Table of Contents

 

Volume 1

Main Text

 

Volume 2              List of Figures

Figure 2.1

Proposed Works in Cheung Chau

Figure 2.2

Proposed General Layout of Cheung Chau STW

Figure 2.3

Cheung Chau Sewerage System Alternatives to KYW SPS - Deep Sewer Option

Figure 2.4

Schematic Flow Diagram of Upgraded Cheung Chau STW

Figure 2.5

Layout Plan of Emergency Outfall of Pak She SPS

Figure 3.1

Air Sensitive Receivers (Sheet 1 of 15)

Figure 3.2

Air Sensitive Receivers (Sheet 2 of 15)

Figure 3.3

Air Sensitive Receivers (Sheet 3 of 15)

Figure 3.4

Air Sensitive Receivers (Sheet 4 of 15)

Figure 3.5

Air Sensitive Receivers (Sheet 5 of 15)

Figure 3.6

Air Sensitive Receivers (Sheet 6 of 15)

Figure 3.7

Air Sensitive Receivers (Sheet 7 of 15)

Figure 3.8

Air Sensitive Receivers (Sheet 8 of 15)

Figure 3.9

Air Sensitive Receivers (Sheet 9 of 15)

Figure 3.10

Air Sensitive Receivers (Sheet 10 of 15)

Figure 3.11

Air Sensitive Receivers (Sheet 11 of 15)

Figure 3.12

Air Sensitive Receivers (Sheet 12 of 15)

Figure 3.13

Air Sensitive Receivers (Sheet 13 of 15)

Figure 3.14

Air Sensitive Receivers (Sheet 14 of 15)

Figure 3.15

Air Sensitive Receivers (Sheet 15 of 15)

Figure 3.16

Air Sensitive Receivers Key Plan

Figure 3.17

Location of Proposed Concrete Batching Plant and Emission Sources at Cheung Chau STW

Figure 3.18

Contour Plot of 1-Hour TSP Concentration in µg/m3 at 1.5m above ground (Unmitigated)

Figure 3.19

Contour Plot of 1-Hour TSP Concentration in µg/m3 at 5m above ground (Unmitigated)

Figure 3.20

Contour Plot of 1-Hour TSP Concentration in µg/m3 at 10m above ground (Unmitigated)

Figure 3.21

Contour Plot of 1-Hour TSP Concentration in µg/m3 at 15m above ground (Unmitigated)

Figure 3.22

Contour Plot of 1-Hour TSP Concentration in µg/m3 at 20m above ground (Unmitigated)

Figure 3.23

Contour Plot of 1-Hour TSP Concentration in µg/m3 at 25m above ground (Unmitigated)

Figure 3.24

Contour Plot of 24-Hour TSP Concentration in µg/m3 at 1.5m above ground (Unmitigated)

Figure 3.25

Contour Plot of 24-Hour TSP Concentration in µg/m3 at 5m above ground (Unmitigated)

Figure 3.26

Contour Plot of 24-Hour TSP Concentration in µg/m3 at 10m above ground (Unmitigated)

Figure 3.27

Contour Plot of 24-Hour TSP Concentration in µg/m3 at 15m above ground (Unmitigated)

Figure 3.28

Contour Plot of 24-Hour TSP Concentration in µg/m3 at 20m above ground (Unmitigated)

Figure 3.29

Contour Plot of 24-Hour TSP Concentration in µg/m3 at 25m above ground (Unmitigated)

Figure 3.30

Contour Plot of Annual TSP Concentration in µg/m3 at 1.5m above ground (Unmitigated)

Figure 3.31

Contour Plot of Annual TSP Concentration in µg/m3 at 5m above ground (Unmitigated)

Figure 3.32

Contour Plot of Annual TSP Concentration in µg/m3 at 10m above ground (Unmitigated)

Figure 3.33

Contour Plot of Annual TSP Concentration in µg/m3 at 15m above ground (Unmitigated)

Figure 3.34

Contour Plot of Annual TSP Concentration in µg/m3 at 20m above ground (Unmitigated)

