1.2 Designated Projects under the EIA Ordinance
1.4 Objectives of the EIA Study
1.5.1 Potential Hazard to Life
1.6 Structure of the EIA Report
2.2 Project Location and History
2.3.1 Effluent Treatment Process
2.3.2 Operation and Maintenance
2.3.3 Measures for Effluent Reuse to avoid Potential Health Impacts
2.4.1 Environmental Benefits of the Project
2.5 Consideration of “Without Project” Alternative
2.6 Consideration of Alternative Siting and Layout
2.7 Consideration of Alternative Construction Method
2.8 Programme and Sequence of Works
3.2 Environmental Legislation, Standards and Guidelines
3.2.1 Technical Memorandum on Environmental Impact Assessment Process
3.2.2 Air Pollution Control Ordinance
3.2.3
Air Pollution Control (Construction Dust) Regulation
3.2.4 Air Pollution Control (Non-road Mobile Machinery) (Emission) Regulation
3.3.1 Local Environment and Study Area Description
3.3.3
Key Pollutants of Concern
3.4 Air Quality Impact Assessment Methodology
3.5 Evaluation and Assessment of Air Quality Impacts
3.8 Environmental Monitoring and Audit
4.2 Environmental
Legislation, Standards and Guidelines
4.4 Description of the Noise Environment
4.6 Identification of Noise Sources
4.8 Evaluation and
Assessment of Noise Impact
4.11 Environmental Monitoring and Audit
5.2 Environmental Legislation, Standards and Guidelines
5.2.1 Environmental Impact Assessment Ordinance
5.2.2 Water Pollution Control Ordinance
5.2.4 Town Planning Board Guidelines No. 12C
5.2.5 Practice Note for Professional Persons on Construction Site Drainage
5.3 Assessment Area, Water Sensitive Receivers and Background Conditions
5.3.1 Assessment Area and Water Sensitive Receivers
5.3.2 Background Water Quality Conditions
5.5 Identification and Evaluation of Water Quality Impacts
5.6 Mitigation of Adverse Water Quality Impacts
5.7 Evaluation of Cumulative and Residual Impact
5.8 Environmental Monitoring and Audit
6 Waste
Management Implications
6.2 Environmental Legislation, Standards and Guidelines
6.2.1 Environmental Impact Assessment Ordinance
6.2.2 Waste Disposal Ordinance
6.2.3 Waste Disposal (Chemical Waste) (General) Regulation
6.2.4 Waste Disposal (Charges for Disposal of Construction Waste) Regulation
6.2.5 Dumping at Sea Ordinance
6.2.6 Public Cleansing and Prevention of Nuisances Regulation
6.2.7 Land (Miscellaneous Provisions) Ordinance
6.3.1 Analysis of Activities and Waste Generation
6.3.2 Development of Proposals for Waste Management
6.3.3 Excavation and Dumping of Sediment
6.4 Identification, Prediction and Evaluation of Environmental Impact
6.4.1 Potential Land Contamination
6.5 Mitigation of Adverse Environmental Impact
6.6 Evaluation of Residual Impact
6.7 Environmental Monitoring and Audit
7 Ecological Impact (Terrestrial and Aquatic)
7.2 Environmental Legislation, Standards and Guidelines
7.3 Study Area and Methodology
7.4 Baseline Condition and Ecological Sensitive Receivers
7.4.1 General Description of the Project Site and Study Area
7.4.2 Recognized Sites of Conservation Interest
7.4.9 Freshwater fish and aquatic fauna
7.5 Evaluation of Ecological Importance of Habitats and Species
7.5.2 Evaluation of Species of Conservation Interest
7.6 Identification and Evaluation of Ecological Impacts
7.6.1 Construction and Decommissioning Phases
7.7 Precautionary and Mitigation Measures
7.7.1 Precautionary Measures for Minimization of Indirect Disturbance on Ecology
7.8 Evaluation of Residual Ecological Impact
7.9 Environmental Monitoring and Audit Requirements
8.2 Relevant Legislation, Standards and Guidelines
8.3.2 Review of Planning and Development Control Framework
8.3.3 Landscape Baseline Survey
8.3.4 Landscape Impact Assessment
8.3.6 Impact Assessment on Trees
8.3.8 Visual Impact Assessment
8.3.9 Recommended Mitigation Measures
8.3.10 Assessment of Residual Impact
8.4.1 Review of Development Control Framework
8.4.3 Landscape Character Types
8.4.4 Landscape Character Areas
8.4.5 Zone of Visual Influence
8.4.6 Visually Sensitive Receivers
8.5.2 Potential Impact on Trees
8.6 Sources of Potential Impact
8.6.1 Sources of Impact during Construction
8.6.2 Sources of Impact during Operation
8.6.3 Sources of Impact during Decommissioning
8.7.1 Magnitude of Change on Landscape Resources
8.7.2 Magnitude of Change on Landscape Character Areas
8.7.3 Magnitude of Change on Visually Sensitive Receivers
