LIST OF
APPENDICES (Volume III)
Checklist
for EIA Study Brief (ESB-296/2016), Annexes 11 and 20 of TM-EIAO |
|
Railway
Area Plan |
|
Depot
Replanning Options |
|
Station
Options |
|
Depot
Replanning Scheme |
|
Tentative
Works Programme and Location of Works Front |
|
Construction
Interface between the Project and the SHD Topside Development |
|
Tentative
Population Intake Year of Planned Comprehensive Residential and Commercial
Development Atop SHD |
|
Calculation
of Construction Dust Emission Source |
|
Traffic
Data |
|
Calculation
of Vehicular Emission Source |
|
Emission
Inventory of Topside Development Construction Works |
|
Emission
Inventory of OWTF and Marine Emission from North Lantau Refuse Transfer
Station |
|
Summary of
Surface Characteristics |
|
Vehicular
Emission Burden of the Study Area |
|
Detailed
Prediction of Construction Dust Impact (Unmitigated) |
|
Detailed
Prediction of Construction Dust Impact (Tier 1) |
|
Construction
Vehicle Routing |
|
Proposed
Location of Reprovisioned SPS and Site Walk at Three Existing SPSs |
|
Representative
NAPs and Respective Operational Noise Assessment Criteria for Each Assessment
Scenario |
|
Construction
Plant Inventory and SWL of PME (Unmitigated Scenario) |
|
Calculation
of Construction Noise Impact (Unmitigated Scenario) |
|
Construction
Plant Inventory and SWL of PME (Mitigated Scenario) |
|
Schematic
Diagram for Construction Noise Barrier and Noise Enclosure |
|
Calculation
of Construction Noise Impact (Mitigated Scenario) |
|
Calculation
of Cumulative Construction Noise Impact |
|
Calculation
of Path Difference for Fixed Plant Noise Source |
|
Rail Noise
Impact Assessment Methodology for TCL and AEL |
|
SHD
Operation Scenarios for Railway Noise Assessment |
|
Details of
Train Noise Measurement |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|