West Kowloon Cultural District

 

 

Environmental Impact Assessment (Final)

PDF version

July 2013

West Kowloon Cultural District Authority

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

29F, Tower 6, The Gateway, 9 Canton Road, Tsim Sha Tsui, Kowloon, Hong Kong

 

 

 

 

 

 

 

Mott MacDonald, 20/F Two Landmark East, 100 How Ming Street, Kwun Tong, Kowloon, Hong Kong
T +852 2828 5757   F +852 2827 1823
,   W www.mottmac.com

 

 

 

This document is issued for the party which commissioned it and for specific purposes connected with the above-captioned project only. It should not be relied upon by any other party or used for any other purpose.

We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties

This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it.

 

 

 

 

                    

 

 

 

 

 

 

 

 

 

 


Content


Chapter    Title                                                                                                                           Page

1.               Introduction___________________________________________________________________ 1-1

1.1                  Background___________________________________________________________________ 1-1

1.2                  Designated Projects under the EIA Ordinance__________________________________________ 1-2

1.3                  Objectives of the EIA Study________________________________________________________ 1-2

1.4                  Key Environmental Issues_________________________________________________________ 1-3

1.5                  Use of Relevant Studies__________________________________________________________ 1-4

1.6                  Structure of the EIA Report________________________________________________________ 1-5

 

2.               Project Description____________________________________________________________ 2-1

2.1              Existing Site Conditions________________________________________________________ 2-1

2.2              Project Components___________________________________________________________ 2-1

2.3              Need of the Project____________________________________________________________ 2-3

2.4              Consideration of Alternative Development Options__________________________________ 2-7

2.5              Consideration of Alternative Construction Methods and Sequences of Works___________ 2-11

2.6              Summary of Selection of Preferred Scenario______________________________________ 2-17

2.7              Proposed Project Programme__________________________________________________ 2-23

2.8              Concurrent Projects___________________________________________________________ 2-24

 

3.               Air Quality Impact______________________________________________________________ 3-1

3.1              Introduction___________________________________________________________________ 3-1

3.2              Air Quality Legislations, Standards and Guidelines__________________________________ 3-1

3.3              Baseline Conditions____________________________________________________________ 3-4

3.4              Identification of Pollution Sources_______________________________________________ 3-32

3.5              Air Quality Modelling Methodology______________________________________________ 3-40

3.6              Evaluation and Assessment of the Air Quality Impacts______________________________ 3-70

3.7              Mitigation Measures___________________________________________________________ 3-87

3.8              Evaluation of Residual Impacts_________________________________________________ 3-92

3.9              Environmental Monitoring and Audit_____________________________________________ 3-97

3.10            Conclusion__________________________________________________________________ 3-98

 

4.               Noise Impact__________________________________________________________________ 4-1

4.1              Introduction___________________________________________________________________ 4-1

4.2              Noise Legislations, Standards and Guidelines______________________________________ 4-1

4.3              Baseline Conditions____________________________________________________________ 4-7

4.4              Identification of Pollution Sources_______________________________________________ 4-12

4.5              Assessment Methodology_____________________________________________________ 4-15

4.6              Evaluation of the Noise Impacts_________________________________________________ 4-24

4.7              Mitigation Measures___________________________________________________________ 4-37

4.8              Evaluation of Residual Impacts_________________________________________________ 4-48

4.9              Environmental Monitoring and Audit_____________________________________________ 4-51

4.10            Conclusion__________________________________________________________________ 4-51

 

5.               Water Quality Impact___________________________________________________________ 5-1

5.1                  Introduction____________________________________________________________________ 5-1

5.2                  Water Quality Legislations, Standards and Guidelines___________________________________ 5-1

5.3                  Assessment Area, Water Sensitive Receivers and Baseline Conditions______________________ 5-6

5.4                  Identification of Water Quality Impact________________________________________________ 5-9

5.5                  Assessment Methodology________________________________________________________ 5-10

5.6                  Prediction and Evaluation of the Water Quality Impact__________________________________ 5-14

5.7                  Mitigation of Adverse Water Quality Impact___________________________________________ 5-20

5.8                  Evaluation of Cumulative and Residual Water Quality Impact_____________________________ 5-24

5.9                  Water Quality Monitoring and Audit_________________________________________________ 5-24

5.10                Conclusion___________________________________________________________________ 5-24

 

6.               Sewerage and Sewage Treatment Implication_______________________________________ 6-1

6.1                  Introduction____________________________________________________________________ 6-1

6.2                  Sewerage and Sewage Treatment Legislations, Standards and Guidelines___________________ 6-1

6.3                  Baseline Conditions_____________________________________________________________ 6-1

6.4                  Assessment Methodology_________________________________________________________ 6-2

6.5                  Evaluation and Assessment of Sewerage and Sewage Treatment Implications________________ 6-5

6.6                  Hydraulic Modelling_____________________________________________________________ 6-9

6.7                  Mitigation Measures____________________________________________________________ 6-10

6.8                  Environmental Monitoring and Audit________________________________________________ 6-13

6.9                  Conclusion___________________________________________________________________ 6-13

 

7.               Waste Management Implication__________________________________________________ 7-1

7.1                  Introduction____________________________________________________________________ 7-1

7.2                  Waste Management Legislations, Standards and Guidelines______________________________ 7-1

7.3                  Assessment Methodology_________________________________________________________ 7-2

7.4                  Identification, Prediction and Evaluation of Environmental Impact__________________________ 7-2

7.5                  Mitigation of Adverse Environmental Impact__________________________________________ 7-13

7.6                  Evaluation of Residual Impact_____________________________________________________ 7-16

7.7                  Environmental Monitoring and Audit________________________________________________ 7-16

7.8                  Conclusion___________________________________________________________________ 7-16

 

8.               Land Contamination____________________________________________________________ 8-1

8.1                  Introduction____________________________________________________________________ 8-1

8.2                  Environmental Legislation, Standards and Guidelines___________________________________ 8-1

8.3                  Description of the Environmental Baseline Conditions___________________________________ 8-1

8.4                  Assessment Methodology_________________________________________________________ 8-2

8.5                  Identification and Evaluation of Environmental Impact___________________________________ 8-5

8.6                  Mitigation of Adverse Environmental Impact___________________________________________ 8-6

8.7                  Evaluation of Residual Impact______________________________________________________ 8-7

8.8                  Environmental Monitoring and Audit_________________________________________________ 8-7

8.9                  Conclusion____________________________________________________________________ 8-7

 

9.               Ecological Impact (Terrestrial)____________________________________________________ 9-1

9.1                  Introduction____________________________________________________________________ 9-1

9.2                  Ecological Legislations, Standards and Guidelines______________________________________ 9-1

9.3                  Assessment Methodology_________________________________________________________ 9-2

9.4                  Baseline Conditions_____________________________________________________________ 9-3

9.5                  Evaluation and Assessment of Ecological Impacts______________________________________ 9-6

9.6                  Mitigation Measures_____________________________________________________________ 9-8

9.7                  Residual Impacts_______________________________________________________________ 9-8

9.8                  Environmental Monitoring and Audit_________________________________________________ 9-8

9.9                  Conclusion____________________________________________________________________ 9-8

9.10                Reference_____________________________________________________________________ 9-8

 

10.              Landscape and Visual Impact___________________________________________________ 10-1

10.1                Introduction___________________________________________________________________ 10-1

10.2                Landscape and Visual Legislations, Standards and Guidelines___________________________ 10-1

10.3                Assessment Methodology________________________________________________________ 10-6

10.4                Baseline Study_______________________________________________________________ 10-12

10.5                Evaluation and Assessment of Landscape and Visual Impacts___________________________ 10-42

10.6                Considerations of Alternatives___________________________________________________ 10-83

10.7                Mitigation Measures___________________________________________________________ 10-83

10.8                Residual Impacts____________________________________________________________ 10-100

10.9                Environmental Monitoring and Audit______________________________________________ 10-114

10.10              Conclusion_________________________________________________________________ 10-114

 

11.              Environmental Monitoring and Audit_____________________________________________ 11-1

11.1                General______________________________________________________________________ 11-1

11.2                Air Quality Impact______________________________________________________________ 11-1

11.3                Noise Impact__________________________________________________________________ 11-1

11.4                Water Quality Impact____________________________________________________________ 11-2

11.5                Sewerage and Sewage Treatment Implications_______________________________________ 11-2

11.6                Waste Management Implications__________________________________________________ 11-2

11.7                Land Contamination____________________________________________________________ 11-2

11.8                Ecological Impact (Terrestrial)_____________________________________________________ 11-3

11.9                Landscape and Visual Impact_____________________________________________________ 11-3

 

12.              Conclusions_________________________________________________________________ 12-1

12.1            General_____________________________________________________________________ 12-1

12.2            Summary of Environmental Outcomes___________________________________________ 12-1

12.3            Air Quality Impact_____________________________________________________________ 12-4

12.4            Noise Impact_________________________________________________________________ 12-6

12.5            Water Quality Impact__________________________________________________________ 12-7

12.6            Sewerage and Sewage Treatment Implications_____________________________________ 12-8

12.7            Waste Management Implications________________________________________________ 12-9

12.8            Land Contamination___________________________________________________________ 12-9

12.9            Ecological Impact (Terrestrial)___________________________________________________ 12-9

12.10          Landscape and Visual Impact__________________________________________________ 12-10

 

13.              Implementation Schedule______________________________________________________ 13-1

13.1                General______________________________________________________________________ 13-1

 

14.              EIA on Underpass Road Serving the Planned WKCD_______________________________ 14-1

14.1                Introduction___________________________________________________________________ 14-1

14.2                Project Description_____________________________________________________________ 14-4

14.3                Air Quality Impact_____________________________________________________________ 14-10

14.4                Noise Impact_________________________________________________________________ 14-80

14.5                Water Quality Impact__________________________________________________________ 14-111

14.6                Sewerage and Sewage Treatment Implication______________________________________ 14-123

14.7                Waste Management Implication_________________________________________________ 14-123

14.8                Land Contamination__________________________________________________________ 14-138

14.9                Ecological Impact____________________________________________________________ 14-145

14.10              Landscape and Visual Impact___________________________________________________ 14-153

14.11              Environmental Monitoring and Audit______________________________________________ 14-221

14.12              Conclusions________________________________________________________________ 14-223

14.13              Implementation Schedule______________________________________________________ 14-226

 

15.              EIA on Austin Road Flyover Serving the Planned WKCD____________________________ 15-1

15.1                Introduction___________________________________________________________________ 15-1

15.2                Project Description_____________________________________________________________ 15-4

15.3                Air Quality Impact______________________________________________________________ 15-9

15.4                Noise Impact_________________________________________________________________ 15-71

15.5                Water Quality Impact___________________________________________________________ 15-85

15.6                Sewerage and Sewage Treatment Implication_______________________________________ 15-97

15.7                Waste Management Implication__________________________________________________ 15-97

15.8                Land Contamination__________________________________________________________ 15-105

15.9                Ecological Impact____________________________________________________________ 15-105

15.10              Landscape and Visual Impact___________________________________________________ 15-112

15.11              Environmental and Monitoring Audit______________________________________________ 15-166

15.12              Conclusions________________________________________________________________ 15-168

15.13              Implementation Schedule______________________________________________________ 15-171

 


Tables

Table ‎2.1:__ Summary of Major Differences between the Conceptual Plan Option: “City Park” and the Modified Conceptual Plan        2-8

Table ‎2.2:__ Summary of Development Plan Approach and Environmental Benefits / Dis-benefits__________ 2-10

Table ‎2.3:__ Comparison of the Benefits and Dis-Benefits of Basement Construction Sequencing__________ 2-16

Table ‎2.4:__ Summary of Alternative Construction Methodologies and Environmental Benefits/Dis-benefits___ 2-19

Table ‎2.5:__ Summary of Preferred Construction Sequence and Environmental Benefits/Dis-benefits________ 2-22

