Volume 3 of 4 – Appendices (Part 1)
List of Appendices
Appendix 2.01
Summary of Key Public Views or Concerns on the Project
Appendix 2.02
Preliminary Programme for Switching and Commissioning Arrangements
Appendix 2.03
Tentative Construction Programme
Appendix 3.01
Details of Representative Air Sensitive Receivers
Appendix 3.02a
Construction of CSTW - Calculation of Dust Emission Source (Short-term Prediction (Tier 1))
Appendix 3.02b
Construction of CSTW - Calculation of Dust Emission Source (Short-term Prediction (Tier 2))
Appendix 3.02c
Construction of CSTW - Calculation of Dust Emission Source (Annual Prediction)
Appendix 3.02d
Construction of CSTW - Dust Emission Source Listing
Appendix 3.02e
Demolition of Existing STSTW - Calculation of Dust Emission Source
Appendix 3.02f
Calculation of Dust Suppression Efficiency by Watering
Appendix 3.03
Traffic Data of Year 2022 and 2027
Appendix 3.04
Calculation of Vehicular Emission Source
Appendix 3.05
Odour Survey for Sha Tin Cavern Sewage Treatment Works
Appendix 3.06
Calculation of Odour Emission Rate of CSTW
Appendix 3.07
Photographs of Concerned Areas during Construction Phase
Appendix 4.01
Measured Prevailing Background Noise Levels
Appendix 4.02
Photographs of Existing Noise Sensitive Receivers
Appendix 4.03
Construction Programme for Noise Calculations
Appendix 4.04
Construction Plant Inventory under Unmitigated Scenario
Appendix 4.05
Predicted Construction Noise Levels under Unmitigated Scenario
Appendix 4.06
Calculation of Construction Ground-borne Noise (Unmitigated Scenario)
Appendix 4.07
Peak Traffic Flow during Construction Phase and Operation Phase
Appendix 4.08
Calculation of Maximum Allowable Sound Power Levels for Fixed Plant Noise
Appendix 4.09
Construction Plant Inventory under Mitigated Scenario
Appendix 4.10
Predicted Construction Noise Levels under Mitigated Scenario
Appendix 5.01a
Methodology for Background Pollution Loading Inventory
Appendix 5.01b
Storm Pollution Loading Inventory for Tolo Harbour
Appendix 5.02
Indicative Locations of Storm Outfalls and Catchment Areas
Appendix 5.03
Contour Plots of Water Quality Modelling Results (Scenarios 1 – 3)
Appendix 5.04a
Contour Plots of Water Quality Modelling Results (Scenarios 4 – 6)
Appendix 5.04b
Time Series Plots of Water Quality Modelling Results (Scenarios 5 & 6a)
Appendix 5.04c
Time Series Plots of Water Quality Modelling Results (Scenarios 5 & 6b)
Appendix 5.04d
Time Series Plots of Water Quality Modelling Results (Scenarios 7) – Dry Season (Spring Tide Mid-ebb)
Appendix 5.04e
Time Series Plots of Water Quality Modelling Results (Scenarios 7) – Wet Season (Neap Tide Low Water)
Appendix 5.05
Water Quality Modelling Results for Marine Water Sensitive Receivers at Tolo Harbour (Scenarios 4 – 7)
Appendix 5.06
Questionnaire Results for Suspended Solids Criterion at Cooling Water Intakes
Appendix 5.07
Existing Contingency Plan
Appendix 5.08
Comparison of Historical Red Tide Data and Chlorophyll-a Concentrations Before, During and After the THEES Maintenance