9.                     lANDSCAPE AND VISUAL IMPACT ASSESSMENT

9.1            Introduction

9.2            Methodology and Criteria

9.3            Baseline Monitoring

9.4            Event and Action Plan

9.5            Mitigation Measures

 

 

List of Appendices

Appendix 1           Implementation Schedule of Recommended Mitigation Measures

 

 

9.           lANDSCAPE AND VISUAL IMPACT ASSESSMENT

9.1         Introduction

9.1.1    The EIA has recommended landscape and visual mitigation measures to be undertaken during both the construction and operational phases of the project.  This section outlines the monitoring and audit of these measures.

9.2         Methodology and Criteria

9.2.1    The design, implementation and maintenance of landscape and visual mitigation measures should be checked to ensure that they are fully realised and that potential conflicts between the proposed landscape measures and any other project works and operational requirements are resolved at the earliest possible date and without compromise to the intention of the mitigation measures.

9.2.2    Site inspection and audit is necessary in the operation stage.

Table 9.1 - Monitoring Programme 

Stage

Monitoring Task

Monitoring Report

Form of Approval

Frequency

Design

Monitoring of design works against the recommendations of the landscape and visual impact assessments within the EIA should be undertaken during detailed design and tender stages, to ensure that they fulfil the intentions of the mitigation measures.  Any changes to the design, including design changes on site should also be checked.

Report by ER confirming that the design conforms to requirements of EP

Approved by Client

At Completion of Design Stage

Construction

Monitoring of the contractor’s operations during the construction period.

Report on Contractor's compliance, by ET

Counter-signature of report by IEC

Weekly

Establishment Works

Monitoring of the planting works during the 24-month Establishment period after completion of the construction works.

Report on Contractor's compliance, by ET

Counter-signature of report by IEC

3 months

Design

9.2.3    The mitigation measures proposed within the EIA to mitigate the landscape and visual impacts of the scheme should be embodied into the detailed engineering design and landscape design drawings and contract documents.  Designs should be checked to ensure that the measures are fully incorporated and that potential conflicts with civil engineering, geo-technical, structural, lighting, signage, drainage, underground utility and operational requirements are resolved prior to construction.

 

Construction & Establishment Period

9.2.4    The implementation of landscape construction works and subsequent maintenance operations during the 12-month establishment period must be supervised by fully qualified Landscape Resident Site Staff (Registered Landscape Architect or Professional Member of the Hong Kong Institute of landscape Architects).

9.2.5    Measures to mitigate landscape and visual impacts during construction, presented in Appendix 1, Table A1-7, should be checked to ensure compliance with the intended aims of the measures.

9.2.6    The progress of the engineering works shall be regularly reviewed on site to identify the earliest practical opportunities for the landscape works to be undertaken.

9.3         Baseline Monitoring

9.3.1    A one off survey shall be conducted prior to commencement of any construction works. A photographic record of the site at the time of the contractor’s possession of the site shall be prepared by the Contractor and approved by the ER.  The approved photographic Record shall be submitted to the Project proponent, ET, IEC and EPD for record.

9.4         Event and Action Plan

9.4.1    Should non-compliance of the landscape and visual impacts occur, actions in accordance with the action plan stated in Table 9.2 should be carried out.

 

Table 9.2 - Event and Action Plan for Landscape and Visual Impact

EVENT

ACTION

ET

IEC

ER

Contractor

Design Check

•                                                                                                                                                                                               Check final design conforms to the requirements of EP and prepare report.

•                                                                                                                                                                                               Check report.

•                                                                                                                                                                                               Recommend remedial design if necessary

•                                                                                                                                                                                               Undertake remedial design if necessary

 

Non-conformity on one occasion

•                                                                                                                                                                                               Identify Source

•                                                                                                                                                                                               Inform IEC and ER

•                                                                                                                                                                                               Discuss remedial actions with IEC, ER and Contractor

•                                                                                                                                                                                               Monitor remedial actions until rectification has been completed

•                                                                                                                                                                                               Check report

•                                                                                                                                                                                               Check Contractor's working method

•                                                                                                                                                                                               Discuss with ET and Contractor on possible remedial measures

•                                                                                                                                                                                               Advise ER on effectiveness of proposed remedial measures.

•                                                                                                                                                                                               Check implementation of remedial measures.

•                                                                                                                                                                                               Notify Contractor

•                                                                                                                                                                                               Ensure remedial measures are properly implemented

•                                                                                                                                                                                               Amend working methods

•                                                                                                                                                                                               Rectify damage and undertake any necessary replacement

Repeated Non-conformity

•                                                                                                                                                                                               Identify Source

•                                                                                                                                                                                               Inform IEC and ER

•                                                                                                                                                                                               Increase monitoring frequency

•                                                                                                                                                                                               Discuss remedial actions with IEC, ER and Contractor

•                                                                                                                                                                                               Monitor remedial actions until rectification has been completed

•                                                                                                                                                                                               If non-conformity stops, cease additional monitoring

•                                                                                                                                                                                               Check monitoring report

•                                                                                                                                                                                               Check Contractor's working method

•                                                                                                                                                                                               Discuss with ET and Contractor on possible remedial measures

•                                                                                                                                                                                               Advise ER on effectiveness of proposed remedial measures

•                                                                                                                                                                                               Supervise implementation of remedial measures.

•                                                                                                                                                                                               Notify Contractor

•                                                                                                                                                                                               Ensure remedial measures are properly implemented

•                                                                                                                                                                                               Amend working methods

•                                                                                                                                                                                               Rectify damage and undertake any necessary replacement

 

 

 

9.5             Mitigation Measures

9.5.1    The landscape and visual impact assessment of the EIA recommends a series on mitigation measures as shown in Appendix 1, Table A1-7.