Contents
Page
1
Introduction
1-1
1.1
Project
Background
1-1
1.2
Site Location and
History
1-2
1.3
The
Project
1-2
1.4
EIA Study
Brief
1-2
1.5
Designated
Projects
1-3
1.6
Objectives of the EIA
Study
1-3
1.7
Structure of This EIA
Report
1-4
2
Project
Description
2-1
2.1
Purposes and Objectives of the
Project
2-1
2.2
Environmental Benefits of the
Project
2-1
2.3
Scenarios “With” and “Without” the
Project
2-2
2.4
Tackling Environmental Challenges and Options
Considered
2-4
2.5
Proposed Development
Scheme
2-27
2.6
Consideration of Alternative Construction
Methodologies
2-39
2.7
Environmental Conscious Turfgrass Management Plan
(TMP) – An
Outline
2-46
2.8
Environmental Initiatives
2-50
2.9
Collating and Addressing Public
Views
2-53
2.10
Tentative Implementation
Programme
2-58
2.11
Concurrent
Projects
2-58
2.12
Summary of Environmental Benefits and
Environmental Achievements of the
Project
2-61
3
Air
Quality
3-1
3.1
Legislation, Standards and
Guidelines
3-1
3.2
Description of the Environment
3-3
3.3
Air Sensitive
Receivers
3-6
3.4
Construction Dust
Assessment
3-8
3.5
Operational Air Quality Impact
Assessment
3-21
3.6
Conclusion
3-44
3.7
Reference
3-45
4
Hazard to
Life
4-1
4.1
Legislation, Standards and
Guidelines
4-1
4.2
Description of the
Environment
4-2
4.3
Development Plan of Project
Site
4-3
4.4
Construction Phase Impact
Evaluation
4-3
4.5
Operational Phase Impact
Evaluation
4-4
4.6
Mitigation
Measures
4-5
4.7
Conclusion
4-6
5
Noise
5-1
5.1
Legislation, Standards and
Guidelines
5-1
5.2
Description of the
Environment
5-5
5.3
Noise Sensitive
Receivers
5-6
5.4
Construction Noise
Assessment
5-8
5.5
Fixed Noise Sources Impact
Assessment
5-15
5.6
Conclusion
5-22
6
Water
Quality
6-1
6.1
Legislation, Standards and
Guidelines
6-1
6.2
Baseline
Conditions
6-12
6.3
Assessment Area and Water Sensitive
Receivers
6-16
6.4
Construction Phase
Assessment
6-17
6.5
Operational Phase
Assessment
6-22
6.6
Conclusion
6-35
6.7
Reference
6-36
7
Waste Management
Implications
7-1
7.1
Legislation, Standards and
Guidelines
7-1
7.2
Description of the
Environment
7-3
7.3
Construction
Phase
7-4
7.4
Operational Phase
7-22
7.5
Conclusion
7-25
8
Land
Contamination
8-1
8.1
Legislation, Standards and
Guidelines
8-1
8.2
The
Project
8-6
8.3
Description of the
Environment
8-6
8.4
Assessment
Methodology
8-7
8.5
Desktop
Review
8-8
8.6
Site
Survey
8-9
8.7
Other Relevant
Information
8-11
8.8
Future
Landuses
8-12
8.9
Potential for Future Land
Contamination
8-12
8.10
Identification of Potentially Contaminated
Sites
8-13
8.11
Conclusion
8-14
9
Landfill Gas
Hazards
9-1
9.1
Legislation, Standards and
Guidelines
9-1
9.2
Description of the
Environment
9-7
9.3
Qualitative Risk Assessment in Construction
Phase
9-7
9.4
Qualitative Risk Assessment in Operational
Phase
9-28
9.5
Conclusion
9-41
9.6
References
9-42
10
Ecological Impact
Assessment
10-1
10.1
Introduction
10-1
10.2
Legislation, Standards and
Guidelines
10-2
10.3
Methodology for Baseline
Establishment
10-5
10.4
Ecological Baseline
Conditions
10-11
