Appendix 1.1 Checklist
for EIA Study Brief, Annexes 11 and 20 of EIAO-TM
Appendix
2.1.1 Consideration
of Alignment for Road P1 (Option 1)
Appendix
2.1.2 Consideration
of Alignment for Road P1 (Option 2)
Appendix 2.2 Consideration
of Land Use Zonings Associated for San Sang San Tsuen Egretry
Appendix 2.3 Consideration
of Flushing Water and Fresh Water Service Reservoir Locations
Appendix 2.4 Implementation
Programme and Phasing
Appendix 3.1 Calculation
of Construction Dust Emission Source
Appendix 3.2 Calculation
of Industrial and Port Backup Emission
Appendix 3.4 Calculation
of Vehicular Emission Source
Appendix 3.5 Calculation
of Portal Emission and Ventilation Building
Appendix 3.6 Chicken
Farm Odour Assessment Methodology
Appendix 3.7 Odour
Survey for Chicken Farm at Hung Shui Kiu
Appendix 3.8 Calculation
of Odour Emission of Refuse Transfer Station and Sewage Treatment Works
Appendix 3.9 Detailed
Prediction Result (Construction Phase) (Unmitigated)
Appendix 3.10 Detail Prediction
of Operation Phase
Appendix 3.11 Detail
Prediction of Construction Phase (Tier 1)
Appendix 3.12 Detail
Prediction of Construction Phase (Tier 2)
Appendix 3.13 Tentative Construction
and Implementation Programme
Appendix 3.14 Sensitivity
Test without Proposed Noise Barrier
Appendix 3.15 Detail
Prediction of Cumulative Odour Concentration due to Existing Chicken Farm
Appendix 3.17 Determination
of Surface Characteristics Parameters
Appendix 4.2.1 The Locations of Background Noise Measurement
Appendix
4.2.2 The
Locations of Background Noise Measurement
Appendix
4.4.1 Photographs
of Existing NSRs outside NDA Boundary
Appendix
4.4.2 Photographs
of Existing NSRs inside NDA Boundary
Appendix
4.5.1 Plant
inventory (Unmitigated Scenario)
Appendix
4.5.2 Construction
Programme, Locations of Works areas and Distance to Notional Sources
Appendix
4.6.1 Predicted
Construction Noise Levels at Representative NSRs (Unmitigated Scenario)
Appendix
4.6.2 Quiet
items of PME
Appendix
4.6.3 Schematic
Diagram for Construction Noise Barrier and Noise Enclosure
Appendix
4.6.4 Plant
Inventory (Mitigated Scenario)
Appendix
4.6.5 Predicted
Construction Noise Levels at Representative NSRs (Mitigated Scenario)
Appendix
4.6.6 Grouping
of PME for Different Works Area and Works Activities
Appendix
4.6.8 Minimum
Separation between Schools and Critical Works Areas During Examination Period
Appendix
4.6.9 Grouping
of PME Required during Examination Period
Appendix
4.6.10 Construction
Noise Assessment during Examination Period
Appendix
4.7.2 Road
Plot and Traffic Speed of Road Links
Appendix
4.7.3 Detailed
Results of Road Traffic Noise Assessment (Unmitigated Scenario)
Appendix
4.7.4 Detailed
Results of Road Traffic Noise Assessment (Mitigated Scenario)
Appendix
4.7.5 Eligibility
Testing for Indirect Noise Mitigation Measures
Appendix
4.7.6 Determination
of Traffic Noise Impact on Existing Road due to the Project
Appendix
4.8.1 West
Rail Viaduct Noise Propagation Model
Appendix
4.8.2 Rail
Noise Model Validation Report
Appendix
4.8.3 Predicted
Noise Level for West Rail (Unmitigated)
Appendix
4.8.4 Predicted
Noise Level for Light Rail (Unmitigated)
Appendix
4.8.5 Predicted
Noise Level for West Rail and Light Rail (Mitigated)
Appendix
4.8.6 EFTS
Track Enhancement Reference
Appendix
4.9.1 Detailed
Calculations of Fixed Plant Noise
Appendix 4.10.1 Detailed Calculations of
Helicopter Noise
Appendix 5.1 Key
Assumptions for Quantification of Construction Site Run-off
Appendix 5.4 Key
Assumptions for Compiling Non-Point Source Pollution from Surface Run-off
Appendix 7.1 Endorsement
Letter of the Construction and Demolition Materials Management Plan
Appendix 8.1 Contamination
Assessment Plan
Appendix 9.1 Representative
Photographs of Habitats Recorded within the Assessment Area
Appendix 9.2 Plant
Species Recorded within the Assessment Area
Appendix 9.4 Avifauna
Species Recorded from the Assessment Area
Appendix 9.5 Height
of Ardeids Flying from Egretry
Appendix 9.6 Mammal
Species Recorded from the Assessment Area
Appendix 9.7 Herpetofauna
Species Recorded from the Assessment Area
Appendix 9.8 Butterfly
Species Recorded from the Assessment Area
Appendix 9.9 Odonate
Species Recorded from the Assessment Area
Appendix
9.10a Freshwater
Communities Recorded from the Assessment Area (Dry Season)
Appendix
9.10b Freshwater
Communities Recorded from the Assessment Area (Wet Season)
Appendix
9.11a Intertidal
Species Recorded from the Assessment Area (Dry Season)
Appendix 9.11b Intertidal Species Recorded from the Assessment Area (Wet Season)
Appendix 9.12 Representative
Photographs of San Sang San Tsuen Egretry and Ngau Hom Shek Egretry
Appendix 9.13 Ardeid
Flight Paths from San Sang San Tsuen Egretry Overlaid on the Revised RODP
Appendix
10.1 Representative
Photographic Records of Ponds within the Assessment Area
Appendix
12.1 Built Heritage
Record
Appendix
12.2 Archaeological
Field Survey Report
Appendix
13.1 Project
Implementation Schedule
Appendix
15.1 Key Assessment
Assumptions and Limitation of Assessment Methodologies
Appendix
15.2 Summary of Environmental Impacts
This Page Left Blank Intentionally