List of Figures

 

Figure 2.1           Site Location Plan

Figure 2.2           Project Layout Plan

Figure 3.1           Locations of Representative Air Quality Sensitive Receivers

Figure 4.1           Locations of Representative Noise Sensitive Receivers

Figure 5.1           QRA Flow Chart

Figure 5.2           Societal Risk Guideline

Figure 5.3           Wind Rose of Peng Chau Weather Station (2006-2015 Day)

Figure 5.4           Wind Rose of Peng Chau Weather Station (2006-2015 Night)

Figure 5.5           Existing Lai Chi Yuen Cemetery

Figure 5.6           Location of the Project Site

Figure 5.7           Consultation Zone of SMBWTW (From PHI Register)

Figure 5.8           Layout of SMBWTW

Figure 5.9           Boundary of TPU 962

Figure 5.10         Representation of Consequence Results

Figure 5.11         Individual Risk Result

Figure 5.12         Societal Risk Result

Figure 6.1           Locations of Representative Water Quality Sensitive Receivers

Figure 8.1           Site of Conservation Importance and Transect Route

Figure 8.2           Habitats Map within Assessment Area and Transect Route

Figure 9.1           Landscape Resources

Figure 9.2           Landscape Character Area

Figure 9.3           Visually Sensitive Receivers (VSRs)

Figure 9.4           Landscape and Visual Mitigation Measures

Figure 9.5           Photomontages

Figure 9.6           Tree Compensation within the Existing Cemetery Boundary

 

List of Appendices

 

Appendix 2.1      Alternative Options for the Extension of the Existing Lai Chi Yuen Cemetery

Appendix 2.2      Construction Programme

Appendix 4.1      Measurement Results for Prevailing Daytime Noise Levels

Appendix 4.2      Noise Criteria for Fixed Noise Sources   

Appendix 4.3      Photographs of Representative Noise Sensitive Receivers

Appendix 4.4      EPD’s Agreement on Noise Assessment Points

Appendix 4.5      Powered Mechanical Equipment (PME) for Construction Tasks during Normal Daytime Working Hours (Without Mitigation Measures)

Appendix 4.6      Calculations of Construction Noise Levels during Normal Daytime Working Hours (Without Mitigation Measures)

Appendix 4.7      Calculation of Total Maximum Allowable Sound Power Level of the Fixed Plants

Appendix 5.1      Population Considered in this Study

Appendix 5.2      Summary of Historical Incidents

Appendix 7.1      Estimated Quantity of C&D Materials Generated From Different Stages of the Construction of the Project

Appendix 8.1      List of Flora Species Recorded and the Relative Abundance within the Assessment Area

Appendix 8.2      List of Herpetofauna Species Recorded within the Assessment Area

Appendix 8.3      List of Dragonfly Species Recorded and the Relative Abundance within the Assessment Area

Appendix 8.4      List of Butterfly Species Recorded and the Relative Abundance within the Assessment Area

Appendix 8.5      List of Avi-fauna Species Recorded and the Relative Abundance within the Assessment Area

Appendix 8.6      List of Aquatic Fauna Recorded and the Relative Abundance within the Assessment Area

Appendix 8.7      Photographs of the Identified Habitats, Project Site and Species of Conservation Importance

Appendix 9.1      Photo Record of Views from the Subject Site towards Potential VSRs along Lantau Trail

Appendix 12.1    Key Assessment Assumptions, Limitation of Assessment Methodologies and related Prior Agreement(s)

Appendix 12.2    Summary of Environmental Impacts

Appendix 13.1    Study Brief Checklist for the Project