List of Figures


Figure No.

Title

NEX2213/C/361/ENS/M50/501

SCL Overall Alignment (With Boundary of SCL – Mong Kok East to Hung Hom Section)

NEX2213/C/361/ENS/M50/502

Proposed SCL Alignment and Associated Works Area & Project Boundary (SCL – Mong Kok East to Hung Hom Section)

NEX2213/C/361/ENS/M50/503

Major Concurrent Projects

NEX2213/C/361/ENS/M52/501

Locations of Representative Noise Sensitive Receivers for Construction Phase (SCL – Mong Kok East to Hung Hom Section)

NEX2213/C/361/ENS/M52/601

Locations of Representative Noise Sensitive Receivers for Operational Phase (SCL – Mong Kok East to Hung Hom Section)

NEX2213/C/361/ENS/M54/501

Landscape Impact Study Boundary

NEX2213/C/361/ENS/M54/502

Visual Impact Study Boundary

NEX2213/C/361/ENS/M54/510

Planning and Development Control Framework

NEX2213/C/361/ENS/M54/520

Landscape Resources

NEX2213/C/361/ENS/M54/521

Photos of Landscape Resource Sheet 1 of 2

NEX2213/C/361/ENS/M54/522

Photos of Landscape Resource Sheet 2 of 2

NEX2213/C/361/ENS/M54/530

Landscape Character Areas

NEX2213/C/361/ENS/M54/531

Photos of Landscape Character Areas Sheet 1 of 2

NEX2213/C/361/ENS/M54/532

Photos of Landscape Character Areas Sheet 2 of 2

NEX2213/C/361/ENS/M54/540

Key Visual Sensitive Receivers (VSR)

NEX2213/C/361/ENS/M54/541

Photos of Key Visually Sensitive Receivers (VSR) Sheet 1 of 4

NEX2213/C/361/ENS/M54/542

Photos of Key Visually Sensitive Receivers (VSR) Sheet 2 of 4

NEX2213/C/361/ENS/M54/543

Photos of Key Visually Sensitive Receivers (VSR) Sheet 3 of 4

NEX2213/C/361/ENS/M54/544

Photos of Key Visually Sensitive Receivers (VSR) Sheet 4 of 4

NEX2213/C/361/ENS/M54/550

Landscape and Visual Mitigation Measures

NEX2213/C/361/ENS/M54/551

Key Landscape Master Plan

NEX2213/C/361/ENS/M54/552

Landscape Master Plan (Sheet 1 of 3)

NEX2213/C/361/ENS/M54/553

Landscape Master Plan (Sheet  2 of 3)

NEX2213/C/361/ENS/M54/554

Landscape Master Plan (Sheet  3 of 3)

NEX2213/C/361/ENS/M54/555

North Side Ventilation Shafts (NSVS) Elevation

NEX2213/C/361/ENS/M54/556

South Side Ventilation Shafts (SSVS) Elevation

NEX2213/C/361/ENS/M54/557

Cooling Tower Landscape Plan

NEX2213/C/361/ENS/M54/558

Cooling Tower Elevation

NEX2213/C/361/ENS/M54/570

Photomontage Viewpoint Locations

NEX2213/C/361/ENS/M54/571

V1 Photomontage

NEX2213/C/361/ENS/M54/572

V2 Photomontage

NEX2213/C/361/ENS/M54/573

V3 Photomontage

NEX2213/C/361/ENS/M54/574

V4 Photomontage

NEX2213/C/361/ENS/M54/575

V5 Photomontage

NEX2213/C/361/ENS/M54/576

V6 Photomontage

NEX2213/C/361/ENS/M57/505

Layout of Assessment Areas 1-4 as Proposed in the Approved CAPS

NEX2213/C/361/ENS/M57/506

Layout of Assessment Area 5

NEX2213/C/361/ENS/M57/507

Potentially Contaminated Sites Identified and As-Built Sampling Locations at Area 1

