List of Appendices
Appendix
2.1
Construction Programme of TKO-LT Tunnel
2.2
Road Works – Profile of TKO-LT Tunnel
2.3
Lateral View of the Main Bridge Piers and Slip Roads at TKO Section
2.4
Detailed Programme and Lateral View of CBL
2.5
Proposed Residential Site at Kwun Tong
2.6
Correspondences From Government Departments Advising Their Status
2.7
Tunnel Facilities Layouts of the TKO-LT Tunnel
3.1
Calculations of Construction Dust Emission Rates
3.2
Methodology Paper for EMFAC-HK Model
3.3
Summary of Vehicular Emission Factors
3.4
Projected Traffic Flows and Vehicle Compositions – Year 2021
3.5
Graphical Plots of 2020 PATH Background Concentration for Different Pollutants
3.6
Summary of Composite Vehicular Emission Factors for CALINE4 Model
3.7
Calculation of Portal Emissions and Emissions of Ventilation Buildings
3.8
Calculation of In-Tunnel Air Quality for TKO-LT Tunnel
3.9
Calculation of In-Tunnel Air Quality
4.1a
Photographs of Existing Noise Sensitive Receivers
4.1b
Background Noise Measurement Locations
4.2
Peak Traffic Flow for with Project, without Project and Prevailing Scenarios
4.3
Powered Mechanical Equipment (PME) for the Different Construction Tasks
4.4
Predicted Construction Noise Levels at Representative NSRs (Unmitigated)
4.5
Detailed Calculation of Construction Ground-borne Noise Impacts from Hydraulic Breakers, Drill Rig and Pile Rig
4.6
Predicted Traffic Noise Level (Unmitigated)
4.7
Road-plots of the Traffic Noise Model and Sample Output Files
4.8
Maximum Allowable SWL Calculation for Fixed Plant Noise at LT Side
4.9
Maximum Allowable SWL Calculation for Fixed Plant Noise at TKO Side
4.10
Predicted Operation Fixed Plant Noise Levels
4.11
Quiet Powered Mechanical Equipment (PME) for the Different Construction Tasks (With Mitigation Measures)
4.12
Predicted Construction Noise Levels at Representative NSRs (Mitigated)
4.13
Predicted Traffic Noise Level (Mitigated)
4.14
Barrier Inventory for Proposed Traffic Noise Mitigated Measures
5.1
Calculation of Sediment Loss Rate for Sediment Plume Modelling
5.2
Mathematical Expressions for Bridge Pier Friction
5.3
Sediment Plume Modelling Results for Construction Scenarios
5.4
Hydrodynamic Modelling Results for Operational Scenarios
5.5
Locations of Water Quality Sensitive Receivers
5.6
Grid Layout for Junk Bay Model
5.7
Bathymetry Schematisation for Junk Bay Model
5.8
Cross-sections for Model Outputs
5.9
Model Setup
5.10
Location of Marine Access for Proposed Reclamation
5.11
Hourly Drogue Track
5.12
Preliminary Geological Profile
6.1
Representative Photograph of Habitat Recorded within Assessment Area
6.2
Representative Photograph of Species of Conservation Interest Recorded
6.3
Plant Species Recorded within the Assessment Area
6.4
Fauna Recorded within the Assessment Area
6.5
Photographic Record of Intertidal Surveys
6.6
Photographic Record of Benthos Surveys
6.7
Photographic Record of Dive Surveys
6.8
Photographic Record of Fish Surveys
6.9
Fauna/Flora Recorded during the Intertidal Surveys
6.10
Detailed Results of REA Surveys
6.11
List of Organisms Recorded during the Benthos Surveys
8.1
Breakdown of C&D Material by Works Area and Year
8.2
Sediment Sampling and Testing Plan
8.3
Summary of Chemical Screen Result and Disposal Option
8.4
Summary of Biological Screen Results
8.5
Detail PAHs Chemical Screen Result
9.1
Photo Logs of the Built Heritages
9.2
Working Paper on Terrestrial Archaeological Review and Marine Archaeological Investigation
10.1
Tree Survey Plans and Preliminary Compensatory Planting Plans
11.1
Landfill Gas and Groundwater Monitoring Data
11.2
EPD/TR8/97 Landfill Gas Hazard Assessment Guidance Note, Chapter 8