The Shatin to
Central Link (SCL) is one of the ten large-scale infrastructure projects
announced by the Chief Executive in his 2007-2008 Policy Address. MTR
Corporation Limited has been entrusted to plan and design for this project.
For the
purposes of the Environmental Impact Assessment (EIA), five EIA Studies, namely
Tai Wai to Hung Hom Section
(SCL (TAW-HUH)), Mong Kok
East to Hung Hom Section (SCL (MKK-HUH)), Hung Hom to Admiralty Section (SCL (HUH-ADM)), Protection Works
at Causeway Bay Typhoon Shelter and Stabling Sidings at Hung Hom Freight Yard (HHS), have been conducted to cover
different sections of the SCL. They include:
·
SCL – Tai Wai to Hung Hom Section [SCL
(TAW-HUH)] – the extension of Ma On Shan Line from Tai Wai
Station via Hin Keng,
Diamond Hill, Kai Tak, To Kwa
Wan, Ma Tau Wai and Ho Man Tin to Hung Hom, and link
up with the existing West Rail Line, along with a proposed stabling sidings
option in Diamond Hill (DHS);.
·
SCL – Stabling Sidings at
Hung Hom Freight Yard [SCL (HHS)] (hereinafter
referred to as “the Project”, being considered in this EIA) – another stabling
sidings option for SCL (TAW – HUH) proposed at the former freight yard in Hung Hom;
·
SCL – Mong
Kok East to Hung Hom
Section [SCL (MKK-HUH)] – the realignment work for the existing East Rail Line
tracks from the tunnel portal near Oi Man Estate
(Portal 1A) to the proposed North Ventilation Building (NOV) in Hung Hom;
·
SCL – Hung Hom to Admiralty Section [SCL (HUH-ADM)] – the section from
NOV, Plant Rooms and Emergency Access in Hung Hom
across the harbour to the Causeway Bay Typhoon
Shelter (CBTS), Exhibition Station (EXH) and then to ADM; and
·
SCL Protection works at
Causeway Bay Typhoon Shelter – the section of approximately 160m long of the
SCL tunnel protection works at the crossing over Central-Wan Chai Bypass (CWB) tunnels, which would be constructed under
the CWB project.
An application (No. ESB-191/2008) for an EIA Study Brief under Section 5(1)(a) of the EIAO was submitted by MTR Corporation in June
2008 with a project profile (No. PP-356/2008). A Study
Brief was issued by EPD in July 2008 to provide the scope and requirements of
the EIA study for SCL (TAW-HUH). In that Study Brief, the rail alignment of the
SCL (TAW-HUH), 7 stations, namely Hin Keng Station (HIK), Diamond Hill Station (DIH), Kai Tak
Station (KAT), To Kwa Wan Station (TKW), Ma Tau Wai
Station (MTW), Ho Man Tin Station (HOM) and Hung Hom
Station (HUH), along with other supporting facilities and the proposed stabling
sidings in Diamond Hill (DHS) were covered.
Following the
cessation of the operations of various freight facilities at Hung Hom in April 2011, MTR Corporation Limited has started a
detailed study to investigate the feasibility and environmental acceptability
of utilizing the former freight yard to accommodate the train stabling
requirements for SCL (TAW-HUH).
To make the former Hung Hom Freight Yard feasible for the use of stabling, in
addition to providing siding tracks underneath the existing podium structure
covering the freight yard, and launching/retrieval and emergency tracks and
shunt neck extending outside the podium, it would be necessary to make
appropriate changes to the design of SCL (TAW-HUH) and SCL (MKK-HUH) at HUH,
KAT and DIH and its associated alignment and facilities. These works are
collectively referred to as the Project in this EIA (Figure 1.1).
According to the latest programme,
the construction works for the Project would commence in 2012. More detailed
description of the Project is given in Sections 2 and 3.
Ove Arup
& Partners Hong Kong Ltd (Arup) was commissioned by MTR Corporation Limited
(MTR Corporation) as the EIA Consultant for the Project.
