Figure
1.1 General Layout Plan
Figure
2.1.1 Proposed Alignment of
SIL(E) (Sheet 1 of 5)
Figure
2.1.2 Proposed Alignment of
SIL(E) (Sheet 2 of 5)
Figure
2.1.3 Proposed Alignment of
SIL(E) (Sheet 3 of 5)
Figure
2.1.4 Proposed Alignment of
SIL(E) (Sheet 4 of 5)
Figure
2.1.5 Proposed Alignment of
SIL(E) (Sheet 5 of 5)
Figure
2.2 Two Possible Locations
Evaluated for SOH Station
Figure
2.3 LET Station to Aberdeen
Channel - Modified Vertical Alignment
Figure
2.5 Envisaged Construction
Methods for SIL(E)
Figure
2.6.1 Works Areas (Sheet 1 of 10)
Figure
2.6.2 Works Areas (Sheet 2 of 10)
Figure
2.6.3 Works Areas (Sheet 3 of 10)
Figure
2.6.4 Works Areas (Sheet 4 of 10)
Figure
2.6.5 Works Areas (Sheet 5 of 10)
Figure
2.6.6 Works Areas (Sheet 6 of 10)
Figure
2.6.7 Works Areas (Sheet 7 of 10)
Figure
2.6.8 Works Areas (Sheet 8 of 10)
Figure
2.6.9 Works Areas (Sheet 9 of 10)
Figure
2.6.10 Works Areas (Sheet 10 of 10)
Figure
2.6.11 Works Areas (Telegraph Bay
Barging Point)
Figure
2.6.12 Works Areas (Chung Hom Shan
Magazine Site)
Figure
2.7 Typical Layout of Crushing
Facilities
Figure 3.1 Preferred Alignment and Assessment
Area
Figure 3.2 The First
Layer of Affected Noise Sensitive Uses (Sheet 1 of 9)
Figure 3.3 The First
Layer of Affected Noise Sensitive Uses (Sheet 2 of 9)
Figure 3.4 The First
Layer of Affected Noise Sensitive Uses (Sheet 3 of 9)
Figure 3.5 The First
Layer of Affected Noise Sensitive Uses (Sheet 4 of 9)
Figure 3.6 The First
Layer of Affected Noise Sensitive Uses (Sheet 5 of 9)
Figure 3.7 The First
Layer of Affected Noise Sensitive Uses (Sheet 6 of 9)
Figure 3.8 The First
Layer of Affected Noise Sensitive Uses (Sheet 7 of 9)
Figure 3.9 The First
Layer of Affected Noise Sensitive Uses (Sheet 8 of 9)
Figure 3.10 The First
Layer of Affected Noise Sensitive Uses (Sheet 9 of 9)
Figure 3.11 Representative
Noise Sensitive Receivers (Sheet 1 of 9)
Figure 3.12 Representative
Noise Sensitive Receivers (Sheet 2 of 9)
Figure 3.13 Representative
Noise Sensitive Receivers (Sheet 3 of 9)
Figure 3.14 Representative
Noise Sensitive Receivers (Sheet 4 of 9)
Figure 3.15 Representative
Noise Sensitive Receivers (Sheet 5 of 9)
Figure 3.16 Representative
Noise Sensitive Receivers (Sheet 6 of 9)
Figure 3.17 Representative
Noise Sensitive Receivers (Sheet 7 of 9)
Figure 3.18 Representative
Noise Sensitive Receivers (Sheet 8 of 9)
Figure 3.19 Representative
Noise Sensitive Receivers (Sheet 9 of 9)
Figure 3.20 Representative
Noise Sensitive Receivers – (Telegraph Bay Barging Point)
Figure 3.21 Representative
Noise Sensitive Receivers – (Chung Hom Shan Magazine Site)
Figure 3.22a Schematic
Configuration of Movable Noise Barrier
Figure 3.22b Schematic
Configuration of Movable Noise Barrier for Slope Work
Figure 3.23 Schematic
Configuration of Full Noise Enclosure for PME
Figure 3.24 Typical Cross Section of Viaduct with
Structural Frame
Figure 3.25 Extent of Noise Mitigation Measures
(Scenario for Existing NSRs)
Figure 3.26 Extent of Noise Mitigation Measures
(Scenario for Existing NSRs)
