2 Considerations of Alternative Options
A new stabling siding is an essential element
for the operation of the SCL. The major function of the stabling sidings is to
accommodate trains for deployment to meet the demand during morning peak hours.
In non-operational hours, the stabling sidings would also be used for regular
cleaning and inspection, but not for major repairing works.
As indicated above, stabling sidings is an
integral part of the SCL (TAW-HUH).
During the design process, a number of alternatives have been identified
and their suitability has been investigated. This section presents how various
alternatives have been developed and factors that have been considered during
the design process. This includes operational requirements, engineering
factors, views from the public as well as also environmental benefits and
impacts.
2.2.1 Operational Requirements for Stabling Sidings
In order to meet the train stabling requirements, it has been established with the Railways Development Office (RDO) that additional stabling facilities would be required. Some operational requirements for allowing proper function of the stabling sidings are listed below:
·
Location
requirement to allow efficient train launching to meet the service requirement;
·
Sufficient
stabling capacity to support operation of SCL (TAW-HUH);
·
Allow
for routine maintenance works such as regular cleaning and inspections but not
for major repairing works;
·
To
achieve adequate length and width (including allowance for EVA, access roads,
turn outs, staff accommodation, plant rooms, but excluding structures)
·
To
provide sidings at intervals that would allow disabled trains to be removed
from the running line to enable service requirements to be restored within a
reasonable period.
2.2.2
Using
Existing Train Depots
Investigation has been conducted for using existing train depots so as to avoid having a new train stabling sidings for SCL (TAW-HUH). A summary of the findings is given below:
Existing MTR Train Depot |
Reasons that cannot be adopted for SCL
(TAW-HUH) Train Stabling
Sidings |
Tai
Wai Depot and Pat Heung Depot |
The
future SCL (TAW-HUH) will have a journey time of about 70 minutes (Wu Kai Sha
to Tuen Mun). Train launching can only start at 5:30am but each station along
the line must have the arrival of the “first train” at or around 6:00am to
allow morning train service to commence.
With just 30 minutes after launching, the first train from Tai Wai
Depot and Pat Heung Depot will not be able to reach the other end of the line
(as stated above the single trip will take 70 minutes) and hence a third
launching point is required. In
addition, the stabling capacity at Pat Heung Depot and Tai Wai Depot is
unbalanced and hence the stabling sidings must be located east of HUH to
allow trains to be launched evenly to meet the morning service requirement. There might be an argument for
commencing the morning train launching earlier than 5:30am to resolve the
launching issue above. This means
further reduction of the current tight maintenance window during non-traffic
hours which will seriously affect the effectiveness and efficiency of
essential maintenance activities (e.g. grinding of rail,
inspection/maintenance of overhead line, repair of structures and trackside
railway equipment, etc.) during non-traffic hours. There will be increasing chances of human
errors and equipment failures if maintenance period is reduced from the
current minimum. |
Ho
Tung Lau Depot |
It is
currently used as the depot for the East Rail Line and the fleet size will
actually be increased after extending its service across the harbour (SCL
(HUH-ADM)). There is already a lack of
space along the East Rail Line for additional stabling and there is no room to
accommodate any trains of SCL (TAW-HUH). The East
Rail Line signalling system is not compatible with SCL (TAW-HUH) and hence it is not possible to stable the
SCL (TAW-HUH) trains in Ho Tung Lau Depot as they cannot run by themselves to
the SCL (TAW-HUH) line tracks. |
|
It is
currently used as the depot for the Kwun Tong Line. The SCL (TAW-HUH) is an extension of the former KCR lines
where the rolling stock, signalling and traction power supply systems are
incompatible with the urban line systems of the Kwun Tong Line. In addition. the ex-KCR trains are bigger
and cannot fit into the Kwun Tong Line tunnels |
Other than the existing train depots, the investigation has also covered a number of other sites further away. A summary of the findings is given below.