The Project
is a Designated Project (DP) under the EIAO falling into the following
categories:
-
A
railway and its associated stations under Item A.2, Part I of Schedule 2 of the
EIAO
- A railway siding under Item A.4,
Part I of Schedule 2 of the EIAO
The Project would be a designated
project under EIA Ordinance. An application
(Application No. ESB-233/2011) for an EIAO Study Brief under Section 5(1)(a) of the EIAO was submitted by MTR Corporation in 30 June
2011. A Study Brief was issued by EPD on 10 August 2011 to provide the scope
and requirements of the EIA study for the Project.
The entire SCL is to form a
strategic rail corridor from Shatin to Central which will bring about various
benefits to the community, including:
·
Redistribution
of railway passenger flows to relieve the existing railway lines in urban
·
Providing
public transport service for Kai Tak Development;
·
Relieving
road-based public transport in the existing developed areas, and alleviation of
the traffic congestion and environmental nuisance on existing road networks,
including the demand on the Hung Hom Cross Harbour
Tunnel; and
·
Stimulation
of the redevelopment of To Kwa Wan and
The HHS covered in this Project or
DHS covered in the SCL (TAW-HUH) would be an essential element for the
operation of SCL (TAW-HUH). Either option would be needed to accommodate trains
for deployment to meet the demand during morning peak hours. In non-operational hours, the sidings would
be used for train stabling. Maintenance works, such as regular cleaning and
inspection, but not for major repairing works, would be conducted during
non-operational hours as well. Without the support of the stabling sidings, the
SCL (TAW-HUH) would not be functional.
The SCL
(TAW-HUH) will provide a fast, reliable and convenient mode of transport
between
Inevitably, environmental impacts will be induced on the existing
environment along the alignment from some of the construction activities.
Environmentally friendly construction methods and appropriate mitigation
measures will be implemented to ensure all the impacts are minimized (see Sections 4 –15 for details).
When HHS and SCL (TAW–HUH) are completed, changes to the environment and
controlled acceptable impacts may be experienced by individuals. However, in
the absence of the Project and SCL (TAW-HUH), passengers travelling between Tai
Wai and Hung Hom will
mainly rely on road-based transport, which will increase road traffic and
contribute to additional noise and air pollution affecting the local districts.
According to the latest programme,
the construction works for SCL (HHS) would commence in 2012 with completion in
2018. The possible potential concurrent projects in the vicinity of the Project
are identified as follows. Figure
1.2 shows the location and
alignment of these concurrent projects.
1.6.1
Shatin to Central
Link – Tai Wai to Hung Hom
Section
SCL (TAW-HUH) is an approximately
DIH will become an interchange
station with the existing Kwun Tong Line (KTL). The SCL (TAW-HUH) will
interchange with the Kwun Tong Line Extension (KTE) and the SCL (MKK-HUH) at
HOM and HUH respectively. The HOM and HUH are to be separately implemented
under KTE and SCL (MKK-HUH) respectively.
An option of having a train stabling
sidings at the Diamond Hill CDA site (i.e. former
The SCL (TAW-HUH) will also form an
important part of the proposed Kai Tak Development, providing mass transit
service not only to the proposed new commercial and residential developments in
the area, but also the Multi-Purpose Stadium Complex and other leisure
facilities planned at Kai Tak.
This project is anticipated to
commence in 2012 with completion in 2018. It will therefore be constructed
concurrently with the proposed Project. Cumulative dust, noise, ecology,
landscape and visual impacts are anticipated. These cumulative impacts will be
addressed in this report.
1.6.2
Shatin to Central
Link – Mong Kok East to
Hung Hom Section, Hung Hom to Admiralty
Section and Protection Works at Causeway Bay Typhoon Shelter
The SCL (MKK-HUH) includes the
realignment and modification of the railway section from Mong
Kok East to Hung Hom and
station modification works at HUH with new underground platforms. According to
updated information, the project is anticipated to commence in mid 2012 and the
overall Project completion is anticipated to be 2018. It will therefore be
constructed concurrently with the proposed Project. Cumulative construction
dust, noise, landscape and visual impacts are therefore anticipated. Permanent
above-ground structures (including alignment of SCL (MKK-HUH) and cooling
tower), will pose cumulative railway noise and landscape and visual impacts on
some receivers during operational phase.
