List of Figures     

 

 

Figure No.

Title

Rev.

Figure 2.1

Route 6 –General Layout Plan

-

Figure 2.2

General Layout of Recommended Scheme

-

Figure 2.3

Preliminary Options Selection Report Route Alignment Options 1-6 Horizontal Alignments

-

Figure 2.4

Recommended Tunnel Option Report Options 1, 2 & 3 Horizontal Alignments

-

Figure 2.5

Possible Locations of Toll Plaza at TKO (Scheme 1 and 2) Sheet 1 of 2

-

Figure 2.6

Possible Locations of Toll Plaza at TKO (Scheme 3 and 4) Sheet 2 of 2

-

Figure 2.7

Non-Toll Arrangement at TKO (Scheme 5)

-

Figure 2.8

Layout Plan of WCR Tunnel Alignment Scheme A and B

-

Figure 2.9

Layout Plan of Refined WCR Coastal Alignment

-

Figure 2.10

Conceptual Scheme A

-

Figure 2.11

Conceptual Scheme E

-

Figure 2.12

P2/D4 Junction – Signal Control Option

-

Figure 2.13

Option 1 – Zig-Zag Ramps at Cycle Track cum Footbridge

-

Figure 2.14

Option 2 – Spiral Ramps at Cycle Track cum Footbridge

-

Figure 2.15

Option 3 – By Lifts and Cycle Track cum Footbridge

-

Figure 2.16

Option 4 – Separated Cycle Track

-

Figure 2.17

Option 5 – Subway

-

Figure 2.18

Option 6 – By Lifts and Cycle Track cum Footbridge + Separated Cycle Track

-

Figure 2.19

General Layout Plan of Landscape Deck Upon Road P2

-

Figure 2.20

Tseung Kwan O Section – General Layout Plan of Conforming Option

-

Figure 2.21

Tseung Kwan O Section – General Layout Plan of Alternative Option 1

-

Figure 2.22

Tseung Kwan O Section – General Layout Plan of Alternative Option 2

-

Figure 2.23

Tseung Kwan O Section – General Layout Plan of Alternative Option 3

-

Figure 2.24

Original Alignment at Lam Tin Hill Section – General Layout Plan

-

Figure 2.25

Alternative Alignment No. 1 at Lam Tin Hill Section – General Layout Plan

-

Figure 2.26

Alternative Alignment No. 2 at Lam Tin Hill Section – General Layout Plan

-

Figure 2.27

Layout of Lam Tin Interchange Option 1

-

Figure 2.28

Layout of Lam Tin Interchange Option 2

-

Figure 2.29

Layout of Lam Tin Interchange Option 3

-

Figure 2.30

Layout of Lam Tin Interchange Option 4

-

Figure 2.31

Layout of Lam Tin Interchange Option 5

-

Figure 2.32

Schematic Layout of The Depressed Road Option and Tunnel Option

-

Figure 2.33

Option H1a – Depressed Option with Tunnel Alignment pass through the Middle of CKLV

-

Figure 2.34

Option H1b – Depressed Option with Tunnel Alignment pass through the Middle of CKLV

-

Figure 2.35

Option H2a – Depressed Option with Tunnel Alignment pass through the Previous Four Hills Public School

-

Figure 2.36

Option H2b – Depressed Option with Tunnel Alignment pass through the Previous Four Hills Public School

-

Figure 2.37

General Layout of Recommended Scheme

-

Figure 2.38

Alternative Alignment Conceptual Plan 

-

Figure 2.39

General Layout Plan of Alignment 1 – Option 1 a

-

Figure 2.40

General Layout Plan of Alignment 1 – Option 1 b

-

Figure 2.41

General Layout Plan of Alignment 1 – Option 1 c

-

Figure 2.42

General Layout Plan of Alignment 2

-

Figure 2.43

Interchange of Alignment 2 

-

Figure 2.44

General Layout Plan of Alignment 3 – Option 3 a

-

Figure 2.45

General Layout Plan of Alignment 3 – Option 3 b

-

Figure 2.46

General Layout Plan of Alignment 3 – Option 3 c

-

Figure 2.47

Interchange of Alignment 3 – Option 3 a

-

Figure 2.48

Interchange of Alignment 3 – Option 3 b

-

Figure 2.49

Interchange of Alignment 3 – Option 3 c

-

Figure 2.50

General Layout

-

Figure 2.51

TKO Reclamation – General Layout Plan (Non-Dredged Method)