Figure 3.27 Extent of Noise Mitigation Measures
(Scenario for Existing NSRs)
Figure 3.28 Extent of Noise Mitigation Measures (Scenario
for Existing and Planned NSRs)
Figure 3.29 Extent of Noise Mitigation Measures
(Scenario for Existing and Planned NSRs)
Figure 3.30 Extent of Noise Mitigation Measures
(Scenario for Existing and Planned NSRs)
Figure 3.31 Schematic Cross-section of Noise
Barrier / Semi-enclosure (Sheet 1 of 3)
Figure 3.32 Schematic Cross-section of Noise
Barrier / Semi-enclosure (Sheet 2 of 3)
Figure 3.33 Schematic Cross-section of Noise
Barrier / Semi-enclosure (Sheet 3 of 3)
Figure 3.34.1 Location of Fixed Plant at Admiralty
Station
Figure 3.34.2 Location of Fixed Plant at Admiralty
Station
Figure 3.34.3 Location of Fixed Plant at Admiralty
Station
Figure 3.34.4 Location of Fixed Plant at Admiralty
Station
Figure 3.35.1 Location of Fixed Plant at Hong Kong
Park
Figure 3.35.2 Location of Fixed Plant at Hong Kong
Park
Figure 3.35.3 Location of Fixed Plant at Hong Kong
Park
Figure 3.35.4 Location of Fixed Plant at Hong Kong
Park
Figure 3.36.1 Location of Fixed Plant at Nam Fung
Portal Ventilation Building
Figure 3.36.2 Location of Fixed Plant at Nam Fung
Portal Ventilation Building
Figure 3.36.3 Location of Fixed Plant at Nam Fung
Portal Ventilation Building
Figure 3.37.1 Location of Fixed Plant at Ocean Park
Station
Figure 3.37.2 Location of Fixed Plant at Ocean Park
Station
Figure 3.38.1 Location of Fixed Plant at Wong Chuk
Hang Station
Figure 3.38.2 Location of Fixed Plant at Wong Chuk
Hang Station
Figure 3.38.3 Location of Fixed Plant at Wong Chuk
Hang Station
Figure 3.38.4 Location of Fixed Plant at Wong Chuk
Hang Station
Figure 3.38.5 Location of Fixed Plant at Wong Chuk
Hang Station
Figure 3.39.1 Location of Fixed Plant Noise Source
Figure 3.39.2 Location of Fixed Plant at Wong Chuk
Hang Depot
Figure 3.39.3 Location of Fixed Plant at Wong Chuk
Hang Depot
Figure 3.39.4 Location of Fixed Plant at Wong Chuk
Hang Depot
Figure 3.39.5 Location of Fixed Plant at Wong Chuk
Hang Depot
Figure 3.39.6 Location of Fixed Plant at Wong Chuk
Hang Depot
Figure 3.39.7 Location of Fixed Plant at Wong Chuk
Hang Depot
Figure 3.39.8 Location of Fixed Plant at Wong Chuk
Hang Depot
Figure 3.39.9 Location of Fixed Plant at Wong Chuk
Hang Depot
Figure 3.40.1 Location of Fixed Plant at Lei Tung
Station and Entrances
Figure 3.40.2 Location of Fixed Plant at Lei Tung
Station and Entrances
Figure 3.40.3 Location of Fixed Plant at Lei Tung
Station and Entrances
Figure 3.40.4 Location of Fixed Plant at Lei Tung
Station and Entrances
Figure 3.40.5 Location of Fixed Plant at Lei Tung
Station and Entrances
Figure 3.40.6 Location of Fixed Plant at Lei Tung
Station and Entrances
Figure 3.41.1 Location of Fixed Plant near Sham Wan
Tower
Figure 3.41.2 Location of Fixed Plant near Sham Wan
Tower
Figure 3.42.1 Location of Fixed Plant at South
Horizons Plant Building and Entrance
Figure 3.42.2 Location of Fixed Plant at South
Horizons Plant Building and Entrance
