描述: C:\Users\Ho\Desktop\EIAO\HTML\List of Appendix.files\image001.gif

List of Appendices

 

Appendix

1.1

East West Corridor and North South Corridor

Appendix

2.1

Graphical Illustrations of Alignment Options

Appendix

2.2

Temporary Reclamation Staging for SCL Construction in Causeway Bay Typhoon Shelter

Appendix

3.1

Plan and Geological Profiles

Appendix

3.2

Plan and Longitudinal Section of Exhibition Station

Appendix

3.3

Summary of Works Areas

Appendix

3.4

Tentative Construction Programme

Appendix

3.5

Supplementary Information on the Proposed Access Road at Lo Wu

Appendix

4.1

Cultural Heritage Baseline Report

Appendix

4.2

Previous Sounding Surveys and Marine Archaeological Studies’ Areas

Appendix

5.1

Baseline Marine Ecological Resources

Appendix

5.2

Coral Survey Results

Appendix

5.3

Intertidal Ecological Survey Results

Appendix

5.4

Representative Photographs of Habitats and Species of Conservation Interest Recorded during Field Surveys

Appendix

6.1

IMT Level Check

Appendix

8.1

Past Environmental Monitoring Data

Appendix

8.2

Emission Inventory of SCL (MKK – HUH)

Appendix

8.3

Emission Inventory of SCL (TAW – HUH)

Appendix

8.4

Emission Inventory of KTE

Appendix

8.5

Emission Inventory for Wan Chai Phase II and Central Wanchai Bypass

Appendix

8.6

Justification for the Percentage of Annual Average Active Area

Appendix

8.7

Calculations of Emission Rates (SCL (HUH – ADM))

Appendix

8.8

Detailed Results of Predicted Cumulative TSP Concentrations

Appendix

9.1

Not used

Appendix

9.2

Construction Plant Inventory for SCL (HUH – ADM) – Unmitigated Scenario

Appendix

9.3

Locations of Notional Sources and Distance to NSRs

Appendix

9.4

Sample Calculation of Construction Noise Levels – Unmitigated Scenario

Appendix

9.5

Summary of Predicted Construction Noise Levels – Unmitigated Scenario

Appendix

9.6

Calculation of Fixed Plant Noise during Daytime and Evening Time

Appendix

9.7

Calculation of Fixed Plant Noise during Night Time

Appendix

9.8

Construction Plant Inventory for SCL (HUH – ADM) – Mitigated Scenario

Appendix

9.9

Sample Calculation of Construction Noise Levels – Mitigated Scenario

Appendix

9.10

Summary of Predicted Construction Noise Levels – Mitigated Scenario

Appendix

9.11

Mitigated Construction Noise Levels of Concurrent Projects for Cumulative Construction Noise Assessment

Appendix

9.12

Cumulative Construction Noise Assessment for Kowloon Area – Mitigated Scenario

Appendix

9.13

Cumulative Construction Noise Assessment for Hong Kong Island – Mitigated Scenario

Appendix

10.1

TBM Vibration Data

Appendix

10.2

Force Density Level (FDL)

Appendix

10.3

Typical Point Source Response (PSR)

Appendix

10.4

Building Coupling Factor (BCF)

Appendix

10.5

Building Vibration Response (BVR)

Appendix

10.6

Calculation of Construction Ground-borne Noise

Appendix

10.7

Calculation of Cumulative Construction Ground-borne Noise

Appendix

10.8

Calculation of Operation Ground-borne Noise

Appendix

11.1

Not used

Appendix

11.2

Temporary Reclamation Stages at CBTS

Appendix

11.3

Coverage, Layout and Grid Quality of Refined VH Model

Appendix

11.4

Sediment Plume Modelling Results (Scenario 1) – Dry Season

Appendix

11.5

Sediment Plume Modelling Results (Scenario 1) – Wet Season

Appendix

11.6

Sediment Plume Modelling Results (Scenario 2) – Dry Season

Appendix

11.7

Sediment Plume Modelling Results (Scenario 2) – Wet Season

Appendix

11.8

Maximum Mixing Zone for SS Elevations  – Scenario 1 (Contributed from SCL and other Concurrent Marine Works)

Appendix

11.9

Maximum Mixing Zone for SS Elevations– Scenario 1 (Contributed from SCL alone)

Appendix

11.10

Maximum Mixing Zone for SS Elevations– Scenario 2 (Contributed from SCL alone)

Appendix

11.11

Tracer Modelling Results for Zinc, Total PCBs and Total PAHs for Scenario 1 

Appendix

11.12

Tracer Modelling Results for Zinc, Total PCBs and Total PAHs for Scenario 2 

Appendix

11.13

Typical Configuration of Silt Curtains and Silt Screens

Appendix

11.14

Location of Proposed SCL IMT Tunnel and Existing CHT Alignments

Appendix

12.1

Breakdown of C&D Material by Works Area and Year

Appendix

12.2

Response from EPD for Waste Disposal to Landfill

Appendix

12.3

Sediment Sampling and Testing Plan and Approval Letter from EPD

Appendix

12.4

Testing Result and Disposal Classification

Appendix

12.5

Results of Biological Screening

Appendix

12.6

MFC’s Response to Dredging Rationale

Appendix

12.7

PFC Endorsement Memo on C&DMMP

Appendix

13.1

Contamination Assessment Plan

Appendix

13.2

Contamination Assessment Report

Appendix

13.3

LCSD’s Response to Site Access for Site Investigation

Appendix

18.1

Key Assessment Assumptions and Methodologies