-

Figure 2.52

TKO Reclamation – Section A-A (Non-Dredged Method)

-

Figure 2.53

TKO Reclamation – Section B-B (Non-Dredged Method)

-

Figure 2.54

TKO Reclamation – Section C-C (Non-Dredged Method)

-

Figure 2.55

TKO Reclamation – Section D-D (Non-Dredged Method)

-

Figure 2.56

TKO Reclamation – Section E-E (Non-Dredged Method)

-

Figure 2.57

General Construction Sequences

-

Figure 2.58

Construction Method of Cellular Caissons

-

Figure 2.59

Surcharge Layout Plan (Sheet 1 of 2)

-

Figure 2.60

Surcharge Layout Plan (Sheet 2 of 2)

-

Figure 2.61

Construction Method of Slit Curtain

-

Figure 3.1

Locations of Representative Air Sensitive Receivers in the Study Area during Construction Phase (Lam Tin)

-

Figure 3.2

Locations of Representative Air Sensitive Receivers in the Study Area during Construction Phase (Tseung Kwan O)

-

Figure 3.3

Locations of Representative Air Sensitive Receivers in the Study Area during Operation Phase (Lam Tin)

-

Figure 3.4

Locations of Representative Air Sensitive Receivers in the Study Area during Operation Phase (Tseung Kwan O)

-

Figure 3.5

Contours of Cumulative Maximum 1-hour Average TSP Concentration in µg/m3 at 7mPD (Lam Tin) (Unmitigated)

-

Figure 3.6

Contours of Cumulative Maximum 1-hour Average TSP Concentration in µg/m3 at 15.5mPD (Lam Tin) (Unmitigated)

-

Figure 3.7

Contours of Cumulative Maximum 24-hour Average TSP Concentration in µg/m3 at 7mPD (Lam Tin) (Unmitigated)

-

Figure 3.8

Contours of Cumulative Maximum 24-hour Average TSP Concentration in µg/m3 at 15.5mPD (Lam Tin) (Unmitigated)

-

Figure 3.9

Contours of Cumulative Annual Average TSP Concentration in µg/m3 at 7mPD (Lam Tin) (Unmitigated)

-

Figure 3.10

Contours of Cumulative Annual Average TSP Concentration in µg/m3 at 15.5mPD (Lam Tin) (Unmitigated)

-

Figure 3.11

Contours of Cumulative Maximum 1-hour Average TSP Concentration in µg/m3 at 5.5mPD (Tseung Kwan O) (Unmitigated)

-

Figure 3.12

Contours of Cumulative Maximum 1-hour Average TSP Concentration in µg/m3 at 14mPD (Tseung Kwan O) (Unmitigated)

-

Figure 3.13

Contours of Cumulative Maximum 24-hour Average TSP Concentration in µg/m3 at 5.5mPD (Tseung Kwan O) (Unmitigated)

-

Figure 3.14

Contours of Cumulative Maximum 24-hour Average TSP Concentration in µg/m3 at 14mPD (Tseung Kwan O) (Unmitigated)

-

Figure 3.15

Contours of Cumulative Annual Average TSP Concentration in µg/m3 at 5.5mPD (Tseung Kwan O) (Unmitigated)

-

Figure 3.16

Contours of Cumulative Annual Average TSP Concentration in µg/m3 at 14mPD (Tseung Kwan O) (Unmitigated)