10.5
Impact Identification and
Prediction
10-37
10.6
Impact Evaluation for Terrestrial
Ecology
10-40
10.7
Impact Evaluation for Marine Ecology
10-47
10.8
Cumulative
Impacts
10-52
10.9
Mitigation
Measures
10-53
10.10
Residual Impacts
10-74
10.11
Environmental Monitoring and Audit
(EM&A)
10-74
10.12
Conclusions
10-75
10.13
Reference
10-76
11
Fisheries
11-1
11.1
Legislation, Standards and
Guidelines
11-1
11.2
Requirements of EIA Study
Brief
11-2
11.3
Methodology for Baseline
Establishment
11-4
11.4
Description of Existing Fisheries Baseline
Conditions 11-5
11.5
Assessment
Methodology
11-10
11.6
Fisheries Impact
Evaluation
11-11
11.7
Cumulative
Impacts
11-20
11.8
Mitigation
Measures
11-22
11.9
Residual
Impacts
11-25
11.10
EM&A for
Fisheries
11-25
11.11
Conclusion
11-25
11.12
References
11-27
12
Landscape and Visual
Impact
12-1
12.1
Introduction
12-1
12.2
Legislation, Standards and
Guidelines
12-2
12.3
Landscape and Visual Assessment
Methodology
12-4
12.4
Key Development
Components
12-14
12.5
Review of Planning and Development Control
Framework
12-15
12.6
Baseline
Condition
12-19
12.7
Identification and Evaluation of Environmental Impact
12-58
12.8
Cumulative
Impacts
12-91
12.9
Mitigation of Landscape and Visual
Impact
12-92
12.10
Programme and Funding Arrangement for Landscape
and Visual Mitigation
Measures
12-103
12.11
Evaluation of Residual
Impact
12-109
12.12
Environmental Monitoring and
Audit
12-134
12.13
Conclusion
12-134
13
Environmental Monitoring and Auditing
Requirements
13-1
13.1
Introduction
13-1
13.2
Project Organisation
13-1
13.3
EM&A
Manual
13-1
13.4
Environmental Mitigation Implementation
Schedule 13-2
13.5
EM&A Programme
13-3
13.6
EM&A
Requirement
13-3
14
Summary of Environmental
Outcomes
14-1
14.1
General
14-1
14.2
Environmental Friendly Options Considered
and Incorporated to Avoid Environmental Impact
14-1
14.3
Environmental Designs Recommended to Minimise
and Mitigate Environmental
Impacts
14-2
14.4
Summary of Key Environmental Problems Avoided
and Sensitive Areas
Protected
14-6
14.5
Estimated Population Protected from Various
Environmental
Impacts
14-7
14.6
Environmental Benefits of Environmental Protection Measures
Recommended 14-7
15
Conclusion
15-1
15.1
General
15-1
15.2
Air
Quality
15-2
15.3
Hazard to
Life
15-3
15.4
Noise
15-3
15.5
Water
Quality
15-4
15.6
Waste Management
Implication
15-5
15.7
Land
Contamination
15-5
15.8
Landfill Gas
Hazards
15-6
15.9
Ecological
Impact
15-7
15.10
Fisheries
Impact
15-8
15.11
Landscape and Visual Impact
15-9
Figures
|
|
Figure 1.1
|
Location of Project
|
Figure 2.1
|
Project Layout (Tentative)
|
Figure 2.2
|
Indicative Illustration of Site
Formation and Landscape Planting in Phases
|
Figure 2.3
|
Layout Comparison
|
Figure 2.4
|
Locations of Concurrent Projects
|
Figure 3.1
|
Locations of Concerned PATH Grids
|
Figure 3.2
|
Key Representative Air Sensitive
Receivers
|
Figure 3.2a
|
Proposed 3m High Hoarding Extent
|
Figure 3.3a
|
Contours of Cumulative Unmitigated
Maximum 1-hour TSP concentrations at 1.5m Above Ground (Year 2021)
