Agreement No. CE 29/2008(EP)
Engineering Investigation
and Environmental
Studies for Integrated
Waste Management Facilities
Phase 1 – Feasibility Study
Integrated Waste Management
Facilities
Environmental Impact
Assessment Report
CONTENTS
VOLUME 1: MAIN TEXT
Table of Content
1.1.......... Background
1.2.......... Assessment Scenarios
1.3.......... Objectives of this EIA Study
1.4.......... Structure of the Report
2............ PROJECT DESCRIPTION
2.1.......... Need for the Project
2.2.......... Site Selection
2.3.......... Technology Selection
2.4.......... Scope of the Project
2.5.......... Consideration of Alternatives
2.6.......... Interfaces with Other Projects
2.7.......... Assessment Areas of the EIA
Study
3a........... AIR QUALITY IMPACT (TTAL Site)
3b.......... AIR QUALITY IMPACT (Artificial
Island near SKC)
3b.1........ Introduction
3b.2........ Environmental Legislation,
Policies, Plans, Standards and Criteria
3b.2.1..... Introduction
3b.2.2..... Air Quality Objectives and EIAO-TM
3b.2.3..... Air Pollution Control (Construction
Dust) Regulation
3b.3........ Description of the Environment
3b.4........ Air Sensitive Receivers
3b.4.1..... General
3b.4.2..... ASRs for Gaseous Pollutants Impact
Assessment
3b.4.3..... ASRs for Odour
Impact Assessment
3b.5........ Identification of Pollution
Sources
3b.5.1..... Construction Phase
3b.5.2..... Operation Phase - Gaseous
Pollutants
3b.5.3..... Operation Phase - Odour Impacts
3b.6........ Assessment Methodology
3b.6.1..... Construction Phase
3b.6.2..... Operation Phase - Gaseous
Pollutants
3b.6.3..... Operation Phase - Odour Impacts
3b.7........ Prediction and Evaluation of
Environmental Impacts
3b.7.1..... Construction Phase
3b.7.2..... Operation Phase - Gaseous
Pollutants
3b.7.3..... Operation Phase - Odour Impacts
3b.8........ Mitigation Measures
3b.8.1..... Construction Phase
3b.8.2..... Operation Phase
3b.9........ Residual Environmental Impact
3b.9.1..... Construction Phase
3b.9.2..... Operation Phase
3b.10...... Environmental Monitoring and Audit
Requirements
3b.10.1... Construction Phase
3b.10.2... Operation Phase
3b.11...... Conclusion
3b.11.1... Construction Phase
3b.11.2... Operation Phase
3c........... AIR QUALITY IMPACT (Co-Exist
Scenario)
4a........... NOISE IMPACT (TTAL Site)
4b.......... NOISE IMPACT (Artificial Island
near SKC)
4b.1........ Introduction
4b.2........ Environmental Legislation,
Policies, Plans, Standards and Criteria
4b.2.1..... General
4b.2.2..... Construction Noise - General
Construction
4b.2.3..... Operation Phase
4b.3........ Description of the Environment
4b.4........ Noise Sensitive Receivers
4b.5........ Assessment Methodology
4b.5.1..... Construction Noise during
Unrestricted Hours
4b.5.2..... Operation Phase
4b.6........ Identification of Environmental
Impacts
4b.6.1..... Construction Phase
4b.6.2..... Operation Phase
4b.7........ Prediction and Evaluation of
Environmental Impacts
4b.7.1..... Construction Phase
4b.7.2..... Operation Phase
4b.8........ Mitigation of Environmental
Impacts
4b.8.1..... Construction Phase
4b.8.2..... Operation Phase
4b.9........ Evaluation of Residual Impacts
4b.10...... Environmental Monitoring and Audit
4b.10.1... Construction Phase
4b.10.2... Operation Phase
4b.11...... Conclusion
4b.11.1... Construction Phase
4b.11.2... Operation Phase
5a........... WATER QUALITY IMPACT (TTAL
Site)
5b.......... WATER QUALITY IMPACT
(Artificial Island near SKC)
5b.1........ Introduction
5b.2........ Environmental Legislation,
Standards and Guidelines
5b.2.1..... Environmental Impact Assessment
Ordinance (EIAO)
5b.2.2..... Water Pollution Control Ordinance
(WPCO)
5b.2.3..... Sediment Quality Assessment
Criteria
5b.3........ Description of the Environment
5b.3.1..... Existing Baseline Marine Water
Quality
5b.3.2..... Existing Baseline Marine Sediment
Quality
5b.4........ Water Sensitive Receivers
5b.5........ Assessment Methodology
5b.6........ Identification of Potential
Impacts
5b.6.1..... Construction Phase
5b.6.2..... Operation Phase
5b.7........ Prediction and Evaluation of
Environmental Impacts
5b.7.1..... Land-based Construction Phase
Impact
5b.7.2..... Construction Phase Impact from
Cofferdam Construction
5b.7.3..... Construction Phase Impact from Loss
of Filling Material from the Reclamation Area and Localized Dredging for
Anti-Scouring Protection Layer
5b.7.4..... Construction Phase Impact from
Installation of Submarine Cables
5b.7.5..... Consideration of Cumulative
Construction Phase Impacts
5b.7.6..... Operation Phase Impact from Project
Effluent
5b.7.7..... Operation Phase Impact due to
Maintenance Dredging
5b.7.8..... Operation Phase Impact on Flow
Regime
5b.7.9..... Operation Phase Impact on the
Channel between the
5b.7.10... Operation Phase Impact on Dissolved
Oxygen within the Breakwaters Sheltered Water
5b.7.11... Operation Phase Impact on Sediment
Deposition and Water Quality
5b.8........ Mitigation Measures
5b.8.1..... Construction Phase
5b.8.2..... Operation Phase
5b.9........ Evaluation of Residual Impacts
5b.10...... Environmental Monitoring and Audit
5b.11...... Conclusion
6a........... WASTE MANAGEMENT IMPLICATIONS
(TTAL Site)
6b.......... WASTE MANAGEMENT IMPLICATIONS
(Artificial Island near SKC)
6b.1........ Introduction
6b.2........ Environmental Legislation,