Table ‎2.6:__ Summary of Tentative Construction and Implementation Programme for Key Facilities of WKCD_ 2-23

Table ‎2.7:      List of concurrent projects for cumulative impact assessment_____________________________ 2-26

 

Table 3.1:      Hong Kong Air Quality Objectives___________________________________________________ 3-2

Table 3.2:      Limits of air pollutant concentrations inside car parks and vehicle tunnels____________________ 3-3

Table 3.3:      Representative ASRs Identified for the Assessment_____________________________________ 3-7

Table 3.4:      Average Background TSP Concentrations from EPD’s Urban Air Monitoring Stations (Year 2007-2011)               3-32

Table 3.5:      Air Quality Monitoring Results for Hong Kong Section of Guangzhou-Shenzhen-Hong Kong Express Rail Link relevant to WKCD (March 2010 – December 2012)_____________________________________________ 3-33

Table 3.6:      Average Background Air Pollutant Concentrations from EPD’s Urban Air Monitoring Stations (Year 2007-2011) 3-33

Table 3.7:      Average Background Air Pollutant Concentrations from EPD’s Local Monitoring Station at WKCD Site (September 2011 – August 2012)________________________________________________________________ 3-34

Table 3.8:      Number of Odour Complaints against NYMTTS Received by EPD (2006-2013)_______________ 3-34

Table 3.9:      Summary of concurrent projects during construction phase______________________________ 3-36

Table 3.10:    Key Dust Emission Factors Adopted in the Assessment_________________________________ 3-42

Table 3.11:    Summary of tentative active area calculations for Tier 2 and Annual TSP assessment__________ 3-44

Table 3.12:    Vehicle Classification in the EMFAC-HK Model________________________________________ 3-48

Table 3.13:    Estimated Emission Rates of Barges at NYPCWA______________________________________ 3-59

Table 3.14:    Estimated Emission Rates of Fast Ferries at China Ferry Terminal_________________________ 3-60

Table 3.15:    Estimated Emission Rates of Cruise Ships at Ocean Terminal____________________________ 3-61

Table 3.16:    Summary of 2015 and 2020 Hong Kong Emission Inventory for the PATH Model______________ 3-62

Table 3.17:    Summary of Predicted Cumulative Hourly Average TSP Concentrations for All ASRs (Tier 1 Unmitigated & Mitigated)____________________________________________________________________________ 3-70

Table 3.18:    Predicted Cumulative Hourly Average TSP Concentrations for ASRs with Exceedance (Tier 1 Mitigated)              3-71

Table 3.19:    Summary of Predicted Cumulative Daily Average TSP Concentrations for All ASRs (Tier 1 Unmitigated & Mitigated)____________________________________________________________________________ 3-72

Table 3.20:    Summary of Predicted Cumulative Hourly Average TSP Concentrations (Tier 2 Mitigated)_______ 3-72

Table 3.21:    Summary of Predicted Cumulative Annual Average TSP Concentrations for All ASRs (Unmitigated & Mitigated)____________________________________________________________________________ 3-73

Table 3.22:    Summary of Predicted Cumulative RSP, SO2 and NO2 Concentrations for All ASRs___________ 3-74

Table 3.23:    Breakdown of Predicted Cumulative NO2 Concentrations by Sources for ASRs with Potential Exceedance         3-75

Table 3.24:    Breakdown of Predicted Cumulative Hourly NO2 Concentrations by Sources for Selected ASRs (for the Worst Case Year of 2015)_____________________________________________________________________ 3-76

Table 3.25:    Breakdown of Predicted Cumulative Hourly NO2 Concentrations by Sources for Selected ASRs (for Year 2020)____________________________________________________________________________ 3-77

Table 3.26:    Estimated Odour Emission Rates for NYMTTS________________________________________ 3-80

Table 3.27:    Summary of Odour modelling Results______________________________________________ 3-82

Table 3.28:    Breakdown of Odour modelling Results under Current Scenario___________________________ 3-85

Table 3.29:    Breakdown of Odour modelling Results under Mitigated Scenario A________________________ 3-85

Table 3.30:    Breakdown of Odour modelling Results under Mitigated Scenario B________________________ 3-86

Table 3.31:    Summary of Recommended Odour Mitigation Measures for NYMTTS______________________ 3-91

 

Table 4.1:      Noise Standards for Daytime Construction Activities_____________________________________ 4-1

Table 4.2:      Relevant Road Traffic Noise Standards for Planning Purposes_____________________________ 4-3

Table 4.3:      Area Sensitivity Rating___________________________________________________________ 4-3

Table 4.4:      Acceptable Noise Level for Fixed Noise Source________________________________________ 4-4

Table 4.5       Noise Criteria of Fixed Plant Noise__________________________________________________ 4-4

Table 4.6       Noise Criteria of Fixed Plant Noise for the Outdoor Performance Venues_____________________ 4-5

Table 4.7:      Ground-borne Operational Noise Level Criteria________________________________________ 4-6

Table 4.8:      Proposed Ground-borne Operational Noise Level Criteria for Special Venues in WKCD__________ 4-7

Table 4.9:      Representative Noise Sensitive Receivers___________________________________________ 4-10

Table 4.10:    Adjustment Factor for Building Coupling Loss (BCF)____________________________________ 4-21

Table 4.11:    Adjustment Factor for Building Structure Attenuation (BSA)_______________________________ 4-21

Table 4.12:    Building Structure Attenuation (BSA) for WKCD Study___________________________________ 4-22

Table 4.13:    Building Structure Resonance (BSR) for WKCD Study___________________________________ 4-22

Table 4.14:    Krad (dB) at Different Location____________________________________________________ 4-23

Table 4.15:    Conversion to Noise Factors______________________________________________________ 4-23

Table 4.16:    Unmitigated Construction Airborne Noise Impact from this Project_________________________ 4-25

Table 4.17:    Unmitigated Road Traffic Noise Impact in Year 2032 – Scenario with Interim Access at Austin Road West           4-26

Table 4.18:    Unmitigated Road Traffic Noise Impact in Year 2032 – Scenario with Permanent Access at Canton Road            4-27

Table 4.19:    Summary of Fixed Plant Noise Sources_____________________________________________ 4-28

Table 4.20:    SWLs of the Existing Fixed Plant and Fixed Plant from XRL projects________________________ 4-29

Table 4.21:    Maximum Allowable SWLs of the Fixed Plant within WKCD______________________________ 4-30

Table 4.22:    Predicted Outdoor Air Activity Noise Impact without Mitigation Measures____________________ 4-33

Table 4.23:    Predicted Ground-borne Noise Impact from XRL EIA___________________________________ 4-33

Table 4.24:    Predicted Ground-borne Noise Impact from WR-KSL___________________________________ 4-35

Table 4.25:    Predicted Ground-borne Noise Impact from AEL/TCL___________________________________ 4-36

Table 4.26:    Quieter PME Recommended for Adoption during Construction Phase______________________ 4-38

Table 4.27:    Noise Mitigation Measures for Certain PME during Construction Phase_____________________ 4-39

Table 4.28:    Mitigated Construction Airborne Noise Impact from this Project___________________________ 4-41

Table 4.29:    Overall Cumulative Construction Noise Impact________________________________________ 4-43

Table 4.30:    Summary of Benefitted and Protected Planned Dwellings (Interim Access at Austin Road West)__ 4-45

Table 4.31:    Summary of Benefitted and Protected Planned Dwellings (Permanent Access at Canton Road)__ 4-45

Table 4.32:    Recommended At-receiver Noise Mitigation Measures for Residential Buildings______________ 4-48

Table 4.33:    Assessment of Residual Impacts during Construction Phase_____________________________ 4-49

 

Table ‎5.1:      Water Quality Objectives for Victoria Harbour WCZ______________________________________ 5-1

Table ‎5.2:      Water Quality Objectives for the Western Buffer WCZ____________________________________ 5-2

Table ‎5.3:      Water Quality Objectives for the Eastern Buffer WCZ____________________________________ 5-3

Table ‎5.4:      WSD’s Water Quality Criteria for Flushing Water at Sea Water Intakes_______________________ 5-5

Table ‎5.5:      Marine Water Quality at Victoria Harbour and Stonecutters Island in 2010_____________________ 5-7

Table ‎5.6:      Marine Water Quality at Yau Ma Tei Typhoon Shelter in 2010______________________________ 5-8

Table ‎5.7:      Summary of Parameters for Thermal Plume Model (Delft3D-FLOW)_______________________ 5-12

Table ‎5.8:      Diurnal pattern of cooling water discharge for proposed WKCD DCWS and the independent cooling systems    5-13

Table ‎5.9:      Approximate distances of existing cooling water intakes and outfalls from the WKCD DCWS proposed Outfall   5-13

Table ‎5.10:    Summary of Parameters for Modelling of Residual Chlorine (Delft3D-WAQ)_________________ 5-14

Table ‎5.11:   Recommended Standard of Recycled Rainwater Quality_________________________________ 5-19

Table ‎5.12:   Temperature elevations at cooling water intakes_______________________________________ 5-20

 

Table 6.1:      Recommended Unit Flow Factors___________________________________________________ 6-3

Table 6.2:      Peaking Factors________________________________________________________________ 6-4

Table 6.3:      Population and Sewage Flow Estimation for WCKD_____________________________________ 6-5

Table 6.4:      Summary of Sewage Flow for Sub-catchment_________________________________________ 6-6

Table 6.5:      Sewage Flow from Different Catchments discharged to the 1350mm Trunk Sewer_____________ 6-7

Table 6.6:      Boundary Conditions for Hydraulic Model_____________________________________________ 6-9

Table 6.7:      Summary of Hydraulic Model Results________________________________________________ 6-9

 

Table ‎7.1:      Estimates of Inert C&D materials to be Generated by WKCD Project_________________________ 7-3

Table ‎7.2:      Estimates of Fill Materials to be Imported from Other Potential Projects and/or Government’s Fill

                        Banks________________________________________________________________________ 7-4

Table ‎7.3:      Estimates of Inert C&D materials to be Used by Other Potential Projects______________________ 7-5

Table ‎7.4:      Estimates of Inert C&D materials to be Generated, Reused On-site, Reused Off-site and Disposed_ 7-6

Table ‎7.5:      Estimation of Maximum Number of Construction Workers during Construction Phase___________ 7-9

Table ‎7.6:      Summary of Waste Arising during Construction Phase__________________________________ 7-11

Table ‎7.7:      Estimation of General Refuse Generation during Operation Phase_________________________ 7-12

 

Table 8.1:      Land Use History of Project Area___________________________________________________ 8-2

Table 8.2:      Comparison of KSL site investigation results against RBRG criteria_________________________ 8-3

Table 8.3:      Potential Contamination for the Project Area and its vicinity_______________________________ 8-5

 

Table 9.1:      Habitat Evaluation_______________________________________________________________ 9-5

Table 9.2:      Summary of the potential ecological impact___________________________________________ 9-7

 

Table ‎10.1:    Impact significance – relationship between sensitivity and magnitude of change______________ 10-8

Table ‎10.2:    Assessment categories for residual impacts__________________________________________ 10-8

Table ‎10.3:    Impact significance – relationship between sensitivity and magnitude of change_____________ 10-10

Table ‎10.4:    Landscape resources and sensitivity_______________________________________________ 10-14

Table ‎10.5:    Landscape character areas and sensitivity__________________________________________ 10-23

Table ‎10.6:    Types of VSRs_______________________________________________________________ 10-27

Table ‎10.7:    VSRs identified within the visual envelope__________________________________________ 10-29

Table ‎10.8:    Sensitivity of the VSRs_________________________________________________________ 10-36

Table ‎10.9:    Source of impacts during construction and operation phase_____________________________ 10-42

Table ‎10.10: Impacts on landscape resources during construction and operation phase__________________ 10-44