|
Figure 3.3b
|
Contours of Cumulative
Unmitigated 10th High 24-hour RSP concentrations at 1.5m Above Ground (Year
2021)
|
Figure 3.3c
|
Contours of Cumulative
Unmitigated Annual RSP concentrations at 1.5m Above Ground (Year 2021)
|
Figure 3.3d
|
Contours of Cumulative
Unmitigated 10th High 24-hour FSP concentrations at 1.5m Above Ground (Year
2021)
|
Figure 3.3e
|
Contours of Cumulative
Unmitigated Annual FSP concentrations at 1.5m Above Ground (Year 2021)
|
Figure 3.3f
|
Contours of Cumulative
Unmitigated Maximum 1-hour TSP concentrations at 1.5m Above Ground (Year
2022)
|
Figure 3.3g
|
Contours of Cumulative
Unmitigated 10th High 24-hour RSP concentrations at 1.5m Above Ground (Year
2022)
|
Figure 3.3h
|
Contours of Cumulative
Unmitigated Annual RSP concentrations at 1.5m Above Ground (Year 2022)
|
Figure 3.3i
|
Contours of Cumulative
Unmitigated 10th High 24-hour FSP concentrations at 1.5m Above Ground (Year
2022)
|
Figure 3.3j
|
Contours of Cumulative
Unmitigated Annual FSP concentrations at 1.5m Above Ground (Year 2022)
|
Figure 3.3k
|
Contours of Cumulative
Unmitigated Maximum 1-hour TSP concentrations at 1.5m Above Ground (Year
2023)
|
Figure 3.3l
|
Contours of Cumulative
Unmitigated 10th High 24-hour RSP concentrations at 1.5m Above Ground (Year
2023)
|
Figure 3.3m
|
Contours of Cumulative
Unmitigated Annual RSP concentrations at 1.5m Above Ground (Year 2023)
|
Figure 3.3n
|
Contours of Cumulative
Unmitigated 10th High 24-hour FSP concentrations at 1.5m Above Ground (Year
2023)
|
Figure 3.3o
|
Contours of Cumulative
Unmitigated Annual FSP concentrations at 1.5m Above Ground (Year 2023)
|
Figure 3.4a
|
Contours of Cumulative Mitigated
Maximum 1-hour TSP concentrations at 1.5m Above Ground (Year 2021)
|
Figure 3.4b
|
Contours of Cumulative Mitigated
10th High 24-hour RSP concentrations at 1.5m Above Ground (Year 2021)
|
Figure 3.4c
|
Contours of Cumulative Mitigated
Annual RSP concentrations at 1.5m Above Ground (Year 2021)
|
Figure 3.4d
|
Contours of Cumulative Mitigated
10th High 24-hour FSP concentrations at 1.5m Above Ground (Year 2021)
|
Figure 3.4e
|
Contours of Cumulative Mitigated
Annual FSP concentrations at 1.5m Above Ground (Year 2022)
|
Figure 3.4f
|
Contours of Cumulative Mitigated
Maximum 1-hour TSP concentrations at 1.5m Above Ground (Year 2022
|
Figure 3.4g
|
Contours of Cumulative Mitigated
10th High 24-hour RSP concentrations at 1.5m Above Ground (Year 2022)
|
Figure 3.4h
|
Contours of Cumulative Mitigated
Annual RSP concentrations at 1.5m Above Ground (Year 2022)
|
Figure 3.4i
|
Contours of Cumulative Mitigated
10th High 24-hour FSP concentrations at 1.5m Above Ground (Year 2022)
|
Figure 3.4j
|
Contours of Cumulative Mitigated
Annual FSP concentrations at 1.5m Above Ground (Year 2022)
|
Figure 3.4k
|
Contours of Cumulative Mitigated
Maximum 1-hour TSP concentrations at 1.5m Above Ground (Year 2023)
|
Figure 3.4l
|
Contours of Cumulative Mitigated
10th High 24-hour RSP concentrations at 1.5m Above Ground (Year 2023)