Figure 3.42.3 Location of Fixed Plant at South
Horizons Plant Building and Entrance
Figure 3.42.4 Location of Fixed Plant at South
Horizons Plant Building and Entrance
Figure 3.42.5 Location of Fixed Plant at South
Horizons Plant Building and Entrance
Figure 3.43.1 Location of Fixed Plant at Lee Wing
Street Plant Building
Figure 3.43.2 Location of Fixed Plant at Lee Wing
Street Plant Building
Figure 3.43.3 Location of Fixed Plant at Lee Wing
Street Plant Building
Figure 3.43.4 Location of Fixed Plant at Lee Wing
Street Plant Building
Figure 3.44 Noise Mitigation Measures for
Operation Ground-borne Noise near South Horizons Station
Figure 4.1 Ecological Assessment Area
Figure 4.2 Habitat Map and Species of
Conservation Concern (Sheet 1 of 13)
Figure 4.3 Habitat Map and Species of
Conservation Concern (Sheet 2 of 13)
Figure 4.4 Habitat Map and Species of
Conservation Concern (Sheet 3 of 13)
Figure 4.5 Habitat Map and Species of
Conservation Concern (Sheet 4 of 13)
Figure 4.6 Habitat Map and Species of
Conservation Concern (Sheet 5 of 13)
Figure 4.7 Habitat Map and Species of
Conservation Concern (Sheet 6 of 13)
Figure 4.8 Habitat Map and Species of
Conservation Concern (Sheet 7 of 13)
Figure 4.9 Habitat Map and Species of
Conservation Concern (Sheet 8 of 13)
Figure 4.10 Habitat Map and Species of
Conservation Concern (Sheet 9 of 13)
Figure 4.11 Habitat Map and Species of
Conservation Concern (Sheet 10 of 13)
Figure 4.12 Habitat Map and Species of
Conservation Concern (Sheet 11 of 13)
Figure 4.13 Habitat Map and Species of
Conservation Concern (Sheet 12 of 13)
Figure 4.14 Habitat Map and Species of
Conservation Concern (Sheet 13 of 13)
Figure 4.15 Mitigation Measures to the Impact on
Ardeid Night Roost
Figure 5.1 Locations of Water Control Zones
Figure 5.2 Locations
of Water Quality Sensitive Receivers
Figure 5.3 Locations of
Marine Piles for Telegraph Bay Barging Point
Figure 5.4 Proposed
Railway Bridge Pier Foundation for Aberdeen Channel – Plan
Figure 5.5 Proposed
Re-Construction Works for Staunton Creek Nullah - Location
Figure 5.6 Proposed Re-Construction Works for Staunton Creek
Nullah - Plan
Figure 5.7 Proposed
Re-construction Works for Staunton Creek Nullah – Typical Section 1
Figure 5.8 Proposed
Re-construction Works for Staunton Creek Nullah – Typical Section 2
Figure 5.9 Proposed Re-construction Works for Staunton Creek
Nullah – Typical Section 3
Figure 5.10.1 Aberdeen Channel to Ocean Park Station
Foundation Layout Plan (Sheet 1 of
4)
Figure 5.10.2 Aberdeen Channel to Ocean Park Station
Foundation Layout Plan (Sheet 2 of
4)
Figure 5.10.3 Aberdeen Channel to Ocean Park Station Foundation
Layout Plan (Sheet 3 of 4)
Figure 5.10.4 Aberdeen Channel to Ocean Park Station
Foundation Layout Plan (Sheet 4 of
4)
Figure
6.1.1 Review of Planning and
Development Control Framework Sheet 1 of 6
Figure
6.1.2 Review of Planning and
Development Control Framework Sheet 2 of 6
Figure
6.1.3 Review of Planning and
Development Control Framework Sheet 3 of 6
Figure