-

Figure 3.17

Contours of Cumulative Maximum 1-hour Average TSP Concentration in µg/m3 at 7mPD (Lam Tin) (Mitigated)

-

Figure 3.18

Contours of Cumulative Maximum 1-hour Average TSP Concentration in µg/m3 at 15.5mPD (Lam Tin) (Mitigated)

-

Figure 3.19

Contours of Cumulative Maximum 1-hour Average TSP Concentration in µg/m3 at 7mPD (Lam Tin) (Mitigated Tier 2 Assessment for CL1 and CL2)

-

Figure 3.20

Contours of Cumulative Maximum 1-hour Average TSP Concentration in µg/m3 at 7mPD (Lam Tin) (Mitigated Tier 2 Assessment for CL8 and CL9)

-

Figure 3.21

Contours of Cumulative Maximum 24-hour Average TSP Concentration in µg/m3 at 7mPD (Lam Tin) (Mitigated)

-

Figure 3.22

Contours of Cumulative Maximum 24-hour Average TSP Concentration in µg/m3 at 15.5mPD (Lam Tin) (Mitigated)

-

Figure 3.23

Contours of Cumulative Annual Average TSP Concentration in µg/m3 at 7mPD (Lam Tin) (Mitigated)

-

Figure 3.24

Contours of Cumulative Annual Average TSP Concentration in µg/m3 at 15.5mPD (Lam Tin) (Mitigated)

-

Figure 3.25

Contours of Cumulative Maximum 1-hour Average TSP Concentration in µg/m3 at 5.5mPD (Tseung Kwan O) (Mitigated)

-

Figure 3.26

Contours of Cumulative Maximum 1-hour Average TSP Concentration in µg/m3 at 14mPD (Tseung Kwan O) (Mitigated)

-

Figure 3.27

Contours of Cumulative Maximum 24-hour Average TSP Concentration in µg/m3 at 5.5mPD (Tseung Kwan O) (Mitigated)

-

Figure 3.28

Contours of Cumulative Maximum 24-hour Average TSP Concentration in µg/m3 at 14mPD (Tseung Kwan O) (Mitigated)

-

Figure 3.29

Contours of Cumulative Annual Average TSP Concentration in µg/m3 at 5.5mPD (Tseung Kwan O) (Mitigated)

-

Figure 3.30

Contours of Cumulative Annual Average TSP Concentration in µg/m3 at 14mPD (Tseung Kwan O) (Mitigated)

-

Figure 3.31

Contours of Cumulative Maximum 1-hour Average NO2 Concentration in µg/m3 at 1.5m Above Ground (Lam Tin)

-

Figure 3.32

Contours of Cumulative Maximum Daily Average NO2 Concentration in µg/m3 at 1.5m Above Ground (Lam Tin)

-

Figure 3.33

Contours of Cumulative Annual Average NO2 Concentration in µg/m3 at 1.5m Above Ground (Lam Tin)

-

Figure 3.34

Contours of Cumulative Maximum Daily Average RSP Concentration in μg/m3 at 1.5m Above Ground (Lam Tin)

-

Figure 3.35

Contours of Cumulative Annual Average RSP Concentration in µg/m3 at 1.5m Above Ground (Lam Tin)

-

Figure 3.36

Contours of Cumulative Maximum 1-hour Average NO2 Concentration in µg/m3 at 1.5m Above Ground (Tseung Kwan O)

-

Figure 3.37

Contours of Cumulative Maximum Daily Average NO2 Concentration in µg/m3 at 1.5m Above Ground (Tseung Kwan O)

-

Figure 3.38

Contours of Cumulative Annual Average NO2 Concentration in µg/m3 at 1.5m Above Ground (Tseung Kwan O)

-

Figure 3.39

Contours of Cumulative Maximum Daily Average RSP Concentration in μg/m3 at 1.5m Above Ground (Tseung Kwan O)

