FIGURES

FIGURE 1.1                    PROJECT LOCATION PLAN

FIGURE 2.1                    LAYOUT PLAN OF LEI YUE MUN WATERFRONT ENHANCEMENT PROJECT

FIGURE 3.1                    LOCATIONS OF AIR SENSITIVE RECEIVERS

FIGURE 4.1                    LOCATIONS OF THE STUDY AREA AND NOISE SENSITIVE RECEIVERS

FIGURE 4.2                    LOCATIONS OF NOISE ASSESSMENT POINTS (KEYPLAN)

FIGURE 4.3                    LOCATIONS OF NOISE ASSESSMENT POINTS

FIGURE 4.4                    LOCATIONS OF NOISE ASSESSMENT POINTS

FIGURE 4.5                    LOCATIONS OF NOISE ASSESSMENT POINTS

FIGURE 5.1                    LOCATIONS OF WATER SENSITIVE RECEIVERS

FIGURE 6.1                    EXISTING SEWERAGE NETWORK AT LEI YUE MUN

FIGURE 6.2                    PROPOSED SEWERAGE IMPROVEMENT WORK BY DSD AT LEI YUE MUN

FIGURE 7.1                    AS-BUILT SEDIMENT SAMPLING LOCATIONS

FIGURE 8.1                    PHOTO RECORDS OF SITE RECONNAISSANCE – KEY PLAN

FIGURE 8.1A                 PHOTO RECORDS OF SITE RECONNAISSANCE (REGION A)

FIGURE 8.1B                  PHOTO RECORDS OF SITE RECONNAISSANCE (REGION B)

FIGURE 8.1C                 PHOTO RECORDS OF SITE RECONNAISSANCE (REGION C)

FIGURE 8.1D                 PHOTO RECORDS OF SITE RECONNAISSANCE (REGION D)

FIGURE 8.1E                  PHOTO RECORDS OF SITE RECONNAISSANCE (REGION E)

FIGURE 9.1                    STUDY AREA AND PROPOSED LOCATION FOR MARINE ECOLOGICAL SURVEYS

FIGURE 9.2                    HABITAT MAP

FIGURE 10.1                  SITES OF FISHERIES IMPORTANCE

FIGURE 11.1                  LAND USE ZONING PLAN NO. S/K15/25 WITH PROJECT AND STUDY BOUNDARIES

FIGURE 11.2                  LANDSCAPE RESOURCE PLAN

FIGURE 11.2.1              PHOTOS OF LANDSCAPE RESOURCE (1 OF 3)

FIGURE 11.2.2              PHOTOS OF LANDSCAPE RESOURCE (2 OF 3)

FIGURE 11.2.3              PHOTOS OF LANDSCAPE RESOURCE (3 OF 3)

FIGURE 11.3                  PLAN OF LANDSCAPE CHARACTER AREAS

FIGURE 11.3.1              PHOTOS OF LANDSCAPE CHARACTER AREAS

FIGURE 11.3.2              ANNOTATED OBLIQUE AERIAL PHOTOS INDICATING LCAS

FIGURE 11.4.1              SECONDARY VSRS & VISUAL ENVELOPE FOR VISUAL IMPACT ASSESSMENT

FIGURE 11.4.2              PRIMARY VSRS & VISUAL ENVELOPE FOR VISUAL IMPACT ASSESSMENT

FIGURE 11.5.1              VIEWS FROM VP-1 – EXISTING CONDITIONS, AT DAY 1 AND AT YEAR 10

FIGURE 11.5.2              VIEWS FROM VP-2 – EXISTING CONDITIONS, AT DAY 1 AND AT YEAR 10

FIGURE 11.5.3              VIEWS FROM VP-3 – EXISTING CONDITIONS, AT DAY 1 AND AT YEAR 10

FIGURE 11.6                  LOCATION PLAN OF MITIGATION MEASURES FOR CONSTRUCTION PHASE (CMS) & OPERATION PHASE (OMS)

FIGURE 11.6.1              LOCATION PLAN OF MITIGATION MEASURES FOR CONSTRUCTION PHASE (CMS) & OPERATION PHASE (OMS) PART 1

FIGURE 11.6.2              LOCATION PLAN OF MITIGATION MEASURES FOR CONSTRUCTION (CMS) & OPERATION PHASE (OMS) PART 2

FIGURE 11.6.3              LOCATION PLAN OF MITIGATION MEASURES FOR CONSTRUCTION (CMS) & OPERATION PHASE (OMS) PART 3

 