6.1.4 Review of Planning and
Development Control Framework Sheet 4 of 6
Figure
6.1.5 Review of Planning and
Development Control Framework Sheet 5 of 6
Figure
6.1.6 Review of Planning and
Development Control Framework Sheet 6 of 6
Figure
6.2.1 Landscape Resources Sheet
1 of 13
Figure
6.2.2 Landscape Resources Sheet
2 of 13
Figure
6.2.3 Landscape Resources Sheet
3 of 13
Figure
6.2.4 Landscape Resources Sheet
4 of 13
Figure
6.2.5 Landscape Resources Sheet
5 of 13
Figure
6.2.6 Landscape Resources Sheet
6 of 13
Figure
6.2.7 Landscape Resources Sheet
7 of 13
Figure
6.2.8 Landscape Resources Sheet
8 of 13
Figure
6.2.9 Landscape Resources Sheet
9 of 13
Figure
6.2.10 Landscape Resources Sheet
10 of 13
Figure
6.2.11 Landscape Resources Sheet
11 of 13
Figure
6.2.12 Landscape Resources Sheet
12 of 13
Figure
6.2.13 Landscape Resources Sheet
13 of 13
Figure
6.2.14 Landscape Resources
Photographs 1 of 5
Figure
6.2.15 Landscape Resources
Photographs 2 of 5
Figure
6.2.16 Landscape Resources
Photographs 3 of 5
Figure
6.2.17 Landscape Resources
Photographs 4 of 5
Figure
6.2.18 Landscape Resources
Photographs 5 of 5
Figure
6.3.1 Landscape Character Areas
and Impacts 1 of 6
Figure
6.3.2 Landscape Character Areas
and Impacts 2 of 6
Figure
6.3.3 Landscape Character Areas
and Impacts 3 of 6
Figure
6.3.4 Landscape Character Areas
and Impacts 4 of 6
Figure
6.3.5 Landscape Character Areas
and Impacts 5 of 6
Figure
6.3.6 Landscape Character Areas
and Impacts 6 of 6
Figure
6.4.1 Landscape Character Areas
Photographs 1 of 5
Figure
6.4.2 Landscape Character Areas
Photographs 2 of 5
Figure
6.4.3 Landscape Character Areas
Photographs 3 of 5
Figure
6.4.4 Landscape Character Areas
Photographs 4 of 5
Figure
6.4.5 Landscape Character Areas
Photographs 5 of 5
Figure
6.5.1 Impact on Landscape
Resources 1 of 13
Figure
6.5.2 Impact on Landscape
Resources 2 of 13
Figure
6.5.3 Impact on Landscape
Resources 3 of 13
Figure
6.5.4 Impact on Landscape
Resources 4 of 13
Figure
6.5.5 Impact on Landscape
Resources 5 of 13
Figure
6.5.6 Impact on Landscape
Resources 6 of 13
Figure
6.5.7 Impact on Landscape Resources
7 of 13
Figure
6.5.8 Impact on Landscape
Resources 8 of 13
Figure
6.5.9 Impact on Landscape
Resources 9 of 13
Figure
6.5.10 Impact on Landscape
Resources 10 of 13
Figure
6.5.11 Impact on Landscape
Resources 11 of 13
Figure
6.5.12 Impact on Landscape
Resources 12 of 13
Figure
6.5.13 Impact on Landscape
Resources 13 of 13
Figure
6.6.1 Visual Envelope and Zone
of Visual Influence 1 of 5
Figure
6.6.2 Visual Envelope and Zone
of Visual Influence 2 of 5
Figure
6.6.3 Visual Envelope and Zone
of Visual Influence 3 of 5
Figure
6.6.4 Visual Envelope and Zone
of Visual Influence 4 of 5
Figure
6.6.5 Visual Envelope and Zone
of Visual Influence 5 of 5
Figure
6.7.1 Visual Context of Visual
Sensitive Receivers 1 of 11
Figure
6.7.2 Visual Context of Visual
Sensitive Receivers 2 of 11
Figure
6.7.3 Visual Context of Visual
Sensitive Receivers 3 of 11
Figure
6.7.4 Visual Context of Visual
Sensitive Receivers 4 of 11