-

Figure 3.40

Contours of Cumulative Annual Average RSP Concentration in µg/m3 at 1.5m Above Ground (Tseung Kwan O)

-

Figure 4.1

Locations of Noise Sensitive Receivers

-

Figure 4.2

Locations of Noise Assessment Points

-

Figure 4.3

Extent of “New” Roads under the Project

-

Figure 4.4

Extent of Low Noise Road Surface on Existing Roads within Study Area

-

Figure 4.5

Location of Fixed Noise Sources and the Representative Noise Assessment Points

-

Figure 4.6

Locations of Proposed Noise Mitigation Measures (for Existing NSRs)

-

Figure 4.7

Locations of Proposed Noise Mitigation Measures (for Planned NSRs)

-

Figure 4.8

Cross Sections of Proposed Mitigation Measures (for Existing NSRs)

-

Figure 4.9

Cross Sections of Proposed Mitigation Measures (for Planned NSRs)

-

Figure 6.1

Assessment Area for Terrestrial Ecological Impact Assessment

-

Figure 6.2

Marine Ecological Sensitive Receivers within and in Vicinity of the  Assessment Areas

-

Figure 6.3

Walk-Transect and Sampling Locations for Terrestrial Wildlife Survey

-

Figure 6.4

Overview of Habitat Map

-

Figure 6.5

Locations of Intertidal Surveys

-

Figure 6.6

Spot-check Dive Areas

-

Figure 6.7

Locations of REA Transects

-

Figure 6.8

Locations of Benthos Surveys

-

Figure 6.9

Locations of Fish Surveys

-

Figure 6.10

Coral Distributions and General Habitat Types of the Subtidal Environment within the Survey Areas

-

Figure 7.1

Key Fisheries Resource within Assessment Area

-

Figure 7.2

Location of Fishing Ground Loss

-

Figure 7.3

Habitat Map

-

Figure 8.1

As-built Sampling Locations

-

Figure 9.1

Assessment Area of Built Heritage and Terrestrial Archaeology with Locations of Historic Buildings/Items

-

Figure 9.2

Cultural Heritage Resources at Cha Kwo Ling

-

Figure 10.1

Conforming and Alternative Tunnel Alignments for TKO-LT

-

Figure 10.4.1

Landscape and Visual Impact Study Area

-

Figure 10.4.2

Review of Planning Framework - TKO

-

Figure 10.4.3

Review of Planning Framework - Lam Tin

-

Figure 10.4.4

Concurrent Projects

-

Figure 10.5.1.1

Overall View of Baseline Landscape Resources  - TKO and Lam Tin

-

Figure 10.5.1.1a

Baseline Landscape Resources  - TKO

-

Figure 10.5.1.1b

Baseline Landscape Resources  - TKO

-

Figure 10.5.1.2

Baseline Landscape Resources Photographs - TKO

-

Figure 10.5.2.1

Baseline Landscape Character Areas  -  TKO

-

Figure 10.5.2.2

Baseline Landscape Character Photographs - TKO

-

Figure 10.5.3.1a

Baseline Landscape Resources  - Lam Tin

-

Figure 10.5.3.1b

Baseline Landscape Resources  - Lam Tin

-

Figure 10.5.3.2

Baseline Landscape Resource Photographs - Lam Tin

-

Figure 10.5.4.1

Baseline Landscape Character Areas  -  Lam Tin

-

Figure 10.5.4.2

Baseline Landscape Character Area Photographs - LamTin

-

Figure 10.5.5.1

Baseline VSRs during Construction - TKO (Sheet 1 of 3)

-

Figure 10.5.5.2

Baseline VSRs during Construction - TKO (Sheet 2 of 3)

-

Figure 10.5.5.3

Baseline VSRs during Construction - TKO (Sheet 3 of 3)

-

Figure 10.5.5.4

Baseline VSRs during Operation  -  TKO (Sheet 1 of 3)

