1
Introduction
1.1
Background
1.1.1.1
BMT Asia Pacific Limited (BMT) was appointed by the Architectural
Services Department (ArchSD) for the Consultancy Agreement Ref. No. 2OC469 –
Application for an Environmental Permit under the Environment Impact Assessment
Ordinance (EIAO) (Cap. 499) for a Rooftop Helipad at the Proposed New Block
at Queen Mary Hospital (QMH). The proposed helipad
development has been classified as Designated Project (DP) under Item B.2, Schedule
2 of the EIAO by virtue of being: “A helipad within 300m of existing
or planned residential development”.
1.1.1.2
An EIA study has been conducted for the construction and operation
of the rooftop helipad (hereafter as “Proposed Helipad” or “the Project”) at
the proposed new block (hereafter as “New Block”) at QMH and to seek approval
of the EIA report under the EIAO and the Technical Memorandum on behalf of the
Food and Health Bureau (hereafter as “the Applicant”).
The environmental study for the demolition of existing structures and
construction of the New Block shall be conducted separately in the Preliminary
Environmental Review (PER) under the Public Works Programme (PWP).
Figure 1.1 shows the location
of the Proposed Helipad and its environs.
1.1.1.3
The EIA Report was prepared in accordance with the EIA Study Brief
(No. ESB-284/2015) and the Technical Memorandum of the Environmental Impact
Assessment Process (TM-EIAO).
1.1.1.4
This executive summary summarises the results of the EIA for the
Proposed Helipad.