Policies, Plans, Standards and Criteria
6b.2.1..... General
6b.2.2..... Waste Disposal Ordinance (Cap. 354)
6b.2.3..... Public Health and Municipal
Services Ordinance (Cap. 132)
6b.2.4..... Land (Miscellaneous Provisions)
Ordinance (Cap 28)
6b.2.5..... Dumping at Sea Ordinance (Cap 466)
6b.2.6..... Environmental Guidelines
6b.3........ Assessment Approach and
Methodology
6b.4........ Identification and Evaluation of
Environmental Impacts
6b.5........ Mitigation of Adverse
Environmental Impacts
6b.5.1..... Construction Phase
6b.5.2..... Operation Phase
6b.6........ Contamination Prevention
Measures
6b.6.1..... General
6b.6.2..... Potential Sources of Contamination
6b.6.3..... Approach to Prevent Land
Contamination
6b.7........ Evaluation of Residual Impacts
6b.8........ Environmental Monitoring and
Audit
6b.9........ Conclusion
7a........... ECOLOGICAL IMPACT (BOTH
TERRESTRIAL AND AQUATIC) (TTAL Site)
7b.......... ECOLOGICAL IMPACT (BOTH
TERRESTRIAL AND AQUATIC) (Artificial Island near SKC)
7b.1........ Introduction
7b.2........ Environmental Legislation,
Policies, Plans, Standards And Criteria
7b.3........ Assessment Methodology
7b.3.1..... Study Area
7b.3.2..... Literature Review
7b.3.3..... Ecological Surveys
7b.4........ Description of the Environment
7b.4.1..... Area of Conservation Interest
7b.4.2..... Habitat and Vegetation
7b.4.3..... Avifauna
7b.4.4..... Terrestrial Mammals
7b.4.5..... Herpetofauna
7b.4.6..... Dragonflies and Butterflies
7b.4.7..... Freshwater Communities
7b.4.8..... Intertidal Fauna
7b.4.9..... Subtidal
Fauna
7b.4.10... Marine Mammals
7b.5........ Ecological Value
7b.6........ Identification and Evaluation of
Environmental Impacts
7b.6.1..... Introduction
7b.6.2..... Construction Phase
7b.6.3..... Operation Phase
7b.6.4..... Overall Impact
7b.7........ Cumulative Impacts
7b.8........ Mitigation of Adverse
Environmental Impacts
7b.8.1..... Introduction
7b.8.2..... Avoidance
7b.8.3..... Minimisation
7b.8.4..... Compensation
7b.8.5..... Additional Enhancement or
Precautionary Measures
7b.8.6..... Summaries of Ecological Impacts and
Mitigation / Enhancement Measures
7b.9........ Evaluation of Residual Impacts
7b.9.1..... Shek Kwu Chau
7b.9.2..... Cheung Sha
7b.9.3..... Along the
Cable Alignment
7b.10...... Environmental Monitoring and Audit
7b.10.1... General
7b.10.2... Finless Porpoise Monitoring
7b.10.3... Coral Monitoring
7b.10.4... White-bellied Sea Eagle Monitoring
7b.10.5... Water Quality Monitoring and Audit
7b.11...... Conclusion
7b.12...... Reference
8a........... FISHERIES IMPACT (TTAL Site)
8b.......... FISHERIES IMPACT (Artificial
Island near SKC)
8b.1........ Introduction
8b.2........ Environmental Legislation,
Policies, Plans, Standards and Guidelines
8b.3........ Study Area
8b.4........ Assessment Methodology
8b.5........ Description of the Environment
8b.5.1..... Sites Of Fisheries Importance
8b.5.2..... Capture Fisheries
8b.5.3..... Culture Fisheries
8b.6........ Identification, Prediction and
Evaluation Of Environmental Impacts
8b.6.1..... Construction Phase
8b.6.2..... Operation Phase
8b.6.3..... Overall Impacts
8b.7........ Evaluation of Cumulative
Environmental Impacts
8b.8........ Mitigation of Environmental
Impacts
8b.9........ Evaluation of Residual
Environmental Impacts
8b.10...... Environmental Monitoring and Audit
8b.11...... Conclusion
8b.12...... References
9a........... HEALTH IMPACT (TTAL Site)
9b.......... HEALTH IMPACT (Artificial
Island near SKC)
9b.1........ Introduction
9b.2........ Potential Health Impacts of
Aerial Emissions from the IWMF during operational phase
9b.2.1..... Project Site
9b.2.2..... Hazard Identification
9b.2.3..... Air Dispersion and Deposition Modelling
9b.2.4..... Exposure Assessment
9b.2.5..... Toxicity Assessment
9b.2.6..... Risk Characterization
9b.3........ Potential Health Impacts of
Biogas from Sorting and Recycling Plant
9b.3.1..... Introduction
9b.3.2..... Description of Potential Biogas
Emissions
9b.3.3..... Impact Evaluation
9b.4........ Potential Health Impacts of
Fugitive Emissions during Transportation, Storage and Handling of Waste and Ash
9b.4.1..... Introduction
9b.4.2..... Description of Operation Process
9b.4.3..... Hazard Identification
9b.4.4..... Impact Evaluation
9b.5........ Health Impacts Associated with
other Potential Accidental Events
9b.6........ Conclusion
9b.7........ Reference
9c........... HEALTH IMPACT (Co-Exist
Scenario)
10a......... LANDSCAPE AND VISUAL IMPACT
(TTAL Site)
10b......... Landscape and Visual Impact
(Artificial Island near SKC)
10b.1...... Introduction
10b.2...... Description of Proposed Works
10b.3...... Environmental Legislation and
Standards
10b.4...... Review of Planning and Development
Control Framework
10b.4.1... Objectives
10b.4.2... Existence of Statutory Plans
10b.5...... Baseline Study Methodology
10b.5.1... Introduction
10b.5.2... Landscape Baseline Study Methodology
10b.5.3... Visual Baseline Study Methodology
10b.5.4... Impact Significance Threshold
Assessment Methodology
10b.5.5... Residual Impacts Assessment
Methodology
10b.5.6... Photomontage Illustration for
Selected Views
10b.5.7... Overall Result of Assessment
10b.6...... Baseline study
10b.6.1... Identification of Landscape Resources
(LRs)
10b.6.2... Identification of Landscape Character
Areas (LCAs)
