12.1 Baseline Monitoring Report12-1
12.3 Quarter EM&A Summary Report12-4
12.4 Final EM&A Summary Report12-6
12.6 Interim Notifications of
Environmental Quality Limit Exceedances12-7
List of Appendices
Appendix
4 Sample Template for Interim
Notifications
·
up to half a page executive
summary;
·
brief project
background information;
·
drawings showing
locations of the baseline monitoring stations;
·
an updated construction
programme with milestones of environmental protection/mitigation activities
annotated;
·
monitoring results
together with the following information:
a)
monitoring methodology;
b)
name of laboratory and types
of equipment used and calibration details;
c)
parameters monitored;
d)
monitoring locations;
e)
monitoring date, time,
frequency and duration;
f)
Quality Assurance/Quality Control
results and detection limits.
·
details
on influencing factors, including:
a)
major activities, if any,
being carried out on the Site during
the period;
b)
weather conditions during the period;
c)
other factors which might
affect the results;
·
determination of the
Action and Limit Levels for each monitoring parameter and statistical analysis
of the baseline data, the analysis shall conclude if there is any significant
difference between control and impact stations for the parameters monitored;
·
revisions for inclusion
in the EM&A Manual; and
·
comments and conclusions.
·
1-2
pages executive summary;
a)
Breaches of Action and Limit
Levels;
b)
Complaint Log;
c)
Notifications of any summons
and successful prosecutions;
d)
Reporting Changes;
·
Basic
Project Information;
e)
Project organisation including
key personnel contact names and telephone numbers;
f)
Construction Programme;
g)
Management structure; and
h)
Works undertaken during the
month;
·
Environmental
Status;
a)
Works undertaken during the
month with illustrations (such as location of works); and
b)
Drawing showing the project
area, the locations of the monitoring and control stations and any environmental sensitive receivers
·
Summary
of EM&A requirements
a)
All monitoring parameters;
b)
Environmental quality performance
limits (Action and Limit levels);
c)
Event-Action Plans;
d)
Environmental mitigation
measures, as recommended in the EIA Report;
e)
Environmental requirements in
contract documents;
·
Implementation
Status - Advise on the implementation status of environmental protection and pollution
control/mitigation measures including measures for ecological and visual
impacts, as recommended in the EIA Report
·
Monitoring
Results (in both hard and CD copies) together with the
following information:
a)
Monitoring methodology;
b)
Name of laboratory and types
of equipment used and calibration details;
c)
Parameters monitored;
d)
Monitoring locations and depth;
e)
Monitoring date, time,
frequency, and duration;
f)
Weather conditions during the
period;
g)
Graphical
plots of the monitored parameters in the month
annotated against;
h)
Major activities being carried out on site during
the period;
i)
Weather
conditions that may affect the results;
j)
Any other factors which might
affect the monitoring results; and
k)
Quality Assurance/Quality
Control results and detection limits.
·
Report
on Non-compliance, Complaints, Notifications of Summons and Successful Prosecutions
a)
Record of all noncompliance
(exceedances) of the environmental quality performance limits (Action
and Limit levels);
b)
Record of all complaints
received (written or verbal) for each media, including locations and nature of
complaints investigation, liaison and consultation undertaken, actions and follow-up procedures
taken, results and summary;
c)
Record of all notifications of
summons and successful prosecutions for breaches of the current
environmental protection/pollution control legislations, including locations and nature of
the breaches, investigation, follow-up actions taken,
results and summary;
d)
Review of the reasons for and
the implications of non-compliance, complaints, summons and prosecutions
including review of pollution sources and working procedures;
e)
Description of the actions
taken in the event of noncompliance and deficiency reporting and any follow-up
procedures related to earlier noncompliance;
·
Other
a)
An account of the future key
issues as reviewed from the works programme and work method statements;
b)
Report
and advise on the waste management status;
and
c)
Upcoming
monitoring schedule and complaint log summarizing
the EM&A of the period.
·
1-2
pages executive summary;
a)
Breaches of Action and Limit
Levels;
b)
Complaint Log;
c)
Notifications of any summons
and successful prosecutions;
d)
Reporting Changes;
·
Basic
Project Information;
a)
Project organisation including
key personnel contact names and telephone numbers;
b)
Construction Programme;
c)
Management structure; and
d)
Works undertaken during the
month;
·
Environmental
Status;
a)
Works undertaken during the
month with illustrations (such as location of works); and
b)
Drawing showing the project
area, the locations of the monitoring and control stations
·
Implementation
Status - Advise on the implementation status of environmental protection and
pollution control/mitigation measures including measures for ecological and
visual impacts, as recommended in the EIA Report
·
Monitoring
Results (in both hard and CD copies) together with the
following information:
a)
Monitoring methodology;
b)
Name of laboratory and types
of equipment used and calibration details;
c)
Parameters monitored;
d)
Monitoring locations and depth;
e)
Monitoring date, time,
frequency, and duration;
f)
Weather conditions during the
period;
g)
Graphical
plots of the monitored parameters in the month
annotated against;
h)
Major activities being carried out on site during the period;
i)
Weather
conditions that may affect the results;
j)
Any other factors which might
affect the monitoring results; and
k)
Quality Assurance/Quality
Control results and detection limits.
