|
CONTENTS |
|
|
|
Page |
|
|
|
1.
|
1-2 |
|
|
|
|
1.1 |
Project Background |
1-2 |
1.2 |
Requirements under the Environmental Impact Assessment Ordinance |
1-2 |
1.3 |
Purpose of the EIA Study |
1-3 |
1.4 |
Objectives of the EIA Study |
1-3 |
1.5 |
Structure of the Report |
1-4 |
|
|
|
2.
|
2-2 |
|
|
|
|
2.1 |
Project Objectives |
2-2 |
2.2 |
Site History and Project Location |
2-2 |
2.3 |
Project Scope |
2-3 |
2.4 |
Need for the Project |
2-4 |
2.5 |
Benefits of the Project |
2-5 |
2.6 |
Without Project Scenario |
2-6 |
2.7 |
With Project Scenario |
2-6 |
2.8 |
Design Considerations |
2-7 |
2.9 |
Consideration of Alternatives Location, Design and Layout |
2-7 |
2.10
|
Construction Aspects of the Project |
2-14 |
2.11
|
Consideration of Alternative Construction Methods |
2-16 |
2.12
|
Consideration of Alternative Construction Sequence |
2-17 |
2.13
|
Implementation Programme |
2-17 |
2.14
|
Concurrent Projects |
2-18 |
2.15
|
Sustainability Considerations |
2-20 |
2.16
|
Continuous Public Involvement |
2-21 |
2.17
|
References |
2.23 |
|
|
|
3.
|
3-2 |
|
|
|
|
3.1 |
Introduction |
3-2 |
3.2 |
Statutory Requirements and Evaluation Criteria |
3-2 |
3.3 |
Study Area |
3-3 |
3.4 |
Identification of Air Sensitive Receivers |
3-3 |
3.5 |
Existing Air Quality |
3-4 |
3.6 |
Evaluation of Impacts during Construction Phase |
3-7 |
3.7 |
Evaluation of Impacts during Operation Phase |
3-10 |
3.8 |
Mitigation Measures |
3-10 |
3.9 |
Potential for Cumulative Impacts |
3-11 |
3.10
|
Residual Impacts |
3-12 |
3.11
|
Monitoring and Audit Requirements |
3-13 |
3.12
|
Conclusion |
3-13 |
|
|
|
4.
|
4-2 |
|
|
|
|
4.1 |
Introduction |
4-2 |
4.2 |
Environmental Legislation, Policies, Standards and Criteria |
4-2 |
4.3 |
Baseline Conditions |
4-7 |
4.4 |
Noise Sensitive Receivers |
4-8 |
4.5 |
Potential Sources of Impacts |
4-9 |
4.6 |
Assessment Methodology |
4-11 |
4.7 |
Impact Assessment |
4-14 |
4.8 |
Mitigation Measures |
4-16 |
4.9 |
Cumulative Impacts |
4-22 |
4.10
|
Residual Impacts |
4-22 |
4.11
|
Monitoring and Audit Requirement |
4-23 |
4.12
|
Conclusion |
4-23 |
|
|
|
5.
|
5-2 |
|
|
|
|
5.1 |
Introduction |
5-2 |
5.2 |
Environmental Legislation, Policies, Standards and Criteria |
5-2 |
5.3 |
Study Area |
5-7 |
5.4 |
Baseline Water Quality Conditions |
5-7 |
5.5 |
Water Sensitive Receivers |
5-12 |
5.6 |
Water Sources of Impacts |
5-12 |
5.7 |
Impact Assessment |
5-13 |
5.8 |
Mitigation Measures |
5-17 |
5.9 |
Cumulative Impacts |
5-22 |
5.10
|
Residual Impacts |
5-24 |
5.11
|
Monitoring and Audit Requirement |
5-24 |
5.12
|
Conclusion |
5-25 |
|
|
|
6.
|
6-2 |
|
|
|
|
6.1 |
Introduction |
6-2 |
6.2 |
Relevant Legislation, Policies, Standards and Criteria |
6-2 |
6.3 |
Assessment Methodology |
6-6 |
6.4 |
Expected Waste Sources |
6-6 |
6.5 |
Waste Management Assessment |
6-7 |
6.6 |
Mitigation Measures |
6-13 |
6.7 |
Land Contamination |
6-18 |
6.8 |
Residual Environmental Impacts |
6-21 |
6.9 |
Environmental Monitoring and Audit Requirements |
6-21 |
6.10
|
Conclusion |
6-22 |
|
|
|
7.