10b.6.3... Identification of Visual Sensitive
Receivers
10b.7...... Sources of Landscape and Visual
Impact
10b.7.1... Sources of Landscape Impact
10b.7.2... Sources of Visual Impacts
10b.8...... Landscape Impact Assessment
(Before Mitigation)
10b.8.1... Sensitivity of Landscape Resources
and Landscape Character Areas
10b.8.2... Magnitude of Change of Landscape
Resources and Landscape Character Areas
10b.8.3... Significance Threshold of Landscape
Resources and Landscape Character Areas
10b.9...... Visual Impact Assessment
10b.9.1... Sensitivity of Visual Sensitive
Receivers
10b.9.2... Magnitude of Change of Visual
Sensitive Receivers
10b.9.3... Significance Threshold of Visual
Sensitive Receivers
10b.10.... Mitigation Measures
10b.10.1. Mitigation Measures Approaches
10b.10.2. General Mitigation Measures /
Strategies
10b.10.3. Residual Impact of Landscape Resources
and Landscape Character Areas
10b.10.4. Residual Impact of Visual Sensitive
Receivers
10b.10.5. Photomontages of Residual Impact of
Visual Sensitive Receivers
10b.11.... Cumulative Impacts
10b.12.... Conclusion
10b.12.1. Landscape Impact
10b.12.2. Visual Impact
10b.12.3. Overall Residual Impact
11a......... IMPACT ON CULTURAL HERITAGE
(TTAL Site)
11b......... IMPACT ON CULTURAL HERITAGE
(Artificial Island near SKC)
11b.1...... Introduction
11b.2...... Environmental Legislation and
Standards
11b.2.1... Overview
11b.2.2... Environmental Impact Assessment
Ordinance (Cap.499) (EIAO)
11b.2.3... Technical Memorandum on Environmental
Impact Assessment Process (EIAO-TM)
11b.2.4... Antiquities and Monuments Ordinance
(Cap.53) (A&MO)
11b.2.5...
11b.2.6... Guidelines for Cultural Heritage
Impact Assessment
11b.2.7... Guidelines for Marine Archaeological
Impact Assessment
11b.3...... Assessment Methodology
11b.3.1... Study Scope
11b.3.2... Terrestrial Archaeology
11b.3.3... Marine Archaeology
11b.3.4... Built Heritage
11b.4...... Result of Terrestrial
Archaeological Review
11b.5...... Result of Marine Archaeological
Investigation Review
11b.5.1... Baseline Review
11b.5.2... Geophysical Survey
11b.5.3... Diver Inspection
11b.6...... Result of Built Heritage Resources
Review and Cultural Landscape
11b.7...... Identification of Potential
Impacts
11b.7.1... Construction Phase
11b.7.2... Operation Phase
11b.8...... Evaluation of Potential Impacts
11b.8.1... Construction Phase
11b.8.2... Operation Phase
11b.9...... Recommended Mitigation Measures
11b.9.1... Construction Phase
11b.9.2... Operation Phase
11b.10.... Environmental Monitoring and Audit
11b.11.... Conclusion
11b.12.... References
12a......... LANDFILL GAS HAZARDS ASSESSMENT
(TTAL Site)
13........... ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
13.1........ Introduction
13.2........ Tsang Tsui Ash Lagoon Site
13.3........ An Artificial
14........... IMPLEMENTATION SCHEDULE OF THE PROPOSED MITIGATION
MEASURES
14.1........ The IWMF at the TTAL Site
14.2........ The IWMF at the
15........... SUMMARY OF ENVIRONMENTAL OUTCOMES
15.1........ Impact Summary for Tsang Tsui
Ash Lagoon Site
15.1.12... Summary of the Measures Taken for the
Minimization of Environmental Impacts
15.2........ Impact Summary for the IWMF at
an Artificial Island near SKC
15.2.11... Summary of the Measures Taken for the
Minimization of Environmental Impacts
15.3........ Impact Summary for IWMF at both
Tsang Tsui Ash Lagoon Site and the Artificial Island near SKC (Co-Exist
Scenario)
15.4........ Key Environmental Outcomes and
Summary of Environmental Performance Comparison
List of Tables
Table 2.1 Criteria
for Selection of Thermal Treatment Technology
Table 2.2 Summary
of Option Evaluation for Thermal Treatment Technologies
Table 2.3 Air
Emission Limits for the IWMF
Table 2.4 Dimensions
of Major Building Structures of IWMF
Table 2.5 Construction
Programme of the IWMF at the TTAL Site
Table 2.6 Construction
Programme of the IWMF at the
Table 2.7 Areas
Covered by the EIA Study
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table 3b.1 Hong
Kong Air Quality Objectives
Table 3b.2 Annual
Average Concentrations of Pollutants from Year 2005 to Year 2009 at EPD's Air
Quality Monitoring Station (Tung Chung)
Table 3b.3 Identified
Air Sensitive Receiver for the
Table 3b.4 Target
emission levels
Table 3b.5 Operation
parameters of the Incineration Plant
Table 3b.6 Allocated
Emission Allowances for Year 2015
Table 3b.7 Different
road types for the hot spot areas
Table 3b.8 Fuel
Efficiency
Table 3b.9 Emission
rate for SO2 for different types of vehicles
Table 3b.10 Total
vehicle emission for different assessment years for the entire territory
Table 3b.11 Total
vehicle emission for different assessment years for each hot spot area
Table 3b.12 Conversion
Factors to 5 second Average Concentration
Table 3b.13 Identified
Air Sensitive Receivers for the
Table 3b.14 Predicted
Odour Levels at the ASR
Table
Table
Table
Table 4b.1 Construction
Noise Criteria for Activity other than Percussive Piling
Table 4b.2 Operation
Noise Criteria for Fixed Noise Sources
Table 4b.3 Summary
of Measured Prevailing Background Noise Level
Table 4b.4 Representative
Noise Sensitive Receivers for Noise Impact Assessment
Table 4b.5 Operation
Mode of the Berths
Table 4b.6 Noise
Inventories
Table 4b.7 Summary
of Cumulative Unmitigated Construction Noise Levels at Representative NSRs