Table ‎10.11: Impacts on landscape character areas during construction and operation phase_____________ 10-47

Table ‎10.12: Source of visual impacts during construction phase___________________________________ 10-56

Table ‎10.13: Source of visual impacts during operation phase_____________________________________ 10-58

Table ‎10.14: Magnitude of change of VSRs____________________________________________________ 10-63

Table ‎10.15: Assessment of visual impact during construction phase________________________________ 10-67

Table ‎10.16: Assessment of visual impact during operation phase__________________________________ 10-73

 

Table ‎10.17: Sources of potential cumulative landscape and visual impacts from concurrent projects in the

                        surrounding areas, and affected LRs, LCAs and VSRs_________________________________ 10-80

Table ‎10.18: Landscape mitigation measures during construction phase_____________________________ 10-84

Table ‎10.19: Landscape mitigation measures during operation phase_______________________________ 10-85

Table ‎10.20: Significance of impacts on landscape resources during construction and operation phases_____ 10-89

Table ‎10.21: Significance of impacts on landscape character area during construction and operation phases (all impacts are adverse unless otherwise stated)________________________________________________________ 10-91

Table ‎10.22: Visual mitigation measures during construction phase_________________________________ 10-93

Table ‎10.23: Good design features and visual mitigation measures during operation phase_______________ 10-98

Table ‎10.25: Residual impacts on existing trees during construction phase___________________________ 10-105

Table ‎10.26: Residual impacts on visually sensitive receivers during operation phase__________________ 10-108

 

Table 13.1:    Implementation Schedule________________________________________________________ 13-1

 

Table 14.2.1:           Comparison of environmental benefits and disbenefits of options for the main WKCD road_ 14-7

Table 14.2.2:           List of concurrent projects for cumulative impact assessment________________________ 14-9

Table 14.3.1:           Hong Kong Air Quality Objectives____________________________________________ 14-11

Table 14.3.2:           Limits of air pollutant concentrations inside car parks_____________________________ 14-12

Table 14.3.3:           Representative ASRs Identified for the Assessment_______________________________ 14-15

Table.14.3.4            Average Background TSP Air Pollutant Concentrations (Year 2007-2011)______________ 14-39

Table 14.3.5:           Air Quality Monitoring Results for Hong Kong Section of Guangzhou-Shenzhen-Hong Kong Express Rail Link relevant to WKCD (March 2010 – December 2012)______________________________________ 14-39

Table 14.3.6:           Average Background Air Pollutant Concentrations from EPD’s Urban Air Monitoring Stations (Year 2007-2011)      14-40

Table 14.3.7:           Average Background Air Pollutant Concentrations from EPD’s Local Monitoring Station at WKCD Site (September 2011 – August 2012)______________________________________________________ 14-40

Table 14.3.8:           Summary of concurrent projects during construction phase_________________________ 14-41

Table 14.3.9:           Key Dust Emission Factors Adopted in the Assessment____________________________ 14-48

Table 14.3.10:         Summary of tentative active area calculations for Tier 2 and Annual TSP assessment____ 14-49

Table 14.3.11:         Vehicle Classification in the EMFAC-HK Model__________________________________ 14-53

Table 14.3.12:         Estimated Emission Rates of Barges at NYPCWA________________________________ 14-62

Table 14.3.13:         Estimated Emission Rates of Fast Ferries at China Ferry Terminal___________________ 14-63

Table 14.3.14:         Estimated Emission Rates of Cruise Ships at Ocean Terminal_______________________ 14-64

Table 14.3.15:         Summary of 2015 and 2020 Hong Kong Emission Inventory for the PATH Model________ 14-65

Table 14.3.16:         Summary of Predicted Cumulative Hourly Average TSP Concentrations for All ASRs (Tier 1 Unmitigated & Mitigated)______________________________________________________________________ 14-67

Table 14.3.17:         Predicted Cumulative Hourly Average TSP Concentrations for ASRs with Exceedance (Tier 1 Mitigated)   14-68

Table 14.3.18:         Summary of Predicted Cumulative Daily Average TSP Concentrations for All ASRs (Tier 1 Unmitigated & Mitigated)______________________________________________________________________ 14-68

Table 14.3.19:         Summary of Predicted Cumulative Hourly Average TSP Concentrations (Tier 2 Mitigated)_ 14-69

Table 14.3.20:         Summary of Predicted Cumulative Annual Average TSP Concentrations for All ASRs (Unmitigated & Mitigated)     14-70

Table 14.3.21:         Summary of Predicted Cumulative RSP, SO2 and NO2 Concentrations for All ASRs______ 14-71

Table 14.3.22:         Breakdown of Predicted Cumulative NO2 Concentrations by Sources for ASRs with Potential Exceedance              14-71

Table 14.3.23:         Breakdown of Predicted Cumulative Hourly NO2 Concentrations by Sources for Selected ASRs (for the Worst Case Year of 2015)____________________________________________________________ 14-72

Table 14.3.24:         Breakdown of Predicted Cumulative Hourly NO2 Concentrations by Sources for Selected ASRs (for Year 2020)     14-74

Table 14.4.1:           Noise Standards for Daytime Construction Activities______________________________ 14-80

Table 14.4.2:           Relevant Road Traffic Noise Standards for Planning Purposes______________________ 14-82

Table 14.4.3:           Area Sensitivity Rating_____________________________________________________ 14-82

Table 14.4.4:           Acceptable Noise Level for Fixed Noise Source__________________________________ 14-82

Table 14.4.5            Noise Criteria of Fixed Plant Noise___________________________________________ 14-83

Table 14.4.6            Noise Criteria of Fixed Plant Noise for the Outdoor Theatre_________________________ 14-84

Table 14.4.7:           Representative Noise Sensitive Receivers______________________________________ 14-86

Table 14.4.8:           Unmitigated Construction Airborne Noise Impact from this Project___________________ 14-94

Table 14.4.9:           Unmitigated Road Traffic Noise Impact in Year 2032 – Scenario with Interim Access at Austin Road West 14-95

Table 14.4.10:         Unmitigated Road Traffic Noise Impact in Year 2032 – Scenario with Permanent Access at Canton Road 14-95

Table 14.4.11:         Summary of Fixed Plant Noise Sources________________________________________ 14-96

Table 14.4.12:         SWLs of the Existing Fixed Plant and Fixed Plant from XRL projects__________________ 14-97

Table 14.4.13:         Maximum Allowable SWLs of the Fixed Plant within WKCD_________________________ 14-98

Table 14.4.14          Quieter PME Recommended for Adoption during Construction Phase________________ 14-101

Table 14.4.15          Noise Mitigation Measures for Certain PME during Construction Phase_______________ 14-102

Table 14.4.16:         Mitigated Construction Airborne Noise Impact from this Project_____________________ 14-104

Table 14.4.17:         Overall Cumulative Construction Noise Impact_________________________________ 14-106

Table 14.4.18:         Assessment of Residual Impacts during Construction Phase______________________ 14-108

Table 14.5.1:           Water Quality Objectives for Victoria Harbour WCZ______________________________ 14-111

Table 14.5.2:           Water Quality Objectives for the Western Buffer WCZ____________________________ 14-112

Table 14.5.3:           Water Quality Objectives for the Eastern Buffer WCZ_____________________________ 14-114

Table 14.5.4:           Marine Water Quality at Victoria Harbour and Stonecutters Island in 2010_____________ 14-116

Table 14.5.5:           Marine Water Quality at Yau Ma Tei Typhoon Shelter in 2010______________________ 14-117

Table 14.7.1:           Estimates of inert C&D Materials to be Generated by WKCD Project_________________ 14-126

Table 14.7.2:           Estimates of Fill Materials to be Imported from Other Potential Projects and/or Government’s Fill Banks    14-127

Table 14.7.3:           Estimates of inert C&D Materials to be Used by Other Potential Projects______________ 14-128

Table 14.7.4            Estimates of Inert C&D Materials to be Generated, Reused On-site, Reused Off-site and Disposed             14-129

Table 14.7.5:           Estimation of Maximum Number of Construction Workers during Construction Phase____ 14-132

Table 14.7.6            Summary of Waste Arisings during Construction Phase__________________________ 14-133

Table 14.8.1:           Land Use History of Project Area___________________________________________ 14-139

Table 14.8.2:           Comparison of KSL site investigation results against RBRG criteria__________________ 14-140

Table 14.8.3:           Potential Contamination for the Project Area and its vicinity________________________ 14-142

Table 14.9.1:           Habitat Evaluation_______________________________________________________ 14-149

Table 14.9.2:           Summary of the potential ecological impact___________________________________ 14-151

Table 14.10.1:         Impact significance - relationship between sensitivity and magnitude of change________ 14-157

Table 14.10.2:         Assessment categories for residual impact____________________________________ 14-158

Table 14.10.3:         Impact significance – relationship between sensitivity and magnitude of change_______ 14-160

Table 14.10.4:         Landscape Resources and Sensitivity________________________________________ 14-164

Table 14.10.5:         Landscape character areas and sensitivity_____________________________________ 14-172

Table 14.10.6:         Types of VSRs__________________________________________________________ 14-175

Table 14.10.7:         Brief Descriptions of the VSRs and the Existing Views____________________________ 14-176

Table 14.10.8:         Sensitivity of the VSRs____________________________________________________ 14-180

Table 14.10.9:         Source of impacts during construction and operation phase_______________________ 14-184

Table 14.10.10:      Impacts on landscape resources during construction and operation phase____________ 14-185

Table 14.10.11:      Impacts on landscape character areas during construction and operation phase________ 14-186

Table 14.10.12:      Sources of Visual Impacts during Construction Phase____________________________ 14-192

Table 14.10.13:      Sources of Visual Impacts during Operation Phase (Day 1 and Year 10)______________ 14-192

Table 14.10.14:      Magnitude of Change of the VSRs___________________________________________ 14-194

Table 14.10.15:      Significance Threshold of Visual Impact Before and After Mitigation Measures (Construction Phase)         14-199

Table.14.10.16:      Significance Threshold of Visual Impact Before and After Mitigation Measures (Operation Phase)______ 14-202

Table 14.10.17:      Landscape mitigation measures during construction phase________________________ 14-205

Table 14.10.18:      Landscape mitigation measures during operation phase__________________________ 14-206

Table 14.10.19:      Significance of impacts on landscape resources during construction and operation phases 14-208

Table 14.10.20:      Significance of impacts on landscape character area during construction and operation phases (all impacts are adverse unless otherwise stated)____________________________________________ 14-209

Table 14.10.21:      Visual Mitigation Measures during Construction Phase___________________________ 14-210

Table 14.10.22:      Visual mitigation measures during Operation Phase_____________________________ 14-211

Table 14.10.23:      Potential cumulative landscape and visual impacts from concurrent project___________ 14-212

Table 14.10.24:      Summary of LRs, LCAs and VSRs affected by concurrent projects__________________ 14-213

Table 14.10.25:      Residual impacts on existing trees during construction phase______________________ 14-217

Table 14.10.26:      Residual impacts on landscape character areas during construction and operation phase 14-218

Table 14.13.1:         Implementation Schedule_________________________________________________ 14-227

 

Table 15.3.1:           Hong Kong Air Quality Objectives____________________________________________ 15-10

Table 15.3.2:           Limits of air pollutant concentrations inside car parks and vehicle tunnes______________ 15-11

Table 15.3.3:           Representative ASRs Identified for the Assessment_______________________________ 15-14

Table.15.3.4            Average Background TSP Air Pollutant Concentrations (Year 2007-2011)______________ 15-31

Table 15.3.5:           Air Quality Monitoring Results for Hong Kong Section of Guangzhou-Shenzhen-Hong Kong Express Rail Link relevant to WKCD (March 2010 – December 2012)______________________________________ 15-31

Table 15.3.6:           Average Background Air Pollutant Concentrations from EPD’s Urban Air Monitoring Stations (Year 2007-2011)      15-32

