List of Figures 


Figure No.

Title

Rev.

NEX2213/C/331/ENS/M50/001

SCL Alignment

D

NEX2213/C/331/ENS/M50/002

Designated Projects 1 and 2

C

NEX2213/C/331/ENS/M50/003

Designated Projects 3 and 4

C

NEX2213/C/331/ENS/M50/011

Preferred Alignment and Construction Method

C

NEX2213/C/331/ENS/M50/021

Project Alignment and Works Areas (Sheet 1 of 4)

A

NEX2213/C/331/ENS/M50/022

Project Alignment and Works Areas (Sheet 2 of 4)

A

NEX2213/C/331/ENS/M50/023

Project Alignment and Works Areas (Sheet 3 of 4)

B

NEX2213/C/331/ENS/M50/024

Project Alignment and Works Areas (Sheet 4 of 4)

D

NEX2213/C/331/ENS/M50/025

Offsite Works Area

A

NEX2213/C/331/ENS/M50/026

Layout Plan of Shek O Casting Yard

A

NEX2213/C/331/ENS/M50/027

General Layout Plan of SCL Protection Works at CBTS (Constructed by CWB) (Sheet 1 of 2)

A

NEX2213/C/331/ENS/M50/028

General Layout Plan of SCL Protection Works at CBTS (Constructed by CWB) (Sheet 2 of 2)

A

NEX2213/C/331/ENS/M55/001

Study Area of Cultural Heritage Impact Assessment

A

NEX2213/C/331/ENS/M55/002

Study Area of Cultural Heritage Impact Assessment

B

NEX2213/C/331/ENS/M55/003

Study Area of Cultural Heritage Impact Assessment

D

NEX2213/C/331/ENS/M55/004

Previously Surveyed Areas in Victoria Harbour

B

NEX2213/C/331/ENS/M55/005

Regularly Dredged Areas in Victoria Harbour

B

NEX2213/C/331/ENS/M55/006

The Proposed SCL (HUH – ADM) Alignment and Overlaying Coastal Line Change in Hong Kong Island

C

NEX2213/C/331/ENS/M55/007

Key Plan of Cultural Heritage Sites

C

NEX2213/C/331/ENS/M55/008

Locations of Cultural Heritage Sites

A

NEX2213/C/331/ENS/M55/009

Locations of Cultural Heritage Sites

A

NEX2213/C/331/ENS/M55/010

Locations of Cultural Heritage Sites

B

NEX2213/C/331/ENS/M55/011

Locations of Cultural Heritage Sites

A

NEX2213/C/331/ENS/M55/012

Locations of Cultural Heritage Sites

A

NEX2213/C/331/ENS/M55/013

Locations of Cultural Heritage Sites

C

NEX2213/C/331/ENS/M55/014

Locations of Cultural Heritage Sites

A

NEX2213/C/331/ENS/M55/015

Locations of Cultural Heritage Sites

A

NEX2213/C/331/ENS/M55/016

Locations of Cultural Heritage Sites

A

NEX2213/C/331/ENS/M55/017

Locations of Cultural Heritage Sites

A

NEX2213/C/331/ENS/M55/018

Locations of Cultural Heritage Sites

A

NEX2213/C/331/ENS/M51/001

Marine Works for SCL (HUH – ADM) within Victoria Harbour

C

NEX2213/C/331/ENS/M51/002

Key Ecological Resources

A

NEX2213/C/331/ENS/M51/003

Benthos and Intertidal Survey Locations within Victoria Harbour

C

NEX2213/C/331/ENS/M51/004

Coral Survey Locations within Victoria Harbour

C

NEX2213/C/331/ENS/M51/011

Ecological Survey Locations at Shek O Quarry

A

NEX2213/C/331/ENS/M51/012

Identified Coral Area at Shek O

A

NEX2213/C/331/ENS/M51/030

Key Fisheries Resources

A

NEX2213/C/331/ENS/M51/031

Habitat Map (Victoria Harbour)

B

NEX2213/C/331/ENS/M51/032

Habitat Map (Shek O Quarry)