during
Table 4b.8 Summary
of Predicted Operation Noise Levels
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table 5b.1 Summary
of Water Quality Objectives for Southern WCZ
Table 5b.2 Sediment
Quality Criteria for the Classification of Sediment
Table 5b.3 Baseline
Marine Water Quality Condition for Southern WCZ
Table 5b.4 Baseline
Marine Sediment Quality Condition
Table 5b.5 Estimated
Amount of Sewage Generated from the IWMF Staff & Visitors and the
Associated Activities
Table 5b.6 Estimated
Quantity and Possible Characteristics of Wastewater Generated from Treatment
Process and Sewage from Floor & Vehicle Washing and the IWMF Staff &
Visitors
Table 5b.7 Ambient
and Tolerance Values for Suspended Solids Concentrations in the Vicinity of
Sensitive Receivers
Table 5b.8 Calculated
Suspended Sediment Elevation under Unmitigated Filling Scenario
Table 5b.9 Proposed
Composition of Filling Material used for Filling at Different Locations
Table 5b.10 Calculated
Suspended Sediment Elevation under Mitigated Filling Scenario
Table 5b.11 Calculated
Suspended Sediment Elevation under Unmitigated Dredging Scenario (Silt Curtain
Implemented)
Table 5b.12 Calculated
Suspended Sediment Elevation under Mitigated Dredging Scenario (Silt Curtain
Implemented and Dredging Rate Reduces)
Table 5b.13 Recommended
Maximum Dredging Rate and Permitted Number of Grab Per
Hour
Table 5b.14 Calculation
of the Effects of Increased Suspended Solids Concentration on Dissolved Oxygen
Concentration under Unmitigated Scenario
Table 5b.15 Comparison
of Saline Water Discharge from Desalination Plant with Effluent Discharge
Standard
Table 5b.16 Density
Profile at SKC IWMF Desalination Plant Outfall
Table 5b.17 Current
Velocity Profile at SKC IWMF Desalination Plant Outfall
Table 5b.18 Summary
of Proposed Model Runs
Table 5b.19 Example
for Background Build Up Correction
Table 5b.20 Summary
of Initial Dilutions Predicted at the Edge of ZID
Table
Table
Table
Table
Table
Table 6b.1 Chemical
Screening Results
Table 6b.2 Disposal
Quantity of Marine Sediment
Table 6b.3 Summary
of C&D Materials Volumes
Table 6b.4 Sampling
Locations and Relevant Results
Table 6b.5 Methane
Hazard Assessment Criteria
Table 6b.6 Calculation
of Methane Flux from the Shek Kwu
Chau Reclamation
Table 6b.7 Incineration
Residue Pollution Control Limits
Table 6b.8 Summary
of Waste Generation from Operation of the IWMF
Table 6b.9 Summary
of Waste Handling Procedures and Disposal Outlets during Construction Phase
Table 6b.10 Materials
used in the IWMF Operation with Land Contamination Potential
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table 7b.1 Ecological
Survey Programme for Shek Kwu Chau
Table 7b.2 Ecological
Survey Programme for Cheung Sha
Table 7b.3 Habitats
Recorded within the Study Area at Shek Kwu Chau
Table 7b.4 Habitats
Recorded within the Study Area at Cheung Sha
Table 7b.5 Marine
Water Quality Condition for
Table 7b.6 Avifauna
Species of Conservation Interest Previously Recorded at Shek
Kwu Chau
Table 7b.7 Avifauna
Species of Conservation Interest Recorded within the Study Area at Shek Kwu Chau
Table 7b.8 Avifauna
Species of Conservation Interest Recorded within the Study Area at Cheung Sha
Table 7b.9 Herpetofauna Species of Conservation Interest Previously
Recorded at Shek Kwu Chau
Table 7b.10 Herpetofauna Species of Conservation Interest Recorded
within the Study Area at Shek Kwu
Chau
Table 7b.11 Herpetofauna Species of Conservation Interest Previously
Recorded at Cheung Sha
Table 7b.12 Herpetofauna Species of Conservation Interest Recorded
within the Study Area at Cheung Sha
Table 7b.13 Dragonfly
Species of Conservation Interest Previously Recorded at Shek
Kwu Chau
Table 7b.14 Dragonflies
and Butterflies Species of Conservation Interest Recorded within the Study Area
at Shek Kwu Chau
Table 7b.15 Freshwater
Species of Conservation Interest Previously Recorded at Cheung Sha
Table 7b.16 Summary
of Intertidal Line-transect Survey Results at Shek Kwu Chau
Table 7b.17
Summary of Intertidal Survey
Results at Cheung Sha
Table 7b.18 Coral
Species Found within the Study Area at Shek Kwu Chau
Table 7b.19
Summary of Benthos Survey
Results in Dry and Wet Seasons at Shek Kwu Chau
Table 7b.20 Comparison
of Diversity Index (H') and Evenness Index (J) of Benthic Communities at Shek Kwu Chau with Other Waters
in
Table 7b.21
Summary of Benthos Survey
Results in Dry and Wet Seasons along the Proposed Submarine Cable
Table 7b.22 Comparison
of Diversity Index (H') and Evenness Index (J) of Benthic Communities along the
Proposed Submarine Cable with Other Waters in
Table 7b.23 Ecological
Value of Shrubland Habitat at Shek
Kwu Chau
Table 7b.24 Ecological
Value of
Table 7b.25 Ecological
Value of Developed Habitat at Shek Kwu Chau
Table 7b.26 Ecological
Value of Pond Habitat at Shek Kwu
Chau
Table 7b.27 Ecological
Value of Watercourse Habitat at Shek Kwu Chau
Table 7b.28 Ecological
Value of Rocky Shore Habitat at Shek Kwu Chau
Table 7b.29 Ecological
Value of Subtidal Hard Bottom Habitat at Shek Kwu Chau
Table 7b.30 Ecological
Value of Subtidal Soft Bottom Habitat at Shek Kwu Chau
Table 7b.31 Ecological
Value of Coastal / Marine Waters at Shek Kwu Chau
Table 7b.32 Ecological
Value of Shrubland Habitat at Cheung Sha
Table 7b.33 Ecological
Value of Developed Habitat at Cheung Sha