Table 15.3.7:           Average Background Air Pollutant Concentrations from EPD’s Local Monitoring Station at WKCD Site (September 2011 – August 2012)______________________________________________________ 15-32

Table 15.3.8:           Summary of concurrent projects during construction phase_________________________ 15-33

Table 15.3.9:           Key Dust Emission Factors Adopted in the Assessment____________________________ 15-39

Table 15.3.10:         Summary of tentative active area calculations for Tier 2 and Annual TSP assessment____ 15-41

Table 15.3.11:         Vehicle Classification in the EMFAC-HK Model__________________________________ 15-44

Table 15.3.12:         Estimated Emission Rates of Barges at NYPCWA________________________________ 15-53

Table 15.3.13:         Estimated Emission Rates of Fast Ferries at China Ferry Terminal___________________ 15-54

Table 15.3.14:         Estimated Emission Rates of Cruise Ships at Ocean Terminal_______________________ 15-56

Table 15.3.15:         Summary of 2015 and 2020 Hong Kong Emission Inventory for the PATH Model________ 15-57

Table 15.3.16:         Summary of Predicted Cumulative Hourly Average TSP Concentrations for All ASRs (Tier 1 Unmitigated & Mitigated)______________________________________________________________________ 15-59

Table 15.3.17:         Predicted Cumulative Hourly Average TSP Concentrations for ASRs with Exceedance (Tier 1 Mitigated)   15-59

Table 15.3.18:         Summary of Predicted Cumulative Daily Average TSP Concentrations for All ASRs (Tier 1 Unmitigated & Mitigated)______________________________________________________________________ 15-60

Table 15.3.19:         Summary of Predicted Cumulative Hourly Average TSP Concentrations (Tier 2 Mitigated)_ 15-60

Table 15.3.20:         Summary of Predicted Cumulative Annual Average TSP Concentrations for All ASRs (Unmitigated & Mitigated)     15-61

Table 15.3.21:         Summary of Predicted Cumulative RSP, SO2 and NO2 Concentrations for All ASRs______ 15-62

Table 15.3.22:         Breakdown of Predicted Cumulative NO2 Concentrations by Sources for ASRs with Potential Exceedance              15-62

Table 15.3.23:         Breakdown of Predicted Cumulative Hourly NO2 Concentrations by Sources for Selected ASRs (for the Worst Case Year of 2015)____________________________________________________________ 15-63

Table 15.3.24:         Breakdown of Predicted Cumulative Hourly NO2 Concentrations by Sources for Selected ASRs (for Year 2020)     15-64

Table 15.4.1:           Noise Standards for Daytime Construction Activities______________________________ 15-71

Table 15.4.2:           Relevant Road Traffic Noise Standards for Planning Purposes______________________ 15-72

Table 15.4.3:           Representative Noise Sensitive Receivers______________________________________ 15-74

Table 15.4.4:           Unmitigated Construction Airborne Noise Impact_________________________________ 15-78

Table 15.4.5:           Unmitigated Road Traffic Noise Impact in Year 2032 – Scenario with Interim Access to the Proposed Underpass of the WKCD Project at Austin Road West___________________________________________ 15-79

Table 15.4.6:           Unmitigated Road Traffic Noise Impact in Year 2032 – Scenario with Permanent Access to the Proposed Underpass of the WKCD Project at Canton Road____________________________________________ 15-79

Table 15.4.7:           Cumulative Mitigated Construction Airborne Noise Impact__________________________ 15-82

Table 15.5.1:           Water Quality Objectives for Victoria Harbour WCZ_______________________________ 15-85

Table 15.7.1            Summary of Waste Arisings during Construction Phase__________________________ 15-101

Table 15.9.1:           Habitat Evaluation_______________________________________________________ 15-109

Table 15.9.2:           Summary of the potential ecological impact___________________________________ 15-111

Table 15.10.1:         Impact significance – relationship between sensitivity and magnitude of change_______ 15-117

Table 15.10.2:         Assessment categories for residual impact____________________________________ 15-117

Table 15.10.3:         Impact significance – relationship between sensitivity and magnitude of change_______ 15-119

Table 15.10.4:         Landscape resources and sensitivity_________________________________________ 15-123

Table 15.10.5:         Landscape character areas and sensitivity_____________________________________ 15-127

Table 15.10.6:         Brief descriptions of the VSRs and the existing views_____________________________ 15-130

Table 15.10.7:         Sensitivity of the VSRs____________________________________________________ 15-133

Table 15.10.8:         Source of impacts during construction and operation phase_______________________ 15-135

Table 15.10.9:         Impacts on landscape resources during construction and operation phase____________ 15-136

Table 15.10.10:      Impacts on landscape character areas during construction and operation phase________ 15-138

Table 15.10.11:      Sources of direct and indirect visual impacts during construction and operation phases__ 15-144

Table 15.10.12:      Magnitude of Change of VSRs______________________________________________ 15-145

Table 15.10.13:      Assessment of Visual Impacts during Construction Phases________________________ 15-147

Table 15.10.14:      Assessment of Visual Impacts during Operation Phase___________________________ 15-149

Table 15.10.15:      Landscape mitigation measures during construction phase________________________ 15-152

Table 15.10.16:      Landscape mitigation measures during operation phase__________________________ 15-152

Table 15.10.17:      Significance of impacts on landscape resources during construction and operation phases 15-154

Table 15.10.18:      Significance of impacts on landscape character area during construction and operation phases (all impacts are adverse unless otherwise stated)____________________________________________ 15-154

Table 15.10.19:      Visual Mitigation Measures during Construction Phase___________________________ 15-156

Table 15.10.20:      Visual Mitigation Measures during Operation Phase_____________________________ 15-157

Table 15.10.21:      Potential cumulative landscape and visual impacts from concurrent projects__________ 15-158

Table 15.10.22:      Summary of LRs, LCAs and VSRs affected by concurrent projects__________________ 15-158

Table 15.10.23:      Residual impacts on existing trees during construction phase______________________ 15-163

Table 15.10.24:      Residual impacts on landscape character areas during operation phase______________ 15-163

Table 15.11.1:         Implementation Schedule_________________________________________________ 15-172

 

 


Figures

Figure 1.1             Project Area

Figure 1.2             Project Layout

Figure 1.3             Location of Designated Projects

 

Figure 2.1a           Conceptual Plan Options – ‘City Park’ by Foster + Partners

Figure 2.1b           Conceptual Plan Options – ‘Cultural Connect: Key to Sustained Vitality’ by Rocco Design Architects Ltd.

Figure 2.1c           Conceptual Plan Options – ‘Project for a New Dimension’ by Office for Metropolitan Architecture

Figure 2.2             Modified Conceptual Plan

 

Figure 3.1a           Locations of Air Sensitive Receivers (Outside WKCD Site)

Figure 3.1b           Locations of Air Sensitive Receivers (Within WKCD Site)

Figure 3.2             Locations of XRL Air Monitoring Stations Close to the WKCD Site  

Figure 3.3a           Locations of Potential Construction Dust Sources from Concrete Batching Plant and its Haul Road in Year 2013

Figure 3.3b           Locations of Potential Construction Dust Sources (Tier 1) in Year 2013

Figure 3.3c-1        Locations of Potential Construction Dust Sources from Concrete Batching Plant (Phase 1) and its Haul Road in Year 2014

Figure 3.3c-2        Locations of Potential Construction Dust Sources from Concrete Batching Plant (Phase 2) and its Haul Road in 2014

Figure 3.3c-3        Locations of Potential Construction Dust Sources (Tier 1) in Year 2014

Figure 3.3d           Locations of Potential Construction Dust Sources from Concrete Batching Plant and its Haul Road in Year 2015 – 2016

Figure 3.3e           Locations of Potential Construction Dust Sources (Tier 1) in Year 2015

Figure 3.3f            Locations of Potential Construction Dust Sources (Tier 1) in Year 2016

Figure 3.3g           Locations of Potential Construction Dust Sources from Concrete Batching Plant and its Haul Road in Year 2017 – 2020

Figure 3.3h           Locations of Potential Construction Dust Sources (Tier 1) in Year 2017

Figure 3.3i            Locations of Potential Construction Dust Sources (Tier 1) in Year 2018

Figure 3.3j            Locations of Potential Construction Dust Sources (Tier 1) in Year 2019

Figure 3.3k           Locations of Potential Construction Dust Sources (Tier 1) in Year 2020

Figure 3.4a           Locations of Potential Construction Dust Sources (Tier 2) for P01d-1 at the end of Year 2015

Figure 3.4b           Locations of Potential Construction Dust Sources (Tier 2) for ASR P53-1 at the end of Year 2015

Figure 3.4c           Locations of Potential Construction Dust Sources (Tier 2) for ASR P01a-1, P01b-1, P01c-1 and P01d-1 at the end of Year 2016

Figure 3.4d           Locations of Potential Construction Dust Sources (Tier 2) for ASR P53-1 at the end of Year 2016

Figure 3.4e           Locations of Potential Construction Dust Sources (Tier 2) for ASR P39-1 and P52-1 at the end of Year 2017

Figure 3.4f            Locations of Potential Construction Dust Sources (Tier 2) for ASR P52-1 at the end of Year 2018

Figure 3.5.1a        Road Links within 500m Assessment Area for 2015 (Key Plan)

Figure 3.5.1b        Road Links within 500m Assessment Area for 2015 (Sheet 1 of 24)

Figure 3.5.1c        Road Links within 500m Assessment Area for 2015 (Sheet 2 of 24)

Figure 3.5.1d        Road Links within 500m Assessment Area for 2015 (Sheet 3 of 24)

Figure 3.5.1e        Road Links within 500m Assessment Area for 2015 (Sheet 4 of 24)

Figure 3.5.1f         Road Links within 500m Assessment Area for 2015 (Sheet 5 of 24)

Figure 3.5.1g        Road Links within 500m Assessment Area for 2015 (Sheet 6 of 24)

Figure 3.5.1h        Road Links within 500m Assessment Area for 2015 (Sheet 7 of 24)

Figure 3.5.1i         Road Links within 500m Assessment Area for 2015 (Sheet 8 of 24)

Figure 3.5.1j         Road Links within 500m Assessment Area for 2015 (Sheet 9 of 24)

Figure 3.5.1k        Road Links within 500m Assessment Area for 2015 (Sheet 10 of 24)

Figure 3.5.1l         Road Links within 500m Assessment Area for 2015 (Sheet 11 of 24)

Figure 3.5.1m      Road Links within 500m Assessment Area for 2015 (Sheet 12 of 24)

Figure 3.5.1n        Road Links within 500m Assessment Area for 2015 (Sheet 13 of 24)

Figure 3.5.1o        Road Links within 500m Assessment Area for 2015 (Sheet 14 of 24)

Figure 3.5.1p        Road Links within 500m Assessment Area for 2015 (Sheet 15 of 24)

Figure 3.5.1q        Road Links within 500m Assessment Area for 2015 (Sheet 16 of 24)

Figure 3.5.1r         Road Links within 500m Assessment Area for 2015 (Sheet 17 of 24)

Figure 3.5.1s        Road Links within 500m Assessment Area for 2015 (Sheet 18 of 24)

Figure 3.5.1t         Road Links within 500m Assessment Area for 2015 (Sheet 19 of 24)

Figure 3.5.1u        Road Links within 500m Assessment Area for 2015 (Sheet 20 of 24)

Figure 3.5.1v        Road Links within 500m Assessment Area for 2015 (Sheet 21 of 24)

Figure 3.5.1w       Road Links within 500m Assessment Area for 2015 (Sheet 22 of 24)

Figure 3.5.1x        Road Links within 500m Assessment Area for 2015 (Sheet 23 of 24)

Figure 3.5.1y        Road Links within 500m Assessment Area for 2015 (Sheet 24 of 24)