|
Figure 3.4m
|
Contours of Cumulative Mitigated
Annual RSP concentrations at 1.5m Above Ground (Year 2023)
|
Figure 3.4n
|
Contours of Cumulative Mitigated
10th High 24-hour FSP concentrations at 1.5m Above Ground (Year 2023)
|
Figure 3.4o
|
Contours of Cumulative Mitigated
Annual FSP concentrations at 1.5m Above Ground (Year 2023)
|
Figure 3.5
|
Locations of Industrial Emissions
|
Figure 3.6
|
Locations of Open Road and Marine
Emissions
|
Figure 3.7
|
Locations of Odour Sources
|
Figure 3.8a
|
Contours of Cumulative 19th High 1-hour
NO2 concentrations at 1.5m Above Ground (Year 2024)
|
Figure 3.8b
|
Contours of Cumulative Annual NO2
concentrations at 1.5m Above Ground (Year 2024)
|
Figure 3.8c
|
Contours of Cumulative 10th High
24-hour RSP concentrations at 1.5m Above Ground (Year 2024)
|
Figure 3.8d
|
Contours of Cumulative Annual RSP
concentrations at 1.5m Above Ground (Year 2024)
|
Figure 3.8e
|
Contours of Cumulative 10th High
24-hour FSP concentrations at 1.5m Above Ground (Year 2024)
|
Figure 3.8f
|
Contours of Cumulative Annual FSP
concentrations at 1.5m Above Ground (Year 2024)
|
Figure 3.9
|
Contours of Cumulative 5-second
Maximum Odour Concentrations at 1.5m Above Ground
|
Figure 4.1
|
Societal Risks Criteria
|
Figure 4.2
|
Locations of Project Site, Tai Po
Gas Production Plant and its Consultation Zone
|
Figure 5.1
|
Locations of Noise Sensitive
Receivers
|
Figure 6.1a
|
Locations of EPD Monitoring
Stations
|
Figure 6.1b
|
Locations of Representative Water
Sensitive Receivers
|
Figure 6.2
|
Proposed Location of Outfall
during Extreme/ Prolonged Rainfall
|
Figure 8.1
|
Photo Records of the Site Survey
(Sheet 1 of 7)
|
Figure 8.1a
|
Photo Records of the Site Survey
(Sheet 2 of 7)
|
Figure 8.1b
|
Photo Records of the Site Survey
(Sheet 3 of 7)
|
Figure 8.1c
|
Photo Records of the Site Survey
(Sheet 4 of 7)
|
Figure 8.1d
|
Photo Records of the Site Survey
(Sheet 5 of 7)
|
Figure 8.1e
|
Photo Records of the Site Survey
(Sheet 6 of 7)
|
Figure 8.1f
|
Photo Records of the Site Survey
(Sheet 7 of 7)
|
Figure 9.1
|
Landfill Gas Consultation Zone of
Shuen Wan Restored Landfill
|
Figure 10.1a
|
Fauna
Sampling Locations
|
Figure 10.1b & c
|
Photos
of Vantage Points for surveys on Collared Crow and Black Kite
|
Figure 10.2
|
Recognised
Site of Conservation Importance
|
Figure 10.3
|
Habitat
Map and Locations of Species of Conservation Importance (Sheet 1 of 4)
|
Figure 10.3a
|
Habitat
Map and Locations of Species of Conservation Importance (Sheet 2 of 4)
|
Figure 10.3b
|
Habitat
Map and Locations of Species of Conservation Importance (Sheet 3 of 4)
|
Figure 10.3c
|
Habitat
Map and Locations of Species of Conservation Importance (Sheet 4 of 4)
|
Figure 10.4
|
Photos
of Habitats and Species of Conservation Importance
|
Figure 10.5a, b & c
|
Collared
Crow Night Roost Locations
|
Figure 10.6a, b & c
|
Black
Kite Night Roost Locations
|
Figure 10.7a
|
Analysis
of Roost Habitat Use – Collared Crow
|
Figure 10.7b
|
Analysis
of Roost Habitat Use – Black Kite
