Environmental Impact Assessment
Comprehensive Development and Wetland Protection
Near Yau
Mei San Tsuen
(Final Report)
Main Text
List of Figures
Figure
1-1........ Location of the Project
Site
Figure 1-2 Locations of Approved EIA Projects and
Adjacent Planned Development Sites
Figure
2-2 ....... Consideration of
Alternatives
Figure
2-3........ Option A Suburban Layout
Figure
2-4 ....... Master Layout Plan for
Option A (Suburban Layout)
Figure
2-5 ....... Option B Conformed
Layout
Figure
2-6 ....... Master Layout Plan for
Option B (Conformed Layout)
Figure
2-7 ....... Option C - Enhanced
Layout
Figure
2-8 ....... Master Layout Plan for
Option C (Enhanced Layout)
Figure
2-9 ....... Recommended Layout
Figure
2-10....... Master Layout Plan for
Recommended Layout
Figure
2-11....... Comparison of Existing
Configuration and the Proposed WRA
Figure
3-1........ Location of Air
Sensitive Receivers
Figure 3-2 Representative ASRs Selected for Construction Phase Air
Quality Assessment
Figure
3-3 Contour Plot of Unmitigated
Maximum Hourly TSP at Worst Hit Level at 5.5 mPD
Figure 3-4 Contour Plot of
Unmitigated Maximum Daily RSP at Worst Hit Level at 5.5 mPD
Figure 3-5 Contour Plot of
Unmitigated Annual Average RSP at Worst Hit Level at 5.7 mPD
Figure 3-6 Contour Plot of
Unmitigated Maximum Daily FSP at Worst Hit Level at 5.5 mPD
Figure 3-7 Contour Plot of
Unmitigated Annual Average FSP at Worst Hit Level at 5.7 mPD
Figure 3-8 Contour Plot of
Mitigated Maximum Hourly TSP at Worst Hit Level at 5.0 mPD
Figure 3-9 Contour Plot of
Mitigated Maximum Daily RSP at Worst Hit Level at 5.7 mPD
Figure 3-10 Contour Plot of
Mitigated Annual Average RSP at Worst Hit Level at 5.7 mPD
Figure 3-11 Contour Plot of
Mitigated Maximum Daily FSP at Worst Hit Level at 5.7 mPD
Figure 3-12 Contour Plot of
Mitigated Annual Average FSP at Worst Hit Level at 5.7 mPD
Figure
4-1........ Residential Planning
Applications near the Project Area
Figure
4-2A...... Assessment Points for
Construction Phase Noise Impacts
Figure
4-2b...... Photographs of NSRs
Selected for Construction Phase Noise Assessment (1 of 2)
Figure
4-2c....... Photographs of NSRs
Selected for Construction Phase Noise Assessment (2 of 2)
Figure
4-3........ Assessment Points For
Operational Phase Noise Impacts
Figure
4-4........ Construction Phasing
Plan
Figure
4-5........ Alignment Of Site Access & Haul Road
Figure
4-6........ Locations of Temporary
Construction Noise Barriers
Figure
4-6A Cross Sectional Diagrame
of Proposed Fixed Temporary Noise Barrier (1 of 2)
Figure 4-6B Cross Sectional Diagrame
of Proposed Fixed Temporary Noise Barrier (2 of 2)
Figure 4-8 Locations of Fixed Noise Source and Noise Measurement
Location at Nearby Village Houses
Figure
5-1C...... Additional Baseline Water Quality Sampling Between September 2012 and January 2013
Figure 5-2 Proposed Drainage System for Construction Stage
Figure 5-3 Proposed Drainage System
Figure
6-1........ Location Plan
Figure
6-2........ Proposed Sewer
Connection
Figure
6-3........ Proposed Ngau Tam Mei Trunk Sewerage
Figure 6-4 Proposed Interim Sewage Arrangement
Figure
8-1........ Project Area at Yau Mei San Tsuen and Adjacent Protected Areas and Egretries
Figure
8-2a....... Habitat Map within the
Project Area and Assessment Area
Figure 8-2b Habitat Map within the Project Area and
Assessment Area
Figure 8-3a ...... Transect and Surveyed Stream
Figure 8-3b ..... Transect and Surveyed Stream
Figure 8-4........ Fragmentation Impact on The Existing Habitat
Figure 8-5........ Proposed Layout of Wetland
Restoration Plan
Figure
8-6........ Proposed Temporary
Wetland Enhancement Area
Figure
10-1....... Potential Cultural
Heritage Resources
Figure
11-01..... Extract of Relevant OZPs
Figure
11-02A... Landscape Resources Plan
(Within Project Site)
Figure 11-02B Landscape Resource Plan (Outside Project
Site)
Figure
11-03..... Landscape Resource Views
On Site and Adjacent to Site (Sheet 1 of 3)
Figure
11-04 .... Landscape Resource Views
On Site and Adjacent to Site (Sheet 2 of 3)
Figure
11-05..... Landscape Resource Views
On Site and Adjacent to Site (Sheet 3 of 3)
Figure
11-06..... Landscape Character Area
Plan
Figure
11-07..... Landscape Character Area
Views
Figure
11-08..... Landscape Character Area
Views
Figure 11-09 Landscape Character Area Views
Figure
11-10..... Zone Of Visual Influence
and Visually Sensitive Receivers
Figure
11-11 .... Section Showing
Derivation of ZVI
Figure
11-12..... Existing VSR Views
(Sheet 1 of 6)
Figure
11-13 .... Existing VSR Views