Figure 3.6             Location of Emission Sources for ISCST model

Figure 3.7             Location of Marine Emission Sources

Figure 3.8             PATH grid

Figure 3.9             Odour Sampling Grids and Discharge Points

Figure 3.10           (not used)

Figure 3.11a         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2013 during construction phase (unmitigated)

Figure 3.11b         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2014 during construction phase (unmitigated)

Figure 3.11c         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2015 during construction phase (unmitigated)

Figure 3.11d         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2016 during construction phase (unmitigated)

Figure 3.11e         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2017 during construction phase (unmitigated)

Figure 3.11f          Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2018 during construction phase (unmitigated)

Figure 3.11g         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2019 during construction phase (unmitigated)

Figure 3.11h         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2020 during construction phase (unmitigated)

Figure 3.12a         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2013 during construction phase (mitigated)

Figure 3.12b         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2014 during construction phase (mitigated)

Figure 3.12c         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2015 during construction phase (mitigated)

Figure 3.12d         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2016 during construction phase (mitigated)

Figure 3.12e         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2017 during construction phase (mitigated)

Figure 3.12f          Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2018 during construction phase (mitigated)

Figure 3.12g         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2019 during construction phase (mitigated)

Figure 3.12h         Cumulative Result – Contour of Tier 1 Hourly TSP Concentration (µg/m3) at 1.5m above ground at year 2020 during construction phase (mitigated)

Figure 3.13a         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2013 during construction phase (unmitigated)

Figure 3.13b         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2014 during construction phase (unmitigated)

Figure 3.13c         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2015 during construction phase (unmitigated)

Figure 3.13d         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2016 during construction phase (unmitigated)

Figure 3.13e         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2017 during construction phase (unmitigated)

Figure 3.13f          Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2018 during construction phase (unmitigated)

Figure 3.13g         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2019 during construction phase (unmitigated)

Figure 3.13h         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2020 during construction phase (unmitigated)

Figure 3.14a         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2013 during construction phase (mitigated)

Figure 3.14b         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2014 during construction phase (mitigated)

Figure 3.14c         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2015 during construction phase (mitigated)

Figure 3.14d         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2016 during construction phase (mitigated)

Figure 3.14e         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2017 during construction phase (mitigated)

Figure 3.14f          Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2018 during construction phase (mitigated)

Figure 3.14g         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2019 during construction phase (mitigated)

Figure 3.14h         Cumulative Result – Contour of Tier 1 Daily TSP Concentration (µg/m3) at 1.5m above ground at year 2020 during construction phase (mitigated)

Figure 3.15a         Cumulative Result – Contour of Tier 2 Hourly TSP Concentration (µg/m3) at 1.5m above ground for dust sources near ASR P01d-1 at year 2015 during construction phase (mitigated)

Figure 3.15b         Cumulative Result – Contour of Tier 2 Hourly TSP Concentration (µg/m3) at 1.5m above ground for dust sources near ASR P53-1 at year 2015 during construction phase (mitigated)

Figure 3.15c         Cumulative Result – Contour of Tier 2 Hourly TSP Concentration (µg/m3) at 1.5m above ground for dust sources near ASR P01a-1, P01b-1, P01c-1 and P01d-1 at year 2016 during construction phase (mitigated)

Figure 3.15d         Cumulative Result – Contour of Tier 2 Hourly TSP Concentration (µg/m3) at 1.5m above ground for dust sources near ASR P53-1 at year 2016 during construction phase (mitigated)

Figure 3.15e         Cumulative Result – Contour of Tier 2 Hourly TSP Concentration (µg/m3) at 1.5m above ground for dust sources near ASR P39-1, P52-1 at year 2017 during construction phase (mitigated)

Figure 3.15f          Cumulative Result – Contour of Tier 2 Hourly TSP Concentration (µg/m3) at 1.5m above ground for dust sources near ASR P52-1 at year 2018 during construction phase (mitigated)

Figure 3.16           Cumulative Result – Contour of Tier 2 Daily TSP Concentration (µg/m3) at 1.5m above ground for dust sources near ASR P01b-1 and P01c-1 at year 2016 during construction phase (mitigated)

Figure 3.17a         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2013 during construction phase (unmitigated)

Figure 3.17b         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2014 during construction phase (unmitigated)

Figure 3.17c         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2015 during construction phase (unmitigated)

Figure 3.17d         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2016 during construction phase (unmitigated)

Figure 3.17e         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2017 during construction phase (unmitigated)

Figure 3.17f          Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2018 during construction phase (unmitigated)

Figure 3.17g         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2019 during construction phase (unmitigated)

Figure 3.17h         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2020 during construction phase (unmitigated)

Figure 3.18a         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2013 during construction phase (mitigated)

Figure 3.18b         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2014 during construction phase (mitigated)

Figure 3.18c         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2015 during construction phase (mitigated)

Figure 3.18d         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2016 during construction phase (mitigated)

Figure 3.18e         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2017 during construction phase (mitigated)

Figure 3.18f          Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2018 during construction phase (mitigated)

Figure 3.18g         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2019 during construction phase (mitigated)

Figure 3.18h         Cumulative Result – Contour of Annual TSP Concentration (µg/m3) at 1.5m above ground at year 2020 during construction phase (mitigated)

Figure 3.19           Cumulative Results - Contour of Hourly NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 1 through portal

Figure 3.20           Cumulative Results - Contour of Hourly NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 2 through portal

Figure 3.21           Cumulative Results - Contour of Hourly NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 3 through portal

Figure 3.22           Cumulative Results - Contour of Hourly NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 4 through portal

Figure 3.23           Cumulative Results - Contour of Hourly NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 1 through stack

Figure 3.24           Cumulative Results - Contour of Hourly NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 2 through stack

Figure 3.25           Cumulative Results - Contour of Hourly NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 3 through stack

Figure 3.26           Cumulative Results - Contour of Hourly NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 4 through stack

Figure 3.27           Cumulative Results - Contour of Daily NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 1 through portal

Figure 3.28           Cumulative Results - Contour of Daily NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 2 through portal

Figure 3.29           Cumulative Results - Contour of Daily NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 3 through portal

Figure 3.30           Cumulative Results - Contour of Daily NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 4 through portal

Figure 3.31           Cumulative Results - Contour of Daily NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 1 through stack

Figure 3.32           Cumulative Results - Contour of Daily NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 2 through stack

Figure 3.33           Cumulative Results - Contour of Daily NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 3 through stack

Figure 3.34           Cumulative Results - Contour of Daily NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 4 through stack

Figure 3.35           Cumulative Results - Contour of Annual NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 1 through portal

Figure 3.36           Cumulative Results - Contour of Annual NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 2 through portal

Figure 3.37           Cumulative Results - Contour of Annual NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 3 through portal

Figure 3.38           Cumulative Results - Contour of Annual NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 4 through portal

Figure 3.39           Cumulative Results - Contour of Annual NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 1 through stack

Figure 3.40           Cumulative Results - Contour of Annual NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 2 through stack

Figure 3.41           Cumulative Results - Contour of Annual NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 3 through stack

Figure 3.42           Cumulative Results - Contour of Annual NO2 Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 4 through stack

Figure 3.43           Cumulative Results - Contour of Daily RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 1 through portal

Figure 3.44           Cumulative Results - Contour of Daily RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 2 through portal

Figure 3.45           Cumulative Results - Contour of Daily RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 3 through portal

Figure 3.46           Cumulative Results - Contour of Daily RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 4 through portal

Figure 3.47           Cumulative Results - Contour of Daily RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 1 through stack

Figure 3.48           Cumulative Results - Contour of Daily RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 2 through stack

Figure 3.49           Cumulative Results - Contour of Daily RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 3 through stack

Figure 3.50           Cumulative Results - Contour of Daily RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 4 through stack

Figure 3.51           Cumulative Results - Contour of Annual RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 1 through portal

Figure 3.52           Cumulative Results - Contour of Annual RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 2 through portal

Figure 3.53           Cumulative Results - Contour of Annual RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 3 through portal

Figure 3.54           Cumulative Results - Contour of Annual RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 4 through portal

Figure 3.55           Cumulative Results - Contour of Annual RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 1 through stack

Figure 3.56           Cumulative Results - Contour of Annual RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 2 through stack

Figure 3.57           Cumulative Results - Contour of Annual RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 3 through stack

Figure 3.58           Cumulative Results - Contour of Annual RSP Concentration (µg/m3) at 1.5m above ground during operational phase for scenario 4 through stack

Figure 3.59           Cumulative Results - Contour of Hourly SO2 Concentration (µg/m3) at 1.5m above ground during operational phase

Figure 3.60           Cumulative Results - Contour of Daily SO2 Concentration (µg/m3) at 1.5m above ground during operational phase

Figure 3.61           Cumulative Results - Contour of Annual SO2 Concentration (µg/m3) at 1.5m above ground during operational phase

Figure 3.62           Cumulative Results - Contour of Hourly NO2 Concentration (µg/m3) at 12m above ground during operational phase for scenario 1 through stack

Figure 3.63           Cumulative Results - Contour of Daily NO2 Concentration (µg/m3) at 12m above ground during operational phase for scenario 1 through stack

Figure 3.64           Cumulative Results - Contour of Annual NO2 Concentration (µg/m3) at 12m above ground during operational phase for scenario 1 through stack

Figure 3.65           Cumulative Results - Contour of Daily RSP Concentration (µg/m3) at 12m above ground during operational phase for scenario 1 through stack

Figure 3.66           Cumulative Results - Contour of Annual RSP Concentration (µg/m3) at 12m above ground during operational phase for scenario 1 through stack

Figure 3.67           Cumulative Results - Contour of Hourly SO2 Concentration (µg/m3) at 12m above ground during operational phase

Figure 3.68           Cumulative Results - Contour of Daily SO2 Concentration (µg/m3) at 12m above ground during operational phase

Figure 3.69           Cumulative Results - Contour of Annual SO2 Concentration (µg/m3) at 12m above ground during operational phase

Figure 3.70           Cumulative Results - Contour of Hourly NO2 Concentration (µg/m3) at 40m above ground during operational phase for scenario 1 through stack

Figure 3.71           Cumulative Results - Contour of Daily NO2 Concentration (µg/m3) at 40m above ground during operational phase for scenario 1 through stack

Figure 3.72           Cumulative Results - Contour of Annual NO2 Concentration (µg/m3) at 40m above ground during operational phase for scenario 1 through stack

Figure 3.73           Cumulative Results - Contour of Daily RSP Concentration (µg/m3) at 40m above ground during operational phase for scenario 1 through stack

Figure 3.74           Cumulative Results - Contour of Annual RSP Concentration (µg/m3) at 40m above ground during operational phase for scenario 1 through stack

Figure 3.75           Cumulative Results - Contour of Hourly SO2 Concentration (µg/m3) at 40m above ground during operational phase

Figure 3.76           Cumulative Results - Contour of Daily SO2 Concentration (µg/m3) at 40m above ground during operational phase

Figure 3.77           Cumulative Results - Contour of Annual SO2 Concentration (µg/m3) at 40m above ground during operational phase

Figure 3.78           Cumulative Results - Contour of Hourly NO2 Concentration (µg/m3) at 50m above ground during operational phase for scenario 1 through stack

Figure 3.79           Cumulative Results - Contour of Daily NO2 Concentration (µg/m3) at 50m above ground during operational phase for scenario 1 through stack

Figure 3.80           Cumulative Results - Contour of Annual NO2 Concentration (µg/m3) at 50m above ground during operational phase for scenario 1 through stack

Figure 3.81           Cumulative Results - Contour of Daily RSP Concentration (µg/m3) at 50m above ground during operational phase for scenario 1 through stack

Figure 3.82           Cumulative Results - Contour of Annual RSP Concentration (µg/m3) at 50m above ground during operational phase for scenario 1 through stack

Figure 3.83           Cumulative Results - Contour of Hourly SO2 Concentration (µg/m3) at 50m above ground during operational phase