A

NEX2213/C/331/ENS/M54/001

Landscape Impact Study Boundary

F

NEX2213/C/331/ENS/M54/002

Landscape Impact Study Boundary at Offsite Works Area

C

NEX2213/C/331/ENS/M54/003

Visual Impact Study Boundary

F

NEX2213/C/331/ENS/M54/004

Visual Impact Study Boundary at Offsite Works Area

C

NEX2213/C/331/ENS/M54/010

Key Plan of Planning and Development Control Framework

F

NEX2213/C/331/ENS/M54/011

Planning and Development Control Framework

A

NEX2213/C/331/ENS/M54/012

Planning and Development Control Framework

B

NEX2213/C/331/ENS/M54/013

Planning and Development Control Framework

B

NEX2213/C/331/ENS/M54/014

Planning and Development Control Framework

D

NEX2213/C/331/ENS/M54/020

Landscape Resources

F

NEX2213/C/331/ENS/M54/021

Landscape Resources of Offsite Works Area

C

NEX2213/C/331/ENS/M54/025

Photos of Landscape Resource (Sheet 1 of 3)

A

NEX2213/C/331/ENS/M54/026

Photos of Landscape Resource (Sheet 2 of 3)

A

NEX2213/C/331/ENS/M54/027

Photos of Landscape Resource (Sheet 3 of 3)

C

NEX2213/C/331/ENS/M54/030

Landscape Character Area

F

NEX2213/C/331/ENS/M54/031

Landscape Character Area of Offsite Works Area

C

NEX2213/C/331/ENS/M54/035

Photos of Landscape Character Areas (Sheet 1 of 2)

A

NEX2213/C/331/ENS/M54/036

Photos of Landscape Character Areas (Sheet 2 of 2)

C

NEX2213/C/331/ENS/M54/040

Key Visually Sensitive Receivers

F

NEX2213/C/331/ENS/M54/041

Key Visually Sensitive Receivers at Offsite Works Area

C

NEX2213/C/331/ENS/M54/045

Photos of Visually Sensitive Receivers (Sheet 1 of 8)

A

NEX2213/C/331/ENS/M54/046

Photos of Visually Sensitive Receivers (Sheet 2 of 8)

A

NEX2213/C/331/ENS/M54/047

Photos of Visually Sensitive Receivers (Sheet 3 of 8)

A

NEX2213/C/331/ENS/M54/048

Photos of Visually Sensitive Receivers (Sheet 4 of 8)

A

NEX2213/C/331/ENS/M54/049

Photos of Visually Sensitive Receivers (Sheet 5 of 8)

A

NEX2213/C/331/ENS/M54/050

Photos of Visually Sensitive Receivers (Sheet 6 of 8)

A

NEX2213/C/331/ENS/M54/051

Photos of Visually Sensitive Receivers (Sheet 7 of 8)

A

NEX2213/C/331/ENS/M54/052

Photos of Visually Sensitive Receivers (Sheet 8 of 8)

