List of Appendices

 

 

Appendix

2.1

Construction Programme of TKO-LT Tunnel

Appendix

2.2

Road Works – Profile of TKO-LT Tunnel

Appendix

2.3

Lateral View of the Main Bridge Piers and Slip Roads at TKO Section

Appendix

2.4

Detailed Programme and Lateral View of CBL

Appendix

2.5

Proposed Residential Site at Kwun Tong

Appendix

2.6

Correspondences From Government Departments Advising Their Status

Appendix

2.7

Tunnel Facilities Layouts of the TKO-LT Tunnel

Appendix

3.1

Calculations of Construction Dust Emission Rates

Appendix

3.2

Methodology Paper for EMFAC-HK Model

Appendix

3.3

Summary of Vehicular Emission Factors

Appendix

3.4

Projected Traffic Flows and Vehicle Compositions – Year 2021

Appendix

3.5

Graphical Plots of 2020 PATH Background Concentration for Different Pollutants

Appendix

3.6

Summary of Composite Vehicular Emission Factors for CALINE4 Model

Appendix

3.7

Calculation of Portal Emissions and Emissions of Ventilation Buildings

Appendix

3.8

Calculation of In-Tunnel Air Quality for TKO-LT Tunnel

Appendix

3.9

Calculation of In-Tunnel Air Quality

Appendix

4.1a

Photographs of Existing Noise Sensitive Receivers

Appendix

4.1b

Background Noise Measurement Locations

Appendix

4.2

Peak Traffic Flow for with Project, without Project and Prevailing Scenarios

Appendix

4.3

Powered Mechanical Equipment (PME) for the Different Construction Tasks

Appendix

4.4

Predicted Construction Noise Levels at Representative NSRs (Unmitigated)

Appendix

4.5

Detailed Calculation of Construction Ground-borne Noise Impacts from Hydraulic Breakers, Drill Rig and Pile Rig

Appendix

4.6

Predicted Traffic Noise Level (Unmitigated)

Appendix

4.7

Road-plots of the Traffic Noise Model and Sample Output Files

Appendix

4.8

Maximum Allowable SWL Calculation for Fixed Plant Noise at LT Side

Appendix

4.9

Maximum Allowable SWL Calculation for Fixed Plant Noise at TKO Side

Appendix

4.10

Predicted Operation Fixed Plant Noise Levels

Appendix

4.11

Quiet Powered Mechanical Equipment (PME) for the Different Construction Tasks (With Mitigation Measures)

Appendix

4.12

Predicted Construction Noise Levels at Representative NSRs (Mitigated)

Appendix

4.13

Predicted Traffic Noise Level (Mitigated)

Appendix

4.14

Barrier Inventory for Proposed Traffic Noise Mitigated Measures

Appendix

5.1

Calculation of Sediment Loss Rate for Sediment Plume Modelling

Appendix

5.2

Mathematical Expressions for Bridge Pier Friction

Appendix

5.3

Sediment Plume Modelling Results for Construction Scenarios

Appendix

5.4

Hydrodynamic Modelling Results for Operational Scenarios

Appendix

5.5

Locations of Water Quality Sensitive Receivers

Appendix

5.6

Grid Layout for Junk Bay Model

Appendix

5.7

Bathymetry Schematisation for Junk Bay Model

Appendix

5.8

Cross-sections for Model Outputs

Appendix

5.9

Model Setup

Appendix

5.10

Location of Marine Access for Proposed Reclamation

Appendix

5.11

Hourly Drogue Track

Appendix

5.12

Preliminary Geological Profile

Appendix

6.1

Representative Photograph of Habitat Recorded within Assessment Area

Appendix

6.2

Representative Photograph of Species of Conservation Interest Recorded

Appendix

6.3

Plant Species Recorded within the Assessment Area

Appendix

6.4

Fauna Recorded within the Assessment Area

Appendix

6.5

Photographic Record of Intertidal Surveys

Appendix

6.6

Photographic Record of Benthos Surveys

Appendix

6.7

Photographic Record of Dive Surveys

Appendix

6.8

Photographic Record of Fish Surveys

Appendix

6.9

Fauna/Flora Recorded during the Intertidal Surveys

Appendix

6.10

Detailed Results of REA Surveys

Appendix

6.11

List of Organisms Recorded during the Benthos Surveys

Appendix

8.1

Breakdown of C&D Material by Works Area and Year

Appendix

8.2

Sediment Sampling and Testing Plan

Appendix

8.3

Summary of Chemical Screen Result and Disposal Option

Appendix

8.4

Summary of Biological Screen Results

Appendix 

8.5

Detail PAHs Chemical Screen Result

Appendix

9.1

Photo Logs of the Built Heritages

Appendix

9.2

Working Paper on Terrestrial Archaeological Review and Marine Archaeological Investigation

Appendix

10.1

Tree Survey Plans and Preliminary Compensatory Planting Plans

Appendix

11.1

Landfill Gas and Groundwater Monitoring Data

Appendix

11.2

EPD/TR8/97 Landfill Gas Hazard Assessment Guidance Note, Chapter 8