|
7-2 |
|
|
|
|
7.1 |
Introduction |
7-2 |
7.2 |
Statutory Requirements and Evaluation Criteria |
7-3 |
7.3 |
Assessment Area |
7-6 |
7.4 |
Methodology for Baseline Establishment |
7-6 |
7.5 |
Baseline Condition |
7-8 |
7.6 |
Identification of Ecological Impacts |
7-10 |
7.7 |
Potential for Cumulative Impacts |
7-28 |
7.8 |
Mitigation |
7-30 |
7.9 |
Precautionary Measures |
7-46 |
7.10
|
Residual Impacts |
7-46 |
7.11
|
Monitoring and Audit Requirements |
7-48 |
7.12
|
Conclusion |
7-48 |
7.13
|
References |
7-51 |
|
|
|
8.
|
8-2 |
|
|
|
|
8.1 |
Introduction |
8-2 |
8.2 |
Statutory Requirements and Evaluation Criteria |
8-2 |
8.3 |
Assessment Area |
8-2 |
8.4 |
Assessment Methodology |
8-3 |
8.5 |
Baseline Condition |
8-3 |
8.6 |
Evaluation of Impacts during Construction Phase |
8-8 |
8.7 |
Evaluation of Impacts during Operational Phase |
8-10 |
8.8 |
Mitigation Measures |
8-11 |
8.9 |
Potential for Cumulative Impacts |
8-13 |
8.10
|
Residual Impacts |
8-13 |
8.11
|
Monitoring and Audit Requirements |
8-13 |
8.12
|
Conclusion |
8-13 |
8.13
|
References |
8-14 |
|
|
|
9.
|
9-2 |
|
|
|
|
9.1 |
Introduction |
9-2 |
9.2 |
Relevant Legislation, Standards & Guidelines |
9-2 |
9.3 |
BHIA Methodology |
9-5 |
9.4 |
Baseline Review |
9-9 |
9.5 |
Impact Assessment |
9-14 |
9.6 |
Mitigation Recommendations |
9-30 |
9.7 |
Cumulative and Residual Impacts |
9-32 |
9.8 |
Conclusion |
9-32 |
9.9 |
Environmental Monitoring and Audit |
9-33 |
9.10
|
References and Bibliography |
9-38 |
|
|
|
10.
|
10-2 |
|
|
|
|
10.1
|
Introduction |
10-2 |
10.2
|
Environmental Legislation, Policies, Standards and Criteria |
10-2 |
10.3
|
Scope and Content of Study |
10-7 |
10.4
|
Landscape and Visual Impact Assessment Methodology |
10-9 |
10.5
|
Planning and Development Control Framework |
10-17 |
10.6
|
Baseline Study |
10-21 |
10.7
|
Landscape Impact Assessment |
10-42 |
10.8
|
Visual Impact Assessment |
10-67 |
10.9
|
Cumulative Impacts |
10-93 |
10.10 |
Residual Impact |
10-93 |
10.11 |
Monitoring and Audit Requirements |
10-94 |
10.12 |
Conclusion |
10-95 |
|
|
|
11.
|
11-2 |
|
|
|
|
11.1
|
Introduction |
11-2 |
11.2
|
EM&A Manuel |
11-2 |
11.3
|
Air Quality |
11-3 |
11.4
|
Noise |
11-3 |
11.5
|
Water Quality |
11-4 |
11.6
|
Waste Management |
11-4 |
11.7
|
Ecology |
11-5 |
11.8
|
Fisheries |
11-6 |
11.9
|
Cultural Heritage |
11-6 |
11.10 |
Landscape and Visual |
11-6 |
11.11 |
Implementation Schedule |
11-7 |
|
|
|
12.
|
12-2 |
|
|
|
|
12.1
|
Introduction |
12-2 |
12.2
|
Environmental Benefits of the Project |
12-2 |
12.3
|
Environmental Friendly Options Considered |
12-3 |
12.4
|
Environmental Friendly Design Recommended |
12-4 |
12.5
|
Estimated Population and Environmentally Sensitive Areas Protected |
12-5 |
12.6
|
Key Environmental Problems Avoided and Compensation Areas Included |
12-6 |
12.7
|
Environmental Benefits of Environmental Protection Measures Recommended |
12-7 |
|
|
|
13.
