1.1 Background
1.2 The Project
1.3 Designated Projects
1.4 EIA Study Brief
1.5 Need of the Project
1.6 Scenario “with” and “without” Project
1.7 Implementation Programme
1.8 Concurrent Projects
1.9 Structure of this EIA Report
2.1 History of Previous Studies
2.2 Public Consultation
2.3 Selection of Preferred Alignment Option in West Portion
2.4 Selection of Preferred Alignment Option in East Portion
2.5 Selection of Preferred Alignment Option for Central Portion
2.6 Selection of the Proposed Alignment
2.7 Justification on the Locations of Ventilation Buildings
3.1 General
Alignment and Key Elements
3.2 Key Design
Elements
3.3
Implementation Programme
3.4 Material
Changes to Exempted Designated Projects
3.5
Proposed Construction Methodology
4.1 Introduction
4.2 Legislation
and Standards
4.3 Construction
Dust Assessment
4.4 Operational
Air Quality Assessment
4.5 Conclusion
4.6 References
5.1 Introduction
5.2
Legislation and Standards
5.3
Noise Sensitive Receivers
5.4
Construction Noise Impact Assessment
5.5
Operational Noise Impact Assessment
5.6
Conclusion
6.1 Introduction
6.2 Legislation
and Standards
6.3 General
Methodology and Principles
6.4 Baseline
Conditions
6.5 Water
Sensitive Receivers
6.6 Potential
Concurrent Projects
6.7 Construction
Phase Water Quality Assessment
6.8 Operational
Phase Water Quality Assessment
6.9 Mitigation
Measures
6.10 Residue Impacts
6.11 Conclusion
6.12 References
7.1 Introduction
7.2 Legislation
and Standards
7.3 General
Methodology and Principles
7.4
Identification and Evaluation of Waste Management Implications
7.5 Mitigation
Measures
7.6 Residual
Environmental Impacts
7.7 Conclusion
8.1 Introduction
8.2 Legislation
and Guidance
8.3 Background
Information
8.4 Site Survey
8.5 Future
Landuse and Activities
8.6 Potentially
Contaminated Sites
8.7 Site
Investigation
8.8
Identification and Evaluation of Land Contamination
8.9 Possible
Soil Contamination Extent
8.10 Remaining SI Works
8.11 Soil Remediation
Options & Recommendations
8.12 Conclusion
9.1 Introduction
9.2 Scope of Hazard to Life Assessment
9.3 Hazard to Life Assessment Objectives and
Risk Criteria
9.4 Approach of the Hazard to Life
Assessment
9.5 Project Description and Assessment
Information
9.6 Transport of Explosives for the CKR
Project
9.7 Use of Explosives for the CKR Project
9.8 Population Estimates
9.9 Hazard Identification
9.10 Incident Review
9.11 Frequency Assessment for Transport of Explosives
9.12 Frequency Assessment for Use of Explosives
9.13 Consequence Assessment
9.14 Risk Analysis
9.15 Risks due to Interfaces with Future Shatin to
Central Link (SCL)
9.16 Risks due to Interfaces with Future Kwun Tong Line
Extension (KTE)
9.17 Conclusion
9.18 Recommendations
9.19 References
10.1
Introduction
10.2 Scope
and Content of the Study
10.3
Legislation and Standards
10.4
General Methodology and Principles
10.5
Review of Planning and Development Control Framework
10.6
Comments on Landscape and Visual Issues Received During Public Forum
10.7
Landscape Baseline Study
10.8
Visual Baseline Study
10.9
Landscape Impact Assessment
10.10 Landscape and Visual
Mitigation Measures
10.11 Visual Impact
Assessment
10.12 Conclusion
11.1
Introduction
11.2
Legislation and Standards
11.3
Methodology and Principles
11.4
Terrestrial Archaeological Assessment
11.5 Marine
Archaeological Assessment
11.6 Conclusion
11.7 References
12.1 Introduction
12.2
Legislation and Standards
12.3
Methodology and Principles
12.4 Results
of the Desk Based Study
12.5 Impact
Assessment
12.6
Mitigation Recommendations
12.7
Conclusion
12.8
References
13.1 Introduction
13.2 Project Organisation
13.3 EM&A Manual and
Implementation Schedule
13.4 Amendments to EM&A Manual
13.5 EM&A Programme
13.6 Environmental Management
Plan
14.1 Population and
Environmental Sensitive Areas Protected
14.2 Approaches Adopted to
Avoid Environmental Impacts
14.3 Approaches Adopted to
Minimize Environmental Impacts
14.4 Approaches Adopted to
Mitigate Environmental Impacts
15.1 General
15.2 Alignment Evaluation
15.3 Construction Method
15.4 Air Quality Impact
15.5 Noise Impact
15.6 Water Quality Impact
15.7 Waste Management
Implications
15.8 Land Contamination
Impact
15.9 Hazard Assessment
15.10 Landscape and Visual Impact
15.11 Impact on Cultural Heritage
(Terrestrial & Marine Archaeology)
15.12 Impact on Cultural Heritage (Built
Heritage)
15.13 Environmental Monitoring and Audit
Requirements
15.14 Overall
2 CONSIDERATION OF
ALTERNATIVE ALIGNMENT OPTIONS
3 PROJECT DESCRIPTION
AND CONSTRUCTION METHODOLOGY
4 AIR QUALITY IMPACT
5 NOISE IMPACT
6 WATER QUALITY IMPACT
8
LAND CONTAMINATION IMPACT
10 LANDSCAPE AND
VISUAL IMPACT
11 IMPACT ON
CULTURAL HERITAGE (TERRESTRIAL & MARINE ARCHAEOLOGY)
12 IMPACT ON
CULTURAL HERITAGE (BUILT HERITAGE)
1 INTRODUCTION
3 PROJECT DESCRIPTION
AND CONSTRUCTION METHODOLOGY
4 AIR QUALITY IMPACT
5 NOISE IMPACT
6 WATER QUALITY IMPACT
7
WASTE MANAGEMENT IMPLICATIONS
8
LAND CONTAMINATION IMPACT
9
HAZARD ASSESSMENT
10 LANDSCAPE AND VISUAL IMPACT ASSESSMENT
11 IMPACT ON
CULTURAL HERITAGE (TERRESTRIAL & MARINE ARCHAEOLOGY)
12 IMPACT ON
CULTURAL HERITAGE (BUILT HERITAGE)
15 CONCLUSION