APPENDICES

APPENDIX 2.1              TENTATIVE CONSTRUCTION PROGRAMME

APPENDIX 2.2              POSSIBLE LOCATIONS OF PROPOSED LANDING FACILITY

APPENDIX 2.3              LAYOUT DESIGN OPTIONS

APPENDIX 2.4              SLOPING SEAWALL UNDER LANDING FACILITY

APPENDIX 2.5              WAVE ABSORBING BREAKWATER - GENERAL ARRANGEMENT

APPENDIX 2.6              RECONSTRUCTION OF VIEWING PLATFORM

APPENDIX 2.7              IMPROVEMENT WORKS AT LOOKOUT POINT 1

APPENDIX 2.8              IMPROVEMENT WORKS AT LOOKOUT POINT 3

APPENDIX 2.9              IMPROVEMENT WORKS AT LOOKOUT POINT 4

APPENDIX 2.10            IMPROVEMENT WORKS AT LOOKOUT POINT 5

APPENDIX 3.1                NOT USED

APPENDIX 3.2              FINAL ODOUR PATROL REPORT

APPENDIX 3.3              TRAFFIC DATA

APPENDIX 3.4              CALCULATION OF VEHICULAR EMISSION SOURCE

APPENDIX 3.5              CALCULATION OF MARINE EMISSION SOURCE

APPENDIX 3.6              EMISSION SOURCES OF NEARBY INDUSTRIAL PROCESS AND CHIMNEY

APPENDIX 3.7              DETERMINATION OF SURFACE CHARACTERISTICS PARAMETERS

APPENDIX 3.8              DETAIL PREDICTION OF AIR QUALITY IMPACT DURING OPERATION PHASE

APPENDIX 3.9              RESULTS OF SEDIMENT ODOUR POTENTIAL TEST

APPENDIX 4.1              PHOTOGRAPHS OF EXISTING NSRS

APPENDIX 4.2              PLANT INVENTORY (UNMITIGATED SCENARIO)

APPENDIX 4.3              CONSTRUCTION PROGRAMME, LOCATIONS OF WORKS AREAS AND DISTANCE TO NOTIONAL SOURCES

APPENDIX 4.4              SWL OF PME

APPENDIX 4.5              CONSTRUCTION NOISE ASSESSMENT (UNMITIGATED SCENARIO)

APPENDIX 4.6              TYPICAL CONFIGURATION OF NOISE BARRIER AND PORTABLE NOISE ENCLOSURE

APPENDIX 4.7              PLANT INVENTORY (MITIGATED SCENARIO)

APPENDIX 4.8              CONSTRUCTION NOISE ASSESSMENT (MITIGATED SCENARIO)

APPENDIX 5.1              COVERAGE AND GRID LAYOUT OF UPDATED MODEL AND REFINED LYM MODEL

APPENDIX 5.2              LOCATIONS OF OBSERVATION & SEDIMENT RELEASE POINTS

APPENDIX 5.3              CONTOUR PLOTS OF SS ELEVATION AND SEDIMENT DEPOSITION UNDER CONSTRUCTION, DRY SEASON

APPENDIX 5.4              CONTOUR PLOTS OF SS ELEVATION AND SEDIMENT DEPOSITION UNDER CONSTRUCTION, WET SEASON

APPENDIX 5.5              SS ELEVATION AT C1 OVER 15-DAY SPRING-NEAP CYCLE, DRY SEASON

APPENDIX 5.6              SS ELEVATION AT C1 OVER 15-DAY SPRING-NEAP CYCLE, WET SEASON

APPENDIX 5.7              SS ELEVATION AT C2 OVER 15-DAY SPRING-NEAP CYCLE, DRY SEASON

APPENDIX 5.8              SS ELEVATION AT C2 OVER 15-DAY SPRING-NEAP CYCLE, WET SEASON

APPENDIX 5.9              SS ELEVATION AT C3 OVER 15-DAY SPRING-NEAP CYCLE, DRY SEASON

APPENDIX 5.10            SS ELEVATION AT C3 OVER 15-DAY SPRING-NEAP CYCLE, WET SEASON

APPENDIX 5.11            SS ELEVATION AT W1 OVER 15-DAY SPRING-NEAP CYCLE, DRY SEASON

APPENDIX 5.12            SS ELEVATION AT W1 OVER 15-DAY SPRING-NEAP CYCLE, WET SEASON

APPENDIX 5.13            TOTAL SEDIMENT DEPOSITION (G/M2) OVER 15-DAY SIMULATION PERIOD, DRY SEASON

APPENDIX 5.14            TOTAL SEDIMENT DEPOSITION (G/M2) OVER 15-DAY SIMULATION PERIOD, WET SEASON

APPENDIX 5.15            CONTOUR PLOTS OF MAXIMUM CONTAMINANT CONCENTRATIONS PREDICTED OVER THE ENTIRE SIMULATION PERIOD UNDER CONSTRUCTION

