/m2 |
38 |
38 |
41 |
38 |
||||
|
|
|
|
|
14.4 kW/m2 |
41 |
41 |
44 |
41 |
||||
|
|
|
|
|
7.3 kW/m2 |
47 |
47 |
49 |
47 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
37 |
37 |
37 |
37 |
||||
|
|
|
50 |
Jet fire |
35.5 kW/m2 |
61 |
62 |
70 |
61 |
||||
|
|
|
|
|
20.9 kW/m2 |
69 |
71 |
76 |
70 |
||||
|
|
|
|
|
14.4 kW/m2 |
76 |
77 |
81 |
77 |
||||
|
|
|
|
|
7.3 kW/m2 |
89 |
90 |
92 |
90 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
84 |
84 |
90 |
82 |
||||
|
|
|
100 |
Jet fire |
35.5 kW/m2 |
107 |
109 |
120 |
108 |
||||
|
|
|
|
|
20.9 kW/m2 |
122 |
125 |
133 |
123 |
||||
|
|
|
|
|
14.4 kW/m2 |
136 |
138 |
143 |
137 |
||||
|
|
|
|
|
7.3 kW/m2 |
165 |
165 |
166 |
164 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
180 |
180 |
195 |
180 |
||||
|
|
|
Full bore (isoln. succ.) |
Fireball |
35.5 kW/m2 |
135 |
135 |
135 |
135 |
||||
|
|
|
|
|
20.9 kW/m2 |
177 |
177 |
177 |
177 |
||||
|
|
|
|
|
14.4 kW/m2 |
213 |
213 |
213 |
213 |
||||
|
|
|
|
|
7.3 kW/m2 |
295 |
295 |
295 |
295 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
38 |
38 |
54 |
38 |
||||
|
|
|
Full bore (isoln. fail.) |
Jet fire |
35.5 kW/m2 |
147 |
148 |
160 |
147 |
||||
|
|
|
|
|
20.9 kW/m2 |
165 |
169 |
179 |
167 |
||||
|
|
|
|
|
14.4 kW/m2 |
185 |
187 |
194 |
186 |
||||
|
|
|
|
|
7.3 kW/m2 |
226 |
227 |
227 |
226 |
||||
|
|
|
. fail.) |
Flash fire |
0.85 LFL |
260 |
260 |
287 |
260 |
||||
G7 |
Gas piping from heater to PRS, including
PRS |
G |
10 |
Jet fire |
35.5 kW/m2 |
12 |
12 |
13 |
12 |
||||
|
|
|
|
20.9 kW/m2 |
13 |
14 |
14 |
13 |
|||||
|
|
|
|
|
14.4 kW/m2 |
14 |
15 |
15 |
15 |
||||
|
|
|
|
|
7.3 kW/m2 |
17 |
17 |
17 |
17 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
11 |
11 |
11 |
11 |
||||
|
|
|
25 |
Jet fire |
35.5 kW/m2 |
30 |
31 |
34 |
31 |
||||
|
|
|
|
|
20.9 kW/m2 |
34 |
35 |
37 |
34 |
||||
|
|
|
|
|
14.4 kW/m2 |
37 |
37 |
39 |
37 |
||||
|
|
|
|
|
7.3 kW/m2 |
42 |
43 |
44 |
43 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
34 |
34 |
34 |
32 |
||||
|
|
|
50 |
Jet fire |
35.5 kW/m2 |
56 |
56 |
64 |
56 |
||||
|
|
|
|
|
20.9 kW/m2 |
63 |
64 |
69 |
64 |
||||
|
|
|
|
|
14.4 kW/m2 |
69 |
70 |
74 |
69 |
||||
|
|
|
|
|
7.3 kW/m2 |
81 |
81 |
83 |
81 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
72 |
76 |
79 |
68 |
||||
|
|
|
100 |
Jet fire |
35.5 kW/m2 |
98 |
99 |
58 |
99 |
||||
|
|
|
|
|
20.9 kW/m2 |
112 |
114 |
59 |
113 |
||||
|
|
|
|
|
14.4 kW/m2 |
124 |
126 |
65 |
125 |
||||
|
|
|
|
|
7.3 kW/m2 |
149 |
150 |
85 |
150 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
155 |
147 |
160 |
136 |
||||
|
|
|
Full bore (isoln. succ.) |
Fireball |
35.5 kW/m2 |
135 |
135 |
135 |
135 |
||||
|
|
|
|
|
20.9 kW/m2 |
177 |
177 |
177 |
177 |
||||
|
|
|
|
|
14.4 kW/m2 |
213 |
213 |
213 |
213 |
||||
|
|
|
|
|
7.3 kW/m2 |
295 |
295 |
295 |
295 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
38 |
38 |
54 |
38 |
||||
|
|
|
Full bore (isoln. fail.) |
Jet fire |
35.5 kW/m2 |
146 |
147 |
160 |
146 |
||||
|
|
|
|
|
20.9 kW/m2 |
164 |
168 |
178 |
166 |
||||
|
|
|
|
|
14.4 kW/m2 |
184 |
186 |
193 |
185 |
||||
|
|
|
|
|
7.3 kW/m2 |
225 |
226 |
225 |
225 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
215 |
215 |
228 |
192 |
||||
G8 |
Gas piping from PRS to mixing station |
G |
10 |
Jet fire |
35.5 kW/m2 |
0 |
0 |
0 |
0 |
||||
|
|
|
|
20.9 kW/m2 |
9 |
9 |
9 |
0 |
|||||
|
|
|
|
|
14.4 kW/m2 |
10 |
10 |
10 |
10 |
||||
|
|
|
|
|
7.3 kW/m2 |
11 |
11 |
11 |
11 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
8 |
8 |
8 |
8 |
||||
|
|
|
25 |
Jet fire |
35.5 kW/m2 |
0 |