NEX2213/C/361/ENS/M57/508

Potentially Contaminated Sites Identified and As-Built Sampling Locations at Area 2

NEX2213/C/361/ENS/M57/509

Potentially Contaminated Sites Identified and As-Built Sampling Locations at Area 2 and 3

NEX2213/C/361/ENS/M57/510

Potentially Contaminated Sites Identified and As-Built Sampling Location within Railway Tracks

NEX2213/C/361/ENS/M58/501

As-Built Sediment Sampling Locations Sheet 1 of 2

NEX2213/C/361/ENS/M58/502

As-Built Sediment Sampling Locations Sheet 2 of 2

NEX2213/C/361/ENS/M59/501

Locations of Water Quality Sensitive Receivers

NEX2213/C/361/ENS/M60/501

Locations of Air Sensitive Receivers

NEX2213/C/361/ENS/M60/502

Contours of Cumulative Maximum 1-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Mitigated)

NEX2213/C/361/ENS/M60/503

Contours of Cumulative Maximum 24-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Mitigated)

NEX2213/C/361/ENS/M60/504

Contours of Cumulative Annual TSP Concentration in µg/m3 at 1.5m above Ground Level (Mitigated)

NEX2213/C/361/ENS/M60/505

Contours of Cumulative Annual TSP Concentration in µg/m3 at 5.0m above Ground Level (Mitigated)

NEX2213/C/361/ENS/M60/506

Contours of Maximum Cumulative 1-Hour TSP Concentration in µg/m3 at 5.0m above Ground Level (Mitigated)

NEX2213/C/361/ENS/M60/507

Contours of Maximum Cumulative 24-Hour TSP Concentration in µg/m3 at 5.0m above Ground Level (Mitigated)

NEX2213/C/361/ENS/M60/514

Contours of Cumulative Maximum 1-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Unmitigated)

NEX2213/C/361/ENS/M60/515

Contours of Cumulative Maximum 24-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Unmitigated)

NEX2213/C/361/ENS/M60/516

Contours of Cumulative Annual TSP Concentration in µg/m3 at 1.5m above Ground Level (Unmitigated)


 

 


 


List of Appendices


Appendix No.

Title

Appendix 1.1

Schematic Diagram of Rail Network

Appendix 1.2

Alignments of Shatin to Central Link

Appendix 1.3

Re-alignment of Cheong Wan Road

Appendix 1.4

Alignment of Homantin Siding

Appendix 1.5

Location of Mong Kok Freight Terminal

Appendix 2.1

Graphical Illustrations of Alignment Options

Appendix 2.2

Typical Cross Section for Hung Hom Station

Appendix 3.1

Tentative Construction Programme for SCL (MKK – HUH)

Appendix 3.2

Geological Plan and Profile

Appendix 4.1

North Ventilation Building, Plant Rooms and Emergency Access (NOV) Master Plan

Appendix 4.2

North Ventilation Building, Plant Rooms and Emergency Access (NOV) Elevations

Appendix 4.3

V1 Photomontage

Appendix 5.1

Calculations of Emission Rates (SCL (MKK – HUH))

Appendix 5.2

Calculations of Emission Rates (SCL (HUH – ADM))

Appendix 5.3

Emission Inventory of SCL (TAW – HUH)

Appendix 5.4

Emission Inventory of KTE

Appendix 5.5

Justification for the percentage of Annual Average Active Area

Appendix 6.1A

Tentative Construction Programme for SCL (MKK – HUH) during Normal Day-time Working Hours

Appendix 6.1B

Tentative Construction Programme for SCL (MKK – HUH) during Restricted Hours

Appendix 6.2A

Construction Plant Inventory for SCL (MKK – HUH) during non-restricted hours (Unmitigated Scenario)

Appendix 6.2B

Construction Plant Inventory for SCL (MKK – HUH) during restricted hours (Unmitigated Scenario)