|
Figure 10.7c
|
Analysis
of Roost Habitat Use – High Use Areas
|
Figure 10.8
|
Project
Layout Plan Overlaid Habitat Map
|
Figure 10.9
|
Locations
of Preserved plantation and New planting trees
|
Figure 10.10
|
Locations
with Restricted Hours for Powered Mechanical Equipment
|
Figure 11.1
|
Location
of the Project Site and Sites of Fisheries Importance within the Assessment
Area
|
Figure 11.2
|
Distribution
of Fisheries Production (Source: AFCD 2018)
|
Figure 11.3a
|
Distribution
of Fishing Vessel Operation (Sampans) (Source: AFCD 2018)
|
Figure 11.3b
|
Distribution
of Fishing Vessel Operation (Other types of Vessels) (Source: AFCD 2018)
|
Figure 11.4a
|
Distribution
of Fisheries Production (Sampans) (Source: AFCD 2018)
|
Figure 11.4b
|
Distribution
of Fisheries Production (Other types of Vessels) (Source: AFCD 2018)
|
Figure 11.5
|
Location of Project Site and Fish
Culture Zones (Source: AFCD 2018)
|
Figure 12.1
|
Review
of Planning and Development Control Framework (Scenario 1 and Scenario 2)
|
Figure 12.2
|
Landscape
Resources (Scenario 1 and Scenario 2)
|
Figure 12.3.1
|
Photographs
of Landscape Resources –Sheet 1 of 7 (Scenario 1 and Scenario 2)
|
Figure 12.3.2
|
Photographs
of Landscape Resources –Sheet 2 of 7 (Scenario 1 and Scenario 2)
|
Figure 12.3.3
|
Photographs
of Landscape Resources –Sheet 3 of 7 (Scenario 1 and Scenario 2)
|
Figure 12.3.4
|
Photographs
of Landscape Resources –Sheet 4 of 7 (Scenario 1 and Scenario 2)
|
Figure 12.3.5
|
Photographs
of Landscape Resources –Sheet 5 of 7 (Scenario 1 and Scenario 2)
|
Figure 12.3.6
|
Photographs
of Landscape Resources –Sheet 6 of 7 (Scenario 1 and Scenario 2)
|
Figure 12.3.7
|
Photographs
of Landscape Resources –Sheet 7 of 7 (Scenario 1 and Scenario 2)
|
Figure 12.4
|
Landscape
Character Areas (Scenario 1 and Scenario 2)
|
Figure 12.5
|
Photographs
of Landscape Character Areas (Scenario 1 and Scenario 2)
|
Figure 12.6.1
|
Visual
Envelope and Visually Sensitive Receivers (Scenario 1)
|
Figure 12.6.2
|
Visual
Envelope and Visually Sensitive Receivers (Scenario 2)
|
Figure 12.7.1
|
Visual
Context of Visually Sensitive Receivers – Sheet 1 of 7 (Scenario 1 and
Scenario 2)
|
Figure 12.7.2.1
|
Visual
Context of Visually Sensitive Receivers – Sheet 2 of 7 (Scenario 1)
|
Figure 12.7.2.2
|
Visual
Context of Visually Sensitive Receivers – Sheet 2 of 7 (Scenario 2)
|
Figure 12.7.3
|
Visual
Context of Visually Sensitive Receivers – Sheet 3 of 7 (Scenario 1 and
Scenario 2)
|
Figure 12.7.4.1
|
Visual
Context of Visually Sensitive Receivers – Sheet 4 of 7 (Scenario 1)
|
Figure 12.7.4.2
|
Visual
Context of Visually Sensitive Receivers – Sheet 4 of 7 (Scenario 2)
|
Figure 12.7.5.1
|
Visual
Context of Visually Sensitive Receivers – Sheet 5 of 7 (Scenario 1)
|
Figure 12.7.5.2
|
Visual
Context of Visually Sensitive Receivers – Sheet 5 of 7 (Scenario 2)
|
Figure 12.7.6.1
|
Visual
Context of Visually Sensitive Receivers – Sheet 6 of 7 (Scenario 1)
|
Figure 12.7.6.2
|
Visual
