Improvement Dredging for Lamma Power Station Navigation Channel |
|
Contents |
Chapter Title
1.1_______ Project Background______________________________________________________________
1.1.1______ Project History_________________________________________________________________
1.2_______ Purpose and Objectives of the Project_______________________________________________
1.3_______ Location and Scale of the Project___________________________________________________
1.4_______ EIA Study Brief Requirements______________________________________________________
1.4.1______ Designated Project under the EIA Ordinance__________________________________________
1.4.2______ Purpose of the EIA Study_________________________________________________________
1.4.3______ Objectives of the EIA Study_______________________________________________________
1.4.4______ Scope of the EIA Study___________________________________________________________
1.5_______ Structure of this EIA Study Report___________________________________________________
2.1_______ Project Overview_______________________________________________________________
2.2_______ The Need for the Project__________________________________________________________
2.3_______ Scenario With the Project_________________________________________________________
2.4_______ Scenario Without the Project_______________________________________________________
2.5_______ Consideration of Alternative Options, Construction Methods and Work Sequences_______________
2.5.1______ Channel Alignment Options________________________________________________________
2.5.2______ Dredging Methods_______________________________________________________________
2.5.3______ Phased Implementation___________________________________________________________
2.5.4______ Use of Smaller Vessels___________________________________________________________
2.5.5______ Need for Operation Dredging_______________________________________________________
2.5.6______ Summary of Options Evaluation and Selection of Preferred Option__________________________
2.6_______ Work Programme______________________________________________________________
2.7_______ Potential Concurrent Projects_____________________________________________________
3.1_______ Introduction____________________________________________________________________
3.2_______ Environmental Legislation, Standards, Guidelines and Criteria______________________________
3.2.1______ Environmental Impact Assessment Ordinance (EIAO)____________________________________
3.2.2______ Water Pollution Control Ordinance (WPCO)____________________________________________
3.2.3______ Dumping at Sea Ordinance (DASO)_________________________________________________
3.2.4______ Water Services Department Standards for Seawater Intakes_______________________________
3.3_______ Baseline Conditions_____________________________________________________________
3.3.1______ Study Area and Water Sensitive Receivers____________________________________________
3.3.2______ Baseline Water Quality___________________________________________________________
3.3.3______ Baseline Sediment Quality_______________________________________________________
3.4_______ Assessment Criteria____________________________________________________________
3.4.1______ Suspended Solids______________________________________________________________
3.4.2______ Dissolved Oxygen______________________________________________________________
3.4.3______ Unionised Ammonia and Total Inorganic Nitrogen______________________________________
3.4.4______ Metals and Other Contaminants___________________________________________________
3.4.5______ Sedimentation_________________________________________________________________
3.5_______ Identification of Pollution Sources__________________________________________________
3.5.1______ Construction Phase Water Quality Impact____________________________________________
3.5.2______ Operation Phase Water Quality Impact______________________________________________
3.5.3______ Concurrent Projects____________________________________________________________
3.6_______ Water Quality Assessment Methodology_____________________________________________
3.6.1______ Hydrodynamic Model___________________________________________________________
3.6.2______ Suspended Sediment___________________________________________________________
3.6.3______ Release of Contaminants from Sediment_____________________________________________
3.6.4______ Impacts on Dissolved Oxygen_____________________________________________________
3.6.5______ Recurrent Improvement Dredging__________________________________________________
3.7_______ Evaluation and Assessment of Water Quality Impacts___________________________________
3.7.1______ Suspended Sediment___________________________________________________________