APPENDIX 5.16            COMPARISON OF THE SIMULATED NEAR SURFACE PEAK EBB & FLOOD TIDE VELOCITY VECTORS, DRY SEASON

APPENDIX 5.17            COMPARISON OF THE SIMULATED NEAR SURFACE PEAK EBB & FLOOD TIDE VELOCITY VECTORS, WET SEASON

APPENDIX 5.18            COMPARISON OF THE SIMULATED WATER SPEEDS AT H1, DRY SEASON

APPENDIX 5.19            COMPARISON OF THE SIMULATED WATER SPEEDS AT H1, WET SEASON

APPENDIX 5.20            COMPARISON OF THE INSTANTANEOUS DISCHARGE THROUGH LYM NARROWS

APPENDIX 5.21            KEY ASSUMPTIONS FOR COMPILING NON-POINT SOURCE POLLUTION FROM SURFACE RUNOFF

APPENDIX 5.22            CONTOUR PLOTS OF SS ELEVATION AND SEDIMENT DEPOSITION UNDER MAINTENANCE DREDGING, DRY SEASON

APPENDIX 5.23            CONTOUR PLOTS OF SS ELEVATION AND SEDIMENT DEPOSITION UNDER MAINTENANCE DREDGING, WET SEASON

APPENDIX 5.24            CONTOUR PLOTS OF MAXIMUM CONTAMINANT CONCENTRATIONS PREDICTED OVER THE ENTIRE SIMULATION PERIOD UNDER MAINTENANCE DREDGING

APPENDIX 6.1              PHOTO OF EXISTING LEI YUE MUN MA WAN PUBLIC TOILET CUM BATHHOUSE

APPENDIX 6.2              BUILDING REGULATIONS (STANDARDS OF SANITARY FITMENTS, PLUMBING, DRAINAGE WORKS AND LATRINES)

APPENDIX 7.1              KEY FINDINGS OF SEDIMENT QUALITY REPORT (SQR-2007)

APPENDIX 7.2              SEDIMENT SAMPLING AND TESTING PLAN

APPENDIX 7.3              CHEMICAL TESTING RESULT AND DISPOSAL CLASSIFICATION

APPENDIX 8.1              SELECTED AERIAL PHOTOS

APPENDIX 8.2              REPLIES FROM ENVIRONMENTAL PROTECTION DEPARTMENT

APPENDIX 8.3              REPLIES FROM FIRE SERVICES DEPARTMENT

APPENDIX 8.4              SITE WALKOVER CHECKLIST

APPENDIX 9.1              RAPID ECOLOGICAL ASSESSMENT

APPENDIX 9.2              REPRESENTATIVE PHOTOGRAPHS OF HABITATS RECORDED WITHIN THE STUDY AREA

APPENDIX 9.3              PLANT SPECIES RECORDED WITHIN THE STUDY AREA

APPENDIX 9.4              AVIFAUNA SPECIES RECORDED WITHIN THE STUDY AREA

APPENDIX 9.5              MAMMAL AND HERPETOFAUNA SPECIES RECORDED WITHIN THE STUDY AREA

APPENDIX 9.6             BUTTERFLY AND ODONATE SPECIES RECORDED WITHIN THE STUDY AREA

APPENDIX 9.7              RAW DATA RECORDED DURING THE INTERTIDAL SURVEYS WITHIN THE STUDY AREA DURING DRY SEASON

APPENDIX 9.8              RAW DATA RECORDED DURING THE INTERTIDAL SURVEYS WITHIN THE STUDY AREA DURING WET SEASON

APPENDIX 9.9              REPRESENTATIVE PHOTOGRAPHS OF SPECIES OF CONSERVATION IMPORTANCE RECORDED WITHIN THE STUDY AREA

APPENDIX 9.10            REPRESENTATIVE PHOTOGRAPHS TAKEN DURING DIVE SURVEY

APPENDIX 9.11            SIZE, HEALTH CONDITION AND TRANSLOCATION FEASIBILITY OF CORAL COLONIES FOUND AT REA TRANSECTS

APPENDIX 9.12            EXAMPLES OF SEAWALL WITH ECOLOGICAL FEATURES

APPENDIX 11.1            BROAD-BRUSH TREE ASSESSMENT SCHEDULE (TREE GROUP SURVEY)

APPENDIX 11.1-1       TREE GROUP LOCATION PLAN (TREE GROUP SURVEY)

APPENDIX 11.2-1       CONCEPTUAL LANDSCAPE PLAN

APPENDIX 11.2-2       CONCEPTUAL LANDSCAPE PLAN (PART 1)

APPENDIX 11.2-3       CONCEPTUAL LANDSCAPE PLAN (PART 2)

APPENDIX 11.2-4       CONCEPTUAL LANDSCAPE PLAN (PART 3)

APPENDIX 11.2-5       ARTIST’S IMPRESSION OF THE PROPOSED WORKS

APPENDIX 11.2-6       ARTIST’S IMPRESSION OF THE PROPOSED WORKS

APPENDIX 11.2-7       ARTIST’S IMPRESSION OF THE PROPOSED WORKS

APPENDIX 11.2-8       EXISTING CONDITION OF LEI YUE MUN WATERFRONT AREA

APPENDIX 11.2-9       ARTIST’S IMPRESSION OF THE PROPOSED WORKS

APPENDIX 14.1            KEY ASSUMPTIONS AND LIMITATIONS

APPENDIX 14.2            SUMMARY OF ENVIRONMENTAL IMPACTS