Appendix 6.3A

Locations of Notional Sources and Distance to NSRs for works during non-restricted hours

Appendix 6.3B

Locations of Notional Sources and Distance to NSRs for works during restricted hours

Appendix 6.4A

Topography Screening Effect between the Construction Site and Carmel Secondary School

Appendix 6.4B

Construction Works Areas during Restricted Hours

Appendix 6.5A

Sample Calculation of Construction Noise Levels during Non-Restricted Hours – Unmitigated Scenario

Appendix 6.5B

Sample Calculation of Construction Noise Levels during Restricted Hours – Unmitigated Scenario

Appendix 6.6A

Summary of Predicted Construction Noise Levels during Non-Restricted Hours – Unmitigated Scenario

Appendix 6.6B

Summary of Predicted Construction Noise Levels during Restricted Hours –  Unmitigated Scenario

Appendix 6.7

Segments of Proposed SCL for Rail Noise Assessment

Appendix 6.8

Calculation for Airborne Rail Noise Assessment for SCL (MKK – HUH) – Unmitigated Scenario

Appendix 6.9

Calculation of Fixed Plant Noise during Daytime and Evening Time Operation

Appendix 6.10

Calculation of Fixed Plant Noise during Night Time Operation

Appendix 6.11A

Construction Plant Inventory for SCL (MKK – HUH) during non-restricted hours (Mitigated Scenario)

Appendix 6.11B

Construction Plant Inventory for SCL (MKK – HUH) during restricted hours (Mitigated Scenario)

Appendix 6.11C

Typical Arrangements of Movable Noise Barriers for sample NSRs

Appendix 6.11D

Schematic Configuration of Noise Enclosure, Moveable Noise Barriers and Acoustic Panels

Appendix 6.12A

Sample Calculation of Construction Noise Levels during Non-Restricted Hours – Mitigated Scenario

Appendix 6.12B

Sample Calculation of Construction Noise Levels during Restricted Hours –  Mitigated Scenario

Appendix 6.13A

Summary of Predicted Construction Noise Levels during Non-Restricted Hours – Mitigated Scenario

Appendix 6.13B

Summary of Predicted Construction Noise Levels during Restricted Hours – Mitigated Scenario

Appendix 6.14

Proposed Mitigation Measures for Rail Noise in Operational Phase

Appendix 6.15

Calculation for Airborne Rail Noise Assessment for SCL (MKK – HUH) –Mitigated Scenario

Appendix 7.1

Sample Calculation of Ground-borne Noise Impacts from PME

Appendix 7.2

Force Density Level (FDL)

Appendix 7.3

Typical Point Source Response (PSR)

Appendix 7.4

Building Coupling Factor (BCF)

Appendix 7.5

Building Vibration Response (BVR)

Appendix 7.6

Operational Ground-borne Noise Results

Appendix 9.1

Breakdown of C&D Material by Works Area and Year

Appendix 9.2

Response from EPD for Waste Disposal to Landfill

Appendix 9.3

Sediment Sampling and Testing Plan

Appendix 9.4

Supplementary Sediment Sampling and Testing Plan

Appendix 9.5

Testing Results and Disposal Classification

Appendix 9.6

Results of Biological Screening of Category M and Category H (>10 LCEL) Samples

Appendix 9.7

Correspondences with MFC for Marine Disposal Reservation

Appendix 9.8

Minutes from Liaison Meetings with Other Projects for Reusing C&D Materials

Appendix 9.9

PFC endorsement memo on C&DMMP

Appendix 10.1

Approved Contamination Assessment Plan

Appendix 10.2

Approved Supplementary Contamination Assessment Plan 

Appendix 10.3

Supplementary Contamination Assessment Plan for Works Area in Area 1

Appendix 10.4

Contamination Assessment Report

Appendix 14.1

Key Assessment Assumptions and Methodologies