Agreement
No. CE 53 / 2008 (CE)
Planning and Engineering Study on Development of Lok Ma Chau Loop - Investigation
Environmental Monitoring and Audit Manual
Figure 2.1a Layout Plan (Overall) and Designated
Projects
Figure 2.1b Revised Preliminary Layout Plan
Figure 2.1c Off-site Works Area – Wetland Compensation(Fishpond)
Figure 2.1d The Project and Temporary Works Area
Figure 2.3 Ecological Area (with associated
drainage network)
Figure 2.4a Western Connection Road – Slip Road
to San Tin Interchange
Figure 2.5 Western Connection Road
Figure 2.6 Western Connection Road (1/5)
Figure 2.7 Western Connection Road (2/5)
Figure 2.8 Western Connection Road (3/5)
Figure 2.9 Western Connection Road (4/5)
Figure 2.10 Western Connection Road (5/5)
Figure 2.11a Direct Link to Lok Ma Chau Station – General Layout – Key Plan
Figure 2.11b Direct Link to Lok Ma Chau Station(Schematic longitudinal section)(1/3)
Figure 2.11c Direct Link to Lok Ma Chau Station(Schematic longitudinal section)(2/3)
Figure 2.11d Direct Link to Lok Ma Chau Station(Schematic longitudinal section)(3/3)
Figure 2.11e Horizontal and Vertical Alignments of Direct Link to Lok Ma Chau Station
Figure 2.12 Eastern Connection Road
Figure 2.13 Eastern Connection Road (1/7)
Figure 2.14 Eastern Connection Road (2/7)
Figure 2.15 Eastern Connection Road (3/7)
Figure 2.16 Eastern Connection Road (4/7)
Figure 2.17 Eastern Connection Road (5/7)
Figure 2.18 Eastern Connection Road (6/7)
Figure 2.19 Eastern Connection Road (7/7)
Figure 2.20 Eastern Connection Road (Schematic longitudinal section) (1/2)
Figure 2.21 Eastern Connection Road (Schematic longitudinal section) (2/2)
Figure 2.22 Eastern Connection Road (Schematic
Cross Section) (1/7)
Figure 2.23 Eastern Connection Road (Schematic
Cross Section) (2/7)
Figure 2.23a Eastern Connection Road (Schematic
Cross Section) (3/7)
Figure 2.23b Eastern Connection Road (Schematic
Cross Section) (4/7)
Figure 2.23c Eastern Connection Road (Schematic
Cross Section) (5/7)
Figure 2.23d Eastern Connection Road (Schematic
Cross Section) (6/7)
Figure 2.23e Eastern Connection Road (Schematic
Cross Section) (7/7)
Figure 2.23f Flushing Water Service Reservoir
Figure 2.26a Sewerage Treatment Works
Figure 2.26b Sewerage Collection Networks/Disposal Pipes
Figure 2.26c TSE Reuse Supply Network (Flushing
Water Network)
Figure 4.1 Locations of Dust Monitoring
Stations
Figure 4.1a Locations of Dust Monitoring
Stations – DMS-1
Figure 4.1b Locations of Dust Monitoring
Stations – DMS-2
Figure 4.1c Locations of Dust Monitoring
Stations – DMS-3
Figure 4.1d Locations of Dust Monitoring
Stations – DMS-4
Figure 4.2 Locations of Odour Monitoring
Stations (AVS and Redox Potential)
Figure 4.3 Locations of Odour Quality
Monitoring Stations (AVS and Redox Potential)
Figure 5.1 Mitigation Measures for
Construction Access Road Traffic Noise in 2016 (1/2)
Figure 5.2 Mitigation Measures for
Construction Access Road Traffic Noise in 2016 (2/2)
Figure 5.3 Mitigation Measures for
Construction Access Road Traffic Noise in 2020 (1/2)
Figure 5.4 Mitigation Measures for
Construction Access Road Traffic Noise in 2020 (2/2)
Figure 5.5 Mitigation Measures for Road
Traffic Noise (1/4)
Figure 5.6 Mitigation Measures for Road
Traffic Noise (2/4)
Figure 5.7 Mitigation Measures for Road
Traffic Noise (3/4)
Figure 5.8 Mitigation Measures for Road
Traffic Noise (4/4)
Figure 5.9 Locations of Construction Airborne
Noise and Operational Noise Monitoring Stations
Figure 6.1 Locations of Water Quality
Monitoring Stations
Figure 8.1 Locations of Possible Contaminated
Zones in LMC Loop
Figure 11.1 Locations and Habitats Proposed for
Mitigation Areas
Appendix
Appendix
1-1.............. PODP & RODP
Appendix
2-1.............. Implementation
Programme
Appendix
2-2.............. Project
Implementation Schedule
Appendix 3-1.............. Project Organization for
Environmental Works
Appendix
4-1.............. Sample Data Sheet
for TSP Monitoring
Appendix 4-2.............. Air Sensitive Receivers
Appendix
5-1.............. Sample Data Sheet
for Noise Monitoring
Appendix 5-2.............. Noise Sensitive Receivers
Appendix 6-1.............. Water Sensitive Receivers
Appendix
14-1............ Incident Report on
Action Level or Limit Level Non-compliance