C

NEX2213/C/331/ENS/M54/060

Landscape and Visual Mitigation Measures

B

NEX2213/C/331/ENS/M54/061

Key Landscape Master Plan

C

NEX2213/C/331/ENS/M54/062

North Ventilation Building, Plant Rooms and Emergency Access (NOV) Master Plan

A

NEX2213/C/331/ENS/M54/063

North Ventilation Building, Plant Rooms and Emergency Access (NOV) Elevations

A

NEX2213/C/331/ENS/M54/064

South Ventilation Shafts, Plant Rooms and Emergency Access (SOV) Master Plan

C

NEX2213/C/331/ENS/M54/065

South Ventilation Shafts, Plant Rooms and Emergency Access (SOV) Elevations

B

NEX2213/C/331/ENS/M54/066

Exhibition Station Master Plan at Roof Level

B

NEX2213/C/331/ENS/M54/067

Exhibition Station Master Plan at Ground Level

C

NEX2213/C/331/ENS/M54/068

Exhibition Station Elevation A and Section B

B

NEX2213/C/331/ENS/M54/069

Exhibition Station Elevation C

B

NEX2213/C/331/ENS/M54/070

Exhibition Station Landscape Mound Elevations

B

NEX2213/C/331/ENS/M54/071

Emergency Access Point (EAP) Master Plan

B

NEX2213/C/331/ENS/M54/072

Emergency Access Point (EAP) Elevations

A

NEX2213/C/331/ENS/M54/073

Admiralty Station Master Plan

C

NEX2213/C/331/ENS/M54/074

Hong Kong Park Ventilation Building (HKB) Master Plan

C

NEX2213/C/331/ENS/M54/080

Photomontage Viewpoint Locations

C

NEX2213/C/331/ENS/M54/081

Photomontage Viewpoint Locations

D

NEX2213/C/331/ENS/M54/082

Photomontage Viewpoint Locations

D

NEX2213/C/331/ENS/M54/083

Photomontage Viewpoint Locations

E

NEX2213/C/331/ENS/M54/085

V1 Photomontage

B

NEX2213/C/331/ENS/M54/086

V2 Photomontage

B

NEX2213/C/331/ENS/M54/087

V2-1 Photomontage

A

NEX2213/C/331/ENS/M54/088

V3 Photomontage

B

NEX2213/C/331/ENS/M54/089

V4 Photomontage

B

NEX2213/C/331/ENS/M54/090

V5 Photomontage

A

NEX2213/C/331/ENS/M54/091

V6 Photomontage

B

NEX2213/C/331/ENS/M54/092

V7 Photomontage

B

NEX2213/C/331/ENS/M54/093

V8 Photomontage (Sheet 1 of 2)

B

NEX2213/C/331/ENS/M54/094

V8 Photomontage (Sheet 2 of 2)

B

NEX2213/C/331/ENS/M60/001

Location of Air Sensitive Receivers

F

NEX2213/C/331/ENS/M60/002

Location of Air Sensitive Receivers

G

NEX2213/C/331/ENS/M60/003

Location of Air Sensitive Receivers

H

NEX2213/C/331/ENS/M60/004

Location of Air Sensitive Receiver at Shek O

B

NEX2213/C/331/ENS/M60/005

Contours of Mitigated Cumulative Maximum 1-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Kowloon Side)

H

NEX2213/C/331/ENS/M60/006

Contours of Mitigated Cumulative Maximum 24-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Kowloon Side)

H

NEX2213/C/331/ENS/M60/007

Contours of Mitigated Cumulative Annual TSP Concentration in μg/m3 at 1.5m above Ground Level (Kowloon Side)

I

NEX2213/C/331/ENS/M60/008

Contours of Mitigated Cumulative Annual TSP Concentration in μg/m3 at 5.0m above Ground Level (Kowloon Side)

I

NEX2213/C/331/ENS/M60/009

Tier 1 Contours of Mitigated Cumulative Maximum 1-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 1)

E

NEX2213/C/331/ENS/M60/010

Tier 1 Contours of Mitigated Cumulative Maximum 1-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 2)

F

NEX2213/C/331/ENS/M60/011

Tier 1 Contours of Mitigated Cumulative Maximum 1-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 3)

F

NEX2213/C/331/ENS/M60/012

Tier 1 Contours of Mitigated Cumulative Maximum 24-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 1)

E

NEX2213/C/331/ENS/M60/013

Tier 1 Contours of Mitigated Cumulative Maximum 24-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 2)

E

NEX2213/C/331/ENS/M60/014

Tier 1 Contours of Mitigated Cumulative Maximum 24-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 3)

E

NEX2213/C/331/ENS/M60/015

Tier 2 Contours of Mitigated Cumulative Maximum 1-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 1)

E

NEX2213/C/331/ENS/M60/016

Tier 2 Contours of Mitigated Cumulative Maximum 1-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 2)

E

NEX2213/C/331/ENS/M60/017

Tier 2 Contours of Mitigated Cumulative Maximum 1-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 3)

E

NEX2213/C/331/ENS/M60/018

Tier 2 Contours of Mitigated Cumulative Maximum 24-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 1)

E

NEX2213/C/331/ENS/M60/019

Tier 2 Contours of Mitigated Cumulative Maximum 24-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 2)

E

NEX2213/C/331/ENS/M60/020

Tier 2 Contours of Mitigated Cumulative Maximum 24-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 3)

E

NEX2213/C/331/ENS/M60/021

Contours of Mitigated Cumulative Annual TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 1)