Other Areas |
Reasons on whether it could be adopted
for SCL (TAW-HUH) Train Stabling Sidings |
|
The
approximate 8 ha disused quarry requires extensive site formation works. The
site at +100mPD will require a 3.3km spur line bifurcating near the Toll
Plaza of the Lion Rock road tunnel from the SCL (TAW-HUH) track level at +0mPD. Such level
difference will impose significant technical problem for track connection.
The rock cavern option inside Lion Rock with over 100m depth below ground
will have problems in providing fireman access and is not considered
further. This site is therefore not
suitable for use as the SCL (TAW-HUH) stabling sidings. |
Hin Keng |
Using this
site as the depot would take up the site available for the proposed HIK and
the entry/exit tracks would need to pass through HIK, jeopardizing the design
of the proposed HIK of SCL (TAW-HUH). |
Tai Shui Hang |
The site
is located south of the MOL Tai Shui Hang Station and is opposite to the
existing Shatin Sewerage Treatment Works. The site is however not
sufficiently large to accommodate the stabling facilities. Even if the arrangement of the tracks and
accommodation areas were to be adjusted, the limited headroom and the column
arrangement of the Tate’s |
Wu Kai
Sha CDA Sites |
Two CDA sites north of Wu Kai Sha Station are yet to be developed, and
the size of two sites combined is sufficient to accommodate the additional
stabling sidings. However, the southern CDA site consists of a large number
of lots, which have been acquired by a local developer. The northern site comprises of a golf club
under a Short Term Tenancy and a number of Government Land Allocations
(GLAs). Unless Government is willing
to revoke the GLAs and resume the private lots, development of stabling
sidings in the CDA sites will not be possible. |
Kai Tak |
As a
result of the change in the alignment along |
Diamond
Hill CDA Site |
The site
is considered a feasible location for the train stabling sidings as this
location is suitable for train deployment to meet the demand during morning
peak hours. However, this site has been identified as a site with potential
cultural values and landscape resources. Assemblage of Tang/Song
archaeological finds was uncovered at the archaeological site. Three
historical buildings and over 1000 trees are located within the site. This option
(i.e. the DHS), as a designated project under Item A4 of Schedule 2 of EIAO,
is assessed in a separate EIA study prepared according to EIA Study Brief (http://www.epd.gov.hk/eia/register/study/latest/esb-191.pdf
ESB-191/2008).
|
Former Hung Hom
Freight Yard |
Following
the termination of freight services in the former Hung Hom Freight Yard in
June 2010 and cessation of container cargo operation in April 2011, there is
a possibility for modifying the former Freight Yard at Hung Hom for use as
the new SCL (TAW-HUH) stabling sidings. However, the existing column grids
were not designed for stabling and the associated connection tracks to the
SCL (TAW-HUH) mainline and would need to be modified to accommodate the
different stabling configuration and facilities. In addition the distance
between Tai Wai and Hung Hom is such that if a train were disabled on the
mainline, the time to retrieve the disabled train to these sidings would significantly
impact the service frequency. As a
result, it may be necessary to make appropriate changes in the Diamond Hill,
Kai Tak and Hung Hom Stations and its associated alignment and facilities of
this Project to suit the SCL operational arrangement. With these adjustments
in place, the former freight yard can thus be as well considered as one
possible site to accommodate the train stabling requirement for SCL. |
2.2.4 Preferred Sites for Stabling Sidings
It can be seen from Section 2.2.1 that it is essential to have separate stabling sidings for SCL (TAW-HUH) and there are no existing depots that could be adopted. Among the possible sites, the Diamond Hill CDA Site (i.e. the former Tai Hom Village) and the former Hung Hom Freight Yard Site are considered as feasible locations for train stabling sidings having considered operational requirements and engineering factors.