The SCL (HUH-ADM) comprises an approximately
6 km extension of the East Rail Line including a rail harbour crossing from
Hung Hom to Admiralty on
Protection Works at Causeway Bay
Typhoon Shelter (CBTS) involves the construction of a section of the twin track
railway tunnel box (the SCL Protection Works) by cut-and-cover method at the
crossing above the CWB tunnels. The length of the SCL Protection Works is
approximately 160m long and it is located entirely offshore within the CBTS.
Upon implementation of the SCL (HUH-ADM) in the future, the south end of the
Protection Works will be extended from the temporary reclamation to connect
with the South Ventilation Building at the existing Police Officers’ Club and
the north end of the Protection Works will be continued in cut and cover
construction to connect to an Immersed Tube Tunnel beneath the harbour. Although the construction of the CBTS is anticipated to
commence in 2012 and complete by 2013, separation distance between CBTS and
the Project is over 500m and thus cumulative construction and operational
impacts are not expected. (Ref: http://www.epd.gov.hk/eia/register/report/eiareport/eia_1872010/EIA/html/TOC-Text.htm)
1.6.3
Central
The Central Kowloon Route (CKR) is a dual-3 lane trunk road across central
The construction of CKR
bored tunnel between
The CKR also includes the
construction of underwater tunnel between underwater Kowloon City Ferry Pier
and Kai Tak Runway (adopt cut-&-cover method involving temporary
reclamation), cut and cover tunnel, depressed and elevated roads between Kai
Tak Runway and the Interchange with Kai Cheung Road, Kai Fuk Road and Trunk
Road T2 on the proposed KTD. The project also includes construction of
ventilation buildings and an administration building south to the Kai Tak
Tunnel portal.
According to the latest information, CKR would commence
construction by 2015 for completion by 2020. Since the Project would be
completed in 2018, the construction work for the Project and CKR would overlap
during 2015-2018. However, the peak for civil construction for the Project
would be at 2014 and hence the impacts due to the Project would have been
reduced. The cumulative impacts on dust, construction noise, visual and water
quality will be addressed separately.
1.6.4
Widening of
This project aims at widening the
existing Gascoigne Road Flyover, which is mainly a single 2-lane 2-way
carriageway of about 1.2km, to increase its capacity. According to updated
information, the Widening of Gascoigne Road Flyover is scheduled to commence
after 2018 and hence would not be concurrent with the construction of the
Project.
According
to the approved EIA Report of Kai Tak Development (KTD) (ref: AEIAR-130/2009) [1-3], the project is located in the
south-eastern part of Kowloon Peninsula, comprising the apron and runway areas
of the former Kai Tak Airport and existing waterfront areas at To Kwa Wan, Ma Tau Kok, Kowloon Bay,
Kwun Tong and Cha Kwo Ling. The Project also covers
The size of this project is
approximately 328 ha and the latest development plan is shown in the
Recommended Outline Development Plan (RODP) dated December 2009. Under this plan, a series of sub-districts
are proposed to be created within KTD. They include a commercial belt and
Station Square planned at North Apron and North Apron East which would be
around the future KAT of the the Project.
According to the LegCo
Papers on Kai Tak Development (LC Paper No CB(1)1919/09-10(05)[1-3], CB(1)396/09-10(05) [1-1] and CB(1)570/08-09(03) [1-2]), the KTD projects are grouped into
three packages for completion by three target years, 2013, 2016 and 2021. Development packages of KTD are described in Table 1.1
and illustrated in Appendix 1.1.