-

Figure 10.5.5.5

Baseline VSRs during Operation  -  TKO (Sheet 2 of 3)

-

Figure 10.5.5.6

Baseline VSRs during Operation  -  TKO (Sheet 3 of 3)

-

Figure 10.5.5.7

Baseline VSR Photographs - TKO (Sheet 1 of 13)

-

Figure 10.5.5.8

Baseline VSR Photographs - TKO (Sheet 2 of 13)

-

Figure 10.5.5.9

Baseline VSR Photographs - TKO (Sheet 3 of 13)

-

Figure 10.5.5.10

Baseline VSR Photographs - TKO (Sheet 4 of 13)

-

Figure 10.5.5.11

Baseline VSR Photographs - TKO (Sheet 5 of 13)

-

Figure 10.5.5.12

Baseline VSR Photographs - TKO (Sheet 6 of 13)

-

Figure 10.5.5.13

Baseline VSR Photographs - TKO (Sheet 7 of 13)

-

Figure 10.5.5.14

Baseline VSR Photographs - TKO (Sheet 8 of 13)

-

Figure 10.5.5.15

Baseline VSR Photographs - TKO (Sheet 9 of 13)

-

Figure 10.5.5.16

Baseline VSR Photographs - TKO (Sheet 10 of 13)

-

Figure 10.5.5.17

Baseline VSR Photographs - TKO (Sheet 11 of 13)

-

Figure 10.5.5.18

Baseline VSR Photographs - TKO (Sheet 12 of 13)

-

Figure 10.5.5.19

Baseline VSR Photographs - TKO (Sheet 13 of 13)

-

Figure 10.5.6.1

Baseline VSRs during Construction  -  Lam Tin (Sheet 1 of 2)

-

Figure 10.5.6.2

Baseline VSRs during Construction  -  Lam Tin (Sheet 2 of 2)

-

Figure 10.5.6.3

Baseline VSRs during Operation  -  Lam Tin (Sheet 1 of 2)

-

Figure 10.5.6.4

Baseline VSRs during Operation  -  Lam Tin (Sheet 2 of 2)

-

Figure 10.5.6.5

Baseline VSR Photographs - LT (Sheet 1 of 12) 

-

Figure 10.5.6.6

Baseline VSR Photographs - LT (Sheet 2 of 12) 

-

Figure 10.5.6.7

Baseline VSR Photographs - LT (Sheet 3 of 12)

-

Figure 10.5.6.8

Baseline VSR Photographs - LT (Sheet 4 of 12) 

-

Figure 10.5.6.9

Baseline VSR Photographs - LT (Sheet 5 of 12)

-

Figure 10.5.6.10

Baseline VSR Photographs - LT (Sheet 6 of 12) 

-

Figure 10.5.6.11

Baseline VSR Photographs - LT (Sheet 7 of 12) 

-

Figure 10.5.6.12

Baseline VSR Photographs - LT (Sheet 8 of 12)

-

Figure 10.5.6.13

Baseline VSR Photographs - LT (Sheet 9 of 12) 

-

Figure 10.5.6.14

Baseline VSR Photographs - LT (Sheet 10 of 12)

-

Figure 10.5.6.15

Baseline VSR Photographs - LT (Sheet 11 of 12) 

-

Figure 10.8.1

Landscape Mitigation Measures during Construction  -  TKO

-

Figure 10.8.2

Landscape Mitigation Measures during Operation  -  TKO

-

Figure 10.8.3

Landscape Mitigation Measures during Construction v Lam Tin

-

Figure 10.8.4

Landscape Mitigation Measures during Operation - Lam Tin

-

Figure 10.8.5.1

Photomontage Key Plan  -  TKO

-

Figure 10.8.5.2

Photomontage from VSR TKO/R1 (Sheet 1 of 2)

-

Figure 10.8.5.3

Photomontage from VSR TKO/R1 (Sheet 2 of 2)

