Agreement No. CE 53 / 2008 (CE)
Planning and Engineering Study on Development of Lok Ma Chau Loop - Investigation
Environmental Impact
Assessment
Table of Contents
Volume 1a - Text (Chapter 1 to 10)
6 Sewerage and Sewage Treatment Implications
7 Waste Management Implications
Volume 1b - Text (Chapter 11 to 18)
11 Landscape and Visual Impact
13 Fisheries Impact Assessment
16 Summary of Environmental Outcomes
17 Environmental Monitoring & Audit
Volume 2 - Figures
Figure
2.1a Layout Plan (Overall) and
Designated Projects
Figure
2.1b Revised Preliminary Layout Plan
Figure
2.1c Off-site Works Area – Wetland Compensation(Fishpond/Reedbed)
Figure
2.1d The Project
and Temporary Works Area
Figure 2.3 Ecological Area (with associated
drainage network)
Figure 2.4a Western Connection Road – Slip Road
to San Tin Interchange
Figure 2.4b Western Connection Road – Slip Road
to San Tin Interchange
(Schematic
longitudinal section)(1/2)
Figure 2.4c Western Connection Road – Slip Road
to San Tin Interchange
(Schematic
longitudinal section)(2/2)
Figure 2.5 Western Connection Road
Figure 2.6 Western Connection Road (1/5)
Figure 2.7 Western Connection Road (2/5)
Figure 2.8 Western Connection Road (3/5)
Figure 2.9 Western Connection Road (4/5)
Figure
2.10 Western Connection Road
(5/5)
Figure
2.11a Direct Link to Lok
Ma Chau Station – General Layout – Key Plan
Figure
2.11b Direct Link to Lok
Ma Chau Station(Schematic longitudinal section)(1/3)
Figure
2.11c Direct Link to Lok
Ma Chau Station(Schematic longitudinal section)(2/3)
Figure
2.11d Direct Link to Lok
Ma Chau Station(Schematic longitudinal section)(3/3)
Figure
2.11e Horizontal and Vertical Alignments of
Direct Link to Lok Ma Chau Station
Figure
2.12 Eastern Connection Road
Figure
2.13 Eastern Connection Road
(1/7)
Figure 2.14 Eastern Connection Road (2/7)
Figure
2.15 Eastern Connection Road
(3/7)
Figure
2.16 Eastern Connection Road
(4/7)
Figure
2.17 Eastern Connection Road
(5/7)
Figure
2.18 Eastern Connection Road
(6/7)
Figure
2.19 Eastern Connection Road
(7/7)
Figure
2.20 Eastern Connection Road
(Schematic longitudinal section) (1/2)
Figure
2.21 Eastern Connection Road
(Schematic longitudinal section) (2/2)
Figure
2.22 Eastern Connection Road
(Schematic Cross Section) (1/7)
Figure
2.23 Eastern Connection Road
(Schematic Cross Section) (2/7)
Figure
2.23a Eastern Connection Road
(Schematic Cross Section) (3/7)
Figure
2.23b Eastern Connection Road
(Schematic Cross Section) (4/7)
Figure
2.23c Eastern Connection Road
(Schematic Cross Section) (5/7)
Figure
2.23d Eastern Connection Road
(Schematic Cross Section) (6/7)
Figure
2.23e Eastern Connection Road
(Schematic Cross Section) (7/7)
Figure
2.23f Flushing Water Service
Reservoir
Figure
2.24 Haul Road for Phase 1
Infrastructure
Figure
2.25a Sequence of Site Formation(1/4)
Figure
2.25b Sequence of Site Formation(2/4)
Figure
2.25c Sequence of Site Formation(3/4)
Figure
2.25d Sequence of Site Formation(4/4)
Figure
2.26a Lok
Ma Chau Sewage Treatment Works – Schematic Diagram
Figure
2.26b Sewerage Collection
Networks/Disposal Pipes
Figure
2.26c TSE Reuse Supply Network
(Flushing Water Network)
Figure 3.1 Proposed
Landuse, Associated Works, and the
500m Assessment Boundary
Figure 3.2 Locations
