Volume 3 of 4 – Appendices (Part 1)

List of Appendices

Appendix 2.01

Summary of Key Public Views or Concerns on the Project

 

 

 

Appendix 2.02

Preliminary Programme for Switching and Commissioning Arrangements  

 

 

 

Appendix 2.03

Tentative Construction Programme

 

 

 

Appendix 3.01

Details of Representative Air Sensitive Receivers

 

 

 

Appendix 3.02a

Construction of CSTW - Calculation of Dust Emission Source (Short-term Prediction (Tier 1))

 

 

 

Appendix 3.02b

Construction of CSTW - Calculation of Dust Emission Source (Short-term Prediction (Tier 2))

 

 

 

Appendix 3.02c

Construction of CSTW - Calculation of Dust Emission Source (Annual Prediction)

 

 

 

 

Appendix 3.02d

Construction of CSTW - Dust Emission Source Listing

 

 

 

Appendix 3.02e

Demolition of Existing STSTW - Calculation of Dust Emission Source

 

 

 

Appendix 3.02f

Calculation of Dust Suppression Efficiency by Watering

 

 

 

Appendix 3.03

Traffic Data of Year 2022 and 2027

 

 

 

Appendix 3.04

Calculation of Vehicular Emission Source

 

 

 

Appendix 3.05

Odour Survey for Sha Tin Cavern Sewage Treatment Works

 

 

 

Appendix 3.06

Calculation of Odour Emission Rate of CSTW

 

 

 

Appendix 3.07

Photographs of Concerned Areas during Construction Phase

 

 

 

Appendix 4.01

Measured Prevailing Background Noise Levels

 

 

 

Appendix 4.02

Photographs of Existing Noise Sensitive Receivers

 

 

 

Appendix 4.03

Construction Programme for Noise Calculations

 

 

 

Appendix 4.04

Construction Plant Inventory under Unmitigated Scenario

 

 

 

Appendix 4.05

Predicted Construction Noise Levels under Unmitigated Scenario

 

 

 

Appendix 4.06

Calculation of Construction Ground-borne Noise (Unmitigated Scenario)

 

 

 

Appendix 4.07

Peak Traffic Flow during Construction Phase and Operation Phase

 

 

 

Appendix 4.08

Calculation of Maximum Allowable Sound Power Levels for Fixed Plant Noise

 

 

 

Appendix 4.09

Construction Plant Inventory under Mitigated Scenario

 

 

 

Appendix 4.10

Predicted Construction Noise Levels under Mitigated Scenario

 

 

 

Appendix 5.01a

Methodology for Background Pollution Loading Inventory

 

 

 

Appendix 5.01b

Storm Pollution Loading Inventory for Tolo Harbour

 

 

 

Appendix 5.02

Indicative Locations of Storm Outfalls and Catchment Areas

 

Appendix 5.03

Contour Plots of Water Quality Modelling Results (Scenarios 1 – 3)

 

Appendix 5.04a

Contour Plots of Water Quality Modelling Results (Scenarios 4 – 6)

 

Appendix 5.04b

Time Series Plots of Water Quality Modelling Results (Scenarios 5 & 6a)          

 

Appendix 5.04c

Time Series Plots of Water Quality Modelling Results (Scenarios 5 & 6b)

 

Appendix 5.04d

Time Series Plots of Water Quality Modelling Results (Scenarios 7) – Dry Season (Spring Tide Mid-ebb)

 

Appendix 5.04e

Time Series Plots of Water Quality Modelling Results (Scenarios 7) – Wet Season (Neap Tide Low Water)

 

Appendix 5.05

Water Quality Modelling Results for Marine Water Sensitive Receivers at Tolo Harbour (Scenarios 4 – 7)

 

Appendix 5.06

Questionnaire Results for Suspended Solids Criterion at Cooling Water Intakes

 

Appendix 5.07

Existing Contingency Plan

 

Appendix 5.08

Comparison of Historical Red Tide Data and Chlorophyll-a Concentrations  Before, During and After the THEES Maintenance