F

NEX2213/C/331/ENS/M60/022

Contours of Mitigated Cumulative Annual TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 2)

F

NEX2213/C/331/ENS/M60/023

Contours of Mitigated Cumulative Annual TSP Concentration in μg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 3)

F

NEX2213/C/331/ENS/M60/024

Contours of Mitigated Cumulative Annual TSP Concentration in μg/m3 at 5.0m above Ground Level (Hong Kong Side) (Scenario 1)

F

NEX2213/C/331/ENS/M60/025

Contours of Mitigated Cumulative Annual TSP Concentration in μg/m3 at 5.0m above Ground Level (Hong Kong Side) (Scenario 2)

F

NEX2213/C/331/ENS/M60/026

Contours of Mitigated Cumulative Annual TSP Concentration in μg/m3 at 5.0m above Ground Level (Hong Kong Side) (Scenario 3)

F

NEX2213/C/331/ENS/M60/027

Tier 2 Contours of Mitigated Cumulative Maximum 1-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Shek O)

B

NEX2213/C/331/ENS/M60/028

Tier 2 Contours of Mitigated Cumulative Maximum 24-hour TSP Concentration in μg/m3 at 1.5m above Ground Level (Shek O)

B

NEX2213/C/331/ENS/M60/029

Contours of Mitigated Cumulative Annual TSP Concentration in μg/m3 at 1.5m above Ground Level (Shek O)

B

NEX2213/C/331/ENS/M60/061

Contours of Mitigated Cumulative Maximum 1-Hour TSP Concentration in µg/m3 at 5.0m above Ground Level (Kowloon Side)

A

NEX2213/C/331/ENS/M60/062

Contours of Mitigated Cumulative Maximum 24-Hour TSP Concentration in µg/m3 at 5.0m above Ground Level (Kowloon Side)

A

NEX2213/C/331/ENS/M60/063

Contours of Unmitigated Cumulative Maximum 1-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Kowloon Side)

A

NEX2213/C/331/ENS/M60/064

Contours of Unmitigated Cumulative Maximum 24-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Kowloon Side)

A

NEX2213/C/331/ENS/M60/065

Contours of Unmitigated Cumulative Annual TSP Concentration in µg/m3 at 1.5m above Ground Level (Kowloon Side)

A

NEX2213/C/331/ENS/M60/066

Contours of Unmitigated Cumulative Maximum 1-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 1)

A

NEX2213/C/331/ENS/M60/067

Contours of Unmitigated Cumulative Maximum 1-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 2)

A

NEX2213/C/331/ENS/M60/068

Contours of Unmitigated Cumulative Maximum 1-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 3)

A

NEX2213/C/331/ENS/M60/069

Contours of Unmitigated Cumulative Maximum 24-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 1)

A

NEX2213/C/331/ENS/M60/070

Contours of Unmitigated Cumulative Maximum 24-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 2)

A

NEX2213/C/331/ENS/M60/071

Contours of Unmitigated Cumulative Maximum 24-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 3)

A

NEX2213/C/331/ENS/M60/072

Contours of Unmitigated Cumulative Annual TSP Concentration in µg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 1)

A

NEX2213/C/331/ENS/M60/073

Contours of Unmitigated Cumulative Annual TSP Concentration in µg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 2)

A

NEX2213/C/331/ENS/M60/074

Contours of Unmitigated Cumulative Annual TSP Concentration in µg/m3 at 1.5m above Ground Level (Hong Kong Side) (Scenario 3)

A

NEX2213/C/331/ENS/M60/075

Contours of Unmitigated Maximum 1-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Shek O)

A

NEX2213/C/331/ENS/M60/076

Contours of Unmitigated Maximum 24-Hour TSP Concentration in µg/m3 at 1.5m above Ground Level (Shek O)

A

NEX2213/C/331/ENS/M60/077

Contours of Unmitigated Annual Average TSP Concentration in µg/m3 at 1.5m above Ground Level (Shek O)

