Table of contents
1.1 Background
1.2 The Project
1.3 Designated Projects
1.4 Purpose of this
Environmental Monitoring and Audit (EM&A) Manual
1.5 Structure of
EM&A Manual
2.1 Introduction
2.2 The Contractor
2.3 Architect’s
Representatives (AR)
2.4 Independent
Environmental Checker (IEC)
2.5 Environmental Team
(ET)
3.1 Introduction
3.2 Monitoring
Parameters
3.3 Monitoring
Equipment
3.4 Monitoring
Requirements
3.5 Monitoring Location
3.6 Placement of
Equipment
3.7 Baseline Monitoring
3.8 Impact Monitoring
3.9 Air Quality
Performance Limit
3.10 Event and Action
Plan
3.11 Mitigation Measures
4.1 Introduction
5.1 Introduction
5.2 Monitoring Parameters
5.3 Monitoring
Equipment
5.4 Monitoring
Requirement
5.5 Monitoring Location
5.6 Baseline Monitoring
5.7 Impact Monitoring
5.8 Noise Performance
Limit
5.9 Event and Action
Plan
5.10 Mitigation Measures
6.1 Introduction
6.2 Construction Phase
6.3 Operation Phase
6.4 Mitigation Measures
7 sewerage
and sewage treatment IMPLICATIONS
7.1 Introduction
8 waste
management IMPLICATIONS
8.1 Introduction
8.2 Mitigation Measures
8.3 Environmental Audit
and Monitoring
9.1 Introduction
10 Terrestrial
ECOLOGICAL IMPACT
10.1 Introduction
10.2 Mitigation Measures
10.3 Environmental
Monitoring & Audit
11 landscape
and visual IMPACT
11.1 Introduction
11.2 Audit Requirements
11.3 Design Phase Audit
11.4 Construction and
Operational Phase Audit
11.5 Mitigation and
Enhancement Measures
12.1 Introduction
13.1 Introduction
13.2 Site Inspection
13.3 Compliance with
Legal and Contractual Requirements
13.4 Environmental
Complaints
14.1 Introduction
14.2 Baseline Monitoring
Report
14.3 EM&A Report
14.4 First EM&A
Report
14.5 Subsequent EM&A
Reports
14.6 Quarterly EM&A
Summary Reports
14.7 Final EM&A
Report for Construction Phase
14.8 Data Keeping
14.9 Interim
Notification of Environmental Quality Limit Exceedances
LIST OF TABLES
Table 3.1 Proposed
Air Monitoring Stations
Table 3.2 Action
and Limit Levels for Air Quality
Table 5.1 Proposed
Construction Noise Monitoring Stations
Table 5.2 Proposed
Music Event Noise Monitoring Stations
Table 5.3 Action
and Limit Levels for Construction Noise
Table 5.4 Trigger
and Action Levels for Noise from Music Events
Table 11.1 Construction/Operational
Phase Audit Checklist
Table 11.2 Recommended
Construction Phase Landscape and Visual Mitigation/Enhancement Measures
Table 11.3 Recommended
Operational Phase Landscape and Visual Mitigation / Enhancement Measures
Table 15.1 Summary
of EM&A Requirements
LIST OF FIGURES
Figure 1-1 Location and Layout Plan of Proposed
Kai Tak MPSC
Figure 2-1 Project Organisation for Environmental
Works
Figure 3-1 Locations of Air Monitoring Stations
Figure 5-1 Locations of Construction Noise
Monitoring Stations
Figure 5-2 Locations of Music Events Noise
Monitoring Stations
LIST OF APPENDICES
Appendix A Environmental Mitigation Implementation
Schedule (EMIS)
Appendix C Event and Action Plan
Appendix D Interim Notifications of Exceedances
Appendix E Tentative Construction Programme for EIA
Submission
Appendix F Content of Stormwater Re-use Management
Plan