Further to the selection of preferred sites for train stabling sidings, investigation was conducted to identify different options to make the best use of the two preferred sites in order to maximize the efficiency of stabling sidings and minimize the adverse views from the public and environmental impacts. As such, three different options have been developed, including using only the Diamond Hill CDA Site (i.e. DHS), only the Hung Hom Freight Yard (i.e. HHS) and combination of HHS and DHS, for operation of SCL (TAW-HUH). The option of having stabling sidings at both Diamond Hill CDA Site and Hung Hom Freight Yard could help to share the need of providing a stabling sidings at either one of the possible sites therefore reducing the capacity of stabling sidings required at either one of the possible sites. However, a reduction in the stabling facilities at the former Hung Hom Freight Yard site would still result in constraining the remainder of the former Hung Hom freight yard being utilised for other uses due to operational constraints. Similarly even with a reduction of stabling facilities at the Diamond Hill CDA Site, the stabling sidings would still occupy a significant portion of the Diamond Hill CDA Site and would pose a constraint to the future use of this site. Therefore, the option of providing stabling sidings at both Diamond Hill CDA Site and former Hung Hom Freight Yard was found to be not preferred during the design process, and was not pursued further.
The option of using DHS is assessed under SCL (TAW-HUH) EIA Report, while the option of using HHS is assessed in this EIA Report.
As one of the SCL Project Objective, an extensive series of meetings/ consultations with public has been conducted during the preliminary design stage of the Project, with an objective to formulate a final scheme which meets the needs of the local community and is fully supported by the general public.
After the Executive Council approved the further planning and preliminary design of SCL by the MTR in March 2008, the Government and the MTR subsequently visited the District Councils and consulted local communities on the SCL project. Extensive public consultation, including roving exhibitions and public forums, was conducted in collaboration with various District Councils and the local community to further collect views from the public on the new links.
Following the termination of freight services in the former Hung Hom Freight Yard in June 2010 and cessation of container cargo operation in April 2011, the Government and MTR visited the District Councils on the option of HHS for operation of SCL in July 2011.
The public generally welcomes and looks forward to the
implementation of SCL as early as possible. However, the public also have
concern on the environmental impacts induced by operation of a stabling
sidings. In response to comments received, some modifications have been made on
the design of the DHS and HHS to address their concerns, as highlighted below.
DHS
Owing to the level difference between
HHS
Owing to the above-ground nature of HHS, the public are concern on the impacts resulted from the operation of HHS. Airborne railway noise impacts are assessed in Section 8 of this report. In accordance with the assessment results, direct noise mitigation measures will be implemented to minimize the airborne railway noise impact.
Both DHS and HHS are a good demonstration of this process of balancing railway needs against environmental concerns.
The environmental implications arising from the two different options of
stabling sidings arrangement including DHS and HHS have been examined, and the
environmental implications have been compared and presented in Table 2.1.
Table 2.1:
Comparison of Options of Stabling Sidings Arrangement
Train Stabling Sidings Options |
Environmental Benefits |
Environmental Impacts |
Engineering Considerations |
Remarks |
|
Location |
Design |
||||
Diamond Hill (DHS) |
Semi-underground |
· The majority of the depot roof would be
handed over to the future developer at Diamond Hill CDA site for development,
including but not limited to landscaping design. · All the new train stabling siding
tracks would be underneath the deck to be constructed and hence any
environmental noise and visual impacts would have been avoided. |
· The construction work for DHS would
inevitably affect the plantation and habitats within the boundary of the
Diamond Hill CDA site. Nevertheless, the ecological value of the plantation
and habitat has been concluded to be low (see Section 5). · The DHS Option would require felling
approximately 1100 trees in Diamond Hill area which is more than that of
approximately 300 for the works for DIH under the HHS Option. · This DHS Option would have direct
impact on the |
· The semi-underground DHS will require
bulk excavation that needs to be sequenced with the construction of the
proposed SCL DIH. · As DHS would occupy a large portion
of the former · Due to the constraint of DHS the
traffic diversion for the DIH works in · The connection tunnels to DHS will
