Environmental Monitoring and Audit Manual

Comprehensive Development and Wetland Protection

Near Yau Mei San Tsuen

(Final Report)

 

 

Main Text

Main Text

 

 

List of Figures

Figure 1-1         Location of the Project Site

Figure 2-1         Master Layout Plan of the Proposed Development

Figure 3-1         Typical Construction Phase Environmental Monitoring and Audit Procedure

Figure 4-1         Construction Phase Air Quality Monitoring Stations

Figure 5-1         Construction Phase Noise Monitoring Stations

Figure 5-2         Locations of Temporary Noise Barriers

Figure 6-1         Construction Phase Water Quality Monitoring Stations

Figure 6-2         Proposed Drainage System for Construction Stage

Figure 6-3         Proposed Drainage System

Figure 7-1         Proposed Sewer Connection

Figure 7-2         Proposed Interim Sewer Arrangement

Figure 9-1         Landscape and Visual Mitigation Measures - Plan

Figure 10-1        Proposed Temporary Wetland Enhancement Area

Figure 10-2        Proposed Layout of Wetland Restoration Plan

Figure 11-1        Preliminary Site Inspection, Deficiency and Action Report System

Figure 11-2        Complaint ¡V Response Procedures


List of Appendices

Appendix I        EM&A Implementation Schedule

Appendix II       Sample EM&A Proforma and Record Forms

Appendix III      Wetland Restoration Plan Attached with EIA Report

Appendix IV      Tentative Construction Programme of the Project