LIST OF APPENDICES (Volume V)

Appendix 6.1

Estimated Sewage Generated from the Existing SHD

Appendix 6.2

Estimated Sewage Generated from the SHO and Reprovisioned SHD

Appendix 6.3

Schematic Plan of Proposed Sewerage System within SHO and Reprovisioned SHD

Appendix 6.4

Proposed Sewage Rising Main Scaled Alignment Plan and Cross Sections

Appendix 6.5

Estimation of Sewage Retention Time in Pumping System and Rising Mains

Appendix 6.6

Proposed Diameter of Rising Mains for SHO and Reprovisioned SHD

Appendix 6.7

Assessment on the Public Sewerage System Downstream of FMH7022270

Appendix 6.8

Proposed Construction, Operation and Maintenance Matrix

Appendix 7.1

PNAP No. 252 (ADV-21) Management Framework for Disposal of Dredged/Excavated Sediment

Appendix 7.2

Memo on Control Measures for Management of Dredged/Excavated Contaminated Sediment

Appendix 7.3

Summary of Chemical Screening Results and Disposal Options

Appendix 7.4

Summary of Biological Screening Results

Appendix 7.5

Laboratory Analytical Report (Chemical Screening)

Appendix 7.6

Laboratory Analytical Report (Biological Screening)

Appendix 8.1

Contamination Assessment Plan

Appendix 9.1

Approximate Location of Affected Trees

Appendix 10.1

Hazard to Life Chapter of Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot ¨C EIA Report

Appendix 11.1

Project Implementation Schedule

Appendix 13.1

Key Assessment Assumptions and Limitation of Assessment Methodologies

Appendix 13.2

Summary of Environmental Impacts