of Existing and Planned Air Sensitive Receivers (Key Plan)
Figure 3.2a Locations of Existing and Planned Air Sensitive Receivers (Sheet 1 of 4)
Figure 3.2b Locations of Existing and Planned Air Sensitive Receivers (Sheet 2 of 4)
Figure 3.2c Locations of Existing and Planned Air Sensitive Receivers (Sheet 3 of 4)
Figure 3.2d Locations of Existing and Planned Air Sensitive Receivers (Sheet 4 of 4)
Figure 3.3 Lok Ma Chau Road Groupings
Figure 3.4 Location of Kiosks and Loading / Unloading Bay (Lok Ma Chau BCP)
Figure 3.5 Locations of Major Odour Sources
Figure 3.6 Odour Sampling Locations (Key Plan)
Figure 3.6a Odour Sampling Locations (Sheet 1 of 5)
Figure 3.6b Odour Sampling Locations (Sheet 2 of 5)
Figure 3.6c Odour Sampling Locations (Sheet 3 of 5)
Figure 3.6d Odour Sampling Locations (Sheet 4 of 5)
Figure 3.6e Odour Sampling Locations (Sheet 5 of 5)
Figure 3.13 Contours of 1-hour NO2 Concentrations at 1.5m above ground in Year 2020
Figure 3.14 Contours of 24-hour NO2 Concentrations at 1.5m above ground in Year 2020
Figure 3.15 Contours of Annual NO2 Concentrations at 1.5m above ground in Year 2020
Figure 3.16 Contours of 1-hour NO2 Concentrations at 1.5m above ground in Year 2027
Figure 3.17 Contours of 24-hour NO2 Concentrations at 1.5m above ground in Year 2027
Figure 3.18 Contours of Annual NO2 Concentrations at 1.5m above ground in Year 2027
Figure 3.19 Contours of 24-hour RSP Concentrations at 1.5m above ground in Year 2020
Figure 3.20 Contours of Annual RSP Concentrations at 1.5m above ground in Year 2020
Figure 3.21 Contours of 24-hour RSP Concentrations at 1.5m above ground in Year 2027
Figure 3.22 Contours of Annual RSP Concentrations at 1.5m above ground in Year 2027
Figure 3.23a Odour Condition for Unmitigated Scenario
Figure 3.24 Regression
Analysis on AVS Removal and Dosage of Calcium Nitrate
(Shenzhen River)
Figure 3.25 Relationship between AVS Removal Efficiency and Dosage of
Calcium Nitrate
Figure 4.2 Adjoining Area in Shenzhen
Figure 4.3 Locations of Prevailing Noise
Measurement
Figure 4.7 Location of Planned Noise Sensitive
Receiver (Fixed Noise)
Figure 4.8a Locations of Temporary Noise Barriers in 2016(Sheet 1 of 3)
Figure 4.8b Locations of Temporary Noise Barriers in 2016(Sheet 2 of 3)
Figure 4.8c Locations of Temporary Noise Barriers in 2016(Sheet 3 of 3)
Figure 4.8d Locations of Temporary Noise Barriers in 2020(Sheet 1 of 3)
Figure 4.8e Locations of Temporary Noise Barriers in 2020(Sheet 2 of 3)
Figure 4.8f Locations of Temporary Noise Barriers in 2020(Sheet 3 of 3)
Figure 4.9 Extent and Locations of Noise Barrier in 2042(Sheet 1 of 5)
Figure 4.9a Extent and Locations of Noise Barrier in 2042(Sheet 2 of 5)
Figure 4.9b Extent and Locations of Noise Barrier in 2042(Sheet 3 of 5)
Figure 4.9c Extent and Locations of Noise Barrier in 2042(Sheet 4 of 5)
Figure 4.9d Extent and Locations of Noise Barrier in 2042(Sheet 5 of 5)
Figure 5.1 Flow Regime for Shenzhen River
Figure 5.2 Water Sensitive Receivers
Figure 6.1 Existing and Planned Sewerage
System along with Sewage Treatment Works
Figure 6.2 Lok Ma Chau
Sewage Treatment Works – Schematic Diagram
Figure 7.1 Area of Sediment Excavating of Western Connection Road
Figure 7.2 Area of Sediment Excavating of Eastern Connection Road