Context of Visually Sensitive Receivers – Sheet 6 of 7 (Scenario 2)
|
Figure 12.7.7
|
Visual
Context of Visually Sensitive Receivers – Sheet 7 of 7 (Scenario 1 and
Scenario 2)
|
Figure 12.8.1
|
Impact
on Landscape Resources (Scenario 1)
|
Figure 12.8.2
|
Impact
on Landscape Resources (Scenario 2)
|
Figure 12.9.1
|
Impact
on Landscape Character Areas (Scenario 1)
|
Figure 12.9.2
|
Impact
on Landscape Character Areas (Scenario 2)
|
Figure 12.10.1
|
Visual
Impacts (Scenario 1)
|
Figure 12.10.2
|
Visual
Impacts (Scenario 2)
|
Figure 12.11.1.1
|
Recommendation
Landscape and Visual Mitigation Plan – Master Plan (Scenario 1)
|
Figure 12.11.1.2
|
Recommendation
Landscape and Visual Mitigation Plan – Master Plan (Scenario 2)
|
Figure 12.11.2
|
Recommendation
Landscape and Visual Mitigation Plan – Sections (Scenario 1 and Scenario 2)
|
Figure 12.11.3
|
Recommendation
Landscape and Visual Mitigation Plan – Sections (Scenario 1 and Scenario 2)
|
Figure 12.11.4
|
Recommendation
Landscape and Visual Mitigation Plan – Sections (Scenario 1 and Scenario 2)
|
Figure 12.11.5
|
Recommendation
Landscape and Visual Mitigation Plan – Sections (Scenario 1 and Scenario 2)
|
Figure 12.11.6.1
|
Recommendation
Landscape and Visual Mitigation Plan – Sections (Scenario 1)
|
Figure 12.11.6.2
|
Recommendation
Landscape and Visual Mitigation Plan – Sections (Scenario 2)
|
Figure 12.11.7.1
|
Recommendation
Landscape and Visual Mitigation Plan – Sections (Scenario 1)
|
Figure 12.11.7.2
|
Recommendation
Landscape and Visual Mitigation Plan – Sections (Scenario 2)
|
Figure 12.12.1
|
Photomontages
– Vantage Point A – Sheet 1 of 2 (Scenario 1 and Scenario 2)
|
Figure 12.12.2
|
Photomontages
– Vantage Point A – Sheet 2 of 2 (Scenario 1 and Scenario 2)
|
Figure 12.12.3
|
Photomontages
– Vantage Point B – Sheet 1 of 2 (Scenario 1 and Scenario 2)
|
Figure 12.12.4
|
Photomontages
– Vantage Point B – Sheet 2 of 2 (Scenario 1 and Scenario 2)
|
Figure 12.12.5.1
|
Photomontages
– Vantage Point C – Sheet 1 of 2 (Scenario 1)
|
Figure 12.12.5.2
|
Photomontages
– Vantage Point C – Sheet 1 of 2 (Scenario 2)
|
Figure 12.12.6.1
|
Photomontages
– Vantage Point C – Sheet 2 of 2 (Scenario 1)
|
Figure 12.12.6.2
|
Photomontages
– Vantage Point C – Sheet 2 of 2 (Scenario 2)
|
Figure 12.12.7.1
|
Photomontages
– Vantage Point D – Sheet 1 of 2 (Scenario 1)
|
Figure 12.12.7.2
|
Photomontages
– Vantage Point D – Sheet 1 of 2 (Scenario 2)
|
Figure 12.12.8.1
|
Photomontages
– Vantage Point D – Sheet 2 of 2 (Scenario 1)
|
Figure 12.12.8.2
|
Photomontages
– Vantage Point D – Sheet 2 of 2 (Scenario 2)
|
Figure 12.12.9
|
Photomontages
– Vantage Point E – Sheet 1 of 2 (Scenario 1 and Scenario 2)
|
Figure 12.12.10
|
Photomontages
– Vantage Point E – Sheet 2 of 2 (Scenario 1 and Scenario 2)
|
Figure 12.12.11.1
|
Photomontages
– Vantage Point F – Sheet 1 of 2 (Scenario 1)
|
Figure 12.12.11.2
|
Photomontages
– Vantage Point F – Sheet 1 of 2 (Scenario 2)
|
Figure 12.12.12.1
|
Photomontages
– Vantage Point F – Sheet 2 of 2 (Scenario 1)
|
Figure 12.12.12.2
|