Table 1.1: Development
Packages of Kai Tak Development
Development |
Package A |
Package B |
Package C |
Development
at North Apron |
·
Public housing developments ·
Primary schools and secondary school ·
Kai Tak Government offices |
·
Sites for commercial/ residential development. ·
Underground streets ·
·
Station Square and |
·
Multiple-Purpose Stadium Complex ·
Sites for commercial / residential development ·
Sung |
Developments
at Runway |
·
Cruise Terminal (first berth); ·
Runway park |
·
Cruise terminal building (including second berth) ·
Tourism Node ·
Heliport ·
Bio-remediation of Kai Tak Approach Channel and
the Kwun Tong Typhoon Shelter |
·
Metro park ·
Sites for residential/ commercial developments |
Development
at South Apron |
|
|
·
Sites for commercial developments |
Kwun
Tong Public Cargo Working Area |
·
Waterfront promenade |
|
|
Supporting
infrastructure |
·
District cooling system (first phase); ·
Roadworks, pedestrian
links, water supply, drainage and sewerage systems. |
·
District cooling system (second phase) ·
Roadworks,
pedestrian links, water supply, drainage and sewerage systems. |
·
District cooling system (final phase) ·
Roadworks,
water supply, drainage and sewerage systems. |
Target completion |
2013 |
2016 |
2021 |
The approved KTD EIA Report
(ref: AEIAR-130/2009) [1-3] identified that construction of electricity
substation, footbridge and subway enhancement, superstructure construction and
concreting works are not major dusty construction activities. In addition,
these facilities are located at more than 300m from the receivers of the Project, it is therefore
anticipated that it would not have significant contribution on the cumulative
construction noise and dust impacts on the receivers affected by the Project.
In the North Apron area, the
The construction of some of these
facilities under KTD may overlap with the construction of KAT and its
associated tunnels, as described below.
Housing Authority Development Sites 1A & 1B
There are 2 housing sites (i.e.
Sites 1A & 1B) within KTD that are within 300m from the Project. According
to the implementation programme in KTD, the first population intake would be
around 2013. Hence, its construction could possibly overlap with that of the
Project during 2012. By 2013, these 2 housing sites would become environmental
sensitive receivers (noise, air and visual) that need to be considered in the
construction and operational phases of the Project.
The existing Kai Tak nullah at the North Apron (with a separation distance of
300m) will be transformed into a river channel as a key landscape feature of
Kai Tak. The river channel will form a major green corridor in shaping the
public space in the city centre. According to the implementation programme in KTD, construction of the
Multi-Purpose Stadium Complex
Part of the Multi-Purpose Stadium
Complex (with a separation distance
of 300m) would be used
as the temporary works area for the Project. According to the implementation
programme in KTD, the construction of the Multi-Purpose Stadium Complex would
tentatively commence in 2013, and completed by 2018. Cumulative dust impact is
therefore anticipated.
District Cooling System
A district Cooling System (DCS) will
be implemented within KTD. The DCS will constitute a seawater
pumping station to be completed by 2013 and a series of pipelines to be
completed in phases between 2013 and 2021. The seawater pumping station would
also be constructed underground and is located approximately at the middle of
the western coastline of the runway and there are no existing noise sensitive
receivers within 300m and no existing air sensitive receivers within 500m. It
is therefore considered that the construction of the seawater pumping station
would not have significant contribution on the cumulative construction noise
and dust impacts on the receivers affected by the Project.
The seawater pipework
would also be implemented within KTD and be connected to the pumping
stations. Most of these pipework would be buried under ground and would be
constructed in sections. In addition,
most of these work sites would be far away from most of the receivers in the
Project. The construction noise and fugitive dust impacts from the construction
of the pipework system would therefore have
insignificant cumulative impacts.
The construction of both the pumping
stations and the pipework would not require any
dredging and hence there is no cumulative impact on construction water quality
impacts.
Cumulative impact from district
cooling system during operational phase is not expected.
Trunk Road T2
According to the EIA Study Brief for
Trunk Road T2 (ref ESB-203/2009), it would connect the eastern connection of
CKR to TKO - LTT. The Trunk Road T2 is a
dual two-lane trunk road of approximately 3.6km long and about 2.6 km of the
trunk road in the form of a tunnel. The
alignment for Trunk Road T2 is more than 300m and 500m from the noise and air
sensitive receivers respectively for the Project. It is therefore anticipated
that it would not have significant contribution on the cumulative construction
noise and dust impacts on the receivers affected by the Project.
Cumulative impact from Trunk Road T2 during operational phase is not expected.
Cruise Terminal
The site formation for Kai Tak Cruise
Terminal will be implemented by Civil Engineering and Development Department.