A

NEX2213/C/331/ENS/M52/001

Location Plan for Representative Noise Sensitive Receivers Locations

D

NEX2213/C/331/ENS/M52/002

Location of Representative Noise Sensitive Receivers for Construction Phase

B

NEX2213/C/331/ENS/M52/003

Locations of Representative Noise Sensitive Receivers for Construction Phase

C

NEX2213/C/331/ENS/M52/004

Locations of Representative Noise Sensitive Receivers for Construction Phase

E

NEX2213/C/331/ENS/M52/005

Location of Representative Noise Sensitive Receivers for Construction Phase (Offsite)

B

NEX2213/C/331/ENS/M52/101

Locations of Representative Noise Sensitive Receivers for Operation Phase

C

NEX2213/C/331/ENS/M52/102

Locations of Representative Noise Sensitive Receivers for Operation Phase

D

NEX2213/C/331/ENS/M52/103

Locations of Representative Noise Sensitive Receivers for Operation Phase

E

NEX2213/C/331/ENS/M52/104

Key Plan of Location of Fixed Plant Noise Sources

D

NEX2213/C/331/ENS/M52/105

Location of Fixed Plant Noise Sources

B

NEX2213/C/331/ENS/M52/106

Location of Fixed Plant Noise Sources

C

NEX2213/C/331/ENS/M52/107

Location of Fixed Plant Noise Sources

C

NEX2213/C/331/ENS/M52/108

Location of Fixed Plant Noise Sources

E

NEX2213/C/331/ENS/M59/001

Locations of  Water Quality Sensitive Receivers (Sheet 1 of 3)

A

NEX2213/C/331/ENS/M59/002

Locations of  Water Quality Sensitive Receivers (Sheet 2 of 3)

A

NEX2213/C/331/ENS/M59/003

Locations of  Water Quality Sensitive Receivers (Sheet 3 of 3)

A

NEX2213/C/331/ENS/M59/004

Locations of Existing Stormwater Outfalls

A

NEX2213/C/331/ENS/M59/005

Locations of  Important Coral Community

A

NEX2213/C/331/ENS/M59/006

Sediment Loss Rate for Dredging and Sand Filling Activities – Scenario 1 – Unmitigated Scenario for SCL

A

NEX2213/C/331/ENS/M59/007

Sediment Loss Rate for Dredging and Sand Filling Activities – Scenario 2 – Unmitigated Scenario for SCL

A

NEX2213/C/331/ENS/M59/008

Coastline Configuration for Scenario 1 and Scenario 2

A

NEX2213/C/331/ENS/M59/009

Locations of Water Quality Sensitive Receivers within Tai Tam Bay

A

NEX2213/C/331/ENS/M59/010

Sediment Sampling Station for Elutriate Testing (Sheet 1 of 5)

A

NEX2213/C/331/ENS/M59/011

Sediment Sampling Station for Elutriate Testing (Sheet 2 of 5)

A

NEX2213/C/331/ENS/M59/012

Sediment Sampling Station for Elutriate Testing (Sheet 3 of 5)

A

NEX2213/C/331/ENS/M59/013

Sediment Sampling Station for Elutriate Testing (Sheet 4 of 5)

A

NEX2213/C/331/ENS/M59/014

Sediment Sampling Station for Elutriate Testing (Sheet 5 of 5)

B

NEX2213/C/331/ENS/M59/015

Locations of Cross Sections

A

NEX2213/C/331/ENS/M58/019

As-built Sediment Sampling Locations (Sheet 1 of 8)

A

NEX2213/C/331/ENS/M58/020

As-built Sediment Sampling Locations (Sheet 2 of 8)

A

NEX2213/C/331/ENS/M58/021

As-built Sediment Sampling Locations (Sheet 3 of 8)

A

NEX2213/C/331/ENS/M58/022

As-built Sediment Sampling Locations (Sheet 4 of 8)

A

NEX2213/C/331/ENS/M58/023

As-built Sediment Sampling Locations (Sheet 5 of 8)

B

NEX2213/C/331/ENS/M58/024

As-built Sediment Sampling Locations (Sheet 6 of 8)

B

NEX2213/C/331/ENS/M58/025

As-built Sediment Sampling Locations (Sheet 7 of 8)

B

NEX2213/C/331/ENS/M58/026

As-built Sediment Sampling Locations (Sheet 8 of 8)

C