Figure 3.35

Contour Plot of Annual TSP Concentration in µg/m3 at 25m above ground (Unmitigated)

Figure 3.36

Contour Plot of 1-Hour TSP Concentration in µg/m3 at 1.5m above ground (Mitigated)

Figure 3.37

Contour Plot of 1-Hour TSP Concentration in µg/m3 at 5m above ground (Mitigated)

Figure 3.38

Contour Plot of 1-Hour TSP Concentration in µg/m3 at 10m above ground (Mitigated)

Figure 3.39

Contour Plot of 1-Hour TSP Concentration in µg/m3 at 15m above ground (Mitigated)

Figure 3.40

Contour Plot of 1-Hour TSP Concentration in µg/m3 at 20m above ground (Mitigated)

Figure 3.41

Contour Plot of 1-Hour TSP Concentration in µg/m3 at 25m above ground (Mitigated)

Figure 3.42

Contour Plot of 24-Hour TSP Concentration in µg/m3 at 1.5m above ground (Mitigated)

Figure 3.43

Contour Plot of 24-Hour TSP Concentration in µg/m3 at 5m above ground (Mitigated)

Figure 3.44

Contour Plot of 24-Hour TSP Concentration in µg/m3 at 10m above ground (Mitigated)

Figure 3.45

Contour Plot of 24-Hour TSP Concentration in µg/m3 at 15m above ground (Mitigated)

Figure 3.46

Contour Plot of 24-Hour TSP Concentration in µg/m3 at 20m above ground (Mitigated)

Figure 3.47

Contour Plot of 24-Hour TSP Concentration in µg/m3 at 25m above ground (Mitigated)

Figure 3.48

Contour Plot of Annual TSP Concentration in µg/m3 at 1.5m above ground (Mitigated)

Figure 3.49

Contour Plot of Annual TSP Concentration in µg/m3 at 5m above ground (Mitigated)

Figure 3.50

Contour Plot of Annual TSP Concentration in µg/m3 at 10m above ground (Mitigated)

Figure 3.51

Contour Plot of Annual TSP Concentration in µg/m3 at 15m above ground (Mitigated)

Figure 3.52

Contour Plot of Annual TSP Concentration in µg/m3 at 20m above ground (Mitigated)

Figure 3.53

Contour Plot of Annual TSP Concentration in µg/m3 at 25m above ground (Mitigated)

Figure 3.54

Potential Odour Sources Identified in the Pak She SPS

Figure 3.55

Contour Plot of 5-second Odour concentration in OU unit at 1.5m above ground (Unmitigated)

Figure 3.56

Contour Plot of 5-second Odour concentration in OU unit at 5m above ground (Unmitigated)

Figure 3.57

Contour Plot of 5-second Odour concentration in OU unit at 10m above ground (Unmitigated)

Figure 3.58

Contour Plot of 5-second Odour concentration in OU unit at 15m above ground (Unmitigated)

Figure 3.59

Contour Plot of 5-second Odour concentration in OU unit at 20m above ground (Unmitigated)

Figure 3.60

Contour Plot of 5-second Odour concentration in OU unit at 25m above ground (Unmitigated)

Figure 3.61

Contour Plot of 5-second Odour concentration in OU unit at 1.5m above ground (Mitigated)

Figure 3.62

Contour Plot of 5-second Odour concentration in OU unit at 5m above ground (Mitigated)

Figure 3.63

Contour Plot of 5-second Odour concentration in OU unit at 10m above ground (Mitigated)

Figure 3.64

Contour Plot of 5-second Odour concentration in OU unit at 15m above ground (Mitigated)

Figure 3.65

Contour Plot of 5-second Odour concentration in OU unit at 20m above ground (Mitigated)

Figure 3.66

Contour Plot of 5-second Odour concentration in OU unit at 25m above ground (Mitigated)

Figure 4.1

Location of Background Noise Measurement

Figure 4.2

Noise Sensitive Receivers (Sheet 1 of 14)