·
Report
on Non-compliance, Complaints, Notifications of Summons and Successful Prosecutions
a)
Record of all noncompliance (exceedances)
of the environmental quality performance limits (Action
and Limit levels);
b)
Record of all complaints
received (written or verbal) for each media, including locations and nature of
complaints investigation, liaison and consultation undertaken, actions and follow-up procedures
taken, results and summary;
c)
Record of all notifications of
summons and successful prosecutions for breaches of the current
environmental protection/pollution control legislations, including locations and nature of
the breaches, investigation, follow-up actions taken,
results and summary;
d)
Review of the reasons for and
the implications of non-compliance, complaints, summons and prosecutions
including review of pollution sources and working procedures;
e)
Description of the actions
taken in the event of noncompliance and deficiency reporting and any follow-up
procedures related to earlier noncompliance;
·
Other
a)
An account of the future key issues
as reviewed from the works programme and work method statements;
b)
Report and advise on the waste
management status; and
c)
Upcoming monitoring schedule
and complaint log summarizing the EM&A of the period.
·
Appendix
a)
Action / Limit Levels;
b)
Graphical plot of monitored
parameters over the past four reporting period with major activities being carried
out on site during the period, weather condition during the period and other factor
which might affect the monitoring results.
c)
Monitoring schedule for the present and next reporting month;
d)
Cumulative complaints statistics,
notifications of summons and successful prosecutions;
e)
Details of complaints,
outstanding issues and deficiencies.
f)
Outstanding issues and deficiencies
·
executive summary;
·
basic
project information including a synopsis of the project organization contacts
of key management, and a synopsis of work undertaken during
the course of the project or past twelve months;
·
a brief summary of EM&A
requirements including:
a)
environmental mitigation
measures, as recommended in the EIA Report;
b)
environmental impact
hypotheses tested;
c)
Action/Limit Levels;
d)
all monitoring parameters; and
e)
Event Action Plans.
·
a summary of the implementation
status of environmental protection and pollution control/mitigation measures as
recommended in the EIA report summarized in the updated implementation schedule;
·
drawings showing the proposed Project
Site, any environmental sensitive receivers and the locations of the monitoring
and control stations;
·
graphical plots and the statistical
analysis of the trends of monitored parameters over the course of the project
for all monitoring stations against;
a)
the major activities being
carried out on site during the period;
b)
weather conditions during the
period; and
c)
any other factors which might
affect the monitoring results
·
advise
on the solid and liquid waste management status;
·
a summary of non-compliance (exceedances)
of the environmental quality performance limits (Action/Limit Levels);
·
a review of the reasons for and the
implications of non-compliance including review of pollution sources and
working procedures as appropriate;
·
where measurement of
suspended solids is required, an quarterly assessment of construction impacts
on suspended solids at the project site, including, but not limited to, a
comparison of the difference between the quarterly mean and 1.3 times of the
ambient mean, which is defined as 30% increase of the baseline data or EPD data,
of the related parameters by using appropriate statistical procedures.
Suggestion of appropriate mitigation measures if the quarterly assessment
analytical results demonstrate that the quarterly mean is significantly higher
than the 1.3 on water quality times of the ambient mean (p < 0.05)
·
a description of the
actions taken in the event of non-compliance and any follow-up procedures
related to earlier non-compliance;
·
a summary record of all complaints
received (written or verbal) for each media liaison and consultation
undertaken, action and follow-up procedures taken;
·
a summary record of notifications of summons
and successful prosecutions for breathes of the current environmental
protection/pollution control legislations including locations and nature of the
breaches, investigation, follow-up actions taken and results;
·
a review of the validity of EIA report predictions and identification
of shortcomings in EIA report recommendations;
·
a review of the effectiveness and
efficiency of the mitigation measures;
·
a review of success of the EM&A
programme to cost effectively identify deterioration and to initiate prompt
effective mitigation action when necessary; and,
·
a
conclusion on the environmental acceptability of the
project.
·
executive summary (1-2
pages);
·
drawings showing the proposed Project
Site, any environmental sensitive receivers and the locations of the monitoring
and control stations;
·
basic
project information including a synopsis of the project organization contacts
of key management, and a synopsis of work undertaken during
the course of the project or past twelve months;
·
a brief summary of EM&A
requirements including:
a)
environmental mitigation measures,
as recommended in the EIA Report;
b)
environmental impact hypotheses
tested;
c)
Action/Limit Levels;
d)
all monitoring parameters; and
e)
Event Action Plans.
·
a summary of the implementation status
of environmental protection and pollution control/mitigation measures as recommended
in the EIA report summarized in the updated implementation schedule;
·
graphical plots and the statistical
analysis of the trends of monitored parameters over the course of the project
for all monitoring stations against;
a)
the major activities being
carried out on site during the period;
b)
weather conditions during the
period; and
c)
any other factors which might
affect the monitoring results
·
a summary of non-compliance (exceedances)
of the environmental quality performance limits (Action/Limit Levels);
·
a review of the reasons for and the implications
of non-compliance including review of pollution sources and working procedures
as appropriate;
·
a description of the actions taken in
the event of non-compliance;
·
a summary record of all complaints
received (written or verbal) for each media liaison and consultation
undertaken, action and follow-up procedures taken;
·
a summary record of notifications of summons
and successful prosecutions for breathes of the current environmental
protection/pollution control legislations including locations and nature of the
breaches, investigation, follow-up actions taken and results;
·
a review of the validity of EIA report predictions and identification of shortcomings in EIA report recommendations;
·
a review of the effectiveness and
efficiency of the mitigation measures;
·
a review of success of the EM&A
programme to cost effectively identify deterioration and to initiate prompt
effective mitigation action when necessary; and,
·
a
conclusion on the environmental acceptability of the
project.