Figure 8.1 Location of Potentially Contaminated Site A
Figure 8.2 Locations of Proposed Sampling
Boreholes in Area LMC Loop
Figure 8.3 Locations of 5 Concerned Boreholes
with Arsenic Contamination
Figure 8.4 Locations of Additional Boreholes
Figure 8.5 Locations of Additional Boreholes for A-S01
Figure 8.6 Locations of Additional Boreholes for A-S03
Figure 8.7 Locations of Additional Boreholes for A-S20
Figure 8.8 Locations of Additional Boreholes for A-S24
Figure 8.9 Locations of Additional Boreholes for A-SG10
Figure 8.10 Locations of Further Additional Boreholes
Figure 8.11 Locations of Further Additional Boreholes for A-S01
Figure 8.12 Locations of Further Additional Boreholes for A-S03
Figure 8.13 Locations of Further Additional Boreholes for A-S20
Figure 8.14 Locations of Further Additional Boreholes for A-S24
Figure 8.15 Locations of Further Additional Boreholes for A-SG10
Figure 8.16 Locations of Possible Contaminated
Zones
Figure 8.17 Locations of Possible Contaminated
Zones for A-S01
Figure 8.18 Locations of Possible Contaminated
Zones for A-S03
Figure 8.18a Locations of Possible Contaminated
Zones for A-S03a1
Figure 8.18b Locations of Possible Contaminated
Zones for A-S03c1
Figure 8.19 Locations of Possible Contaminated
Zones for A-S20
Figure 8.20 Locations of Possible Contaminated
Zones for A-S24
Figure 8.21 Locations of Possible Contaminated
Zones for A-SG10
Figure 8.22 Programme for Land Contamination Assessment and Remediation after Land Resumption
Figure 10.1 Previous Archaeological Investigations
Figure 10.2 Archaeological Potential in the Heritage Study Area
Figure 10.3 Historic Buildings (Index Plan)
Figure 10.4 Historic Buildings in Lok Ma Chau Tsuen
Figure 10.5 Historic Buildings in Pun Uk
Tsuen
Figure 10.6 Historic Buildings in Chau Tau Tsuen
Figure 10.7 Location
of Lok Ma Chau Police Station
Figure 10.8 Location
of Macintosh Fort(Ma Tso
Lung)\
Figure 10.9 Location
of Tung Shan Temple
Figure 11.1a Review of Planning and Development
Control Framework 1 of 5
Figure 11.1b Review of Planning and Development
Control Framework 2 of 5
Figure 11.1c Review of Planning and Development
Control Framework 3 of 5
Figure 11.1d Review of Planning and Development
Control Framework 4 of 5
Figure 11.1e Review of Planning and Development
Control Framework 5 of 5
Figure 11.2a Landscape Resources 1 of 5
Figure 11.2b Landscape Resources 2 of 5
Figure 11.2c Landscape Resources 3 of 5
Figure 11.2d Landscape Resources 4 of 5
Figure 11.2e Landscape Resources 5 of 5
Figure 11.2f Landscape Resources Photographs 1 of
18
Figure 11.2g Landscape Resources Photographs 2 of
18
Figure 11.2h Landscape Resources Photographs 3 of
18
Figure 11.2i Landscape Resources Photographs 4 of
18
Figure 11.2j Landscape Resources Photographs 5 of
18
Figure 11.2k Landscape Resources Photographs 6 of
18
Figure 11.2l Landscape Resources Photographs 7 of
18
Figure 11.2m Landscape Resources Photographs 8 of 18
Figure 11.2n Landscape Resources Photographs 9 of
18
Figure 11.2o Landscape Resources Photographs 10 of
18
Figure 11.2p Landscape Resources Photographs 11 of
18
Figure 11.2q Landscape Resources Photographs 12 of
18
Figure 11.2r Landscape Resources Photographs 13 of
18
Figure 11.2s Landscape Resources Photographs 14 of
18