8.8 Assessment of Potential Impact without Mitigation
8.8.1 Potential Impact on Landscape Resources without Mitigation
8.8.2 Potential Impact on Landscape Character Areas without Mitigation
8.8.3 Potential Impact on Visually Sensitive Receivers without Mitigation
8.9 Recommended Precautionary / Enhancement / Mitigation Measures
8.9.1 Recommended Construction Phase Precautionary / Enhancement Measures
8.9.2 Recommended Operation Phase Mitigation Measures
8.9.3 Recommended Decommissioning Phase Mitigation Measures
8.10 Assessment of Potential Impact with Mitigation
8.10.2 Potential Impact on Landscape Resources with Mitigation
8.10.3 Potential Impact on Landscape Character Areas with Mitigation
8.10.4 Potential Impact on Visually Sensitive Receivers with Mitigation
8.11 Assessment of Cumulative Impact
8.11.1 Potential Concurrent Project
8.11.2 Potential Cumulative Impact
8.12.1
Review of Planning and Development Control Framework
8.12.2 Potential Impact on Trees
8.12.3 Residual Landscape Impact
8.13.1 Overall Landscape Impact
9.2 Summary of Environmental Outcomes
9.2.1 Estimated Population Protected from Various Environmental Impacts
9.2.2 Environmentally Sensitive Areas Protected
9.2.3 Environmental Designs Recommended
9.2.4 Key Environmental Problems Avoided
9.2.5 Compensation Areas Included
9.2.6 Main Concerns of General Public
9.6 Waste Management Implications
9.8 Landscape and Visual Impact
9.8.1 Overall Landscape Impact
9.9 Summary of Environmental Impacts
9.10 Key Assessment Assumptions, Limitations of Assessment Methodologies and related Prior Agreement
10 Environmental
Monitoring and Audit
10.5 Waste Management Implications
10.7 Landscape and Visual Impact
Tables
Table
2.1: WSD Reuse Water Quality Standard for Non-Potable Uses
Table 2.2: Summary of Hong Kong Project Utilizing Reclaimed Water for Non-Potable Use
Table 2.3: Summary of Alternative Siting and Layout of the Project
Table 3.1: Air Quality Objectives
Table 3.2:
Historical Air Quality at the Project Area
Table 3.3: Future Background air quality from PATH-2016 for year 2020
Table 3.4: Location of Representative Air Sensitive Receivers
Table 3.5: Summary of Concurrent Projects
Table 4.1: Noise Standards for Daytime Construction Activities
Table 4.2: Area Sensitivity Rating
Table 4.3: Acceptable Noise Level for Fixed Noise Sources
Table 4.4: Noise Criteria for the Planned Fixed Noise Sources
Table 4.5: Representative Noise Sensitive Receivers for Construction and Operation Phases
Table 4.6: Maximum Predicted Cumulative Construction Noise Levels at Representative NSRs
Table 4.7: Maximum Allowable SWL and Predicted Fixed Plant Noise Level
Table 5.1: Water Quality Objectives for Deep Bay WCZ
Table 5.6: Summary of Impact Water Quality Monitoring Results of the Planned WSW Development (2015)
Table 5.7: WSD Reuse Water Quality Standard for Non-Potable Uses
Table 6.1: Estimation of Sediment Quantities for Each Category
Table 6.2: Criteria for Reuse of Treated Sediment
Table 6.3: Summary of Waste Arising during Construction Phase
Table 6.4: Estimation of General Refuse Generation during Operation Phase
Table 7.1: Habitats Present in the Project Site
Table 7.2: Habitats Present in the Study Area (excluding the Project Site)
Table 7.3: Summary Table for Avifauna Species of Conservation Interest Recorded in the Study Area
Table 7.4: Summary Table for Fish Species Recorded in Major Habitats within Study Area
Table 7.5: Ecological Evaluation of Wetland Restoration Area
Table 7.6: Ecological Evaluation of Fishpond
Table 7.7: Ecological Evaluation of Abandoned Fishpond
Table 7.8: Ecological Evaluation of Drainage Channel/Ditch
Table 7.9: Ecological Evaluation of Marsh/Reedbed
Table 7.10: Ecological Evaluation of Secondary Woodland
Table 7.11: Ecological Evaluation of Plantation
Table 7.12: Ecological Evaluation of Developed / Disturbed Area
Table 7.14: Evaluation of Indirect Ecological Impact on Habitats
Table 7.15: Evaluation of Indirect Ecological Impact on Egretries
Table 7.16:
Evaluation of Indirect Ecological Impact on Fauna Species of Conservation
Interest
Table 7.17: Evaluation of Disturbance Impact during Operation Phase
Table 7.18: Evaluation of Indirect Ecological Impact to Aquatic Habitats during Operation Phase
Table 8.1: Sensitivity and Magnitude of Change on the Degree of Impact Significance
