Environmental Monitoring and Audit Manual
Comprehensive Development and Wetland Protection
Near Yau Mei San Tsuen
(Final
Report)
Main Text
List of Figures
Figure 1-1 Location
of the Project Site
Figure 2-1 Master
Layout Plan of the Proposed Development
Figure 3-1 Typical Construction Phase Environmental
Monitoring and Audit Procedure
Figure 4-1 Construction
Phase Air Quality Monitoring Stations
Figure 5-1 Construction
Phase Noise Monitoring Stations
Figure 5-2 Locations
of Temporary Noise Barriers
Figure 6-1 Construction
Phase Water Quality Monitoring Stations
Figure 6-2 Proposed
Drainage System for Construction Stage
Figure 6-3 Proposed
Drainage System
Figure 7-1 Proposed
Sewer Connection
Figure 7-2 Proposed
Interim Sewer Arrangement
Figure 9-1 Landscape
and Visual Mitigation Measures - Plan
Figure 10-1 Proposed
Temporary Wetland Enhancement Area
Figure 10-2 Proposed
Layout of Wetland Restoration Plan
Figure 11-1 Preliminary
Site Inspection, Deficiency and Action Report System
Figure 11-2 Complaint
¡V Response Procedures
List of Appendices
Appendix
I EM&A
Implementation Schedule
Appendix
II Sample
EM&A Proforma and Record Forms
Appendix
III Wetland
Restoration Plan Attached with EIA Report
Appendix IV Tentative
Construction Programme of the Project