Chapter
1.1........ Project
Background
1.2........ Background
to this EIA
1.3........ Purpose
and Approach of the EIA Study
1.4........ Structure
of this EIA Study Report
2........... PROJECT DESCRIPTION
2.1 Location
and Description of the Project
2.2 Need
of the Project
2.3 Scenarios
With and Without the ProjeCT
2.4 Consideration
of Alternative Treatment Level
2.5 Consideration
of Alternative Design, Layout and Outfall Alignment
2.6 Consideration
of Alternative Construction Methods and Sequence of Works
2.7 Selection
of Preferred Scenario
2.8 Programme
2.9 Public
Consultations
2.10 Project Interfaces
and Concurrent Projects
3........... AIR QUALITY IMPACT
ASSESSMENT
3.1 Introduction
3.2 Legislation
Requirement & Assessment Criteria
3.3 Baseline
Condition
3.4 Air
Sensitive Receivers
3.5 Potential
Sources of Impact
3.6 Impact
Assessment
3.7 Mitigation
Measures
3.8 Residual
Impacts
3.9 Environmental
Monitoring & Audit
3.10 Conclusions
4........... NOISE IMPACT ASSESSMENT
4.1 Introduction
4.2 Relevant
Legislation, Policies, Standards and Criteria
4.3 Baseline
Conditions
4.4 Noise
Sensitive Receivers
4.5 Potential
Sources of Impacts
4.6 Assessment
Methodology
4.7 Impact
Assessment
4.8 Mitigation
Measures
4.9 Residual
Impacts
4.10 Cumulative
Impacts
4.11 Monitoring
and Audit Requirement
4.12 Conclusion
5........... water quality IMPACT ASSESSMENT
5.1 Introduction
5.2 Legislation
Requirement & Guidelines
5.3 Baseline
Condition
5.4 Water
Quality Sensitive Receivers
5.5 Assessment
CriteriA
5.6 ASSESSMENT
METHODOLOGY
5.7 Potential Sources of
Impact
5.8 Impact Assessment
5.9 Mitigation
Measures
5.10 Residual
Impacts
5.11 Cumulative
Impacts
5.12 Environmental
Monitoring and Audit
5.13 Conclusion
6........... WASTE management
IMPLICATION and Land Contaminationn assessment
6.1 Introduction
6.2 Relevant
Legislation, Policies, Standards and Criteria
6.3 Assessment
Methodology
6.4 Sources
and Types of Waste arising from the Project
6.5 Impact
Assessment and Evaluation
6.6 Mitigation
Measures
6.7 Land
Contamination
6.8 Evaluation
of Residual Impacts
6.9 Environmental
Audit
6.10 Summary
7........... Ecological Impact Assessment (Terrestrial
and Marine)
7.1 Introduction
7.2 Legislative
Requirements & Evaluation Criteria
7.3 Baseline
Conditions
7.4 Impact
Identification
7.5 Impact
Assessment
7.6 Impact
Evaluation
7.7 Mitigation
Measures
7.8 Cumulative
Impact
7.9 Residual
Impact
7.10 Environmental
Monitoring & Audit (EM&A)
7.11 Conclusions
8........... Fisheries Impact
Assessment
8.1 Introduction
8.2 Relevant
Legislation & Assessment Criteria
8.3 Baseline
Conditions & Fisheries Sensitive Receivers
8.4 Assessment
Methodology
8.5 Potential
Impacts & Impact Assessment on Fisheries Resources
8.6 Impact
Evaluation
8.7 Mitigation
Measures
8.8 Residual
Impacts
8.9 Cumulative
Impacts
8.10 Environmental
Monitoring & Audit
8.11 Conclusions
9........... LANDSCAPE AND VISUAL
IMPACT ASSESSMENT
9.1 Introduction
9.2
Environmental Legislation, Standards and
Guidelines
9.3 Assessment
Area
9.4 Assessment
Methodology
9.5 Planning
and Development Control Framework
9.6 Findings of Baseline Study
9.7 Potential Sources of Landscape
and Visual Impact
9.8 Landscape
Impact Assessment
9.9 Cumulative
Landscape Impacts
9.10 Visual
Impact Assessment
9.11 Cumulative
Visual Impacts
9.12 Conclusions
10........ cultural heritage IMPACT aSSESSMENT
10.1 Introduction
10.2 Relevant
Legislations, Standards and Guidelines
10.3 Built
Heritage Impact Assessment
11........ summary of environmental
outcomes
11.1 Introduction
11.2 Air Quality