Figure 11.2t Landscape Resources Photographs 15 of
18
Figure 11.2u Landscape Resources Photographs 16 of
18
Figure 11.2v Landscape Resources Photographs 17 of
18
Figure 11.2w Landscape Resources Photographs 18 of 18
Figure 11.3a Landscape Character Areas 1 of 5
Figure 11.3b Landscape Character Areas 2 of 5
Figure 11.3c Landscape Character Areas 3 of 5
Figure 11.3d Landscape Character Areas 4 of 5
Figure 11.3e Landscape Character Areas 5 of 5
Figure 11.3f Landscape Character Areas Photographs
1 of 1
Figure 11.4a Impacts on Landscape Resources 1 of 19
Figure 11.4b Impacts on Landscape Resources 2 of 19
Figure 11.4c Impacts on Landscape Resources 3 of 19
Figure 11.4d Impacts on Landscape Resources 4 of 19
Figure 11.4e Impacts on Landscape Resources 5 of 19
Figure 11.4f Impacts on Landscape Resources 6 of 19
Figure 11.4g Impacts on Landscape Resources 7 of 19
Figure 11.4h Impacts on Landscape Resources 8 of 19
Figure 11.4i Impacts on Landscape Resources 9 of
19
Figure 11.4j Impacts on Landscape Resources 10 of
19
Figure 11.4k Impacts on Landscape Resources 11 of
19
Figure 11.4l Impacts on Landscape Resources 12 of
19
Figure 11.4m Impacts on Landscape Resources 13 of 19
Figure 11.4n Impacts on Landscape Resources 14 of
19
Figure 11.4o Impacts on Landscape Resources 15 of
19
Figure 11.4p Impacts on Landscape Resources 16 of
19
Figure 11.4q Impacts on Landscape Resources 17 of
19
Figure 11.4r Impacts on Landscape Resources 18 of
19
Figure 11.4s Impacts on Landscape Resources 19 of
19
Figure 11.5a Impacts on Landscape Character Area 1
of 5
Figure 11.5b Impacts on Landscape Character Area 2
of 5
Figure 11.5c Impacts on Landscape Character Area 3
of 5
Figure 11.5d Impacts on Landscape Character Area 4
of 5
Figure 11.5e Impacts on Landscape Character Area 5
of 5
Figure 11.6a Zone of Visual Influence
and Visually Sensitive Receivers 1 of 7
Figure 11.6b Zone of Visual Influence
and Visually Sensitive Receivers 2 of 7
Figure 11.6c Zone of Visual Influence
and Visually Sensitive Receivers 3 of 7
Figure 11.6d Zone of Visual Influence
and Visually Sensitive Receivers 4 of 7
Figure 11.6e Zone of Visual Influence and
Visually Sensitive Receivers 5 of 7
Figure 11.6f Zone of Visual Influence
and Visually Sensitive Receivers 6 of 7
Figure 11.6g Zone of Visual Influence
and Visually Sensitive Receivers 7 of 7
Figure 11.6h Visual Sensitive Receiver Photographs
1 of 12
Figure 11.6i Visual Sensitive Receiver Photographs
2 of 12
Figure 11.6j Visual Sensitive Receiver Photographs
3 of 12
Figure 11.6k Visual Sensitive Receiver Photographs
4 of 12
Figure 11.6l Visual Sensitive Receiver Photographs
5 of 12
Figure 11.6m Visual Sensitive Receiver Photographs 6
of 12
Figure 11.6n Visual Sensitive Receiver Photographs
7 of 12
Figure 11.6o Visual Sensitive Receiver Photographs
8 of 12
Figure 11.6p Visual Sensitive Receiver Photographs
9 of 12
Figure 11.6q Visual Sensitive Receiver Photographs
10 of 12
Figure 11.6r Visual Sensitive Receiver Photographs
11 of 12
Figure 11.6s Visual Sensitive Receiver Photographs
12 of 12
Figure 11.7a Visual Impacts 1 of 7
Figure
11.7b Visual
Impacts 2 of 7
Figure 11.7c Visual Impacts 3 of 7
Figure 11.7d Visual Impacts 4 of 7
Figure 11.7e Visual Impacts 5 of 7
Figure 11.7f Visual Impacts 6 of 7