3.7.2______ Sedimentation_________________________________________________________________
3.7.3______ Release of Contaminants from Sediment_____________________________________________
3.7.4______ Impact on Dissolved Oxygen______________________________________________________
3.7.5______ Recurrent Improvement Dredging__________________________________________________
3.8_______ Mitigation Measures____________________________________________________________
3.9_______ Evaluation of Residual Impacts____________________________________________________
3.10______ Environmental Monitoring and Audit Requirements_____________________________________
3.11______ Conclusion___________________________________________________________________
4.1_______ Introduction____________________________________________________________________
4.2_______ Environmental Legislation, Standards, Guidelines and Criteria______________________________
4.3_______ Study Area and Methodology______________________________________________________
4.3.1______ Study Area____________________________________________________________________
4.3.2______ Desktop Review________________________________________________________________
4.3.3______ Ecological Field Surveys__________________________________________________________
4.4_______ Baseline Conditions and Marine Ecological Sensitive Receivers_____________________________
4.4.1______ Marine Waters_________________________________________________________________
4.4.2______ Recognized Sites of Conservation Importance__________________________________________
4.4.3______ Coral Communities and Sub-tidal Hard Bottom Habitat___________________________________
4.4.4______ Benthic Infauna and Sub-tidal Soft Bottom Habitat______________________________________
4.4.5______ Intertidal Habitats and Communities________________________________________________
4.5_______ Evaluation of Ecological Importance________________________________________________
4.5.1______ Habitat Evaluation______________________________________________________________
4.5.2______ Species of Conservation Interest___________________________________________________
4.6_______ Identification and Evaluation of Potential Marine Ecological Impacts_________________________
4.6.1______ Assessment Methodology________________________________________________________
4.6.2______ Identification of Potential Ecological Impacts__________________________________________
4.6.3______ Evaluation of Potential Ecological Impacts____________________________________________
4.7_______ Mitigation/Precautionary Measures_________________________________________________
4.8_______ Evaluation of Residual Impacts____________________________________________________
4.9_______ Ecological Monitoring and Audit Requirements________________________________________
4.10______ Conclusion___________________________________________________________________
4.11______ References___________________________________________________________________
5.1_______ Introduction____________________________________________________________________
5.2_______ Environmental Legislation, Standards, Guidelines and Criteria_____________________________
5.3_______ Baseline Conditions_____________________________________________________________
5.3.1______ Study Area____________________________________________________________________
5.3.2______ Physical Environmental Background_________________________________________________
5.3.3______ Fisheries Baseline_______________________________________________________________
5.4_______ Identification and Evaluation of Potential Fisheries Impacts________________________________
5.4.1______ Construction Phase______________________________________________________________
5.4.2______ Operation Phase________________________________________________________________
5.5_______ Mitigation of Adverse Environmental Impacts__________________________________________
5.6_______ Cumulative Impacts_____________________________________________________________
5.7_______ Evaluation of Residual Impacts____________________________________________________
5.8_______ Ecological Monitoring and Audit Requirements________________________________________
5.9_______ Conclusion___________________________________________________________________
5.10______ References___________________________________________________________________
6.1_______ Introduction____________________________________________________________________
6.1.1______ Project Background______________________________________________________________
6.1.2______ Objectives____________________________________________________________________
6.1.3______ Scope of Work_________________________________________________________________
6.2_______ Description of Existing Submarine Natural Gas Pipeline___________________________________
6.2.1______ Submarine Natural Gas Pipeline____________________________________________________