Table 7b.34 Ecological
Value of Watercourse Habitat at Cheung Sha
Table 7b.35 Ecological
Value of Rocky Shore Habitat at Cheung Sha
Table 7b.36 Ecological
Value of Subtidal Hard Bottom Habitat at Cheung Sha
Table 7b.37 Ecological
Value of Subtidal Soft Bottom Habitat at Cheung Sha
Table 7b.38 Ecological
Value of Coastal / Marine Waters at Cheung Sha
Table 7b.39 Ecological
Value of Subtidal Soft Bottom Habitat along the
Submarine Cable Alignment
Table 7b.40 Ecological
Value of Coastal / Marine Waters along the Submarine Cable Alignment
Table 7b.41 Species
of Conservation Interest Recorded in the Study Area of Shek
Kwu Chau during the Current and Previous Studies
Table 7b.42 Species
of Conservation Interest Recorded in the Study Area of at Cheung Sha and Along the Submarine Cable Alignment during the
Current and Previous Studies
Table 7b.43 Area
of Habitat to be Directly Affected under the Project
Table 7b.44 Brief
summary of REA Survey Results within the Reclamation Area at Shek Kwu Chau
Table 7b.45 Potentially
Affected Coral Species Recorded within the Reclamation Area at Shek Kwu Chau
Table 7b.46 Calculated
Suspended Solids (SS) Concentrations at Shek Kwu Chau under Unmitigated Dredging Scenario (Dredging Rate
Table 7b.47 Overall
Impact Evaluation at Shek Kwu
Chau: Shrubland
Table 7b.48 Overall
Impact Evaluation at Shek Kwu
Chau:
Table 7b.49 Overall
Impact Evaluation at Shek Kwu
Chau: Developed Area
Table 7b.50 Overall
Impact Evaluation at Shek Kwu
Chau: Pond
Table 7b.51 Overall
Impact Evaluation at Shek Kwu
Chau: Watercourse
Table 7b.52 Overall Impact Evaluation at Shek Kwu Chau: Rocky Shore
Table 7b.53 Overall Impact Evaluation at Shek Kwu Chau: Subtidal Hard and Soft Bottom Habitat
Table 7b.54 Overall
Impact Evaluation at Shek Kwu
Chau: Coastal / Marine Waters
Table 7b.55 Overall Impact Evaluation at Cheung Sha: Shrubland
Table 7b.56 Overall
Impact Evaluation at Cheung Sha: Developed Area
Table 7b.57 Overall
Impact Evaluation at Cheung Sha: Watercourse
Table 7b.58 Overall
Impact Evaluation at Cheung Sha: Rocky Shore
Table 7b.59 Overall
Impact Evaluation at Cheung Sha: Subtidal
Hard and Soft Bottom Habitat
Table 7b.60 Overall
Impact Evaluation at Cheung Sha: Coastal / Marine
Waters
Table 7b.61 Overall
Impact Evaluation along the Submarine Cable Alignment: Subtidal
Soft Bottom Habitat
Table 7b.62 Overall
Impact Evaluation along the Cable Alignment: Coastal / Marine Waters
Table 7b.63 Overall
Impacts on Species of Conservation Interest at Shek Kwu Chau
Table 7b.64 Overall
Impacts on Species of Conservation Interest at Cheung Sha
and Along the Submarine Cable Alignment
Table 7b.65 Overall
Construction Stage Impact and Mitigation / Enhancement for Shek
Kwu Chau
Table 7b.66 Overall
Operation Stage Impact and Mitigation / Enhancement for Shek
Kwu Chau
Table 7b.67 Overall
Construction Stage Impact and Mitigation / Enhancement for Cheung Sha
Table 7b.68 Overall
Operation Stage Impact and Mitigation / Enhancement for Cheung Sha
Table 7b.69 Overall
Construction Stage Impact and Mitigation / Enhancement for Submarine Cable
Alignment
Table 7b.70 Overall
Operation Stage Impact and Mitigation / Enhancement for Submarine Cable
Alignment
Table
Table
Table
Table 8b.1 Fisheries
Sensitive Receivers within the Study Area
Table 8b.2 Recent
Figures for Capture Fisheries in
Table 8b.3 Summary
of Capture Fisheries Data in the Study Area
Table 8b.4 Fisheries
Production (kg/ha) of Top Ten Families in the Study Area
Table 8b.5 Recent
Figures on
Table 8b.6 Sizes
of Works Areas for the IWMF an
Table 8b.7 Fisheries
Impact Evaluation during Construction and Operation Phases
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table 9b.1 Identified
Air Sensitive Receivers for
Table 9b.2 Particle
Size Distributions
Table 9b.3 First
Schedule - Maximum permitted concentration of certain metals naturally present
in specified foods
Table 9b.4 Second
Schedule - Maximum permitted concentration of certain metals present in
specified foods
Table 9b.5 Food
Consumption Rates
Table 9b.6 Mechanisms
for Environmental Media Contamination
Table 9b.7 Summary
of General Water Body and Watershed Parameters
Table 9b.8 Toxicity
Factors for the Risk Assessment
Table 9b.9 Exposure
Limits/Reference Levels for COPCs Acute Exposure
Table 9b.10 Potential
Accidental Events and Preventive Measures
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table
Table 10b.1 Matrix
for Impact Significance Threshold - Combination and Relationship between
Sensitivity and Magnitude of Change
Table 10b.2 Landscape
Resources within Study Area
Table 10b.3 Landscape
Character Areas within Study Area
Table 10b.4 Visual
Sensitive Receivers within Visual Envelope
Table 10b.5 Sources
of Landscape Impact during Construction Phase
Table 10b.6 Sources
of Landscape Impact during Operation Phase
Table 10b.7 Sources
of Visual Impact during Construction Phase
Table 10b.8 Sources
of Visual Impact during Operation Phase
Table 10b.9 Sensitivity
of Identified Landscape Resources and Landscape Character Areas
Table 10b.10 Magnitude
of Change of Identified Landscape Resources and Landscape Character Areas
Table 10b.11 Significance
Threshold of Identified Landscape Resources and Landscape Character Areas before
Mitigation
Table 10b.12 Sensitivity