Figure
6.7.5 Visual Context of Visual
Sensitive Receivers 5 of 11
Figure
6.7.6 Visual Context of Visual
Sensitive Receivers 6 of 11
Figure
6.7.7 Visual Context of Visual
Sensitive Receivers 7 of 11
Figure
6.7.8 Visual Context of Visual
Sensitive Receivers 8 of 11
Figure
6.7.9 Visual Context of Visual
Sensitive Receivers 9 of 11
Figure
6.7.10 Visual Context of Visual
Sensitive Receivers 10 of 11
Figure
6.7.11 Visual Context of Visual
Sensitive Receivers 11 of 11
Figure
6.8.1 Visual Impacts 1 of 4
Figure
6.8.2 Visual Impacts 2 of 4
Figure
6.8.3 Visual Impacts 3 of 4
Figure
6.8.4 Visual Impacts 4 of 4
Figure
6.9.1.1 Recommended Landscape
Mitigation Measures
Figure
6.9.1.2 Recommended Landscape
Mitigation Measures
Figure
6.9.1.3 Recommended Landscape
Mitigation Measures
Figure
6.9.2 Recommended Landscape
Mitigation Measures
Figure
6.9.3.1 Recommended Landscape
Mitigation Measures
Figure
6.9.3.2 Recommended Landscape
Mitigation Measures
Figure
6.9.4 Recommended Landscape
Mitigation Measures
Figure
6.9.5 Recommended Landscape
Mitigation Measures
Figure
6.9.6 Recommended Landscape
Mitigation Measures
Figure
6.9.7 Recommended Landscape
Mitigation Measures
Figure
6.9.8 Recommended Landscape
Mitigation Measures
Figure
6.9.9 Recommended Landscape
Mitigation Measures
Figure
6.9.10 Recommended Landscape
Mitigation Measures
Figure
6.9.11 Recommended Landscape
Mitigation Measures
Figure
6.9.12 Recommended Landscape
Mitigation Measures
Figure
6.9.13 Recommended Landscape
Mitigation Measures
Figure
6.9.14 Recommended Landscape
Mitigation Measures
Figure
6.9.15 Recommended Landscape Mitigation
Measures
Figure
6.9.16 Recommended Landscape
Mitigation Measures
Figure
6.9.17 Recommended Landscape
Mitigation Measures
Figure
6.9.18 Recommended Landscape
Mitigation Measures
Figure
6.9.19 Recommended Landscape
Mitigation Measures
Figure
6.9.20 Recommended Landscape
Mitigation Measures
Figure
6.9.21 Recommended Landscape
Mitigation Measures
Figure
6.9.22 Recommended Landscape
Mitigation Measures
Figure
6.9.23 Recommended Landscape
Mitigation Measures
Figure
6.9.24 Recommended Landscape
Mitigation Measures
Figure
6.9.25 Recommended Landscape
Mitigation Measures
Figure
6.9.26 Recommended Landscape
Mitigation Measures
Figure
6.9.27 Recommended Landscape
Mitigation Measures
Figure
6.10.1 Photomontage - Vantage
Points A
Figure
6.10.2 Photomontage - Vantage
Points A
Figure
6.10.3 Photomontage - Vantage
Points B
Figure
6.10.4 Photomontage - Vantage
Points B
Figure
6.10.5 Photomontage - Vantage
Points C
Figure
6.10.6 Photomontage - Vantage Points
C
Figure
6.10.7 Photomontage - Vantage
Points D
Figure
6.10.8 Photomontage - Vantage
Points D
Figure
6.10.9 Photomontage - Vantage
Points E
Figure
6.10.10 Photomontage - Vantage Points
F
Figure
6.10.11 Photomontage - Vantage Points
F
Figure
6.10.12 Photomontage - Vantage Points
G
Figure
6.10.13 Photomontage - Vantage Points
H
Figure
6.10.14 Photomontage - Vantage Points
I
Figure
6.10.15 Photomontage - Vantage Points
J
Figure