6.2.2______ Physical Properties of Natural Gas__________________________________________________
6.3_______ Description of Dredging Methods____________________________________________________
6.3.1______ Grab Dredging_________________________________________________________________
6.3.2______ Trailing Suction Hopper Dredging___________________________________________________
6.4_______ Risk Assessment Methodology____________________________________________________
6.4.1______ Qualitative Risk Assessment Approach______________________________________________
6.4.2______ Hazard Identification____________________________________________________________
6.4.3______ Risk Analysis_________________________________________________________________
6.4.4______ Risk Evaluation________________________________________________________________
6.4.5______ Risk Treatment________________________________________________________________
6.5_______ Review of Previous Risk Assessment for the Submarine Pipeline of the Hongkong Electric_______
6.5.1______ Background of Previous Risk Assessments for the Submarine Pipeline______________________
6.5.2______ Potential Causes of Failure of the Submarine Pipeline___________________________________
6.5.3______ Recommended Mitigation Measures from Previous Assessments__________________________
6.6_______ Hazard Identification Workshop____________________________________________________
6.6.1______ Results______________________________________________________________________
6.6.2______ Recommendations of Risk Mitigation Measures________________________________________
6.7_______ Environmental Monitoring and Audit________________________________________________
6.8_______ Conclusions__________________________________________________________________
6.9_______ References___________________________________________________________________
7.1_______ Introduction____________________________________________________________________
7.2_______ Environmental Legislation, Standards, Guidelines and Criteria_____________________________
7.2.1______ Construction Phase______________________________________________________________
7.2.2______ Operation Phase________________________________________________________________
7.3_______ Description of the Environment_____________________________________________________
7.3.1______ Study Area____________________________________________________________________
7.3.2______ Baseline Conditions_____________________________________________________________
7.3.3______ Noise Sensitive Receivers_________________________________________________________
7.4_______ Identification of Noise Emission Sources______________________________________________
7.4.1______ Construction Phase Noise Impact___________________________________________________
7.4.2______ Operation Phase Noise Impact_____________________________________________________
7.4.3______ Concurrent Projects_____________________________________________________________
7.5_______ Noise Impact Assessment Methodology______________________________________________
7.5.1______ Dredging Working Zones__________________________________________________________
7.6_______ Construction Noise Impact Assessment_______________________________________________
7.6.1______ Noise Impact during Normal Working Hours (i.e. Non-Restricted Hours)_____________________
7.6.2______ Noise Impact during Evening and Holiday Day-time Periods_______________________________
7.6.3______ Noise Impact during Night-time Period________________________________________________
7.7_______ Operation Phase Noise Impact Assessment___________________________________________
7.8_______ Mitigation Measures____________________________________________________________
7.9_______ Evaluation of Residual Impacts____________________________________________________
7.10______ Environmental Monitoring and Audit Requirements_____________________________________
7.11______ Conclusion___________________________________________________________________
8.1_______ Introduction____________________________________________________________________
8.2_______ Environmental Legislation, Standards and Guidelines___________________________________
8.2.1______ Environmental Impact Assessment Ordinance________________________________________
8.2.2______ Waste Disposal Ordinance_______________________________________________________
8.2.3______ Waste Disposal (Chemical Waste) (General) Regulation________________________________
8.2.4______ Dumping at Sea Ordinance_______________________________________________________
8.2.5______ Public Cleansing and Prevention of Nuisances Regulation_______________________________
8.3_______ Assessment Methodology_________________________________________________________
8.3.1______ Analysis of Activities and Waste Generation__________________________________________
