|
|
Improvement Dredging for Lamma Power Station Navigation Channel |
|
Contents |
Chapter
Title
1.1_______ Project
Background______________________________________________________________
1.1.1______ Project
History_________________________________________________________________
1.2_______ Purpose and Objectives
of the Project_______________________________________________
1.3_______ Location and Scale of
the Project___________________________________________________
1.4_______ EIA Study Brief
Requirements______________________________________________________
1.4.1______ Designated Project
under the EIA Ordinance__________________________________________
1.4.2______ Purpose of the EIA
Study_________________________________________________________
1.4.3______ Objectives of the EIA
Study_______________________________________________________
1.4.4______ Scope of the EIA
Study___________________________________________________________
1.5_______ Structure of this EIA Study Report___________________________________________________
2.1_______ Project
Overview_______________________________________________________________
2.2_______ The Need for
the Project__________________________________________________________
2.3_______ Scenario With
the Project_________________________________________________________
2.4_______ Scenario
Without the Project_______________________________________________________
2.5.1______ Channel
Alignment Options________________________________________________________
2.5.2______ Dredging
Methods_______________________________________________________________
2.5.3______ Phased
Implementation___________________________________________________________
2.5.4______ Use of Smaller
Vessels___________________________________________________________
2.5.5______ Need for
Operation Dredging_______________________________________________________
2.6_______ Work Programme______________________________________________________________
2.7_______ Potential Concurrent Projects_____________________________________________________
3.1_______
Introduction____________________________________________________________________
3.2.1______
Environmental Impact Assessment Ordinance
(EIAO)____________________________________
3.2.2______
Water Pollution Control Ordinance
(WPCO)____________________________________________
3.2.3______
Dumping at Sea Ordinance
(DASO)_________________________________________________
3.2.4______
Water Services Department Standards for Seawater
Intakes_______________________________
3.3_______
Baseline Conditions_____________________________________________________________
3.3.1______
Study Area and Water Sensitive
Receivers____________________________________________
3.3.2______
Baseline Water
Quality___________________________________________________________
3.3.3______
Baseline Sediment Quality_______________________________________________________
3.4_______
Assessment Criteria____________________________________________________________
3.4.1______
Suspended Solids______________________________________________________________
3.4.2______
Dissolved Oxygen______________________________________________________________
3.4.3______
Unionised Ammonia and Total Inorganic
Nitrogen______________________________________
3.4.4______
Metals and Other
Contaminants___________________________________________________
3.4.5______
Sedimentation_________________________________________________________________
3.5_______
Identification of Pollution
Sources__________________________________________________
3.5.1______
Construction Phase Water Quality
Impact____________________________________________
3.5.2______
Operation Phase Water Quality
Impact______________________________________________
3.5.3______
Concurrent Projects____________________________________________________________
3.6_______
Water Quality Assessment Methodology_____________________________________________
3.6.1______
Hydrodynamic Model___________________________________________________________
3.6.2______
Suspended Sediment___________________________________________________________
3.6.3______
Release of Contaminants from
Sediment_____________________________________________
3.6.4______
Impacts on Dissolved
Oxygen_____________________________________________________
3.6.5______
Recurrent Improvement
Dredging__________________________________________________
3.7_______
Evaluation and Assessment of Water Quality
Impacts___________________________________
3.7.1______
Suspended Sediment___________________________________________________________
3.7.2______
Sedimentation_________________________________________________________________
3.7.3______
Release of Contaminants from
Sediment_____________________________________________
3.7.4______
Impact on Dissolved
Oxygen______________________________________________________
3.7.5______
Recurrent Improvement Dredging__________________________________________________
3.8_______
Mitigation Measures____________________________________________________________
3.9_______
Evaluation of Residual
Impacts____________________________________________________
3.10______
Environmental Monitoring and Audit Requirements_____________________________________
3.11______
Conclusion___________________________________________________________________
4.1_______
Introduction____________________________________________________________________
4.3_______ Study Area and
Methodology______________________________________________________
4.3.1______ Study
Area____________________________________________________________________
4.3.2______ Desktop
Review________________________________________________________________
4.3.3______ Ecological Field
Surveys__________________________________________________________
4.4.1______ Marine