The scope of works comprises the construction of a sloping seawall of about
1,100m and a 35m wide and 850m long apron area for berthing of cruise vessels
of different sizes and capacities, as well as the dredging of about 1.38
million cubic meters of marine sediments to allow manoeuvring and berthing of
mega cruise vessels. The first berth is
expected to commence operation in mid-2013.
According to the approved EIA Report
for the Dredging Works for Proposed Cruise Terminal at Kai Tak (ref: AEIAR-115/2007) [1-4], there are 2
stages of dredging. The first stage of dredging would involve a total dredging
volume of about 1,022,300m3. The second stage of
dredging involving a lesser amount of about 680,000m3.
Further liaison has been made with CEDD and the website of Tourism Commission
has been reviewed. According to information available, the dredging works for
the cruise terminal has commenced in 2010 and is anticipated to complete in
2015. Maintenance dredging will be carried out regularly during the
construction period.
Since the Cruise Terminal is located
more than 300m and 500m from the noise and air sensitive receivers respectively
for the Project,
cumulative noise and air quality impacts are not anticipated.
Other Infrastructure (such as Sewage
Pumping Station and Roads)
Some of the infrastructures such as
sewage pumping stations and roads would also be implemented concurrently with
the Project. The cumulative noise, dust and visual impacts during the
construction phase would need to be addressed. Cumulative visual impacts would
also be anticipated during the operational phase.
Commercial Facilities Development Above KAT
The Project is located inside the
For the
development of Commercial Facilities Development on top of KAT by others, there
is no solid implementation programme yet. However, as KAT will be designed to
support the loading of the development and the construction of this low-rise
development would commence after KAT is substantially completed. As a result, no major cumulative impact is
anticipated. The commercial facilities development will be considered as visual sensitive receivers
during operational phase.
1.6.6 Kwun Tong Line Extension & Associated
EPIW
The project is an approximately
2.6km extension of the existing Kwun Tong Line from Yau
Ma Tei Station to a new railway station at Whampoa
and an interchange with SCL (TAW-HUH) at Ho Man Tin Station. The construction works of KTE has commenced in mid-2011 and is scheduled for
completion in 2015 according to the
approved EIA Report (ref: AEIAR-154/2010) [1-5].
The KTE includes the construction of
the running line from Yau Ma Tei
Station through to Ho Man Tin Station and Ho Man Tin Station to Whampoa
Station, the proposed Ho Man Tin Station, Whampoa Station and their associated
structures. 3 EPIWs have been assessed as concurrent projects (for potential
cumulative impacts) in the approved KTE EIA Report. The 3 EPIWs for KTE are
summarised below:
Oi Man Estate and Ho Man Tin Estate
Connections
Oi Man Estate and Ho Man Tin Estate
are situated to the west and north side respectively of the proposed Ho Man Tin
Station of SCL (TAW-HUH). In order to provide and enhance better pedestrian
connectivity from the station to these estates and during the public
consultation process undertaken by MTR, the connectivity to the new station
would be improved. This EPIW, Oi Man Estate and Ho
Man Tin Estate Connections, are a network of subways/covered walkways/covered
footbridges are proposed to provide a direct, safe and barrier free pedestrian
connection. The construction of these connections and their associated slope
stabilisation works would interface with that for Ho Man Tin Station of SCL
(TAW-HUH).
Public Transport Facilities
The public transport facilities
including 3 lay-bys and 1 general pick-up/drop off facilities along
A new Chatham Road Footbridge is proposed to direct pedestrians from
The new bridge is designed in 3
spans with the longest span up to 53m spanning across
The demolished and construction of this footbridge would interface with that for Ho Man Tin Station of SCL (TAW-HUH).
The construction of Ho Man Tin
Station and associated tunnels and EPIW would be concurrent with the
construction of the Project. Cumulative noise and dust impacts during the
construction phase would need to be addressed. During the operational phase,
cumulative groundborne noise impact would also be anticipated.
1.6.7 HKPU Student Hostel (Phase 3) Development at
The Hong Kong Polytechnic University
(HKPU) Student Hostel (Phase 3) Development is located at the junction of
The HKPU Student Hostel (Phase 3)
Development will be considered as a
sensitive receiver on dust impact during construction phase and visual impact
during construction and operational phase.