Photomontages
– Vantage Point F – Sheet 2 of 2 (Scenario 2)
|
Figure 12.12.13
|
Photomontages
– Vantage Point G – Sheet 1 of 2 (Scenario 1 and Scenario 2)
|
Figure 12.12.14
|
Photomontages
– Vantage Point G – Sheet 2 of 2 (Scenario 1 and Scenario 2)
|
Figure 12.12.15
|
Photomontages
– Vantage Point H – Sheet 1 of 2 (Scenario 1 and Scenario 2)
|
Figure 12.12.16
|
Photomontages
– Vantage Point H – Sheet 2 of 2 (Scenario 1 and Scenario 2)
|
Figure 12.12.17
|
Photomontages
– Vantage Point I – Sheet 1 of 2 (Scenario 1 and Scenario 2)
|
Figure 12.12.18
|
Photomontages
– Vantage Point I – Sheet 2 of 2 (Scenario 1 and Scenario 2)
|
Figure 12.13.1.1
|
Artist
Impression of the Golf Course – Sheet 1 of 2 (Scenario 1)
|
Figure 12.13.1.2
|
Artist
Impression of the Golf Course – Sheet 1 of 2 (Scenario 2)
|
Figure 12.13.2.1
|
Artist
Impression of the Golf Course – Sheet 2 of 2 (Scenario 1)
|
Figure 12.13.2.2
|
Artist
Impression of the Golf Course – Sheet 2 of 2 (Scenario 2)
|
Appendices
|
|
Appendix 2.1
|
Monthly
Means of Rainfall Statistics for Tai Po (2000 – 2018)
|
Appendix 2.2
|
Construction
Programme
|
Appendix 2.3
|
Engineering
Drawings
|
Appendix 3.1
|
Construction
Programme
|
Appendix 3.2
|
Calclations
of Dust Emissions
|
Appendix 3.3
|
Surface
Characteristic Parameters
|
Appendix 3.4
|
Vehicular
Emission Factors (Construction Phase)
|
Appendix 3.5
|
Detailed
Construction Dust Assessment Results (Unmitigated Scenario)
|
Appendix 3.6
|
Justification
of Watering Efficiency
|
Appendix 3.7
|
Detailed
Construction Dust Assessment Results (Mitigated Scenario)
|
Appendix 3.8
|
Traffic
Forecast
|
Appendix 3.9
|
EMFAC-HK
Model Assumptions
|
Appendix 3.10
|
Vehicular
Emission Factor (Operational Phase)
|
Appendix 3.11
|
Calculations
of Industrial Emissions
|
Appendix 3.11a
|
Sensitivity
Test with Maximum SP Emission Rates for Non-SP Chimneys
|
Appendix 3.12
|
Calculations
of Marine Emissions
|
Appendix 3.13
|
Calculations
of Odour Emissions
|
Appendix 3.14
|
Detailed
Operational Air Quality Assessment Results
|
Appendix 5.1
|
Photos
of the Representative Existing NSRs
|
Appendix 5.2
|
SWL
of PME
|
Appendix 5.3
|
Detailed
PME Inventory
|
Appendix 5.4
|
Locations
of Workfronts and Phases of Construction
|
Appendix 5.5
|
Unmitigated
Construction Noise Impacts at Selected NSRs
|
Appendix 5.6
|
Sketch
of Typical Temporary Noise Barrier
|
Appendix 5.7
|
Mitigated
Construction Noise Impacts at Selected NSRs
|
Appendix 5.8
|
Locations
of Fixed Noise Sources in the Project
|
Appendix 5.8a
|
Catalogue
of Tractor, Aerator and Mower
|
Appendix 5.9
|
Predicted
Fixed Noise Sources Impacts at Selected NSRs
|
Appendix 5.10
|
Section
Drawings for Staff Quarters and Overnight Accommodation
|
Appendix 5.11
|
Sketch
of Absorptive Noise Barrier
|
Appendix 5.12
|
Predicted
Fixed Noise Sources Impacts at Selected NSRs (Mitigated)
|
Appendix 6.1
|
Detailed
Calculation of Criteria for Fungicides and Insecticides
|
Appendix 6.2
|
Analysis
of Stormwater Bypass
|
Appendix 6.2a
|
Preliminary