Waters_________________________________________________________________
4.4.2______ Recognized Sites of
Conservation Importance__________________________________________
4.4.3______ Coral Communities and
Sub-tidal Hard Bottom Habitat___________________________________
4.4.4______ Benthic Infauna and
Sub-tidal Soft Bottom Habitat______________________________________
4.4.5______ Intertidal Habitats
and Communities________________________________________________
4.5_______ Evaluation of
Ecological Importance________________________________________________
4.5.1______ Habitat
Evaluation______________________________________________________________
4.5.2______ Species of
Conservation Interest___________________________________________________
4.6.1______ Assessment
Methodology________________________________________________________
4.6.2______ Identification of
Potential Ecological Impacts__________________________________________
4.6.3______ Evaluation of
Potential Ecological Impacts____________________________________________
4.7_______
Mitigation/Precautionary
Measures_________________________________________________
4.8_______ Evaluation of Residual
Impacts____________________________________________________
4.9_______ Ecological Monitoring
and Audit Requirements________________________________________
4.10______
Conclusion___________________________________________________________________
4.11______
References___________________________________________________________________
5.1_______
Introduction____________________________________________________________________
5.3_______
Baseline
Conditions_____________________________________________________________
5.3.1______
Study Area____________________________________________________________________
5.3.2______
Physical Environmental
Background_________________________________________________
5.3.3______
Fisheries Baseline_______________________________________________________________
5.4.1______
Construction
Phase______________________________________________________________
5.4.2______
Operation Phase________________________________________________________________
5.5_______
Mitigation of Adverse Environmental
Impacts__________________________________________
5.6_______ Cumulative
Impacts_____________________________________________________________
5.7_______
Evaluation of Residual
Impacts____________________________________________________
5.8_______
Ecological Monitoring and Audit
Requirements________________________________________
5.9_______
Conclusion___________________________________________________________________
5.10______ References___________________________________________________________________
6.1_______
Introduction____________________________________________________________________
6.1.1______
Project
Background______________________________________________________________
6.1.2______ Objectives____________________________________________________________________
6.1.3______
Scope of Work_________________________________________________________________
6.2_______
Description of Existing Submarine Natural Gas
Pipeline___________________________________
6.2.1______
Submarine Natural Gas Pipeline____________________________________________________
6.2.2______
Physical Properties of Natural
Gas__________________________________________________
6.3_______
Description of Dredging
Methods____________________________________________________
6.3.1______ Grab
Dredging_________________________________________________________________
6.3.2______
Trailing Suction Hopper
Dredging___________________________________________________
6.4_______ Risk
Assessment Methodology____________________________________________________
6.4.1______
Qualitative Risk Assessment Approach______________________________________________
6.4.2______
Hazard
Identification____________________________________________________________
6.4.3______ Risk
Analysis_________________________________________________________________
6.4.4______ Risk
Evaluation________________________________________________________________
6.4.5______ Risk
Treatment________________________________________________________________
6.5.1______
Background of Previous Risk Assessments for the Submarine
Pipeline______________________
6.5.2______
Potential Causes of Failure of the Submarine
Pipeline___________________________________
6.5.3______
Recommended Mitigation Measures from Previous Assessments__________________________
6.6_______
Hazard Identification
Workshop____________________________________________________
6.6.1______
Results______________________________________________________________________
6.6.2______
Recommendations of Risk Mitigation
Measures________________________________________
6.7_______
Environmental Monitoring and
Audit________________________________________________
6.8_______
Conclusions__________________________________________________________________
6.9_______
References___________________________________________________________________
7.1_______ Introduction____________________________________________________________________
7.2.1______
Construction
Phase______________________________________________________________
7.2.2______
Operation Phase________________________________________________________________
7.3_______
Description of the
Environment_____________________________________________________
7.3.1______ Study
Area____________________________________________________________________
7.3.2______ Baseline
Conditions_____________________________________________________________
7.3.3______ Noise
Sensitive Receivers_________________________________________________________
7.4_______
Identification of Noise Emission
Sources______________________________________________
7.4.1______
Construction Phase Noise