Figure 3.84           Cumulative Results - Contour of Daily SO2 Concentration (µg/m3) at 50m above ground during operational phase

Figure 3.85           Cumulative Results - Contour of Annual SO2 Concentration (µg/m3) at 50m above ground during operational phase

Figure 3.86           Cumulative Results - Contour of Hourly NO2 Concentration (µg/m3) at 60m above ground during operational phase for scenario 1 through stack

Figure 3.87           Cumulative Results - Contour of Daily NO2 Concentration (µg/m3) at 60m above ground during operational phase for scenario 1 through stack

Figure 3.88           Cumulative Results - Contour of Annual NO2 Concentration (µg/m3) at 60m above ground during operational phase for scenario 1 through stack

Figure 3.89           Cumulative Results - Contour of Daily RSP Concentration (µg/m3) at 60m above ground during operational phase for scenario 1 through stack

Figure 3.90           Cumulative Results - Contour of Annual RSP Concentration (µg/m3) at 60m above ground during operational phase for scenario 1 through stack

Figure 3.91           Cumulative Results - Contour of Hourly SO2 Concentration (µg/m3) at 60m above ground during operational phase

Figure 3.92           Cumulative Results - Contour of Daily SO2 Concentration (µg/m3) at 60m above ground during operational phase

Figure 3.93           Cumulative Results - Contour of Annual SO2 Concentration (µg/m3) at 60m above ground during operational phase

Figure 3.94           Contour of 5-s Odour Concentration (ou/m3) at 1.5m above ground during operation phase (Background Scenario)

Figure 3.95           Contour of 5-s Odour Concentration (ou/m3) at 1.5m above ground during operation phase (Current Scenario)

Figure 3.96           Contour of 5-s Odour Concentration (ou/m3) at 1.5m above ground during operation phase (Mitigated - A 1:1 Scenario)

Figure 3.97           Contour of 5-s Odour Concentration (ou/m3) at 1.5m above ground during operation phase (Mitigated - A 1:0.75 Scenario)

Figure 3.98           Contour of 5-s Odour Concentration (ou/m3) at 1.5m above ground during operation phase (Mitigated - A 1:0.50 Scenario)

Figure 3.99           Contour of 5-s Odour Concentration (ou/m3) at 1.5m above ground during operation phase (Mitigated - A 1:0.25 Scenario)

Figure 3.100         Contour of 5-s Odour Concentration (ou/m3) at 1.5m above ground during operation phase (Mitigated - B 1:1 Scenario)

Figure 3.101         Contour of 5-s Odour Concentration (ou/m3) at 1.5m above ground during operation phase (Mitigated - B 1:0.75 Scenario)

Figure 3.102         Contour of 5-s Odour Concentration (ou/m3) at 1.5m above ground during operation phase (Mitigated - B 1:0.50 Scenario)

Figure 3.103         Contour of 5-s Odour Concentration (ou/m3) at 1.5m above ground during operation phase (Mitigated - B 1:0.25 Scenario)

 

Figure 4.1              Noise Impact Study Area

Figure 4.2a           Locations of All Noise Sensitive Receivers (NSRs) for Construction Noise Impact Assessment

Figure 4.2b           Locations of Noise Sensitive Receivers (NSRs) and Construction Area between October 2013 and March 2014

Figure 4.2c           Locations of Noise Sensitive Receivers (NSRs) and Construction Area between April 2014 and March 2015

Figure 4.2d           Locations of Noise Sensitive Receivers (NSRs) and Construction Area between April 2015 and March 2016

Figure 4.2e           Locations of Noise Sensitive Receivers (NSRs) and Construction Area between April 2016 and March 2017

Figure 4.2f            Locations of Noise Sensitive Receivers (NSRs) and Construction Area between April 2017 and March 2018

Figure 4.2g           Locations of Noise Sensitive Receivers (NSRs) and Construction Area between April 2018 and March 2019

Figure 4.2h           Locations of Noise Sensitive Receivers (NSRs) and Construction Area between April 2019 and March 2020

Figure 4.2i            Locations of Noise Sensitive Receivers (NSRs) and Construction Area between April 2020 and December 2020

Figure 4.2j            Locations of Noise Sensitive Receivers (NSRs) and Construction Area in Year 2021 and Before FQ Relocation

Figure 4.2k           Locations of Noise Sensitive Receivers (NSRs) and Construction Area after 2022 during Excluded Area Construction

Figure 4.2l             Locations of Noise Sensitive Receivers (NSRs) and Construction Area after 2030

Figure 4.3              Locations of Noise Sensitive Receivers for Road Traffic Noise Impact Assessment

Figure 4.4a           Locations of Noise Sensitive Receivers (NSRs) and Noise Sources for Fixed Plant Noise Impact Assessment (Sheet 1 of 2)

Figure 4.4b           Locations of Noise Sensitive Receivers (NSRs) and Noise Sources for Fixed Plant Noise Impact Assessment (Sheet 2 of 2)

Figure 4.5              Photos of Existing Noise Sensitive Receivers

Figure 4.6              Locations of Baseline Noise Measurement

Figure 4.7a           Locations of Noise Sensitive Receivers for Ground-borne Noise Impact Assessment

Figure 4.7b           Locations of Ground-borne Vibration Monitoring

Figure 4.8              Locations of Marine Traffic Noise Monitoring

Figure 4.9              Schematic Configuration of Movable Noise Barrier

Figure 4.10           Schematic Configuration of Full Noise Enclosure for PME

Figure 4.11           Conceptual Design of Building Isolation

Figure 4.12           Conceptual Design of Box-in-Box Installation

Figure 4.13           Locations of Facades Recommended for At-receivers Noise Mitigation Measures

Figure 4.14           Typical Layout of At-receivers Noise Mitigation Measures

Figure 4.15           Conceptual Design of Balcony

Figure 4.16           Conceptual Design of Non-openable Windows

Figure 4.17           Locations of Underpass Portal Recommended for Acoustic Treatment

 

Figure 5.1              Locations of Water Control Zones

Figure 5.2              Locations of Key Water Sensitive Receivers

Figure 5.3              Tentative Location of Marine Features

Figure 5.4              Tentative General Arrangement of Possible Piers

Figure 5.5              Tentative Piling Arrangement of Possible Piers

Figure 5.6              (Not used)

Figure 5.7              Typical Drainage Pipe Outfall

 

Figure 6.1              Layout Plan of WKCD and the Surrounding Development

Figure 6.2              Existing Sewerage System

Figure 6.3              Proposed Sewerage Sub-catchment Plan

Figure 6.4              Proposed Sewerage System

Figure 6.5              Access to Proposed Sewerage System

Figure 6.6              InfoWorks Network

Figure 6.7              Proposed Sewerage Layout Plan (Key Plan)

Figure 6.8              Proposed Sewerage Layout Plan (Sheet 1 of 11)

Figure 6.9              Proposed Sewerage Layout Plan (Sheet 2 of 11)

Figure 6.10           Proposed Sewerage Layout Plan (Sheet 3 of 11)

Figure 6.11           Proposed Sewerage Layout Plan (Sheet 4 of 11)

Figure 6.12           Proposed Sewerage Layout Plan (Sheet 5 of 11)

Figure 6.13           Proposed Sewerage Layout Plan (Sheet 6 of 11)

Figure 6.14           Proposed Sewerage Layout Plan (Sheet 7 of 11)

Figure 6.15           Proposed Sewerage Layout Plan (Sheet 8 of 11)

Figure 6.16           Proposed Sewerage Layout Plan (Sheet 9 of 11)

Figure 6.17           Proposed Sewerage Layout Plan (Sheet 10 of 11)

Figure 6.18           Proposed Sewerage Layout Plan (Sheet 11 of 11)

Figure 6.19           Proposed Sewerage System Manhole Schedule

 

Figure 9.1              Habitat Map

Figure 9.2              Transect Route for Ecological Survey

 

Figure 10.1           Baseline Landscape Resources within the Assessment Area (Reference Plan)

Figure 10.1a         Baseline Landscape Resources within the Assessment Area (Sheet 1 of 4)

Figure 10.1b         Baseline Landscape Resources within the Assessment Area (Sheet 2 of 4)

Figure 10.1c         Baseline Landscape Resources within the Assessment Area (Sheet 3 of 4)

Figure 10.1d         Baseline Landscape Resources within the Assessment Area (Sheet 4 of 4)

Figure 10.2a         Baseline Landscape Resources Photo Record (Sheet 1 of 20)

Figure 10.2b         Baseline Landscape Resources Photo Record (Sheet 2 of 20)

Figure 10.2c         Baseline Landscape Resources Photo Record (Sheet 3 of 20)

Figure 10.2d         Baseline Landscape Resources Photo Record (Sheet 4 of 20)

Figure 10.2e         Baseline Landscape Resources Photo Record (Sheet 5 of 20)

Figure 10.2f          Baseline Landscape Resources Photo Record (Sheet 6 of 20)

Figure 10.2g         Baseline Landscape Resources Photo Record (Sheet 7 of 20)

Figure 10.2h         Baseline Landscape Resources Photo Record (Sheet 8 of 20)

Figure 10.2i          Baseline Landscape Resources Photo Record (Sheet 9 of 20)

Figure 10.2j          Baseline Landscape Resources Photo Record (Sheet 10 of 20)

Figure 10.2k         Baseline Landscape Resources Photo Record (Sheet 11 of 20)

Figure 10.2l          Baseline Landscape Resources Photo Record (Sheet 12 of 20)

Figure 10.2m        Baseline Landscape Resources Photo Record (Sheet 13 of 20)

Figure 10.2n         Baseline Landscape Resources Photo Record (Sheet 14 of 20)

Figure 10.2o         Baseline Landscape Resources Photo Record (Sheet 15 of 20)

Figure 10.2p         Baseline Landscape Resources Photo Record (Sheet 16 of 20)

Figure 10.2q         Baseline Landscape Resources Photo Record (Sheet 17 of 20)

Figure 10.2r          Baseline Landscape Resources Photo Record (Sheet 18 of 20)

Figure 10.2s         Baseline Landscape Resources Photo Record (Sheet 19 of 20)

Figure 10.2t          Baseline Landscape Resources Photo Record (Sheet 20 of 20)

Figure 10.3           Broad Brush Tree Survey Plan

Figure  10.4          Baseline Landscape Character Area within the Assessment Area

Figure 10.5a         Baseline Landscape Character Area Photo Record (Sheet 1 of 8)

Figure 10.5b         Baseline Landscape Character Area Photo Record (Sheet 2 of 8)

Figure 10.5c         Baseline Landscape Character Area Photo Record (Sheet 3 of 8)

Figure 10.5d         Baseline Landscape Character Area Photo Record (Sheet 4 of 8)

Figure 10.5e         Baseline Landscape Character Area Photo Record (Sheet 5 of 8)

Figure 10.5f          Baseline Landscape Character Area Photo Record (Sheet 6 of 8)

Figure 10.5g         Baseline Landscape Character Area Photo Record (Sheet 7 of 8)

Figure 10.5h         Baseline Landscape Character Area Photo Record (Sheet 8 of 8)

Figure 10.6           Zoning of the Site and  Surrounding Areas

Figure 10.7           Building Height Limits of the Proposed WKCD Development

Figure 10.8           Locations of VSRs Located within the Visual Envelope (Outside the Primary Zone of Visual Influence)

Figure 10.9           Aerial Photo of the Site

Figure 10.10         Zoning of Surrounding Areas & Location of VSRs Located within the Primary Zone of Visual Influence