of Identified Visual Sensitive Receivers
Table 10b.13 Magnitude
of Change of Identified Visual Sensitive Receivers
Table 10b.14 Significance
Threshold of Identified Visual Sensitive Receivers before Mitigation
Table 10b.15 Recommended
Landscape and Visual Mitigation Measures
Table 10b.16 Residual
Impact of Identified Landscape Resources and Landscape Character Areas after
Mitigation
Table 10b.17 Residual
Impact of Identified Visual Sensitive Receivers after Mitigation
Table 10b.18 Visibility
of Visual Sensitive Receivers to Proposed Works
Table
Table 11b.1 Sonar
Contact List
Table 11b.2 Seismic
Contact List
Table 11b.3 Potential
Impact on Cultural Heritage Site
Table
Table
Table
Table
Table
Table
Table 14.1 Implementation
Schedule for Air Quality Measures for the IWMF at the TTAL site
Table 14.2 Implementation
Schedule for Water Quality Measures for the IWMF at the TTAL site
Table 14.3 Implementation
Schedule for Waste Quality Measures for the IWMF at the TTAL site
Table 14.4 Implementation
Schedule for Ecological Quality Measures for the IWMF at the TTAL site
Table 14.5 Implementation
Schedule for Health Impact Measures for the IWMF at the TTAL site
Table 14.6 Implementation
Schedule for Landscape and Visual Measures for TTAL Site
Table 14.7 Implementation
Schedule for Landfill Gas Measures for the IWMF at the TTAL site
Table 14.8 Implementation
Schedule for Air Quality Measures for the IWMF at the artificial island near
SKC
Table 14.9 Implementation
Schedule for Noise Impact Measures for the IWMF at the artificial island near
SKC
Table 14.10 Implementation
Schedule for Water Quality Measures for the
Table 14.11 Implementation
Schedule for Waste Quality Measures for the IWMF at the artificial island near
SKC
Table 14.12 Implementation
Schedule for Ecological Quality Measures for the IWMF at the artificial island
near SKC
Table 14.13 Implementation
Schedule for Fisheries Measures for the IWMF at the artificial island near SKC
Table 14.14 Implementation
Schedule for Landscape and Visual Measures for the IWMF at the artificial
island near SKC
Table 15.1 Summary
of Key Environmental Outcomes / Benefits and Environmental Performance
Comparison
VOLUME 2: APPENDICES 3.1 – 3.12
List
of Appendices
Appendix 3.1 Comparison of Target Emission
Levels with other Relevant Standards
Appendix 3.2 Detailed Calculations of
Emissions from the IWMF
Appendix 3.3 Detailed Calculations of Marine
Emission for the IWMF at the Artificial Island near Shek Kwu Chau
Appendix 3.4 Summary of Emission Inventory
for ISC Modelling
Appendix 3.5 Summary of Emission Inventory
for PATH Modelling
Appendix 3.6 Marine Emission for PATH model
Appendix 3.7 Key Assumptions for EMFAC-HK
Model
Appendix 3.8 Summary of Vehicle Emissions
for the Territory of Hong Kong
Appendix 3.9 Detailed Calculations of Odour
Emission
Appendix 3.10 Wind Tunnel Testing Report
Appendix 3.11 Plots of the Predicted
Concentration from PATH model
Appendix 3.12 Detailed Assessment Results
for Identified Potential Hot Spot Areas
VOLUME 3: APPENDICES 4.1 –
List
of Appendices
Appendix 4.1 Photographs of Representative
Noise Sensitive Receivers at Shek Kwu Chau Site
Appendix 4.2 Response Letter from Transport
Department
Appendix 4.3 Locations of Notional Source
and Distance for NSRs
Appendix 4.4 Powered Mechanical Equipment
(PME) for the Different Construction Tasks
Appendix 4.5 Details of Construction Noise
Calculations (Unmitigated)
Appendix 4.6 Predicted Operation Noise
Levels
Appendix 5.1 Baseline Sedimentation Rates
within the Study Area
Appendix 5.2 Not Used
Appendix 5.3 Typical Sediment Removal
Facility (Extracted from ProPECC PN 1/94 "Construction Site
Drainage")
Appendix 5.4 Not Used
Appendix 5.5 Application of Silt Curtains
for Construction and Operation of the Shek Kwu Chau Faciliities
Appendix
6.1 Sediment / PFA Sampling and
Testing Plan
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix
Appendix 7b.1 Representative Photographs of
Habitats at Shek Kwu Chau
Appendix 7b.2 Rapid Ecological Assessment
Methodology
Appendix 7b.3 Representative Photographs of
Coral Communities at Shek Kwu Chau
Appendix 7b.4 Photographs of Fauna Species
of Conservation Interest at Shek Kwu Chau
Appendix 7b.5 Flora Species Recorded within
the Study Area at Shek Kwu Chau
Appendix 7b.6 Fauna Species recorded within
the Study Area at Shek Kwu Chau
Appendix 7b.7 Fauna Species recorded during
the Cover Board Survey at Shek Kwu Chau
Appendix 7b.8 Detailed Benthos Survey
Results for Shek Kwu Chau
Appendix 7b.9 Line-Transect Survey Effort
for Finless Porpoise
Appendix 7b.10 Detailed Marine Mammal Survey
Results
Appendix 7b.11 Detailed Results of Spot
Check Dive & REA Transects at Shek Kwu Chau
Appendix 7b.12 Representative Photographs of
Habitats at Cheung Sha
Appendix 7b.13 Photographs of Flora and
Fauna Species of Conservation Interest at Cheung Sha
Appendix 7b.14 Flora Species Recorded within
the Study Area at Cheung Sha
Appendix 7b.15 Fauna Species recorded within
the Study Area at Cheung Sha
Appendix 7b.16 Detailed Benthos Survey
Results for the Submarine Cable Alignment Cheung Sha
Appendix 7b.17 Detailed Description of Spot
Check Dive Results at Cheung Sha
Appendix 9.1 Equations for Evaluating
Exposure and Risk
Appendix 9.2 Not Used
Appendix 9.3 Predicted Concentration and
Percentage of Averaged Project Contribution