Impact___________________________________________________
7.4.2______
Operation Phase Noise
Impact_____________________________________________________
7.4.3______
Concurrent Projects_____________________________________________________________
7.5_______ Noise
Impact Assessment Methodology______________________________________________
7.5.1______ Dredging
Working Zones__________________________________________________________
7.6_______
Construction Noise Impact
Assessment_______________________________________________
7.6.2______ Noise
Impact during Evening and Holiday Day-time Periods_______________________________
7.6.3______ Noise
Impact during Night-time Period________________________________________________
7.7_______ Operation
Phase Noise Impact Assessment___________________________________________
7.8_______
Mitigation Measures____________________________________________________________
7.9_______
Evaluation of Residual
Impacts____________________________________________________
7.10______
Environmental Monitoring and Audit Requirements_____________________________________
7.11______
Conclusion___________________________________________________________________
8.1_______
Introduction____________________________________________________________________
8.2_______
Environmental Legislation, Standards and
Guidelines___________________________________
8.2.1______
Environmental Impact Assessment
Ordinance________________________________________
8.2.2______
Waste Disposal Ordinance_______________________________________________________
8.2.3______
Waste Disposal (Chemical Waste) (General)
Regulation________________________________
8.2.4______
Dumping at Sea Ordinance_______________________________________________________
8.2.5______
Public Cleansing and Prevention of Nuisances
Regulation_______________________________
8.3_______
Assessment Methodology_________________________________________________________
8.3.1______
Analysis of Activities and Waste
Generation__________________________________________
8.3.2______
Dredging and Dumping__________________________________________________________
8.4.1______
Construction Phase_____________________________________________________________
8.4.2______
Operation Phase_______________________________________________________________
8.5_______
Mitigation
Measures_____________________________________________________________
8.5.1______
Marine Sediment_______________________________________________________________
8.5.2______
Chemical Waste_______________________________________________________________
8.5.3______
General Refuse________________________________________________________________
8.6_______
Evaluation of Residual Impacts____________________________________________________
8.7_______
Environmental Monitoring and Audit
Requirements_____________________________________
8.8_______
Conclusion____________________________________________________________________
8.8.1______
Construction Phase_____________________________________________________________
8.8.2______
Operation Phase_______________________________________________________________
9.1_______
General______________________________________________________________________
9.2_______ Summary of Environmental
Outcomes______________________________________________
9.2.2______ Environmental Designs
Recommended_____________________________________________
9.2.3______ Estimated Population and
Environmentally Sensitive Areas Protected_____________________
9.2.4______ Key Environmental
Problems Avoided and Compensation Areas Included__________________
9.2.5______ Environmental Benefits of
Environmental Protection Measures Recommended______________
9.3_______ Key Assessment Assumptions
and Limitations of Assessment Methodologies_______________
9.4_______ Summary of Environmental
Impacts_________________________________________________
9.4.1______ Water Quality
Impact_____________________________________________________________
9.4.2______ Marine Ecological
Impact_________________________________________________________
9.4.3______ Fisheries
Impact________________________________________________________________
9.4.4______ Hazard to
Life__________________________________________________________________
9.4.5______ Noise
Impact___________________________________________________________________
9.4.6______ Waste Management Implications___________________________________________________
10.1______
General_____________________________________________________________________
10.2______
Water Pollution________________________________________________________________
10.3______
Marine Ecology________________________________________________________________
10.4______
Fisheries_____________________________________________________________________
10.5______
Hazard to Life_________________________________________________________________
10.6______
Noise_______________________________________________________________________
10.7______ Waste Management____________________________________________________________
11.1______ Project Implementation Schedule__________________________________________________
Tables
Table 2-2:__ Summary of
Dredging Technology_________________________________________________
Table 2-3:__ Siltation
Rates Based on Past Bathymetry Records____________________________________
Table 2-4:__ Summary of
Options Evaluation and the Preferred Option_______________________________
Table 2-5:__ Summary of Concurrent Projects Considered for Cumulative Impact Assessment____________
Table 3 1:__ Water
Quality Objectives for Western Buffer WCZ_____________________________________
Table 3
2:__ Water Quality Objectives for Southern
WCZ__________________________________________
Table 3
3:__ Sediment Quality Criteria under ETWB TCW No. 34/2002_______________________________