Figure 10.11         Baseline VSRs Located on Hong Kong Island

Figure 10.12a       Baseline VSR 1 to VSR 4

Figure 10.12b       Baseline VSR 5 to VSR 8

Figure 10.12c       Baseline VSR 9 to VSR 12

Figure 10.12d       Baseline VSR 13 to VSR 17

Figure 10.12e       Baseline VSR 18 to VSR 21

Figure 10.12f        Baseline VSR 22 to VSR 26

Figure 10.12g       Baseline VSR 27 to VSR 30

Figure 10.12h       Baseline VSR 31 to VSR 34

Figure 10.12i        Baseline VSR 35 to VSR 38

Figure 10.12j        Baseline VSR 39 to VSR 42

Figure 10.12k       Baseline VSR 43

Figure 10.13         Location Plan of the 10 Selected Viewpoints for the Photomontages

Figure 10.13a       Photomontages 1A & 1B Viewpoint 1 (Sun Yat Sen Memorial Park)

Figure 10.13b       Photomontages 1C & 1D Viewpoint 1 (Sun Yat Sen Memorial Park)

Figure 10.14a       Photomontages 2A & 2B Viewpoint 2 (Central Star Ferry Pier No. 7)

Figure 10.14b       Photomontages 2C & 2D Viewpoint 2 (Central Star Ferry Pier No. 7)

Figure 10.15a       Photomontages 3A & 3B Viewpoint 3 (Hong Kong Convention and Exhibition Centre)

Figure 10.15b       Photomontages 3C & 3D Viewpoint 3 (Hong Kong Convention and Exhibition Centre)

Figure 10.16a       Photomontages 4A & 4B Viewpoint 4 (The Peak)

Figure 10.16b       Photomontages 4C & 4D Viewpoint 4 (The Peak)

Figure 10.17a       Photomontages 5A & 5B Viewpoint 5 (Hoi Fei Road Waterfront)

Figure 10.17b       Photomontages 5C & 5D Viewpoint 5 (Hoi Fei Road Waterfront)

Figure 10.18a       Photomontages 6A & 6B Viewpoint 9 (The Elements)

Figure 10.18b       Photomontages 6C & 6D Viewpoint 9 (The Elements)

Figure 10.19a       Photomontages 7A & 7B Viewpoint 19 (Western Harbour Crossing Toll Plaza)

Figure 10.19b       Photomontages 7C & 7D Viewpoint 19 (Western Harbour Crossing Toll Plaza)

Figure 10.20a       Photomontages 8A & 8B Viewpoint 19 (Wai On Building & Wai Hang Building)

Figure 10.20b       Photomontages 8C & 8D Viewpoint 19 (Wai On Building & Wai Hang Building)

Figure 10.21a       Photomontages 9A & 9B Viewpoint 26 (Gateway Hong Kong)

Figure 10.21b       Photomontages 9C & 9D Viewpoint 26 (Gateway Hong Kong)

Figure 10.22a       Photomontages 10A & 10B Viewpoint 31 (Ocean Terminal)

Figure 10.22b       Photomontages 10C & 10D Viewpoint 31 (Ocean Terminal)

Figure 10.23         Location of the Temporary Landscaped Area

Figure 10.24         Location of Proposed Wind Turbines

Figure 10.25a       Site Section and Building Height Profile

Figure 10.25b       Stepped Height Profile of the WKCD development & S Curve Concept

Figure 10.26a       Good Design Feature – Visual Permeability

Figure 10.26b       Artist’s Impression of View from WKT

Figure 10.26c       Artist’s Impression of View Corridor along an Alleyway

Figure 10.26d       Artist’s Impression of View from Central Square

Figure 10.27a       Proposed Landscape Concept Plan

Figure 10.27b       Landscape Concept Plan for Park

Figure 10.27c       Landscape Concept for Park - Section 01 and Section 02

Figure 10.27d       Landscape Concept for Waterfront Promenade

Figure 10.27e       Landscape Concept for Waterfront Promenade - Section A – A

Figure 10.27f        Landscape Concept for the Avenue

Figure 10.27g       Landscape Concept for Landscape Deck Connecting WKT

Figure 10.27h       Landscape Concept for Austin Road West Section A – A

Figure 10.28         Artist’s Impression of Aerial View

 

Figure 14.1.1        Project Layout

Figure 14.2.1        Detailed WKCD Basement Layout

Figure 14.2.2a     Road C Alignment And Setting Out Data (Sheet 1 of 4)

Figure 14.2.2b     Road C Alignment And Setting Out Data (Sheet 2 of 4)

Figure 14.2.2c      Road C Alignment And Setting Out Data (Sheet 3 of 4)

Figure 14.2.2d     Road C Alignment And Setting Out Data (Sheet 4 of 4)

Figure 14.2.2e     Interim Road C4 – Layout Plan and Profile

Figure 14.2.2f      Road C1 – Road Profile

Figure 14.2.2g     Road C2 – Road Profile

Figure 14.2.2h     Road C3 – Road Profile (Sheet 1 of 2)

Figure 14.2.2i       Road C3 – Road Profile (Sheet 2 of 2)

Figure 14.2.2j       Road C5 – Road Profile

Figure 14.5.1        Locations of Water Control Zones

Figure 14.5.2        Locations of Key Water Sensitive Receivers

Figure 14.9.1        Habitat Map

Figure 14.9.2        Transect Route for Ecological Survey

Figure 14.10.1     Baseline Landscape Resources within the Assessment Area of Underpass Road

Figure 14.10.2     (not used)

Figure 14.10.3a   Baseline Landscape Resources Photo Record (Sheet 1 of 15)

Figure 14.10.3b   Baseline Landscape Resources Photo Record (Sheet 2 of 15)

Figure 14.10.3c   Baseline Landscape Resources Photo Record (Sheet 3 of 15)

Figure 14.10.3d   Baseline Landscape Resources Photo Record (Sheet 4 of 15)

Figure 14.10.3e   Baseline Landscape Resources Photo Record (Sheet 5 of 15)

Figure 14.10.3f    Baseline Landscape Resources Photo Record (Sheet 6 of 15)

Figure 14.10.3g   Baseline Landscape Resources Photo Record (Sheet 7 of 15)

Figure 14.10.3h   Baseline Landscape Resources Photo Record (Sheet 8 of 15)

Figure 14.10.3i    Baseline Landscape Resources Photo Record (Sheet 9 of 15)

Figure 14.10.3j    Baseline Landscape Resources Photo Record (Sheet 10 of 15)

Figure 14.10.3k   Baseline Landscape Resources Photo Record (Sheet 11 of 15)

Figure 14.10.3l    Baseline Landscape Resources Photo Record (Sheet 12 of 15)

Figure 14.10.3m  Baseline Landscape Resources Photo Record (Sheet 13 of 15)

Figure 14.10.3n   Baseline Landscape Resources Photo Record (Sheet 14 of 15)

Figure 14.10.3o   Baseline Landscape Resources Photo Record (Sheet 15 of 15)

Figure 14.10.4     Broad Brush Tree Survey Plan

Figure 14.10.5     Baseline Landscape Character Area within the Assessment Area of Underpass Road

Figure 14.10.6     (not used)

Figure 14.10.7a   Baseline Landscape Character Area Photo Record (Sheet 1 of 8)

Figure 14.10.7b   Baseline Landscape Character Area Photo Record (Sheet 2 of 8)

Figure 14.10.7c   Baseline Landscape Character Area Photo Record (Sheet 3 of 8)

Figure 14.10.7d   Baseline Landscape Character Area Photo Record (Sheet 4 of 8)

Figure 14.10.7e   Baseline Landscape Character Area Photo Record (Sheet 5 of 8)

Figure 14.10.7f    Baseline Landscape Character Area Photo Record (Sheet 6 of 8)

Figure 14.10.7g   Baseline Landscape Character Area Photo Record (Sheet 7 of 8)

Figure 14.10.7h   Baseline Landscape Character Area Photo Record (Sheet 8 of 8)

Figure 14.10.8     Locations of VSRs located within the Primary Zone of Visual Influence

Figure 14.10.9a   Photos of VSR 1 to VSR 4

Figure 14.10.9b   Photos of VSR 5 to VSR 9

Figure 14.10.9c   Photos of VSR 10 to VSR 11

Figure 14.10.9d   Photos of VSR 12 to VSR 16

Figure 14.10.9e   Photos of VSR 18 to VSR 21

Figure 14.10.10   Location of Ventilation Exhaust/ Shaft for Underpass Road during Transition Period

Figure 14.10.11   Section of Completed Buildings and Ventilation Shafts for Underpass Road during Transition Period

Figure 14.10.12   Locations and Sections of Notional Louvres within the Buildings at the WKCD

Figure 14.10.13a Photomontages 1A & 1B - Viewpoint 14 (Gateway Tower)

Figure 14.10.13b Photomontages 1C & 1D - Viewpoint 14 (Gateway Tower)

Figure 14.10.14   List of Landscape Mitigation Measure for Underpass Road

Figure 14.10.15   Proposed Landscape Concept Plan

Figure 14.10.16   Landscape Concept Plan for Park

Figure 14.10.17   Landscape Concept for the Avenue

Figure 14.10.18   Landscape Concept for Landscape Deck Connecting WKT

 

Figure 15.1.1        Project Layout

Figure 15.2.1        Proposed Austin Road Flyover Profile of Layout Plan (Sheet 1 of 4)

Figure 15.2.2        Proposed Austin Road Flyover Profile of Layout Plan (Sheet 2 of 4)

Figure 15.2.3        Proposed Austin Road Flyover Profile of Layout Plan (Sheet 3 of 4)

Figure 15.2.4        Proposed Austin Road Flyover Profile of Layout Plan (Sheet 4 of 4)

Figure 15.3.1        Locations of Air Sensitive Receivers (outside WKCD Site)

Figure 15.3.2        Locations of Air Sensitive Receivers (within WKCD Site)

Figure 15.4.1        Locations of Noise Sensitive Receivers for Flyover

Figure 15.5.1        Locations of Water Control Zones

Figure 15.5.2        Locations of Key Water Sensitive Receivers

Figure 15.9.1        Habitat Map

Figure 15.9.2        Transect Route for Ecological Survey

Figure 15.10.1     Baseline Landscape Resources within the Assessment Area of Austin Road Flyover

Figure 15.10.2     (not used)

Figure 15.10.3a   Baseline Landscape Resources Photo Record (Sheet 1 of 6)

Figure 15.10.3b   Baseline Landscape Resources Photo Record (Sheet 2 of 6)

Figure 15.10.3c   Baseline Landscape Resources Photo Record (Sheet 3 of 6)

Figure 15.10.3d   Baseline Landscape Resources Photo Record (Sheet 4 of 6)

Figure 15.10.3e   Baseline Landscape Resources Photo Record (Sheet 5 of 6)

Figure 15.10.3f    Baseline Landscape Resources Photo Record (Sheet 6 of 6)

Figure 15.10.4     Broad Brush Tree Survey Plan

Figure 15.10.5     Baseline Landscape Character Area within the Assessment Area of Austin Road Flyover

Figure 15.10.6     (not used)

Figure 15.10.7a   Baseline Landscape Character Area Photo Record (Sheet 1 of 6)

Figure 15.10.7b   Baseline Landscape Character Area Photo Record (Sheet 2 of 6)

Figure 15.10.7c   Baseline Landscape Character Area Photo Record (Sheet 3 of 6)

Figure 15.10.7d   Baseline Landscape Character Area Photo Record (Sheet 4 of 6)

Figure 15.10.7e   Baseline Landscape Character Area Photo Record (Sheet 5 of 6)

Figure 15.10.7f    Baseline Landscape Character Area Photo Record (Sheet 6 of 6)

Figure 15.10.8     Locations of the VSRs located within the Primary Zone of Visual Influence

Figure 15.10.9     Photos of VSR 1 to VSR 4

Figure 15.10.10   Photos of VSR 5 to VSR 8

Figure 15.10.11a Photomontages 1A & 1B - Viewpoint 1 (International Commerce Centre at Podium Level)

Figure 15.10.11b Photomontages 1C & 1D - Viewpoint 1 (International Commerce Centre at Podium Level)