Appendix 9.4 Predicted Annual Concentrations
of the Other COPCs
Appendix 9.5 Predicted Total Cancer Risk and
Hazard Quotient
Appendix 9.6 Predicted Acute Concentrations
of the Other COPCs
Appendix 9.7 Predicted Maximum Permitted
Concentration of Certain Metals in Foods
Appendix
Appendix 11b.1 Results of Hydrographic
Office Wreck Search
Appendix 11b.2 Geophysical Survey Charts and
Images of Sonar and Seismic Contacts
Appendix 11b.3 Inventory of Cultural
Heritage Sites for the artificial island near SKC
Appendix
VOLUME 4: FIGURES
List
of Figures
Figure 1.1 Location of the IWMF at the Tsang
Tsui Ash Lagoons Site
Figure 1.2 Location of the IWMF at the
Artificial Island near Shek Kwu Chau
Figure 2.1 Areas of Exclusion for Development
of the IWMF
Figure 2.2 Shortlisted Sites for the IWMF in
Site Search Study
Figure 2.3 General Layout of the IWMF at Tsang
Tsui Ash Lagoons Site
Figure 2.4 General Layout of the IWMF at the Artificial
Island near Shek Kwu Chau
Figure 2.7 Construction Details of Cellular
Cofferdams
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure 3b.1 Locations of Air Sensitive
Receviers (Artificial Island near Shek Kwu Chau)
Figure 3b.2 Locations of Emission Sources (Artificial
Island near Shek Kwu Chau)
Figure 3b.5b Contours of Cumulative Annual
Average NO2 Concentration in mg/m3- South Lantau (Artificial Island near
Shek Kwu Chau)
Figure 3b
Figure 3b.7b Contours of Cumulative Annual
Average RSP Concentration in mg/m3-
South Lantau (Artificial Island near Shek Kwu Chau)
Figure 3b
Figure
Figure
Figure
Figure 4b.1 Locations of Representative Noise
Sensitive Receivers at the Artificial Island near SKC
Figure 4b.2 Locations of Fixed Noise Sources at
the Artificial Island near SKC
Figure
Figure
Figure 5b.1 Locations of Water Quality
Sensitive Receivers
Figure 5b.2 Proposed Reclamation Site at the
Artificial Island near SKC
Figure 5b.3 Proposed Submarine Cable Alignment
Option from the Artificial Island near SKC to CLP Power Grid
Figure 5b.4 Recommended Extent and Dredging
Rate of Dredging for Anti-scouring Protection Layer
Figure 5b.5 Proposed Phasing of the Reclamation
and Construction of Breakwater
Figure 5b.6 Location of Outfall for
Concentrated Brine
Figure 5b.7 Concurrent Marine Work at South
Lantau
Figure 5b.8 Recommended Extent and Dredging
Rate for the Maintenance Dredging
Figure 5b.9 Extent of Filling before Closing of
Seawall and Predicted Maximum Extent of SS Mixing Zone for Reclamation
Figure 6b.1 As-Built Sampling Locations at the
Artificial Island near Shek Kwu Chau
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure 7b.1 Habitat Map and Species of
Conservation Importance at Shek Kwu Chau
Figure 7b.2 Habitat Map and Species of
Conservation Importance at Cheung Sha
Figure 7b.3 Marine Ecological Study Area
Figure 7b.4 Locations of Ecological Surveys at
Shek Kwu Chau
Figure 7b.5 Locations of Ecological Surveys at
Cheung Sha
Figure 7b.6 Locations of Benthos Sampling Sites
along the Submarine Cable Alignment
Figure 7b.7 Cover Board Survey Locations at
Shek Kwu Chau
Figure 7b.8 Marine Mammal Line Transect Surveys
Figure 7b.9 REA Transects at Shek Kwu Chau
Figure 7b.10 Distribution of Finless Porpoise
Sighting in Hong Kong between 2005 and 2011
Figure 7b.11 Seasonal Distribution of Finless
Porpoise Sightings in Hong Kong between 2004 and 2010
Figure 7b.12 SPSE and DPSE of Finless Porpoise
in Hong Kong between 2004 and 2010
Figure 7b.13 Distribution of Finless Porpoise
Sighting in Southeast Lantau between December 2008 and May 2009
Figure 7b.14 Original Layout Plan at Shek Kwu Chau
Figure 7b.15 Indicative Travel Route for IWMF
Vessels
Figure
Figure 8b.1 Locations of Key Fisheries
Sensitive Receivers at Southern Water Control Zone
Figure 9.1 Location of
Radon Progeny
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure 10b.1 IWMF at the Artificial Island
near SKC - Landscape Resource Plan
Figure 10b.2 IWMF at the Artificial Island
near SKC - Photos of Landscape Resources
Figure 10b.3 IWMF at the Artificial Island
near SKC - Landscape Character Area Plan
Figure 10b.4 IWMF at the Artificial Island
near SKC - Photos of Landscape Character Areas
Figure 10b.5 IWMF at the Artificial Island
near SKC - Visual Sensitive Receiver Plan (Sheet 1 of 2)
Figure 10b.6 IWMF at the Artificial Island
near SKC - Visual Sensitive Receiver Plan (Sheet 2 of 2)
Figure 10b.7 IWMF at the Artificial Island
near SKC - Photos of Visual Sensitive Receivers (Sheet 1 of 3)
Figure 10b.8 IWMF at the Artificial Island
near SKC - Photos of Visual Sensitive Receivers (Sheet 2 of 3)
Figure 10b.9 IWMF at the Artificial Island
near SKC - Photos of Visual Sensitive Receivers (Sheet 3 of 3)
Figure 10b.10 IWMF at the Artificial Island
near SKC - Landscape and Visual Mitigation Measures Plan
Figure 10b.11 Existing Condition of IWMF at the
Artificial Island near SKC viewed from VSR 1 - Footpath along the Hill
Figure 10b.12 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 1 - Footpath along the Hill in
Unmitigated Scenario
Figure 10b.13 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 1 - Footpath along the Hill in Day 1
Operation
Figure 10b.14 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 1 - Footpath along the Hill in Year
10 Operation
Figure 10b.15 Existing Condition of IWMF at the