Figure 4.3

Noise Sensitive Receivers (Sheet 2 of 14)

Figure 4.4

Noise Sensitive Receivers (Sheet 3 of 14)

Figure 4.5

Noise Sensitive Receivers (Sheet 4 of 14)

Figure 4.6

Noise Sensitive Receivers (Sheet 5 of 14)

Figure 4.7

Noise Sensitive Receivers (Sheet 6 of 14)

Figure 4.8

Noise Sensitive Receivers (Sheet 7 of 14)

Figure 4.9

Noise Sensitive Receivers (Sheet 8 of 14)

Figure 4.10

Noise Sensitive Receivers (Sheet 9 of 14)

Figure 4.11

Noise Sensitive Receivers (Sheet 10 of 14)

Figure 4.12

Noise Sensitive Receivers (Sheet 11 of 14)

Figure 4.13

Noise Sensitive Receivers (Sheet 12 of 14)

Figure 4.14

Noise Sensitive Receivers (Sheet 13 of 14)

Figure 4.15

Noise Sensitive Receivers (Sheet 14 of 14)

Figure 4.16

Cheung Chau Sewage Treatment Works Location of Operational Fixed Plant Noise Source

Figure 5.1

Water Sensitive Receivers

Figure 5.1a

Layout Plan of Submarine Outfall and Emergency Outfall of Cheung Chau STW

Figure 5.2

Model Output Locations

Figure 7.1

Potential Contaminated Site

Figure 7.2

Year 1924 Aerial Photo Photo No: 16

Figure 7.3

Year 1977 Aerial Photo Photo No: 18327

Figure 7.4

Year 1980 Aerial Photo Photo No: 29188

Figure 7.5

Year 1984 Aerial Photo Photo No: 57247

Figure 7.6

Year 1990 Aerial Photo Photo No: A20681

Figure 7.7

Year 1996 Aerial Photo Photo No: A43432

Figure 7.8

Year 2011 Aerial Photo Photo Nos: CW89340 & CW89559

Figure 8.1

Site of Conservation Importance within Southern Water Control Zone

Figure 8.2

Distribution of Finless Porpoise Sightings in Marine Ecological Assessment Area in 2012-2013

Figure 9.1

Distribution of Adult Fish Production

Figure 9.2

Distribution of Fish Fry Production

Figure 9.3

The Value of Fisheries Production

Figure 9.4

Zones for Culture Fisheries in Hong Kong

Figure 9.5

Important Spawning Ground for Commercial Species in Hong Kong

Figure 9.6

Important Nursery Ground for Commercial Species in Hong Kong

Figure 10.1

Location of Site of Archaeological Interest - Key Plan

Figure 10.2

Location of Tung Wan Site of Archaeological Interest and Cheung Chau Rock Carving

Figure 10.3

Location of Tai Kwai Wan Site of Archaeological Interest

Figure 10.4

Location of Sai Wan Site of Archaeological Interest

Figure 10.5

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 1 of 15)

Figure 10.6

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 2 of 15)

Figure 10.7

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 3 of 15)

Figure 10.8

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 4 of 15)

Figure 10.9

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 5 of 15)

Figure 10.10

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 6 of 15)

Figure 10.11

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 7 of 15)

Figure 10.12

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 8 of 15)

Figure 10.13

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 9 of 15)

Figure 10.14

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 10 of 15)

Figure 10.15

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 11 of 15)

Figure 10.16

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 12 of 15)

Figure 10.17

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 13 of 15)

Figure 10.18

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 14 of 15)

Figure 10.19

Assessment of Archaeological Potential within Project in Cheung Chau (Sheet 15 of 15)

Figure 10.20

Location of Built Heritage Resources (Sheet 1 of 15)

Figure 10.21

Location of Built Heritage Resources (Sheet 2 of 15)

Figure 10.22

Location of Built Heritage Resources (Sheet 3 of 15)

Figure 10.23

Location of Built Heritage Resources (Sheet 4 of 15)