6.10.16 Photomontage - Vantage Points
J
Figure
6.10.17 Photomontage - Vantage Points
K
Figure
6.10.18 Photomontage - Vantage Points
L
Figure
6.10.19 Photomontage - Vantage Points
L
Figure
6.10.20 Photomontage - Vantage Points
M
Figure
6.10.21 Photomontage - Vantage Points
N
Figure
6.10.22 Photomontage - Vantage Points
N
Figure
6.10.23 Photomontage - Vantage Points
O
Figure
6.10.24 Photomontage - Vantage Points
O
Figure
6.10.25 Photomontage - Vantage Points
P
Figure
6.10.26 Photomontage - Vantage Points
Q
Figure
6.10.27 Photomontage - Vantage Points
Q
Figure
6.10.28 Photomontage - Vantage Points
R
Figure
6.10.29 Photomontage - Vantage Points
S
Figure
6.10.30 Photomontage - Vantage Points
T
Figure
6.10.31 Photomontage - Vantage Points
T
Figure
6.10.32 Photomontage - Vantage Points
U
Figure
6.10.33 Photomontage - Vantage Points
U
Figure
6.10.34 Photomontage - Vantage Points
V
Figure
6.10.35 Photomontage - Vantage Points
V
Figure 7.1 Hong Kong
Government Risk Guidelines
Figure 7.2 Schematic
diagram of QRA Process
Figure 7.2 Schematic
diagram of QRA Process
Figure 7.3 Proposed
Alignment and Work Areas
Figure 7.4 Proposed Alignment,
Proposed Magazine Locations and Explosives Transport Routes
Figure 7.5 Maximum IR
for the Delivery Routes from Chung Hom Shan Magazine
Figure 7.6 IR of
Proposed Chung Hom Shan Magazine
Figure 7.7 F-N Curves
for Storage and Transport of Explosives
Figure 7.8 F-N Curves
for Base Case with Breakdown by Transport and Storage
Figure 7.9 Location of
South Horizons Station and the LPG Depot
Figure 7.10 Layout of
the LPG Depot
Figure 7.12 FN Curves
showing Construction Phase (Year 2014) Risk Breakdown by Population Type
Figure 7.13 IR Contours
for the LPG Depot
Figure 8.1 Location of Grab Sampling
Figure 9.1 Proposed Land Contamination Site
Investigation Location on Ocean Park Station (OCP)
Figure 9.2 Proposed Land Contamination Site
Investigation Locations on South Horizons Station (SOH)
Figure 10.1 Study Area for Air Quality Impact
Assessment
Figure 10.2 Locations of Air Sensitive Receivers
in Admiralty
Figure 10.3 Locations of Air Sensitive Receivers
at Nam Fung Portal and Ocean Park
Figure 10.4 Locations of Air Sensitive Receivers
in Wong Chuk Hang
Figure 10.5 Locations of Air Sensitive Receivers
in Lei Tung
Figure 10.6 Locations of Air Sensitive Receivers
in South Horizons and Lee Nam Road Barging Point
Figure 10.8 Zoning for Site Formation Works and
Zoning for Structure / Fitting Out Works
Figure 10.9 Locations of Potential Dust Emission
Sources in Admiralty (1) (Tier 1)
Figure 10.10 Location of Potential Dust Emission
Sources in Admiralty (2) (Tier 1)
Figure 10.11 Location of Potential Dust Emission
Sources in Nam Fung and Ocean Park (Tier 1)
Figure 10.12 Location of Potential Dust Emission
Sources in Wong Chuk Hang (Tier 1)
Figure 10.13 Location of Potential Dust Emission
Sources in Ap Lei Chau and Lei Tung (Tier 1)
Figure 10.14 Location of Potential Dust Emission
Sources in South Horizons (Tier 1)
Figure 10.15 Locations of Potential Dust Emission