Artificial Island near SKC viewed from VSR 2 - Shun House
Figure 10b.16 Photomontage of IWMF at the Artificial
Island near SKC viewed from VSR 2 - Shun House in Unmitigated Scenario
Figure 10b.17 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 2 - Shun House in Day 1 Operation
Figure 10b.18 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 2 - Shun House in Year 10 Operation
Figure 10b.23 Existing Condition of IWMF at the
Artificial Island near SKC viewed from VSR 4 - Sea
Figure 10b.24 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 4 - Sea in Unmitigated Scenario
Figure 10b.25 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 4 - Sea in Day 1 Operation
Figure 10b.26 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 4 - Sea in Year 10 Operation
Figure 10b.27 Existing Condition of IWMF at the
Artificial Island near SKC viewed from VSR 5 - Cheung Sha, South Lantau Island
Figure 10b.29 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 5 - Cheung Sha, South Lantau Island
in Day 1 Operation
Figure 10b.31 Existing Condition of IWMF at the
Artificial Island near SKC viewed from VSR 6 - Cheung Po Tsai Cave, Cheung Chau
Figure 10b.33 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 6 - Cheung Po Tsai Cave, Cheung Chau
in Day 1 Operation
Figure 10b.35 Existing Condition of IWMF at the
Artificial Island near SKC viewed from VSR 7 - Cheung Chau Ferry Pier
Figure 10b.36 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 7 - Cheung Chau Ferry Pier in
Unmitigated Scenario
Figure 10b.37 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 7 - Cheung Chau Ferry Pier in Day 1
Operation
Figure 10b.38 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR7 - Cheung Chau Ferry Pier in Year 10
Operation
Figure 10b.39 Existing Condition of IWMF at the
Artificial Island near SKC viewed from VSR 8 - Pui O Beach
Figure 10b.40 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 8 - Pui O Beach in Unmitigated
Scenario
Figure 10b.41 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 8 - Pui O Beach in Day 1 Operation
Figure 10b.42 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR8 - Pui O Beach in Year 10 Operation
Figure 10b.43 Existing Condition of IWMF at the
Artificial Island near SKC viewed from VSR 9 - Lantau Trail Stage 2
Figure 10b.44 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 9 - Lantau Trail Stage 2 in
Unmitigated Scenario
Figure 10b.45 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 9 - Lantau Trail Stage 2 in Day 1
Operation
Figure 10b.46 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR9 - Lantau Trail Stage 2 in Year 10 Operation
Figure 10b.47 Existing Condition of IWMF at the
Artificial Island near SKC viewed from VSR 10 - Lantau Trail Stage 3
Figure 10b.48 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 10 - Lantau Trail Stage 3 in
Unmitigated Scenario
Figure 10b.49 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 10 - Lantau Trail Stage 3 in Day 1
Operation
Figure 10b.50 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR10 - Lantau Trail Stage 3 in Year 10
Operation
Figure 10b.51 Existing Condition of IWMF at the
Artificial Island near SKC viewed from VSR 11 - Tong Fuk Beach
Figure 10b.52 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 11 - Tong Fuk Beach in Unmitigated
Scenario
Figure 10b.53 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 11 - Tong Fuk Beach in Day 1
Operation
Figure 10b.54 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR11 - Tong Fuk Beach in Year 10
Operation
Figure 10b.59 Existing Condition of IWMF at the
Artificial Island near SKC viewed from VSR 13 - Chi Ma Wan Trail - Yi Long Wan
Figure 10b.61 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 13 - Chi Ma Wan Trail - Yi Long Wan
in Day 1 Operation
Figure 10b.62 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR13 - Chi Ma Wan Trail - Yi Long Wan
in Year 10 Operation
Figure 10b.63 Existing Condition of IWMF at the
Artificial Island near SKC viewed from VSR 14 - Tai Long Wan
Figure 10b.64 Photomontage of IWMF at the Artificial
Island near SKC viewed from VSR 14 - Tai Long Wan in Unmitigated Scenario
Figure 10b.65 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 14 - Tai Long Wan in Day 1 Operation
Figure 10b.66 Photomontage of IWMF at the
Artificial Island near SKC viewed from VSR 14 - Tai Long Wan in Year 10
Operation
Figure 10b.67 Existing Condition of IWMF at the
Artificial Island near SKC - Bird's eye View
Figure 10b.68 Photomontage of IWMF at the
Artificial Island near SKC - Bird's eye View in Unmitigated Scenario
Figure 10b.69 Photomontage of IWMF at the
Artificial Island near SKC - Bird's eye View in Day 1 Operation
Figure 10b.70 Photomontage of IWMF at the
Artificial Island near SKC - Bird's eye View in Year 10 Operation
Figure
Figure 11b.1 Study Area for Marine
Archaeological Investigation
Figure 11b.2 British Admiralty Chart 1899 and
Chart of Islands S.E. of Lantau 1786
Figure 11b.3 Locations of Sonar and Seismic
Contacts in the MAI Study Area
Figure 11b.4 Location of the Built Heritage
Resources at Shek Kwu Chau
Figure 11b.5 Location of Built Heritage Sites at Shek Kwu Chau
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
Figure
VOLUME 5: PUBLIC COMMENTS ON
EIA REPORT
SUBMITTED IN FEBRUARY 2011 AND
RESPONSES