(Sheet 2 of 6)
Figure
11-14..... Existing VSR Views
(Sheet 3 of 6)
Figure
11-15..... Existing VSR Views
(Sheet 4 of 6)
Figure
11-16..... Existing VSR Views
(Sheet 5 of 6)
Figure
11-17..... Existing VSR Views
(Sheet 6 of 6)
Figure
11-18..... Landscape and Visual
Mitigation Measures Plan
Figure
11-19..... Landscape and Visual
Mitigation Measures House Diagrams
Figure
11-20..... Landscape and Visual
Mitigation Measures Section A
Figure
11-21..... Landscape and Visual
Mitigation Measures Section B
Figure
11-22..... Landscape and Visual
Mitigation Measures Section C
Figure
11-23..... Landscape and Visual
Mitigation Measures Section D
Figure
11-24..... Landscape and Visual
Mitigation Measures Section E
Figure
11-25..... Landscape and Visual
Mitigation Measures Section F
Figure
11-26..... Landscape and Visual
Mitigation Measures Section G
Figure
11-27..... Landscape and Visual
Mitigation Measures Section H
Figure
11-28..... Residual Landscape
Resources Impacts during Construction
Figure
11-29A... Residual Landscape
Resources Impacts during Operation (Day 1)
Figure
11-29B... Residual Landscape
Resources Impacts during Operation (Year 10)
Figure
11-30..... Residual Landscape
Character Impacts during Construction
Figure
11-31A... Residual Landscape
Character Impacts during Operation (Day 1)
Figure
11-31B... Residual Landscape
Character Impacts during Operation (Year 10)
Figure
11-32..... Residual Visual Impacts
during Construction
Figure
11-33..... Residual Visual Impacts
during Operation
Figure
11-34..... Landscape and Visual
Mitigation Measures Photomontage (Sheet 1 of 8)
Figure
11-35..... Landscape and Visual
Mitigation Measures Photomontage (Sheet 2 of 8)
Figure
11-36..... Landscape and Visual
Mitigation Measures Photomontage (Sheet 3 of 8)
Figure
11-37..... Landscape and Visual
Mitigation Measures Photomontage (Sheet 4 of 8)
Figure
11-38..... Landscape and Visual
Mitigation Measures Photomontage (Sheet 5 of 8)
Figure
11-39..... Landscape and Visual
Mitigation Measures Photomontage (Sheet 6 of 8)
Figure
11-40..... Landscape and Visual
Mitigation Measures Photomontage (Sheet 7 of 8)
Figure
11-41..... Landscape and Visual
Mitigation Measures Photomontage (Sheet 8 of 8)
List of Appendices
Appendix 1-1... Project Implementation programme
Appendix 1-2 Original Project Implementation Programme
Appendix 3-1A Programe of Site Formation Works of
Phases B to D of this Project
Appendix 3-1B Construction
Programme of the Adjacent Planned Development Projects
Appendix 3-1C Background Contribution from the PATH Output
File
Appendix 3-2 Calculation of
TSP
Emission Rates of this Project
Appendix
3-3 Calculation of RSP Emission
Rates of this Project
Appendix 3-4 Hourly
TSP Results (Unmitigated Scenario)
Appendix 3-5 Daily
and Annual RSP and FSP Results (Unmitigated Scenario)
Appendix 3-6 Hourly
TSP Results (Mitigated Scenario)
Appendix 3-7 Daily
and Annual RSP and FSP Results (Mitigated Scenario)
Appendix
3-8 Phasing Construction During Site Formation Stage
Appendix 3-9 Calculation
of Dust Suppression Efficiency and Annual Active Works Area
Appendix 3-10 RSP/
TSP and FSP/ RSP Ratios
Appendix 3-11A Odour Impact Assessment of Proposed
Interim STP
Appendix 3-11B Findings of Odour Patrol
Appendix 3-12 Sensitivity Test of Vehicular Emissions Due to Traffic Generated by
This Project
Appendix 4-1 Background
Noise Level of the Project Site and Field Visit Records
Appendix 4-2 Traffic
Forecast Data
Appendix 4-3A Calculation
of Construction Noise Levels (Unmitigated Scenario)
Appendix 4-4 Estimated
Construction Noise Levels Due to Adjacent Approved EIA Projects
Appendix 4-5 Estimated Construction Noise Levels Due to Planned RD Site
Appendix 4-6 Sensitive
Test on Traffic Noise Impact
Appendix 4-7 Photograph
of Industrial Site
Appendix 4-8 Fixed
Noise Source Data
Appendix 5-1 Additional
Baseline Water Quality Survey Data in Year 2012/2013
Appendix 5-2 Calculation
of Pollution Loading of Stormwater During
Operational Phase
Appendix 6-1 Estimation
of Sewage Flow from Proposed Development
Appendix 6-2 Field
Survey Findings on Condition of Village House and Associated Sewerage System
Appendix 6-3 Estimation of Pollutant Load from Existing Houses Found on Site
Appendix 7-1 Historic
Aerial Photos
Appendix 8-1 Photos
Showing Major Habitats Within the Project Area and
500m Assessment Area
Appendix 8-4 Summary
of Flight Line Surveys
Appendix 8-10 Wetland Restoration Plan
Appendix 10-1 Site
Visits of CHIA Study
Appendix 11-1 Broad
Brush Tree Survey Information