Table
3-5:__ Water Sensitive
Receivers_______________________________________________________
Table 3
6:__ Baseline Marine Water Quality in Western Buffer WCZ (1986 to
2015)_____________________
Table 3
7:__ Baseline Marine Water Quality in Southern WCZ (1986 to
2015)__________________________
Table
3-9:__ Summary of Sediment Sampling and Elutriation Test
Results_____________________________
Table
3-10:_ Assessment Criteria for Suspended
Solids___________________________________________
Table
3-11:_ Assessment Criteria for Suspended Solids (WSD Seawater
Intakes)_______________________
Table
3-15:_ Summary of Assumptions for Dredgers______________________________________________
Table
3-17:_ WSRs and Sediment Sampling Locations Assessed using the Gaussian
Dispersion Model______
Table
3-18:_ Predicted Worst Affected WSRs and Maximum Allowable SS Release
Rates_________________
Table
3-19:_ Predicted Maximum Allowable Dredging
Rates________________________________________
Table
3-22:_ Recommended Maximum Allowable SS Release Rates and Maximum Allowable
Dredging Rates_
Table
3.29:_ Factors Affecting Operation Phase Recurrent
Dredging__________________________________
Table
3.30:_ Wet and Dry Season Tidal Discharges (m3/s)__________________________________________
Table 4 1: __ Ecological Evaluation of Sham
Wan SSSI and Restricted Area____________________________
Table 4 7: __ Ecological
Evaluation of Marine Waters______________________________________________
Table 5-1:__ Fishing
Operations within the Project area_____________________________________________
Table 6 2: __
Consequence Criteria for the Cause of
Incident________________________________________
Table 6 3: __
Risk Analysis Matrix____________________________________________________________
Table 6 4: __
Risk Evaluation
Criteria__________________________________________________________
Table 6 5: __
Risk Ranking for SWIFT Log Sheets – Grab Dredging
Method____________________________
Table 6 6: __
Risk Ranking for SWIFT Log Sheets – TSHD Method___________________________________
Table 6 7: __
Summary of Hazards in High Risk Level – Grab Dredging
Method_________________________
Table 6 8: __ Summary of Hazards in High Risk Level – TSHD Method________________________________
Table 7 1:__ Noise Standards
for Daytime Construction Activities____________________________________
Table 7 4:__ PME
Adopted in Previous Approved EIA Study________________________________________
Table 7 6:__
Construction Noise Impact during Normal Working Hours________________________________
Table 7 8:__ Construction Noise Impact during Night-time Period____________________________________
Table 8.1:__
Summary of Previous Sediment Sampling Works______________________________________
Table 9.1:__ Key Assessment Assumptions,
Limitations of Assessment Methodologies___________________
Table 9.2:__ Summary of Environmental Impacts_________________________________________________
Table 11.1:_ Implementation
Schedule of Recommended Mitigation Measures__________________________
Figures
Figure 3.1__ Water Sensitive Receivers
Figure 3.2__ Sediment Sampling Locations for Elutriation
Test
Figure 3.3__ Dredging Locations for Water Quality
Modelling
Figure 4.1__ Locations of Coral Dive Survey
Figure 4.2__ Marine Benthic Sampling Stations
Figure 4.3__ Locations of Intertidal Survey
Figure 4.4__ Locations of Marine Ecological Sensitive
Receivers
Figure 4.5__ Density of Finless Porpoises in Southern
Waters of Hong Kong During Wet and Dry Seasons
Figure 5.1 _ Fisheries Sensitive Receivers
Figure 5.2 _ Overall Distribution of Fishing
Operations
Figure 5.3 _ Distribution of Fishing
Operations Vessel Exceeding 15M in Length
Figure 5.4 __ Distribution of Fishing Operations Vessel Not
Exceeding 15M in Length
Figure 5.5 _ Distribution of Adult Fish
Production
Figure 5.6 _ Distribution of Fisheries
Production (Fish Fry)
Figure 6-1: _ Location
of the Lamma Power Station Navigation Channel
Figure 6-2:
_ Alignment of the Submarine Pipeline
Figure 6-3:
_ Submarine Pipeline across Lamma Power Station Navigation Channel
Figure 6-4:
_ Clamshell Grab Dredger
Figure 6-5:
_ Cage Type Silt Curtain
Figure 6-6:
_ Cross-section of Cage Type Silt Curtain Arrangement
Figure 6-7:
_ Clamshell installed in Grab Dredger
Figure 6-8:
_ Trailing Suction Hopper Dredger
Figure 6-9:
_ Draghead and Suction Pipe
Figure 6-10: Swell Compensator
Figure 7.1__ Noise Impact Study Area and Locations of
Representative Noise Sensitive Receivers
Figure 8.1__ Grab Sampling Location
Maps
Map 2-1:___ Possible Alternatives
for Channel Alignment and Approach
Appendices
Appendix 1.1____ Extracts of
Past Bathymetry Surveys and Dredging Extents
Appendix
3.1____ Model Grid Refinement and Validation Results
Appendix
3.2____ Modelling Assumptions for Concurrent Projects
Appendix
3.3____ Dilution Results and Calculated Maximum Allowable SS Release (Project
Only)
Appendix
3.4____ Predicted Maximum SS at WSRs (Concurrent Projects Only)
Appendix
3.5____ Contour plots of SS due to Concurrent Projects Only
Appendix
3.6____ Predicted Maximum SS and Sedimentation Rate at WSRs (Cumulative)
Appendix 3.8____ (not used)
Appendix 3.9____ (not used)
Appendix
3.10___ Calculated DO Concentrations at WSRs
Appendix
3.11___ Operation Phase Hydrodynamic Results (Before and After Dredging)
Appendix 4.1____ Coral
Dive Survey Results
Appendix 4.2
____ Benthic Field Surveys Results
Appendix
4.3 ____ Intertidal Field Survey Results
Appendix 4.4____ Inter-nesting
Locations of the Green Turtle in Hong Kong in 2003, 2008 and 2012
Appendix 6.1____
SWIFT Workshop Attendance List
Appendix 6.2____ SWIFT Log
Sheet
Appendix
7.1____ Construction Plant Inventory and Noise Impact Assessment
Appendix
8.1____ Relevant EPD Sediment Monitoring Results
Appendix
8.2 ____ Approved Sediment Quality Report