1.6.8
Ex-San
According to the approved Tsz
Wan Shan, Diamond Hill & San Po Kong Outline Zoning Plan (S/K11/25), the
ex-San
Since the majority of the site
formation work has been completed, the demolition work and the superstructure
work would only generate insignificant construction noise, fugitive dust and
visual impacts for the noise, air and visual sensitive receivers considered in
the Project.
The public housing development at ex-San
1.6.9
Tsz Wan Shan
Pedestrian Link
The Project Proponent will also
design and construct, as Government entrusted works, the Tsz Wan Shan
Pedestrian Link which will connect to the KTL Diamond Hill Station. This
walkway system would implement a number of covered walkways, pedestrian
footbridges, lifts etc to provide a convenient connection system for the
neighbouring community.
The construction of this walkway
system would generally be concurrent with the construction of the DIH. The
associated construction noise, dust and visual impacts from this walkway system
would need to taken into account in the cumulative assessment. Cumulative visual impact from Tsz Wan Shan
pedestrian link during operational phase has been addressed.
1.6.10
Covered Walkway at
Kai Tak
A covered walkway which connected to TKW would be
proposed. The walkway system would provide convenient connection system for the
neighbouring community. However, there is no status for its implementation and
hence its cumulative impacts would not be considered in this EIA.
1.6.11
Comprehensive
Development Area (CDA) at Diamond Hill
This CDA site is bounded by
The CDA site comprises the area occupied by the
former
1.6.12
Proposed 132kV
Cable Circuits Connecting with Ho Man Tin KCRC Substation and Tsim Sha Tsui Substation (Hung Hom Side)
The proposed cable connects Ho Man Tin KCRC
Substation and Tsim Sha
Tsui Substation. Initially, it runs
underneath the Chatham Road North Interchange and then along the
The proposed cable duct along the existing
footpaths and carriageways will be constructed mainly by open trenching method
except for the proposed no-dig cable duct crossing underneath Chatham Road
North Interchange. The section potentially causing minor and limited
disturbance to the environment will be constructed by trenchless method and no potential
environmental impact will be anticipated. For other sections, to minimize any
disturbance to the surrounding environment, the construction works will be
conducted in phases. The construction works will only involve minor and limited
excavation works, and no adverse environmental impact will be expected.
Therefore, it is anticipated that there will be no cumulative impact with the
Project.
1.6.13 Summary of Concurrent Projects
The potential impacts of concurrent projects during
the construction and operation of the proposed Project are summarised in Table 1.2
and Figure
1.2.
Table 1.2: Summary of Potential Concurrent Projects
Project (Construction Methodology [2]) |
Potential Cumulative Impacts |
|
Construction Phase [1] |
Operational Phase [1] |
|
SCL
(TAW-HUH) (Bored tunnel, at grade works and cut-&-cover tunnel) |
· Fugitive dust · Airborne noise · Ecology · Landscape and visual |
· Airborne noise · Landscape and visual |
SCL
(MKK-HUH) (cut-&-cover tunnel) |
· Fugitive dust · Airborne noise · Landscape and visual |
· Airborne noise · Landscape and visual |
SCL
(HUH-ADM) (Land-based construction activities) |
· Fugitive dust · Airborne noise · Ecology · Landscape and visual |
· Airborne noise · Landscape and visual |
Protection
Works at |
· Nil |
· Nil |
Central |
· Fugitive dust · Airborne noise · Water quality · Visual |
· Visual |
Widening of |
· Not concurrent |
· Nil |
Kai Tak Development (Package A, B and C) |
· Fugitive dust · Airborne noise · Visual |
· Visual |
Housing Authority Development Sites 1A & 1B within Kai
Tak Development (superstructure construction) |
· Fugitive dust · Airborne Noise · Visual |
· Visual |
(Nullah modification and landscape works) |
· Fugitive dust · Visual |
· Visual |
Multi-Purpose Stadium Complex within Kai Tak Development (construction method to be established by respective
proponent) |
· Fugitive dust |
· Nil |
District Cooling System within Kai Tak Development (No dredging required, pumping station is underground and