Sewage Flow Estimation
|
Appendix 6.2b
|
Peak
Sewerage Flow of Proposed and Existing Sewerage Catchments
|
Appendix 6.2c
|
Hydraulic
Performance of the Downstream Sewerage System
|
Appendix 6.3
|
Detailed
Calculation of Residual Concentrations of Fungicides, Insecticides, TIN and
TP
|
Appendix 6.4
|
Detailed
Calculation of TIN and TP Loading to Tolo Harbour
|
Appendix 8.1
|
Historical
Aerial Photographs
|
Appendix 8.2
|
Site Walkover Checklist
|
Appendix 8.3
|
Correspondences
with FSD and EPD
|
Appendix 9.1
|
Not Used
|
Appendix 9.2
|
Not Used
|
Appendix 9.3
|
Not Used
|
Appendix
9.4
|
Monitoring Data for Shuen Wan
Restored Landfill
|
Appendix
9.5
|
Preliminary Plan for Settlement
Monitoring
|
Appendix
9.6
|
Mitigation Measures on LFG Hazards
|
Appendix
9.7
|
Air Change Rate Calculation
|
Appendix
9.8
|
LFG Controls by Gas-proof Membrane
and Compacted High Density Concrete
|
Appendix 10.1
|
Plant Species Recorded within the Assessment Area
|
Appendix 10.2
|
Mammal Species Recorded within the Assessment Area
|
Appendix 10.3a
|
Bird Species Recorded within the Assessment Area
|
Appendix 10.3b
|
Number of Collared Crow recorded during the Roosting
Surveys
|
Appendix 10.3c
|
Number of Black Kite recorded during Roosting
Surveys
|
Appendix 10.4
|
Reptile Species Recorded within the Assessment Area
|
Appendix 10.5
|
Amphibian Species Recorded within the Assessment
Area
|
Appendix 10.6
|
Dragonfly Species Recorded within the Assessment
Area
|
Appendix 10.7
|
Butterfly Species Recorded within the Assessment
Area
|
Appendix 10.8
|
Aquatic fauna recorded in the watercourse within the
Assessment Area during wet season
|
Appendix 10.9
|
Aquatic fauna recorded in the watercourse within the
Assessment Area during dry season
|
Appendix 10.10
|
Intertidal organisms recorded in the qualitative
survey within the Assessment Area during wet season
|
Appendix 10.11
|
Intertidal organisms recorded in the qualitative
survey within the Assessment Area during dry season
|
Appendix 10.12
|
Intertidal organisms recorded in the quantitative
survey within the Assessment Area during wet season
|
Appendix 10.13
|
Intertidal organisms recorded in the quantitative
survey within the Assessment Area during dry season
|
Appendix 10.14
|
Abundance of subtidal benthos species recorded at
each sampling location within the Assessment Area during wet season
|
Appendix 10.15
|
Biomass of subtidal benthos species recorded at each
sampling location within the Assessment Area during wet season
|
Appendix 10.16
|
Abundance of subtidal benthos species recorded at each
sampling location within the Assessment Area during dry season
|
Appendix 10.17
|
Biomass of subtidal benthos species recorded at each
sampling location within the Assessment Area during dry season
|
Appendix 10.18
|
Construction Programme
|
Appendix 12.1
|
Group Tree Survey
|
Appendix 15.1
|
Key Assessment Assumptions and Limitation of
Assessment Methodologies
|
Appendix 15.2
|
Summary of environmental impacts associated with the
Project
|