Figure 10.24

Location of Built Heritage Resources (Sheet 5 of 15)

Figure 10.25

Location of Built Heritage Resources (Sheet 6 of 15)

Figure 10.26

Location of Built Heritage Resources (Sheet 7 of 15)

Figure 10.27

Location of Built Heritage Resources (Sheet 8 of 15)

Figure 10.28

Location of Built Heritage Resources (Sheet 9 of 15)

Figure 10.29

Location of Built Heritage Resources (Sheet 10 of 15)

Figure 10.30

Location of Built Heritage Resources (Sheet 11 of 15)

Figure 10.31

Location of Built Heritage Resources (Sheet 12 of 15)

Figure 10.32

Location of Built Heritage Resources (Sheet 13 of 15)

Figure 10.33

Location of Built Heritage Resources (Sheet 14 of 15)

Figure 10.34

Location of Built Heritage Resources (Sheet 15 of 15)

Figure 11.1

Location of Landscape Resource

Figure 11.2

Location of Landscape Character Areas

Figure 11.3

Location of Visually Sensitive Receivers and Visual Envelop

Figure 11.4

Photo of Landscape Resources, Landscape Character Areas and Visually Sensitive Receivers (Sheet 1 of 3)

Figure 11.5

Photo of Landscape Resources, Landscape Character Areas and Visually Sensitive Receivers (Sheet 2 of 3)

Figure 11.6

Photo of Landscape Resources, Landscape Character Areas and Visually Sensitive Receivers (Sheet 3 of 3)

Figure 11.7

Photomontage of the Proposed Cheung Chau STW (View from VSR1)

Figure 11.8

Photomontage of the Proposed Cheung Chau STW (View from VSR2)

Figure 11.9

Photomontage of the Proposed Cheung Chau STW (View from VSR3)

Figure 11.10

Photomontage of the Proposed Cheung Chau STW (View from VSR4)

Figure 11.11

Photomontage of the Proposed Cheung Chau STW (View from VSR5)

 


Volume 3             List of Appendices

Appendix 3.1       Odour Survey Results

Appendix 3.2       TSP Emissions Factors Calculations

Appendix 3.3       TSP Modelling Output File Sample

Appendix 3.4       Odour Emissions Factors Calculations

Appendix 3.5       Odour Modelling Output File Sample

Appendix 3.6       Correspondences with Interfacing Projects

Appendix 4.1       Construction Plant Inventory – Unmitigated Scenario

Appendix 4.2       Photographs of NSRs

Appendix 4.3       Detailed Calculation of Construction Noise Levels at Representative NSRs – Unmitigated Scenario

Appendix 4.4       Construction Plant Inventory – Mitigated Scenario

Appendix 4.5       Detailed Calculation of Construction Noise Levels at Representative NSRs – Mitigated Scenario

Appendix 4.6       Detailed Calculation of Construction Stage Noise Levels at Representative NSRs – Mitigated Scenario

Appendix 4.7       Detailed Calculation of Operation Noise Levels at Representative NSRs – Unmitigated Scenario

Appendix 4.8       Detailed Calculation of Operation Noise Levels at Representative NSRs – Mitigated Scenario

Appendix 5A        Details on Hydrodynamic and Water Quality Modelling

Appendix 5B        Pollution Loads Calculations

Appendix 5C        Output Figures from Water Quality Modelling

Appendix 7.1       Correspondences with Government Department for Potential Land Contamination Sites

Appendix 8.1       Ecological Baseline Survey Report

Appendix 10.1     Methodology for Archaeological Watching Brief

Appendix 10.2     Built Heritage Catalogue

Appendix 11.1     Existing Trees Conditions and Tree Schedule for the Trees at the Development Site Extracted from the Tree Survey Report under “Agreement No. CE 31/2007(DS) Upgrading of Cheung Chau and Tai O Sewage Collection, Treatment and Disposal Facilities – Investigation”

Appendix 11.2     Proposed Tree Planting Plan of Cheung Chau STW