Impact
11.3 Noise ImpaCT
11.4 Water Quality
Impact
11.5 Waste
Management Implication and Land Contamination
11.6 Ecological
Impact (Terrestrial And Marine)
11.7 Fisheries
Impact
11.8 Landscape and
Visual Impacts
11.9 Cultural
Heritage
11.10 Environmental
Benefits of the Project
11.11 Environmentally
Friendly Design Recommended
11.12 Key
Environmental Problems Avoided, Population and Environmentally Sensitive Areas
Protected
12........ environmental monitoring
and audit (EM&a) requirements
12.1 Introduction
12.2 Objective of
EM&A
12.3 Air Quality
12.4 Noise
12.5 Water Quality
12.6 Waste
Management
12.7 Ecology
12.8 FISHERIES
12.9 Landscape and
Visual Impact
12.10 Cultural
Heritage
13.1 project
background
13.2 purpose and
nature of the project
13.3 purpose and approach
of the eia study
13.4 justification
for the need of the project
13.5 project
components and project layout
13.6 site location
and history
13.7 project
programme
13.8 consideration
of alternative treatment level, design, layout, outfall alignment, construction
methods and sequence of works
13.9 air quality
13.10 noise
13.11 water quality
13.12 waste
management and land contamination
13.13 ecology
13.14 fisheries
13.15 landscape
& visual
13.16 cultural
heritage
13.17 environmental
monitoring & audit
13.18 overall
conclusion
Drawings
Key Location Plan |
|
Proposed Layout Plan |
|
Proposed Layout Plan |
|
Aerial Photo of Existing STKSTW |
|
Schematic Process Flow Diagram of STKSTW |
|
Schematic Process Flow Diagram of Temporary Sewage Treatment Plant |
|
General Layout Plan of Expanded STKSTW and Temporary STP |
|
General Layout Plan of Expanded STKSTW |
|
Roof Plan of Expanded STKSTW |
|
+15.25mPD Floor Plan of Expanded STKSTW |
|
+11.25mPD Floor Plan of Expanded STKSTW |
|
+5.25mPD Floor Plan of Expanded STKSTW |
|
-0.80mPD Level Plan of Expanded STKSTW |
|
Section A-A & B-B |
|
Elevation A & B |
|
Elevation C & D |
|
Elevation E & F (of Temporary STP) |
|
Elevation G & H (of Temporary STP) |
|
Options for Proposed Submarine Outfall |
|
Options for Gravity Sewer |
|
Typical Horizontal Direction Drilling Method for Submarine Outfall Construction |
|
Expansion Scheme – Option 1 |
|
Expansion Scheme – Option 2 |
|
Expansion Scheme – Option 3 |
|
Dredging Area under Concurrent Project “Sediment Removal at Sha Tau Kok Fish Culture Zone, Boast Shelter and Approach Channel” |
|
Works Area under Concurrent Project “Drainage Improvement Works at North District, including Various Drainage Improvement Measures in Sha Tau Kok” |
|
Location of Concurrent Project “The Construction of the Public Rental Housing Estate at Sha Tau Kok under Hong Kong Housing Society’s Project” |
|
Alternative Layout Plan of Expanded STKSTW |
|
Elevation I |
|
Locations of Representative Air Sensitive Receivers |
|
Predicted Maximum 5-second Averaged Odour Concentration at 1.5m Above Ground during Operation of Temporary Sewage Treatment Plant |
|
Predicted Maximum 5-second Averaged Odour Concentration at 10.5m Above Ground during Operation of Temporary Sewage Treatment Plant |
|
Predicted Maximum 5-second Averaged Odour Concentration at 1.5m Above Ground during Operation of Permenant Sewage Treatment Works |
|
Predicted Maximum 5-second Averaged Odour Concentration at 10.5m Above Ground during Operation of Permanent Sewage Treatment Works |
|
Location Plan of Proposed Noise Monitoring Station and Noise Sensitive Receivers |
|
Water Sensitive Receiver near the Project |
|
Locations of Geophysical Survey Locations |
|
Consideration of Concurrent Projects |