away from noise and air receivers for the Project, only minor construction
works required for the pipework). |
· Nil |
· Nil |
Trunk Road T2 within Kai Tak Development (at-grade and tunnelling work, but far away from noise and
air receivers for the Project) |
· Nil |
· Nil |
Cruise Terminal within Kai Tak Development (concurrent dredging with that for the project, but far
away from noise and air receivers for the Project) |
· Nil |
· Nil |
Other Infrastructure within Kai Tak Development |
· Fugitive dust · Airborne Noise · Visual |
· Visual |
Commercial Facilities
Development Above Kai Tak Station |
· Not concurrent |
· Visual |
Kwun Tong Line Extension & Associated EPIW (cut-&-cover station and tunnel) |
· Fugitive dust · Airborne noise |
· Groundborne noise |
HKPU Student Hostel (Phase 3) Development at (typical superstructure construction) |
· Fugitive dust · Visual |
· Visual |
Ex-San Po Kong Flatted factory (typical superstructure construction) |
· Fugitive dust · Visual |
· Visual |
Tsz Wan Shan Pedestrian Link (typical at-grade works for lift and walkway systems) |
· Fugitive dust · Airborne noise · Visual |
· Visual |
Covered Walkway at Kai Tak (typical walkway construction) |
· No status |
· No status |
Comprehensive Development Area (CDA) at
Diamond Hill |
· Not concurrent |
· Noise · Landscape and Visual |
Proposed 132kV Cable Circuits Connecting
with Ho Man Tin KCRC Substation and Tsim Sha Tsui Substation (Hung Hom
Side) |
· Nil |
· Nil |
Note: [1] Construction phase of the Project
[2] For the section near scope of
the Project
The structure of this EIA report is outlined below
for ease of reference.
Section |
Title |
Aims |
|
Introduction |
Introduces
the background information and the layout of the EIA Report. |
|
Considerations of Revised Scheme Alignment |
Summarises
the various options considered and the main reasons for adopting the scheme recommended.
|
|
Project Description and Proposed Construction Methodology |
Describes
the project requirements covering the study area and site location, project
nature and scope and the implementation programme, and describes relevant
main construction/engineering aspects for the recommended scheme. |
|
Cultural Heritage Impact Assessment |
Presents
the legislation, methodology, assessment and recommendations for cultural
heritage impacts. |
|
Ecological Impact Assessment |
Presents
the legislation, methodology, assessment and recommendations for ecological
impacts. |
|
Landscape and Visual Impact Assessment |
Presents
the legislation, methodology, assessment and recommendations for landscape
and visual impacts. |
|
Construction Dust Impact Assessment |
Presents
the legislation, methodology, assessment and recommendations for construction
dust impacts. |
|
Airborne Noise Impact Assessment |
Presents
the legislation, methodology, assessment and recommendations for airborne
noise impacts. |
|
Groundborne Noise Impact Assessment |
Presents
the legislation, methodology, assessment and recommendations for groundborne
noise impacts. |
|
Water Quality Impact Assessment |
Presents
the legislation, methodology, assessment and recommendations for water
quality impacts. |
|
Waste Management Implications |
Presents
the legislation, methodology, assessment and recommendations for waste
management. |
|
Land Contamination |
Presents
the legislation, methodology, assessment and recommendations for land
contamination evaluation. |
|
EM&A Requirements |
Presents
the EM&A requirements. |
|
Summary of Environmental Outcomes |
Presents
the Key Environmental Outcomes. |
|
Conclusions |
Summarises
the findings. |
[1-1] LC Paper No CB(1)396/09-10(05) Legislative Council Panel on Development, Enhancing the delivery of Kai Tak Development, 24 November 2009
[1-2] LC Paper No CB(1)570/08-09(03) Legislative Council Panel on Development, The Implementation Plan for the Kai Tak Development, 20 January 2009
[1-3] Environmental Impact Assessment Report, Kai Tak Development, 2008.
[1-4] Environmental Impact Assessment Report, Dredging Works for Proposed Cruise Terminal at Kai Tak, October 2007.
[1-5] Environmental Impact Assessment Report, Kwun Tong Line Extension, June 2010.