Figure 11.7g Visual Impacts 7 of 7
Figure 11.8 Preliminary Landscape Master Plan
Figure 11.9a Recommended Landscape and Visual
Mitigation Measures sheet
1 of 25
Figure 11.9b Recommended Landscape and Visual
Mitigation Measures sheet
2 of 25
Figure 11.9c Recommended Landscape and Visual
Mitigation Measures sheet
3 of 25
Figure 11.9d Recommended Landscape and Visual
Mitigation Measures sheet
4 of 25
Figure 11.9e Recommended Landscape and Visual
Mitigation Measures sheet
5 of 25
Figure 11.9f Recommended Landscape and Visual
Mitigation Measures sheet
6 of 25
Figure 11.9g Recommended Landscape and Visual
Mitigation Measures sheet
7 of 25
Figure 11.9h Recommended Landscape and Visual
Mitigation Measures sheet
8 of 25
Figure 11.9i Recommended Landscape and Visual
Mitigation Measures sheet
9 of 25
Figure 11.9j Recommended Landscape and Visual
Mitigation Measures sheet 10 of 25
Figure 11.9k Recommended Landscape and Visual
Mitigation Measures sheet 11 of 25
Figure 11.9l Recommended Landscape and Visual
Mitigation Measures sheet 12 of 25
Figure 11.9m Recommended Landscape and Visual
Mitigation Measures sheet 13 of 25
Figure 11.9n Recommended Landscape and Visual
Mitigation Measures sheet 14 of 25
Figure 11.9o Recommended Landscape and Visual
Mitigation Measures sheet 15 of 25
Figure 11.9p Recommended Landscape and Visual
Mitigation Measures sheet 16 of 25
Figure 11.9q Recommended Landscape and Visual
Mitigation Measures sheet 19 of 25
Figure 11.9r Recommended Landscape and Visual
Mitigation Measures sheet 18 of 25
Figure 11.9s Recommended Landscape and Visual
Mitigation Measures sheet 19 of 25
Figure 11.9t Recommended Landscape and Visual
Mitigation Measures sheet 20 of 25
Figure 11.9u Recommended Landscape and Visual
Mitigation Measures sheet 21 of 25
Figure 11.9v Recommended Landscape and Visual
Mitigation Measures sheet 22 of 25
Figure 11.9w Recommended Landscape and Visual
Mitigation Measures sheet 23 of 25
Figure 11.9x Recommended Landscape and Visual
Mitigation Measures sheet 24 of 25
Figure 11.9y Recommended Landscape and Visual
Mitigation Measures sheet 25 of 25
Figure 11.10a Photomontages – Vantage Point A
Figure 11.10b Photomontages – Vantage Point A
Figure 11.10c Photomontages – Vantage Point B
Figure 11.10d Photomontages – Vantage Point B
Figure 11.10e Photomontages – Vantage Point C
Figure 11.10f Photomontages – Vantage Point C
Figure 11.10g Photomontages – Vantage Point D
Figure 11.10h Photomontages – Vantage Point D
Figure 11.10i Photomontages – Vantage Point E
Figure 11.10j Photomontages – Vantage Point E
Figure 11.10k Photomontages – Vantage Point H
Figure 11.10l Photomontages – Vantage Point H
Figure 11.10m Photomontages – Vantage Point I
Figure 11.10n Photomontages – Vantage Point I
Figure 11.10o Photomontages – Vantage Point K
Figure 11.10p Photomontages – Vantage Point K
Figure 11.10q Photomontages – Vantage Point L
Figure 11.10r Photomontages – Vantage Point L
Figure 11.10s Photomontages – Vantage Point O
Figure 11.10t Photomontages – Vantage Point O
Figure 12.1 Habitat Map for Lok
Ma Chau Loop and Its Vicinity
Figure 12.1a Habitat Map for Lok
Ma Chau Loop and Its Vicinity (page 1 of 10)
Figure 12.1b Habitat Map for Lok
Ma Chau Loop and Its Vicinity (page 2 of 10)
Figure 12.1c Habitat Map for Lok
