List of Appendices

Appendix 1.1        Checklist for EIA Study Brief, Annexes 11 and 20 of EIAO-TM

Appendix 2.1.1      Consideration of Alignment for Road P1 (Option 1)

Appendix 2.1.2      Consideration of Alignment for Road P1 (Option 2)

Appendix 2.2        Consideration of Land Use Zonings Associated for San Sang San Tsuen Egretry

Appendix 2.3        Consideration of Flushing Water and Fresh Water Service Reservoir Locations

Appendix 2.4        Implementation Programme and Phasing

Appendix 3.1        Calculation of Construction Dust Emission Source

Appendix 3.2        Calculation of Industrial and Port Backup Emission

Appendix 3.3        Traffic Data

Appendix 3.4        Calculation of Vehicular Emission Source

Appendix 3.5        Calculation of Portal Emission and Ventilation Building

Appendix 3.6        Chicken Farm Odour Assessment Methodology

Appendix 3.7        Odour Survey for Chicken Farm at Hung Shui Kiu

Appendix 3.8        Calculation of Odour Emission of Refuse Transfer Station and Sewage Treatment Works

Appendix 3.9        Detailed Prediction Result (Construction Phase) (Unmitigated)

Appendix 3.10       Detail Prediction of Operation Phase

Appendix 3.11       Detail Prediction of Construction Phase (Tier 1)

Appendix 3.12       Detail Prediction of Construction Phase (Tier 2)

Appendix 3.13       Tentative Construction and Implementation Programme

Appendix 3.14       Sensitivity Test without Proposed Noise Barrier

Appendix 3.15       Detail Prediction of Cumulative Odour Concentration due to Existing Chicken Farm

Appendix 3.16       Detail Prediction of Cumulative Odour Concentration due to Sewage Treatment Works and Refuse Transfer Station

Appendix 3.17       Determination of Surface Characteristics Parameters

Appendix 4.2.1      The Locations of Background Noise Measurement

Appendix 4.2.2      The Locations of Background Noise Measurement

Appendix 4.4.1      Photographs of Existing NSRs outside NDA Boundary

Appendix 4.4.2      Photographs of Existing NSRs inside NDA Boundary

Appendix 4.5.1      Plant inventory (Unmitigated Scenario)

Appendix 4.5.2      Construction Programme, Locations of Works areas and Distance to Notional Sources

Appendix 4.5.3      SWL of PME

Appendix 4.6.1      Predicted Construction Noise Levels at Representative NSRs (Unmitigated Scenario)

Appendix 4.6.2      Quiet items of PME

Appendix 4.6.3      Schematic Diagram for Construction Noise Barrier and Noise Enclosure

Appendix 4.6.4      Plant Inventory (Mitigated Scenario)

Appendix 4.6.5      Predicted Construction Noise Levels at Representative NSRs (Mitigated Scenario)

Appendix 4.6.6      Grouping of PME for Different Works Area and Works Activities

Appendix 4.6.7      Construction Noise Assessment After Adoption of Grouping of PME at Critical Works Areas

Appendix 4.6.8      Minimum Separation between Schools and Critical Works Areas During Examination Period

Appendix 4.6.9      Grouping of PME Required during Examination Period

Appendix 4.6.10    Construction Noise Assessment during Examination Period

Appendix 4.7.1      Traffic Data

Appendix 4.7.2      Road Plot and Traffic Speed of Road Links

Appendix 4.7.3      Detailed Results of Road Traffic Noise Assessment (Unmitigated Scenario)

Appendix 4.7.4      Detailed Results of Road Traffic Noise Assessment (Mitigated Scenario)

Appendix 4.7.5      Eligibility Testing for Indirect Noise Mitigation Measures

Appendix 4.7.6      Determination of Traffic Noise Impact on Existing Road due to the Project

Appendix 4.8.1      West Rail Viaduct Noise Propagation Model

Appendix 4.8.2      Rail Noise Model Validation Report

Appendix 4.8.3      Predicted Noise Level for West Rail (Unmitigated)

Appendix 4.8.4      Predicted Noise Level for Light Rail (Unmitigated)  

Appendix 4.8.5      Predicted Noise Level for West Rail and Light Rail (Mitigated)        

Appendix 4.8.6      EFTS Track Enhancement Reference

Appendix 4.9.1      Detailed Calculations of Fixed Plant Noise

Appendix 4.10.1    Detailed Calculations of Helicopter Noise

Appendix 5.1        Key Assumptions for Quantification of Construction Site Run-off

Appendix 5.2        Key Assumptions for Compiling Pollution Loading of Point Source Discharge to North Western WCZ

Appendix 5.3        Key Assumptions for Compiling Pollution Loading to Deep Bay WCZ from Unsewered Developments

Appendix 5.4        Key Assumptions for Compiling Non-Point Source Pollution from Surface Run-off

Appendix 7.1        Endorsement Letter of the Construction and Demolition Materials Management Plan

Appendix 8.1        Contamination Assessment Plan

Appendix 8.2        Potentially Contaminated Sites identified in the Schedule 2 Designated Projects in HSK NDA

Appendix 9.1        Representative Photographs of Habitats Recorded within the Assessment Area

Appendix 9.2        Plant Species Recorded within the Assessment Area

Appendix 9.3        Representative Photographs of Species of Conservation Importance Recorded within the Assessment Area

Appendix 9.4        Avifauna Species Recorded from the Assessment Area

Appendix 9.5        Height of Ardeids Flying from Egretry

Appendix 9.6        Mammal Species Recorded from the Assessment Area

Appendix 9.7        Herpetofauna Species Recorded from the Assessment Area

Appendix 9.8        Butterfly Species Recorded from the Assessment Area

Appendix 9.9        Odonate Species Recorded from the Assessment Area

Appendix 9.10a     Freshwater Communities Recorded from the Assessment Area (Dry Season)

Appendix 9.10b     Freshwater Communities Recorded from the Assessment Area (Wet Season)

Appendix 9.11a     Intertidal Species Recorded from the Assessment Area (Dry Season)

Appendix 9.11b     Intertidal Species Recorded from the Assessment Area (Wet Season)

Appendix 9.12       Representative Photographs of San Sang San Tsuen Egretry and Ngau Hom Shek Egretry

Appendix 9.13       Ardeid Flight Paths from San Sang San Tsuen Egretry Overlaid on the Revised RODP


Appendix 10.1    Representative Photographic Records of Ponds within the Assessment Area

Appendix 12.1    Built Heritage Record

Appendix 12.2    Archaeological Field Survey Report

Appendix 13.1    Project Implementation Schedule

Appendix 15.1    Key Assessment Assumptions and Limitation of Assessment Methodologies

Appendix 15.2    Summary of Environmental Impacts


 

 

 

 

 

 

This Page Left Blank Intentionally