|
Project Layout and the Surrounding Ecological Resources |
|
Project Layout and the Surrounding Ecological Resources (500m Study Area) |
|
100m No Works Boundary from the Night Roosting Site |
|
Distribution of Fishing Operation Vessels in Hong Kong Water as recorded by Agriculture, Fisheries and Conservation Department in Port Survey 2006 |
|
Distribution of Fishing Production (Adult Fish) in terms of Weight (kg/ha) in Hong Kong Water as recorded by Agriculture, Fisheries and Conservation Department in Port Survey 2006 |
|
Distribution of Fishing Production (Adult Fish & Fish Fry) in terms of Value (HK$/ha) in Hong Kong Water as recorded by Agriculture, Fisheries and Conservation Department in Port Survey 2006 |
|
Distribution of Fishing Production (Fish Fry) in terms of Density (tails/ha) in Hong Kong Water as recorded by Agriculture, Fisheries and Conservation Department in Port Survey 2006 |
|
Fisheries Sensitive Receivers |
|
Extent of Landscape Impact Assessment |
|
Aerial View of Landscape Assessment Area |
|
Plan of ZVI and VSRs |
|
Visual Condition |
|
Plan of Land Use Zoning |
|
Location Plan of Landscape Resources |
|
Photographs of Landscape Resources (1) – (11) |
|
Location Plan of Landscape Character Area |
|
Photographs of Landscape Character Areas (1) – (4) |
|
Views of Visually Sensitive Receivers (1) – (9) |
|
Impacts on Landscape Resources |
|
Impacts on Landscape Character Area |
|
Recommendation Mitigation Measures (1) |
|
Recommendation Mitigation Measures (2) |
|
Visual Impacts |
|
Plan of Photomontages |
|
Photomontages |
|
View of Existing Site and Proposed TSTP |
|
Study Area of Built Heritage Impact Assessment |
|
Identified Built Heritage at Ha Tam Shui Hang & Sha Tau Kok |
Appendices
Emergency Response Plan |
|
Odour Emission Rate Estimation for
Permanent Sha Tau Kok Sewage Treatment Works (STKSTW) and Temporary Sewage
Treatment Plant (TSTP) |
|
Emission Input to Model |
|
Calculation of Odour Emission rate
in STKSTW |
|
Calculation of Odour Emission rate
in TSTP |
|
Summary of Baseline Noise
Monitoring |
|
Photos of Noise Sensitive Receivers |
|
Details
of Construction Noise Impact Assessment |
|
Details
of Operational Noise Impact Assessment of Expanded STKSTW |
|
Details
of Operational Noise Impact Assessment of TSTP |
|
Water Quality Modelling Methodology Statement |
|
Detailed CORMIX Modelling Results |
|
Technical Note on Delft3D Water
Quality Model |
|
Construction Phase Sediment Plume
Modelling Results |
|
Sediment Testing Report |
|
Construction Phase Pollutant
Release Modelling Results |
|
Delft3D WAQ Outfall Tracer
Simulation |
|
Delft3D WAQ Modelling Results 2030
baseline and Expanded STKSTW |
|
Method Statement for Emergency
Discharge Modelling for the TSTP and the Expanded STKSTW Operation |
|
Counter Plot Results For The
Emergency Discharge Modelling |
|
Timeseries Results For The
Emergency Discharge Modelling At Nearby Mariculture Zones |
|
Loading Calculation for TSTP |
|
Assessment of Potential Water
Qality Impact at Hong Kong Mainland Marine Border |
|
EPD Sediment Sampling and Testing
Plan |
|
Sediment Quality Report |
|
Historical Aerial Photos |
|
Existing Site Conditions of the
Works Area |
|
Correspondence from Relevant
Authorities |
|
Site Walkover Checklist - STKSTW |
|
Site Walkover Checklist - STKSPS |
|
Baseline Ecological Survey Report |
|
Supplementary Coral Survey Report |
|
Summary of Tree Survey Findings |
|
Photo Images of Build Heritage
Features |
|
Implementation Schedule of
Recommended Mitigation Measures |