Table 8.2: Review of Existing Planning and Development Control Framework
Table 8.3: Sensitivity of Landscape Resources
Table 8.4: Descriptions on Landscape Character Types within the Study Area
Table 8.5: Sensitivity of Landscape Character Areas
Table 8.6: Sensitivity of Visually Sensitive Receivers
Table 8.7: Estimated Number of Trees in Tree Groups
Table 8.8: Magnitude of Change on Landscape Resources
Table 8.9: Magnitude of Change on Landscape Character Areas
Table 8.10: Magnitude of Change on Visually Sensitive Receivers
Table 8.11: Potential Impact on Landscape Resources without Mitigation
Table 8.12: Potential Impact on Landscape Character Areas without Mitigation
Table 8.13: Potential Impact on Visually Sensitive Receivers without Mitigation
Table 8.14: Recommended Construction Phase Precautionary / Enhancement Measures
Table 8.15: Recommended Operation Phase Mitigation Measures
Table 8.16: Summary of Impact Assessment on Landscape Resources
Table 8.17: Summary of Impact Assessment on Landscape Character Areas
Table 8.18: Summary of Impact Assessment on Visually Sensitive Receivers
Table 9.1: Summary of Environmental Impacts
Table 9.2: Key Assessment Assumptions, Limitations of Assessment Methodologies and Prior Agreements
Table 11.1
Implementation Schedule
Figures
Figure 2.1a Project Location Options
Figure 2.2 Historical Aerial Photo
Figure 2.3 Proposed Effluent Reuse Facility
Figure 2.4 Process Flow Diagram of Interim On-site STP
Figure 3.1 Location of Representative Air Sensitive Receivers and Air Quality Monitoring Stations
Figure 4.1 Location of Representative Noise Sensitive Receivers (Construction Phase)
Figure 4.2 Location of Representative Noise Sensitive Receivers (Operation Phase)
Figure 4.3 Photos of Existing Representative Noise Sensitive Receivers
Figure 4.4 Temporary Noise Barrier and Site Hoarding Locations for Construction Phase
Figure 5.1 Location of Representative Water Sensitive Receivers and Existing Monitoring Locations
Figure 5.2 Proposed Onsite Sewerage Network
Figure 8.1 Landscape Study Area
Figure 8.2 Aerial View of Landscape Study Area
Figure 8.3 Zone of Visual Influence and Visually Sensitive Receivers
Figure 8.4 Zoning in Outline Zoning Plan within the Landscape Study Area
Figure 8.5 Location Plan of Landscape Resources
Figure 8.6a Representative Photographs of Landscape Resources (Sheet 1 of 4)
Figure 8.6b Representative Photographs of Landscape Resources (Sheet 2 of 4)
Figure 8.6c Representative Photographs of Landscape Resources (Sheet 3 of 4)
Figure 8.6d Representative Photographs of Landscape Resources (Sheet 4 of 4)
Figure 8.7 Location Plan of Landscape Character Types
Figure 8.8 Location Plan of Landscape Character Areas
Figure 8.9a Representative Photographs of Landscape Charcater Areas (Sheet 1 of 2)
Figure 8.9b Representative Photographs of Landscape Charcater Areas (Sheet 2 of 2)
Figure 8.10 Anticipated View from Selected Vantage Point without the Project
Figure 8.11 Preliminary Landscape Master Plan
Figure 8.12 Photomontages for Selected Vantage Point
Figure 8.13 Assessment of Landscape Impact
Figure 8.14 Assessment of Visual Impact
Appendices
Appendix
2.1 Approved Sewerage Impact
Assessment
Appendix
4.1 Letter from MTR Corporation
Appendix
4.2 Construction Noise Impact
Assessment in Approved WSW VEP (ERR for Change in Master Layout Plan)
(Application No. VEP-538/2017)
Appendix
4.3 Fixed Noise Sources Impact
Assessment
Appendix
5.1 Calculations for Sewage Loads
Appendix
5.2 Calculations for Reclaimed Water
Demand
Appendix
6.1 Remediation Report
Appendix
6.2 Site Photos of STP Project Area
Appendix
6.3 Approval Letter of SSTP from EPD
Appendix
6.4 Chemical Testing Results
Appendix
6.5 Biological Testing Results
Appendix
6.6 Approval Letter of SQR from EPD
Appendix 7.1 Plates – Representative Photographs of Habitats
Appendix 7.2 Bird Species Recorded in Major Habitats within the Project Site and the Study Area
Appendix 7.3 Mammal Species Recorded in Major Habitats within the Project Site and the Study Area
Appendix 7.5 Butterfly Species Recorded in Major Habitats within the Project Site and the Study Area
Appendix 7.6 Dragonfly Species Recorded in Major Habitats within the Project Site and the Study Area
Appendix 8.1 Tree Assessment Schedule of Tree Groups within the Landscape Study Area