Ma Chau Loop and Its Vicinity (page 3 of 10)
Figure 12.1d Habitat Map for Lok
Ma Chau Loop and Its Vicinity (page 4 of 10)
Figure 12.1e Habitat Map for Lok
Ma Chau Loop and Its Vicinity (page 5 of 10)
Figure 12.1f Habitat Map for Lok
Ma Chau Loop and Its Vicinity (page 6 of 10)
Figure 12.1g Habitat Map for Lok
Ma Chau Loop and Its Vicinity (page 7 of 10)
Figure 12.1h Habitat Map for Lok
Ma Chau Loop and Its Vicinity (page 8 of 10)
Figure 12.1i Habitat Map for Lok
Ma Chau Loop and Its Vicinity (page 9 of 10)
Figure 12.1j Habitat Map for Lok
Ma Chau Loop and Its Vicinity (page 10 of 10)
Figure 12.2 Transect Routes and Count
Locations for Various Ecological Surveys
Figure 12.3 Records of Eurasian Otter in and
around Lok Ma Chau Loop
Figure 12.5 Watercourses in the Ecological
Assessment Area, their condition and ecological value
Figure 12.6 Permanent Habitat Loss Impacts arising from
the Project
Figure 12.8 Construction Impacts arising from
Eastern Connection Road
Figure 12.10 Locations and Habitats Proposed for
Mitigation Areas
Figure 12.12 Proposed Location of Secondary Woodland
Compensation
Figure 13.1 Findings of Fishpond Survey within Lok Ma Chau Loop and Its Vicinity
Figure 14.1 Location of Ma Tso Lung Landfill
Volume 3 to 8 – Appendix
Appendix 1-1.............. PODP and RODP
Appendix
2-2.............. Development
Options
Appendix
2-3a............. Road Alignment
Options for Western Connection Road
Appendix
2-3b............ Road Alignment
Options for Eastern Connection Road
Appendix 2-3c............. Road Alignment Options for
Direct Link to Lok Ma Chau Station
Appendix
2-4.............. Evaluation of
Road Options Selections
Appendix
2-6.............. Implementation Programme
Appendix
3-1.............. Justification for
the Percentage of Active Area
Appendix 3-2.............. Calculation of Dust
Suppression Efficiency from Watering
Appendix 3-3.............. Details of Dust Emission Sources and
Calculations
Appendix 3-4.............. Key Assumptions for EmFAC
Modelling
Appendix
3-5.............. Vehicle Emission
Factors for 2020 and 2027
Appendix 3-6.............. In-tunnel Emission
Appendix
3-7.............. Detailed
Calculations of Idling Emissions
Appendix
3-8.............. Odour Emission
Literature Review and Reconnaissance Site Surveys
Appendix
3-9.............. Measurement
Reports for Odour Sampling at Shenzhen River (PolyU)
Appendix 3-10 Briefing Note on Binhe WWTP Site
Inspection
Appendix
3-11 Measured Emission Rates
Adopted for Shatin STW
Appendix 3-12 Emission Rates for Proposed LMC STW and Binhe WWTP
Appendix
4-1.............. NSR Photos
Appendix
4-1A........... Ground Levels
Appendix 4-2.............. SWL of PME
Appendix
4-3.............. Location of
Workfront and Separation Distance to NSRs
Appendix
4-4.............. Plant Inventory
Appendix
4-5.............. Distance between
Notional Sources and Workfront
Appendix
4-6.............. Unmitigated
Construction Work Programme
Appendix
4-7.............. Construction
Noise Impact (Unmitigated)
Appendix
4-8.............. Computer Plot of
Road Traffic at 2016, 2020 and 2042 (Without Project)
Appendix
4-8A........... Location of
Existing Low Noise Surfacing
Appendix
4-9.............. Key Map to
Traffic Flow in 2020 and 2042 (Without Project)