-

Figure 10.8.5.4

Photomontage from VSR TKO/R5 (Sheet 1 of 2)

-

Figure 10.8.5.5

Photomontage from VSR TKO/R5 (Sheet 2 of 2)

-

Figure 10.8.5.6

Photomontage from VSR TKO/CDA1 (Sheet 1 of 2)

-

Figure 10.8.5.7

Photomontage from VSR TKO/CDA1 (Sheet 2 of 2)

-

Figure 10.8.5.8

Photomontage from VSR TKO/REC1 (Sheet 1 of 2)

-

Figure 10.8.5.9

Photomontage from VSR TKO/REC1 (Sheet 2 of 2)

-

Figure 10.8.5.10

Photomontage from VSR TKO/REC2 (Sheet 1 of 2)

-

Figure 10.8.5.11

Photomontage from VSR TKO/REC2 (Sheet 2 of 2)

-

Figure 10.8.5.12

Photomontage from VSR TKO/R3 (Sheet 1 of 2)

-

Figure 10.8.5.13

Photomontage from VSR TKO/R3 (Sheet 2 of 2)

-

Figure 10.8.7.1

Photomontage Key Plan  -  Lam Tin

-

Figure 10.8.7.2

Photomontage from VSR LT/T1 (Sheet 1 of 2)

-

Figure 10.8.7.3

Photomontage from VSR LT/T1 (Sheet 2 of 2)

-

Figure 10.8.7.4

Photomontage from VSR LT/GIC1 (Sheet 1 of 2)

-

Figure 10.8.7.5

Photomontage from VSR LT/GIC1 (Sheet 2 of 2)

-

Figure 10.8.7.6

Photomontage from VSR LT/R5 (Sheet 1 of 2)

-

Figure 10.8.7.7

Photomontage from VSR LT/R5 (Sheet 2 of 2)

-

Figure 10.8.7.8

Photomontage from VSR LT/R4 (Sheet 1 of 2)

-

Figure 10.8.7.9

Photomontage from VSR LT/R4 (Sheet 2 of 2)

-

Figure 10.9.1

Residual Impacts on Landscape Resources with Mitigation Measures, Year 10  - TKO

-

Figure 10.9.2

Residual Impacts on Landscape Resources with Mitigation Measures, Year 10  -  Lam Tin

-

Figure 10.9.3

Residual Impacts on Landscape Character Areas with Mitigation Measures, Year 10  -  TKO

-

Figure 10.9.4

Residual Impacts on Landscape Character Areas with Mitigation Measures, Year 10 - Lam Tin

-

Figure 10.9.5

Residual Impacts on VSRs, Year 10 - TKO, (Sheet 1 of 3)

-

Figure 10.9.6

Residual Impacts on VSRs, Year 10 - TKO, (Sheet 2 of 3)

-

Figure 10.9.7

Residual Impacts on VSRs, Year 10 -  TKO, (Sheet 3 of 3)

-

Figure 10.9.8

Residual Impacts on VSRs, Year 10 -  Lam Tin, (Sheet 1 of 2)

-

Figure 10.9.9

Residual Impacts on VSRs, Year 10 -  Lam Tin, (Sheet 2 of 2)

-

Figure 11.1

Locations of Pervious Landfill and Proposed Alignment

A

Figure 11.2

Location of Landfill Gas Monitoring Wells at Sai Tso Wan Landfill

A

Figure 11.3

Location of Groundwater  Monitoring Wells at Sai Tso Wan Landfill

A

Figure 11.4

Typical Details of Gas Resistant Membrane

A

Figure 11.5

Typical Details of Subfloor Venting

A

Figure 11.6

Typical Details of Services Passing Through Consultation Zone

A

Figure 11.7

Typical Details of Water Seal

A

Figure 11.8

Typical Details of Vented Manhole

A

Figure 11.9

Typical Details of Collar Seal

A

Figure 11.10

Typical Details of Above Ground Service Entry

A