22 |
24 |
22 |
||||
|
|
|
|
|
20.9 kW/m2 |
24 |
24 |
26 |
24 |
||||
|
|
|
|
|
14.4 kW/m2 |
26 |
26 |
28 |
26 |
||||
|
|
|
|
|
7.3 kW/m2 |
30 |
30 |
31 |
30 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
21 |
21 |
21 |
21 |
||||
|
|
|
50 |
Jet fire |
35.5 kW/m2 |
40 |
41 |
47 |
42 |
||||
|
|
|
|
|
20.9 kW/m2 |
46 |
47 |
51 |
47 |
||||
|
|
|
|
|
14.4 kW/m2 |
50 |
51 |
54 |
50 |
||||
|
|
|
|
|
7.3 kW/m2 |
58 |
58 |
60 |
58 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
47 |
47 |
49 |
47 |
||||
|
|
|
100 |
Jet fire |
35.5 kW/m2 |
73 |
74 |
84 |
73 |
||||
|
|
|
|
|
20.9 kW/m2 |
83 |
85 |
92 |
84 |
||||
|
|
|
|
|
14.4 kW/m2 |
92 |
93 |
98 |
92 |
||||
|
|
|
|
|
7.3 kW/m2 |
109 |
109 |
111 |
109 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
102 |
102 |
106 |
95 |
||||
|
|
|
Full bore (isoln. succ.) |
Fireball |
35.5 kW/m2 |
114 |
114 |
114 |
114 |
||||
|
|
|
|
|
20.9 kW/m2 |
150 |
150 |
150 |
150 |
||||
|
|
|
|
|
14.4 kW/m2 |
180 |
180 |
180 |
180 |
||||
|
|
|
|
|
7.3 kW/m2 |
250 |
250 |
250 |
250 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
30 |
30 |
42 |
30 |
||||
|
|
|
Full bore (isoln. fail.) |
Jet fire |
35.5 kW/m2 |
145 |
147 |
159 |
146 |
||||
|
|
|
|
|
20.9 kW/m2 |
163 |
167 |
178 |
165 |
||||
|
|
|
|
|
14.4 kW/m2 |
183 |
186 |
192 |
184 |
||||
|
|
|
|
|
7.3 kW/m2 |
224 |
225 |
225 |
224 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
205 |
205 |
215 |
180 |
||||
G09 |
Pig receiver |
G |
25 |
Jet fire |
35.5 kW/m2 |
33 |
34 |
38 |
33 |
||||
|
|
|
|
20.9 kW/m2 |
38 |
38 |
41 |
38 |
|||||
|
|
|
|
14.4 kW/m2 |
41 |
41 |
44 |
41 |
|||||
|
|
|
|
7.3 kW/m2 |
47 |
47 |
49 |
47 |
|||||
|
|
|
|
Flash fire |
0.85 LFL |
37 |
37 |
37 |
37 |
||||
|
|
|
Full bore |
Jet fire |
35.5 kW/m2 |
147 |
148 |
160 |
147 |
||||
|
|
|
|
|
20.9 kW/m2 |
165 |
169 |
179 |
167 |
||||
|
|
|
|
|
14.4 kW/m2 |
185 |
187 |
194 |
186 |
||||
|
|
|
|
|
7.3 kW/m2 |
226 |
227 |
227 |
226 |
||||
|
|
|
|
Flash fire |
0.85 LFL |
260 |
260 |
287 |
260 |
||||
The frequencies and consequences of the various
outcomes of the numerous accident scenarios are integrated at this stage, to give
measures of the societal risk (FN curves and Potential Loss of Life) and
individual risk.
Risk results are compared with the criteria for
acceptability as laid down in the Hong Kong Planning Standards and Guidelines, Chapter 12 and also in Annex
4 of the Technical Memorandum of EIAO.
Risk results are presented in the Section 12 of the EIA Report.
[1]
Committee for the Prevention of Disasters, Guidelines for Quantitative
Risk Assessment (the “Purple Book”).,
[2]
BMT Asia Pacific Ltd., personal communication, 2006
[6]
Cox, Lees and Ang, Classification of Hazardous Locations, IChemE.
[7]
Lees, F. P., Loss
Prevention in the Process Industries, Butterworth-Heinemann, 1996
[8]
GCO, Review of
earthquake data for the
[9]
GEO, Seismic hazard analysis of the
[11] Byrne, J. P., The Calculation of
Aircraft Crash Risk in the
[12]
www.ntsb.gov/aviation/Table6.htm
[13]
Annual Review of
Aircraft Accident Data:
[14] Spouge, J., A guide to
Quantitative Risk Assessment for Offshore Installations, CMPT, 1999.
[16] Lee, B. Y., Report of
Hong Kong in the International Tsunami Seminar in the Western Pacific Region,
International Tsunami Seminar in the Western Pacific Region,
[17] The Gas Authority, Gas
Production & Supply Code of Practice, GPS 01, 1st Edition, The
Government of the
[18]
[19] Institution of Chemical
Engineers
[20] Personal Communication
with the
[21] Hong Kong Observatory,
“ The Year’s Weather – 2003”