Sources at Lee Nam Barging Point (Tier 1)
Figure 10.17 Location of Potential Dust Emission
Sources in Wong Chuk Hang (Tier 2 for ASR – WCH14)
Figure 10.18 Location of Potential Dust Emission
Sources in Wong Chuk Hang (Tier 2 for ASR – WCH2)
Figure 10.21 Location of Potential Dust Emission
Sources in Wong Chuk Hang (Tier 2 for ASR – WCH6)
Figure 10.41 Not used
Figure 10.42 Not used
Figure 10.44 Not used
Figure
11.1 Geological map for the
proposed works area at Admiralty
Figure
11.2 Geological map for the
proposed work sites at Wong Chuk Hang
Figure
11.3 Geological map for the
proposed alignment on Ap Lei Chau
Figure
11.4 Historical map for project
study area at Admiralty (1856)
Figure
11.5 Historical map for project
study area at Admiralty (1936-46)
Figure
11.6 Historical map of Wong
Chuk Hang Area (1895)
Figure
11.7 Aerial photograph of the
Wong Chuk Hang Area (1949)
Figure
11.9 Map showing the area of
previously identified archaeological potential near Ocean Park
Figure
11.12 1845 Map showing the
location of the historical settlement known as Little Hong Kong
Figure
11.13 Graded historic building
and built heritage resource around Ap Lei Chau
Figure
11.14.1 Graded historic building and
Declared Monument around Admiralty
Figure
11.14.2 Proposed Graded Buildings
along Nam Fung Tunnel
Figure
11.15 Graded historic building and
built heritage resource around Wong Chuk Hang
Figure
11.16 Graded historic building
and Declared Monument around Wong Chuk Hang
Figure
11.17 Location of the previously
recorded resources in Wong Chuk Hang San Wai
Figure
11.18 Map in 1936-46 overlaying
map in 1880 of Admiralty
Figure
11.21 Assessment of
archaeological potential – Admiralty
Figure
11.22 Assessment of
archaeological potential – Admiralty
Figure
11.23 Assessment of archaeological
potential – Admiralty
Figure
11.24 Assessment of
archaeological potential – Nam Fung Tunnel
Figure
11.25 Assessment of
archaeological potential – Nam Fung Tunnel
Figure
11.26 Assessment of
archaeological potential – Nam Fung Tunnel
Figure
11.27 Assessment of
archaeological potential – Nam Fung Tunnel
Figure
11.28 Assessment of
archaeological potential – Nam Fung Portal
Figure
11.29 Assessment of
archaeological potential – Ocean Park
Figure
11.30 Assessment of
archaeological potential – Wong Chuk Hang
Figure
11.31 Assessment of
archaeological potential – Ap Lei Chau
Figure
11.32 Assessment of
archaeological potential – Ap Lei Chau
Figure
11.33 Assessment of
archaeological potential – Ap Lei Chau
Figure
11.34 Assessment of
archaeological potential – Ap Lei Chau
Figure
11.35 Plan showing the area
proposed for watching brief at Wong Chuk Hang (pier locations)
Figure
11.36 1957 map showing the
general area at Admiralty
Figure
11.37 1963 map showing the
general area at Admiralty
Figure
11.38 1977 map showing the
general area at Admiralty
Figure
11.39 1986 map showing the Harcourt
Garden Site at Admiralty
Figure
11.40 Underground section of the
proposed cut-and-cover station box at Harcourt Garden