Agreement
No. CE10/2014 (CE)
Development
of Anderson Road Quarry Site – Investigation, Design and Construction
Environmental
Impact Assessment Report for Rock Cavern Developments
TABLE
OF CONTENTS
1.1 Background
1.2 Nature of Designated Project
1.3 Objective of EIA Study
1.4 Structure of the EIA Report
2.1 The Need of the Project
2.2 Scope of Work
2.3 Concurrent Projects
2.4 Project Programme
2.5 Study Area
3 Consideration of Alternatives
3.1 Scenario with and without the Project
3.2 Consideration of Alternative Development Options. 3-1
3.3 Alternative Construction Methods and Sequences of Works
3.4 Selection of Preferred Scenario
4.1 Environmental Legislation, Plans, Standards, and Guidelines
4.2 Description of the Environment and Future Trends
4.3 Study Area and Air Sensitive Receivers
4.4 Identification of Environmental Impacts (Construction Phase)
4.5 Assessment Methodology (Construction Phase) 4-7
4.6 Prediction and Evaluation of Environmental Impacts (Construction
Phase)
4.7 Recommended Mitigation Measures (Construction Phase)
4.8 Evaluation of Residual Environmental Impacts (Construction Phase)
4.9 Identification of Environmental Impacts (Operational Phase)
4.10 Evaluation of Residual Environmental Impacts (Operational Phase)
4.11 EM&A Requirements
4.12 Conclusion
5.1 Introduction
5.2 Description of the Environment
5.3 Construction Programme
5.4 Noise Sensitive Receivers
5.5 Potential Sources of Impact
5.6 Environmental Legislation, Standards and Guidelines
5.7 Identification of Environmental Impacts
5.8 Assessment Methodologies
5.9 Prediction and Evaluation of Environmental Impacts
5.10 Recommended Mitigation Measures
5.11 Evaluation of Residual Environmental Impacts
5.12 EM&A Requirements
5.13 Conclusion
6.1 Introduction
6.2 Environmental Legislation, Plans, Standards and Guidelines
6.3 Water Sensitive Receivers
6.4 Description of the Environment
6.5 Assessment Methodologies
6.6 Identification of Environmental Impacts
6.7 Evaluation of Environmental Impacts
6.8 Cumulative Impacts from Concurrent Project
6.9 Mitigation of Adverse Environmental Impacts
6.10 Evaluation of Residual Environmental Impacts
6.11 EM&A Requirements
6.12 Conclusions
7 Sewerage and Sewage Treatment implication
7.1 Introduction
7.2 Description of the Environment
7.3 Design Guidelines and Standards
7.4 Design Assumption and Parameters
7.5 Sewage Estimation and Assessment Methodology
7.6 Conclusion
8 Waste
Management Implication
8.1 Introduction
8.2 Environmental Legislation, Plans, Standards and Guidelines
8.3 Assessment Methodologies
8.4 Identification of Potential Environmental Impacts
8.5 Prediction & Evaluation of Environmental Impacts
8.6 Mitigation of Adverse Environmental Impacts
8.7 Evaluation of Residual Environmental Impacts
8.8 EM&A Requirements
8.9 Conclusions
9 LANDSCAPE AND VISUAL IMPACTS
9.1 Introduction
9.2 Environmental Legislation, Standards and Guidelines
9.3 Assessment Methodology
9.4 Review of Planning and Development Control Framework
9.5 Baseline Study
9.6 Landscape Impact Assessment
9.7 Visual Impact Assessment
9.8 Landscape and Visual Mitigation Measures
9.9 Residual
Impacts
10 IMPLEMENTATION SCHEDULE OF MITIGATION MEASURES
List of figures
Figure 2.2 General Arrangement of Cavern for
Quarry Exhibition Area/Resource Centre
Figure 3.1 Alternative Locations of Cavern
Figure
4.1 Locations of Representative
Air Sensitive Receivers (Construction Phase)
Figure 5.1 Location of Representative Noise Sensitive Receivers
Figure
6.1 Locations of Inland Water
Bodies Near The Project Site
Figure
9.1 Landscape Impact Study
Boundary (Rock Cavern Development)
Figure
9.2 Landscape Resources Plan
Figure
9.3 Photo of Landscape Resources
Figure
9.4 Landscape Character Areas Plan
Figure
9.5 Photo of Landscape Character
Area
Figure
9.6 Visual Envelope of Visual
Impact
Figure
9.7 Key Visual Sensitive Receivers
(VSR)
Figure
9.7-1 Locations of Potential Visual
Sensitive Receivers (VSR)
Figure
9.7-2 Cross-sectional Drawings from
VSR to Proposed Site of Rock Cavern Development
Figure
9.7-3 Illustrative View from Shun
Tin Estate
Figure
9.8 Photo of Key Visual Sensitive
Receivers
Figure
9.9 Photomontage of VSR1
Figure
9.10 Photomontage of VSR2
Figure
9.11 Photomontage of VSR3
Figure
9.12 Photomontage of VSR4
Figure
9.13 Landscape and Visual
Mitigation Plan
list of Appendices
Appendix 2.1 Tentative Construction Programme for the
Quarry Exhibition Cavern
Appendix 4.1 Active Works Area and TSP Emission Burden
Calculation
Appendix 4.2 Details of Construction Dust Impact
Assessment
Appendix 4.3 Construction Dust Impact Assessment Results – Total
Suspended Particulates
Appendix 4.4 Construction Dust Impact Assessment Results –
Respirable Suspended Particulates
Appendix 4.5 Construction Dust Impact Assessment Results – Fine
Suspended Particulates
Appendix 4.6 Calucation of Dust Suppresion Efficiency
from Watering
Appendix 4.7 Alignment of the Local Distributor within ARQ
Appendix 5.1 Photos of Existing Noise Sensitive Receivers
Appendix 5.2 Details of Construction Noise Assessment
Appendix 5.3 Fixed Plant Noise Assessment
Appendix 9.1 Tree Survey General Layout Plan