8.3.2______ Dredging and Dumping__________________________________________________________
8.4_______ Identification, Prediction and Evaluation of Environmental Impact__________________________
8.4.1______ Construction Phase_____________________________________________________________
8.4.2______ Operation Phase_______________________________________________________________
8.5_______ Mitigation Measures_____________________________________________________________
8.5.1______ Marine Sediment_______________________________________________________________
8.5.2______ Chemical Waste_______________________________________________________________
8.5.3______ General Refuse________________________________________________________________
8.6_______ Evaluation of Residual Impacts____________________________________________________
8.7_______ Environmental Monitoring and Audit Requirements_____________________________________
8.8_______ Conclusion____________________________________________________________________
8.8.1______ Construction Phase_____________________________________________________________
8.8.2______ Operation Phase_______________________________________________________________
9.1_______ General______________________________________________________________________
9.2_______ Summary of Environmental Outcomes______________________________________________
9.2.1______ Environmentally Friendly Options Considered and Incorporated in the Preferred Option_______
9.2.2______ Environmental Designs Recommended_____________________________________________
9.2.3______ Estimated Population and Environmentally Sensitive Areas Protected_____________________
9.2.4______ Key Environmental Problems Avoided and Compensation Areas Included__________________
9.2.5______ Environmental Benefits of Environmental Protection Measures Recommended______________
9.3_______ Key Assessment Assumptions and Limitations of Assessment Methodologies_______________
9.4_______ Summary of Environmental Impacts_________________________________________________
9.4.1______ Water Quality Impact_____________________________________________________________
9.4.2______ Marine Ecological Impact_________________________________________________________
9.4.3______ Fisheries Impact________________________________________________________________
9.4.4______ Hazard to Life__________________________________________________________________
9.4.5______ Noise Impact___________________________________________________________________
9.4.6______ Waste Management Implications___________________________________________________
10.1______ General_____________________________________________________________________
10.2______ Water Pollution________________________________________________________________
10.3______ Marine Ecology________________________________________________________________
10.4______ Fisheries_____________________________________________________________________
10.5______ Hazard to Life_________________________________________________________________
10.6______ Noise_______________________________________________________________________
10.7______ Waste Management____________________________________________________________
11.1______ Project Implementation Schedule__________________________________________________
Tables
Table 2-2:__ Summary of Dredging
Technology_________________________________________________
Table 2-3:__ Siltation Rates Based
on Past Bathymetry Records____________________________________
Table 2-4:__ Summary of Options
Evaluation and the Preferred Option_______________________________
Table 2-5:__ Summary of Concurrent Projects Considered for Cumulative Impact Assessment____________
Table 3 1:__ Water
Quality Objectives for Western Buffer WCZ_____________________________________
Table 3 2:__ Water
Quality Objectives for Southern WCZ__________________________________________
Table 3 3:__
Sediment Quality Criteria under ETWB TCW No.
34/2002_______________________________
Table 3-5:__ Water
Sensitive Receivers_______________________________________________________
Table 3 6:__ Baseline
Marine Water Quality in Western Buffer WCZ (1986 to 2015)_____________________
Table 3 7:__
Baseline Marine Water Quality in Southern WCZ (1986 to
2015)__________________________
Table 3-9:__ Summary
of Sediment Sampling and Elutriation Test Results_____________________________
Table 3-10:_
Assessment Criteria for Suspended
Solids___________________________________________
Table 3-11:_
Assessment Criteria for Suspended Solids (WSD Seawater
Intakes)_______________________
Table 3-15:_ Summary
of Assumptions for Dredgers______________________________________________
Table 3-17:_ WSRs
and Sediment Sampling Locations Assessed using the Gaussian Dispersion
Model______
Table 3-18:_
Predicted Worst Affected WSRs and Maximum Allowable SS Release
Rates_________________
