List of figures

Figure 2.1         Site Location Plan

Figure 2.2         General Arrangement of Cavern for Quarry Exhibition Area/Resource Centre

Figure 3.1         Alternative Locations of Cavern

Figure 4.1         Locations of Representative Air Sensitive Receivers (Construction Phase)

Figure 4.2         Contours of Cumulative Maximum 1-hour Average TSP Concentration in µg/m3 at 1.5m above ground (Unmitigated)

Figure 4.3         Contours of Cumulative Highest 10th 24-hour Average RSP Concentration in µg/m3 at 1.5m above ground (Unmitigated)

Figure 4.4         Contours of Cumulative Highest 10th 24-hour Average FSP Concentration in µg/m3 at 1.5m above ground (Unmitigated)

Figure 4.5         Contours of Cumulative Annual Average RSP Concentration in µg/m3 at 1.5m above ground (Unmitigated)

Figure 4.6         Contours of Cumulative Annual Average FSP Concentration in µg/m3 at 1.5m above ground (Unmitigated)

Figure 4.7         Contours of Cumulative Maximum 1-hour Average TSP Concentration in µg/m3 at 1.5m above ground (Mitigated)

Figure 4.8         Contours of Cumulative Highest 10th 24-hour Average RSP Concentration in µg/m3 at 1.5m above ground (Mitigated)

Figure 4.9         Contours of Cumulative Highest 10th 24-hour Average FSP Concentration in µg/m3 at 1.5m above ground (Mitigated)

Figure 4.10        Contours of Cumulative Annual Average RSP Concentration in µg/m3 at 1.5m above ground (Mitigated)

Figure 4.11        Contours of Cumulative Annual Average FSP Concentration in µg/m3 at 1.5m above ground (Mitigated)

Figure 4.12        Locations of Assessment Point in Apporved Schedule 3 EIA Report for ARQ Near The Rock Cavern

Figure 5.1         Location of Representative Noise Sensitive Receivers

Figure 6.1         Locations of Inland Water Bodies Near The Project Site

Figure 9.1         Landscape Impact Study Boundary (Rock Cavern Development)

Figure 9.2         Landscape Resources Plan

Figure 9.3         Photo of Landscape Resources

Figure 9.4         Landscape Character Areas Plan

Figure 9.5         Photo of Landscape Character Area

Figure 9.6         Visual Envelope of Visual Impact

Figure 9.7         Key Visual Sensitive Receivers (VSR)

Figure 9.7-1       Locations of Potential Visual Sensitive Receivers (VSR)

Figure 9.7-2       Cross-sectional Drawings from VSR to Proposed Site of Rock Cavern Development

Figure 9.7-3       Illustrative View from Shun Tin Estate

Figure 9.8         Photo of Key Visual Sensitive Receivers

Figure 9.9         Photomontage of VSR1

Figure 9.10        Photomontage of VSR2

Figure 9.11        Photomontage of VSR3

Figure 9.12        Photomontage of VSR4

Figure 9.13        Landscape and Visual Mitigation Plan

 

 

list of Appendices

Appendix 2.1    Tentative Construction Programme for the Quarry Exhibition Cavern

Appendix 4.1    Active Works Area and TSP Emission Burden Calculation

Appendix 4.2    Details of Construction Dust Impact Assessment

Appendix 4.3    Construction Dust Impact Assessment Results – Total Suspended Particulates

Appendix 4.4    Construction Dust Impact Assessment Results – Respirable Suspended Particulates

Appendix 4.5    Construction Dust Impact Assessment Results – Fine Suspended Particulates

Appendix 4.6    Calucation of Dust Suppresion Efficiency from Watering

Appendix 4.7    Alignment of the Local Distributor within ARQ

Appendix 4.8    Year 2026 Contour Plots Extracted from the Approved EIA Report for Development of Anderson Road Quarry (Register No.: AEIAR-183/2014)

Appendix 5.1    Photos of Existing Noise Sensitive Receivers

Appendix 5.2    Details of Construction Noise Assessment

Appendix 5.3    Fixed Plant Noise Assessment

Appendix 9.1    Tree Survey General Layout Plan