Appendix
4-10............ Traffic Data at2016, 2020
and 2042 (Without Project)
Appendix 4-10A......... Approval from TD on Traffic Data
Appendix
4-11............ Computer Plot of
Road Traffic at 2042 (With Project)
Appendix
4-12............ Key Map to Traffic
Flow in 2042 (With Project)
Appendix
4-13............ Traffic Data at
2042 (With Project)
Appendix
4-14............ Predicted
Unmitigated Operational Road Traffic Noise in 2042
Appendix
4-14A......... Sample Calculations
for Operational Road Traffic Noise
Appendix
4-15............ Fixed Noise
Calculations
Appendix
4-15A......... Fixed Noise Levels
at NSRs
Appendix
4-16............ Drawings Showing
Barrier and Enclosure for Construction Noise
Appendix
4-17............ Mitigated
Construction Work Programme
Appendix
4-18............ Mitigated
Construction Noise Impacts
Appendix
4-19............ Drawings Showing
Noise Barriers for Road Traffic Noise
Appendix
4-20............ Mitigated
Construction Access Road Traffic Noise Impacts at 2016
Appendix
4-20A......... Mitigated Construction Access
Road Traffic Noise Impacts at 2020
Appendix
4-21............ Mitigated
Operational Noise Impacts
Appendix
5-1.............. Stormwater
Pollution Control Plan
Appendix 5-3.............. Runoff Loading
Appendix 5-4.............. Construction of Underpass
at ECR
Appendix 6-1.............. Flow and Load Estimates
Appendix
6-2.............. Compliance with
No Net Increase in Pollution Load Policy
Appendix 6-3.............. Sewerage Master Plan
Appendix
7-1.............. Eddorsement
Letters from PFC and CEDD Vetting Committee of C&DMMP
Appendix
7-2.............. Agreement Email
from the Project Proponent of NENT NDA
Appendix 7-3.............. Sediment Sampling and Testing Plan
Appendix 7-4.............. Objection Letter for the Sediment Sampling at Old Shenzhen Meander
Appendix
7-5.............. Laboratory
Chemical Testing Report (Final Report)
Appendix 8-1.............. Contamination Assessment
Plan for LMC Loop
Appendix
10-1............ Historical Map and
Aerial Photos
Appendix 10-2............ Building Heritage Survey
Appendix
10-3............ Archaeological
Survey Report
Appendix 11-1............ Broadbrush Tree Group Survey
Appendix 12-1............ Methodology and Results of
Botanical Surveys
Appendix 12-3............ Methodology and Results of Flight
Line Surveys
Appendix 12-4............ Methodology and Results of
Bird Trapping Surveys
Appendix 12-5............ Methodology and
Results of Bird Transect and Point Count Surveys
Appendix 12-6............ Methodology and Results of
Mammal Surveys
Appendix 12-8............ Methodology and Results of
Herpetofauna Surveys
Appendix 12-9............ Methodology and Results of
Odonata Surveys
Appendix 12-10.......... Methodology and Results of
Butterfly Surveys
Appendix 12-11.......... Methodology and Results of
Aquatic Fauna Surveys
Appendix
12-12.......... Photographs of
Habitats and Impacted Areas
Appendix
12-13.......... Habitat
Requirements of Key Species
Appendix
12-15.......... Reed Marsh
Establishment Methods
Appendix
16-1............ Key Assessment
Assumptions & Limitation of Assessment
Appendix
16-2............ Impact Summary
Appendix 17-1............ Project Implementation
Schedule