Table 3-19:_
Predicted Maximum Allowable Dredging
Rates________________________________________
Table 3-22:_
Recommended Maximum Allowable SS Release Rates and Maximum Allowable Dredging
Rates_
Table 3.29:_ Factors
Affecting Operation Phase Recurrent Dredging__________________________________
Table 3.30:_ Wet and Dry Season Tidal Discharges (m3/s)__________________________________________
Table
4 1: __ Ecological Evaluation of Sham Wan SSSI and Restricted
Area____________________________
Table
4 7: __ Ecological Evaluation of Marine
Waters______________________________________________
Table 5-1:__ Fishing
Operations within the Project area_____________________________________________
Table 6 2: __ Consequence
Criteria for the Cause of Incident________________________________________
Table 6 3: __ Risk
Analysis Matrix____________________________________________________________
Table 6 4: __ Risk
Evaluation Criteria__________________________________________________________
Table 6 5: __ Risk Ranking
for SWIFT Log Sheets – Grab Dredging Method____________________________
Table 6 6: __ Risk Ranking
for SWIFT Log Sheets – TSHD Method___________________________________
Table 6 7: __ Summary of
Hazards in High Risk Level – Grab Dredging Method_________________________
Table 6 8: __ Summary of Hazards in High Risk Level – TSHD Method________________________________
Table 7 1:__ Noise Standards
for Daytime Construction Activities____________________________________
Table 7 4:__ PME Adopted in
Previous Approved EIA Study________________________________________
Table 7 6:__ Construction
Noise Impact during Normal Working Hours________________________________
Table 7 8:__ Construction Noise Impact during Night-time Period____________________________________
Table 8.1:__
Summary of Previous Sediment Sampling Works______________________________________
Table
9.1:__ Key Assessment Assumptions, Limitations of Assessment
Methodologies___________________
Table 9.2:__ Summary of Environmental Impacts_________________________________________________
Table 11.1:_ Implementation Schedule of Recommended Mitigation Measures__________________________
Figures
Figure 3.1__ Water Sensitive Receivers
Figure 3.2__ Sediment Sampling Locations for Elutriation Test
Figure 3.3__ Dredging Locations for Water Quality Modelling
Figure 4.1__ Locations of Coral Dive Survey
Figure 4.2__ Marine Benthic Sampling Stations
Figure 4.3__ Locations of Intertidal Survey
Figure 4.4__ Locations of Marine Ecological Sensitive Receivers
Figure 4.5__ Density of Finless Porpoises in Southern Waters of Hong Kong During Wet and Dry Seasons
Figure 5.1 _ Fisheries Sensitive Receivers
Figure 5.2 _ Overall Distribution of Fishing Operations
Figure 5.3 _ Distribution of Fishing Operations Vessel Exceeding 15M in Length
Figure 5.4 __ Distribution of Fishing Operations Vessel Not Exceeding 15M in Length
Figure 5.5 _ Distribution of Adult Fish Production
Figure 5.6 _ Distribution of Fisheries Production (Fish Fry)
Figure 6-1: _ Location of the Lamma Power Station Navigation Channel
Figure 6-2: _ Alignment of the Submarine Pipeline
Figure 6-3: _ Submarine Pipeline across Lamma Power Station Navigation Channel
Figure 6-4: _ Clamshell Grab Dredger
Figure 6-5: _ Cage Type Silt Curtain
Figure 6-6: _ Cross-section of Cage Type Silt Curtain Arrangement
Figure 6-7: _ Clamshell installed in Grab Dredger
Figure 6-8: _ Trailing Suction Hopper Dredger
Figure 6-9: _ Draghead and Suction Pipe
Figure 6-10: Swell Compensator
Figure 7.1__ Noise Impact Study Area and Locations of Representative Noise Sensitive Receivers
Figure 8.1__ Grab Sampling Location
Maps
Map 2-1:___ Possible Alternatives for Channel Alignment and Approach
Appendices
Appendix 1.1____ Extracts of Past Bathymetry Surveys and Dredging Extents
Appendix 3.1____ Model Grid Refinement and Validation Results
Appendix 3.2____ Modelling Assumptions for Concurrent Projects
Appendix 3.3____ Dilution Results and Calculated Maximum Allowable SS Release (Project Only)
Appendix 3.4____ Predicted Maximum SS at WSRs (Concurrent Projects Only)
Appendix 3.5____ Contour plots of SS due to Concurrent Projects Only
Appendix 3.6____ Predicted Maximum SS and Sedimentation Rate at WSRs (Cumulative)
Appendix 3.8____ (not used)
Appendix 3.9____ (not used)
Appendix 3.10___ Calculated DO Concentrations at WSRs
Appendix 3.11___ Operation Phase Hydrodynamic Results (Before and After Dredging)
Appendix 4.1____ Coral Dive Survey Results
Appendix 4.2 ____ Benthic Field Surveys Results
Appendix 4.3 ____ Intertidal Field Survey Results
Appendix 4.4____ Inter-nesting Locations of the Green Turtle in Hong Kong in 2003, 2008 and 2012
Appendix 6.1____ SWIFT Workshop Attendance List
Appendix 6.2____ SWIFT Log Sheet
Appendix 7.1____ Construction Plant Inventory and Noise Impact Assessment
Appendix 8.1____ Relevant EPD Sediment Monitoring Results
Appendix 8.2 ____ Approved Sediment Quality Report