require the diversion of a number of existing utilities in · The connection tunnel to DHS will
require a retrieval shaft near · In the operational phase pedestrian
access from |
Environmental assessments have been
included in the EIA for SCL (TAW – HUH) |
Hung Hom (HHS) |
Above-ground |
· The works for HHS would be within the
footprint of the existing railway facilities in former Hung Hom Freight Yard
and hence would achieve a high degree of landuse compatibility. · The works for DIH would only require
to fell approximately 300 trees which is less than that of the approximately
1100 for the DHS Option adopted under the SCL (TAW-HUH). · The works for DIH would have direct
impact on the two of the three historical buildings at · All the new train stabling siding
tracks would be underneath the deck of
Hung Hom Station and hence any environmental noise and visual impacts
would have been avoided to a large extent. · Overall construction waste generated
by the HHS is lesser than the DHS options as shallow excavation would involve
for accommodate the tracks under podium structure. |
· Configuration and number of
ventilation shafts / plant room required for HUH to support HHS Option would
be different from that required to support DHS Option. This would introduce
additional visual impacts and hence require mitigation measures to alleviate
impacts. · The new fan area to the north of HHS
would generate additional noise and visual impacts to the neighbouring
receivers. Direct noise mitigation
measures such as semi-enclosures and vertical noise barriers would be
required (see Section 8). These noise mitigation measures would also
require aesthetic consideration to alleviate any visual impacts. |
· The stabling tracks are at grade and
will only require a relatively shallow excavation to accommodate the tracks
below the existing podium structure. The stabling sidings are therefore
largely unseen by the public whereas the DHS option has a visible structure
above · The former Hung Hom Freight Yard is
no longer utilised and the adaption to a stabling sidings is a productive use
of this area that would be otherwise limited for other usage. Rail
connections to the freight yard already exist however they will need to be
modified due to the different operational requirements for the stabling
sidings. · The connection tunnel proposed
between KAT and DHS under the DHS option will not be required. · A refuge sidings will be required at
KAT for taking out of service trains that would not be required under the DHS
option. · The part of the Tai Hom village
unaffected by DIH is available for the CDA development with less constraint
on the future development options. · In the operational phase the
pedestrian access to DIH can be more convenient for pedestrians accessing
from · The HHS option would avoid impact on
the Stone House at Tai Hom village and also the part of the Kai Tak nullah
within the site. |
This option also requires
implementing amendments to the originally proposed works for Hung Hom
Station, Kai Tak Station and Diamond Hill Station. Environmental assessments
of these amendments along with HHS are assessed in this EIA Report. |
.
As illustrated in Table 2.1, the two different arrangement options of stabling sidings would bring about different environmental benefits and impacts.
As concluded in the EIA reports for SCL(TAW-HUH) and this Project, the environmental impacts of both DHS and HHS options would comply with the respective criteria stipulated in the TM-EIAO, and would be considered as acceptable with implementation of appropriate mitigation measures. For this reason, both options of using only the DHS and only the HHS would be considered as environmentally acceptable and could be adopted to support the operation of SCL (TAW-HUH).
It should be noted that the HHS would affect less trees, archaeological site and built heritages. The train stabling sidings at Former Hung Hom Freight Yard is also mostly within the footprint of existing railway facilities. Even including the necessary modification works at Hung Hom Station and construction works at Kai Tak Station and Diamond Hill Station, it would still affect less trees. All the siding tracks would also be accommodated underneath the existing deck of Hung Hom Station to minimise noise and visual impacts as much as possible. Although the new fan area to the north of the HHS would inevitably generate additional noise and visual impacts, direct noise mitigation measures including semi-enclosure and vertical noise barriers with appropriate aesthetic design would be implemented to alleviate any impacts that may be generated. It is therefore considered that the HHS option would be slightly preferred from an environmental perspective. However, train stabling, launching and retrieval requirements are complex. In addition to environmental factors, it is important to consider other factors such as engineering, operational requirements and safety aspects in determining the preferred scheme. The ultimate suitability of using either the DHS or HHS for train stabling would be subject to the findings of both detailed EIA and engineering studies.