Figure 15.10.12a Photomontages 2A & 2B - Viewpoint 5 (Western Harbour Crossing Toll Plaza)

Figure 15.10.12b Photomontages 2C & 2D - Viewpoint 5 (Western Harbour Crossing Toll Plaza)

Figure 15.10.13a Photomontages 3A & 3B - Viewpoint 6 (Pedestrian at the Footbridge Crossing Western Harbour Crossing Toll Plaza)

Figure 15.10.13b Photomontages 3C & 3D - Viewpoint 6 (Pedestrian at the Footbridge crossing Western Harbour Crossing Toll Plaza)

Figure 15.10.14   List of Landscape Mitigation Measures for Austin Road Flyover

Figure 15.10.15   Proposed Landscape Concept Plan

Figure 15.10.16   Landscape Concept Plan for Park

Figure 15.10.17   Landscape Concept for Austin Road West Section A – A

 

 


Appendices

Appendix 2.1        Summary of Desirable Features for Consideration in Modified CP

Appendix 2.2        Changes to the Findings of the Preliminary Environmental Assessment arising from the Modified Conceptual Plan

Appendix 2.3        Summary of Views Received in Stage 3 PE Exercise

Appendix 2.4        Tentative Construction Programme

 

Appendix 3.1        Details of Dust Emission Sources for 1-hour and Daily TSP Assessment (Tier 1) from Year 2013 – 2020

Appendix 3.2        Details of Dust Emission Sources for 1-hour and Daily TSP Assessment (Tier 2) from Year 2015 – 2020

Appendix 3.3        Details of Dust Emission Sources for Annual TSP Assessment from Year 2013 – 2020

Appendix 3.4        Data Input of Tier 1 Dust Sources for Unmitigated and Mitigated Scenario including their Coordinates, Dimensions and Estimated Emission Rates

Appendix 3.5        Data Input of Tier 2 Dust Sources including their Coordinates, Dimensions and Estimated Emission Rates

Appendix 3.6        Data Input of Annual Dust Sources for Unmitigated and Mitigated Scenario including their Coordinates, Dimensions and Estimated Emission Rates

Appendix 3.7        Detailed Estimation of the Percentages Active Work Areas

Appendix 3.8        Calculation of Dust Suppression Efficiency

Appendix 3.9        Letter from Traffic Department regarding Traffic Forecast Data

Appendix 3.10     24-Hour Traffic Pattern

Appendix 3.11     Vehicle Age Distribution in Base Year 2010

Appendix 3.12     Lengths of Individual Road Links of Connecting Road

Appendix 3.13     24-hour VKT values for All Vehicle Classes in each of the Model years 2015, 2020, 2025 and 2030

Appendix 3.14     Trip Estimation

Appendix 3.15     24-hour variations of Annual Averages of Temperature and Relative Humidity

Appendix 3.16     24-hour speed fractions

Appendix 3.17     Calculation of Emission Factors for Each Model Year

Appendix 3.18a   Calculation of emission rate for scenario 1 through portal for ISCST3 model input (for 2015 traffic forecast)

Appendix 3.18b   Calculation of emission rate for scenario 2 through portal for ISCST3 model input (for 2015 traffic forecast)

Appendix 3.18c   Calculation of emission rate for scenario 3 through portal for ISCST3 model input (for 2015 traffic forecast)

Appendix 3.18d   Calculation of emission rate for scenario 4 through portal for ISCST3 model input (for 2015 traffic forecast)

Appendix 3.18e   Calculation of emission rate for scenario 1 through stack for ISCST3 model input (for 2015 traffic forecast)

Appendix 3.18f    Calculation of emission rate for scenario 2 through stack for ISCST3 model input (for 2015 traffic forecast)

Appendix 3.18g   Calculation of emission rate for scenario 3 through stack for ISCST3 model input (for 2015 traffic forecast)

Appendix 3.18h   Calculation of emission rate for scenario 4 through stack for ISCST3 model input (for 2015 traffic forecast)

Appendix 3.19     Calculation of emission rate for scenario 1 through stack for ISCST3 model input (for 2020 traffic forecast)

Appendix 3.20     Summary data for EPD's WKCD air quality monitoring station

Appendix 3.21     (not used)

Appendix 3.22     (not used)

Appendix 3.23     Composition Emission factor in Year 2015

Appendix 3.24     Composition Emission factor in Year 2020

Appendix 3.25     Marine emission calculations

Appendix 3.26a   Odour Patrol Report

Appendix 3.26b   Report on Expert Review of New Yau Ma Tei Typhoon Shelter (NYMTTS) Odour Source Measurement

Appendix 3.26c   Estimation of Odour Emission Rates

Appendix 3.27     XRL EM&A TSP monitoring data

Appendix 3.28     Tier 1 TSP Screening Results for Unmitigated and Mitigated Scenarios including Background Contribution

Appendix 3.29     Tier 2 TSP Results for Mitigated Scenario including Background Contribution

Appendix 3.30     Annual TSP Results for Unmitigated and Mitigated Scenarios including Background Contribution

Appendix 3.31     Modelling results for SO2, NO2 and RSP during operation phase (for traffic forecast and background concentrations in 2015)

Appendix 3.32     Modelling results for NO2 during operation phase (for traffic forecast and background concentrations in 2020)

Appendix 3.33     Estimation of Odour Emission Reduction by Improvement of DWFI Interception Efficiency

Appendix 3.34     Estimated Odour Emission Rates for Background, Current, Mitigated Scenario A and Mitigated Scenario B

Appendix 3.35     Odour Modelling Results for Background, Current, Mitigated Scenario A and Mitigated Scenario B

Appendix 3.36     Review of Government’s Existing and Planned Measures for New Yau Ma Tei Typhoon Shelter

 

 

Appendix 4.1        Measured Background Noise Levels

Appendix 4.1a     Methodology of identification of Sound Power Levels for Existing Fixed Plant Noise Sources

Appendix 4.1b     Measurement Results and Calculation of Sound Power Levels for Existing Noise Sources adopted in the Fixed Plant Noise Impact Assessment

Appendix 4.1c      Measurement Locations for Sound Power Levels of Existing Fixed Plant Noise Sources (Sheet 1 of 2)

Appendix 4.1d     Measurement Locations for Sound Power Levels of Existing Fixed Plant Noise Sources (Sheet 2 of 2)

Appendix 4.2a     Peak Hour Traffic Forecast

Appendix 4.2b     Key Plan for WKCD External Road Links 2032

Appendix 4.2c      Key Plan for WKCD Internal Road Links 2032

Appendix 4.2d     Key Plan for WKCD External Road Links 2032 without Project

Appendix 4.2e     Key Plan for WKCD External Road Links 2013 (Prevailing Scenario)

Appendix 4.2f      Letter from Traffic Department regarding Traffic Forecast Data

Appendix 4.3a     Details for Helicopter Noise Assessment

Appendix 4.3b     Details for Helicopter Noise Measurement

Appendix 4.4a     Unmitigated Construction Plant Inventory and Noise Impact in Year 2013 and 2014

Appendix 4.4b     Unmitigated Construction Plant Inventory and Noise Impact in Year 2014 and 2015

Appendix 4.4c      Unmitigated Construction Plant Inventory and Noise Impact in Year 2015 and 2016

Appendix 4.4d     Unmitigated Construction Plant Inventory and Noise Impact in Year 2016 and 2017

Appendix 4.4e     Unmitigated Construction Plant Inventory and Noise Impact in Year 2017 and 2018

Appendix 4.4f      Unmitigated Construction Plant Inventory and Noise Impact in Year 2018 and 2019

Appendix 4.4g     Unmitigated Construction Plant Inventory and Noise Impact in Year 2019 and 2020

Appendix 4.4h     Unmitigated Construction Plant Inventory and Noise Impact in Year 2020

Appendix 4.4i       Unmitigated Construction Plant Inventory and Noise Impact in Year 2021 and after

Appendix 4.5a     Unmitigated Road Traffic Noise Impact (Year 2032) – Interim Access at Austin Road West

Appendix 4.5b     Unmitigated Road Traffic Noise Impact (Year 2032) – Permanent Access at Canton Road

Appendix 4.5c      Unmitigated Road Traffic Noise Impact (Year 2032 – without Project)

Appendix 4.5d     Prevailing Road Traffic Noise Impact (Year 2013)

Appendix 4.5e     Layout of Road Plots

Appendix 4.5f      Sample Calculations of Road Traffic Noise Modelling

Appendix 4.6        Fixed Plant Noise Assessment

Appendix 4.7a     Open Air Entertainment Activity Noise Assessment

Appendix 4.7b     Measurement Details for Open Air Entertainment Activity Noise from Music Concert conducted in WKCD in October 2011

Appendix 4.8        Railway Ground-borne Noise Impact Assessment

Appendix 4.9        Marine Traffic Noise Impact Assessment

Appendix 4.10a   Mitigated Construction Plant Inventory and Noise Impact in Year 2013 and 2014

Appendix 4.10b   Mitigated Construction Plant Inventory and Noise Impact in Year 2014 and 2015

Appendix 4.10c   Mitigated Construction Plant Inventory and Noise Impact in Year 2015 and 2016

Appendix 4.10d   Mitigated Construction Plant Inventory and Noise Impact in Year 2016 and 2017

Appendix 4.10e   Mitigated Construction Plant Inventory and Noise Impact in Year 2017 and 2018

Appendix 4.10f    Mitigated Construction Plant Inventory and Noise Impact in Year 2018 and 2019

Appendix 4.10g   Mitigated Construction Plant Inventory and Noise Impact in Year 2019 and 2020

Appendix 4.10h   Mitigated Construction Plant Inventory and Noise Impact in Year 2020

Appendix 4.10i    Mitigated Construction Plant Inventory and Noise Impact in Year 2020 and after

Appendix 4.11     Geological Information of WKCD

Appendix 4.12     Trackform Information of AEL/TCL at WKCD

 

Appendix 5.1        Delft3D Model Setup

Appendix 5.2        Predicted Temperature Elevation at Surface Water (Dry Season & Wet Season)

Appendix 5.3        Predicted Depth-averaged Residual Chlorine Concentration (Dry Season & Wet Season)

 

Appendix 6.1        Sewerage Catchment Plan for the sewer at Canton Road

Appendix 6.2        Hydraulic Assessment for Existing and Proposed Sewerage System

Appendix 6.3        Breakdown of Sewage Flow Estimation at Upstream of Canton Road

 

Appendix 7.1        Relevant drillholes at various Zones and  ground investigation records for Zone 1

Appendix 7.2        Previous site investigation records for Zone 2a

Appendix 7.3        Previous site investigation records for Zone 2b

Appendix 7.4        Previous site investigation records for Zones 3 and 4

Appendix 7.5       Copies of relevant correspondences with potential projects

 

Appendix 8.1        Contamination Assessment Plan for WKCD

 

Appendix 9.1        Plates

Appendix 9.2        List of Avifauna recorded within the Study Area

 

Appendix 12.1     Documentation of Key Assessment Assumptions, Limitation of Assessment Methodologies and related Prior Agreement(s) with the Director

 

Appendix 14.4.1  Unmitigated Road Traffic Noise Impact (Year 2032) – Interim Access at Austin Road West

Appendix 14.4.2  Unmitigated Road Traffic Noise Impact (Year 2032) – Permanent Access at Canton Road

Appendix 14.4.3  Unmitigated Road Traffic Noise Impact (Year 2032 – without Project)

 

Appendix 15.4.1  Unmitigated Road Traffic Noise Impact (Year 2032) – Interim Access at Austin Road West

Appendix 15.4.2  Unmitigated Road Traffic Noise Impact (Year 2032) – Permanent Access at Canton Road

Appendix 15.4.3  Unmitigated Road Traffic Noise Impact (Year 2032 – without Project)

Appendix 15.4.4  Peak Hour Flow (2032) – without Proposed Flyover