|
13-2 |
|
|
|
|
13.1
|
Introduction |
13-2 |
13.2
|
Air Quality Impact |
13-3 |
13.3
|
Noise Impact |
13-3 |
13.4
|
Water Quality Impact |
13-3 |
13.5
|
Waste Management and Land Contamination |
13-4 |
13.6
|
Ecological Impact |
13-5 |
13.7
|
Fisheries Impact |
13-7 |
13.8
|
Cultural Heritage Impact |
13-7 |
13.9
|
Landscape and Visual Impact |
13-8 |
13.10 |
Environmental Monitoring and Audit (EM&A) |
13-8 |
13.11 |
Overall Conclusion |
13-9 |
|
|
|
|
END OF TEXT |
|
|
|
|
LIST OF TABLES
Table 2.1 |
Summary of Project Scope |
Table 2.2 |
Rainfall Increase and Sea Level Rise due
to Climate Change |
Table 2.3 |
Comparison Summary of Options A and B |
Table 2.4 |
Summary of Operation Scenarios for the
Barrage Scheme |
Table 2.5 |
Key Construction Phases & Description |
Table 2.6 |
Potential Concurrent Projects |
Table 3.1 |
Hong Kong Air Quality Objectives |
Table 3.2 |
Identified Representative Air Sensitive
Receivers |
Table 3.3 |
5-year Averaged Annual Background
Concentration of Air Pollutants recorded at Yuen Long Station by EPD for the
Period of 2015-2019 |
Table 3.4 |
Dust Concentrations extracted from
PATH-2016 Model |
Table 4.1 |
EIAO-TM Day-time Construction Noise
Standards |
Table 4.2 |
Area Sensitivity Ratings |
Table 4.3 |
Acceptable Noise Levels (ANLs) for
General Construction Works to be carried out during Restricted Hours (GW-TM) |
Table 4.4 |
ANLs for Fixed Noise Source under NCO |
Table 4.5 |
Measured Baseline Noise Levels |
Table 4.6 |
Representative Noise Sensitive Receivers
(NSRs) |
Table 4.7 |
Predicted Construction Noise Levels
(Without Mitigation Measures) |
Table 4.8 |
Predicted Fixed Plant Noise Levels due to
the Proposed Pumping Stations |
Table 4.9 |
Sound Power Level of Quiet PME |
Table 4.10 |
Sound Pressure Level of Quiter
Equipment/Methods |
Table 4.11 |
Predicted Construction Noise Levels (With
Mitigation Measures) |
Table 5.1 |
Water Quality
Objectives of the Deep Bay Water Control Zones |
Table 5.2 |
|
Table 5.3 |
|
Table 5.4 |
Summary of
EPD¡¦s Routine Marine Water Quality Data for Inner Deep Bay WCZ in Year 2018 |
Table 5.5 |
Water Sampling Result in YLTN EIA |
Table 6.1 |
Government Facilities for Disposal of
C&D Materials |
Table 6.2 |
Estimated Quantities of C&D Materials
and Other Wastes during Construction |
Table 6.3 |
Estimated Quantities of Sediment under
Disposal Option |
Table 6.4 |
Review of Historical Aerial Photographs |
Table 7.1 |
Ecological Survey Programme from July
2019 to July 2020 |
Table 7.2 |
Habitat Evaluation |
Table 7.3 |
Estimated Loss of Area of Each Habitat
Type |
Table 7.4 |
Comparison of Waterbirds¡¦ Abundance among
the Assessment Area, Nam Sang Wai, Shan Pui River and Deep Bay Area during
the Ecological Survey Period |
Table 7.5 |
Potential Cumulative Ecological Impact
from Concurrent Projects |
Table 7.6 |
Summary of Construction Phase and
Operational Phase Impacts |
Table 8.1 |
Baseline Information of Fisheries
Resources in the Assessment Area |
Table 8.2 |
Fishpond Area and Annual Fish Production
in Hong Kong from 2009 to 2018 |
Table 8.3 |
Recent Figures of Hong Kong Capture
Fisheries Industry |
Table 8.4 |
Summary of Capture Fisheries Data in Deep
Bay WCZ |
Table 8.5 |
Top Ten Families / Groups of Fish Catch
in Hong Kong Waters |
Table 8.6 |
Fisheries Impact on Active and Inactive
Fishponds within the Assessment Area |
Table 9.1 |
Recorded Not-Graded and Nil-Grade
Buildings |
Table 9.2 |
Graded Historic Buildings |
Table 9.3 |
Other Heritage Items (Not-Graded and
Nil-Grade) |
Table 9.4 |
Fung Shui Woodlands |
Table 9.5 |
Summary of Recommended Mitigation
Measures Prior and During the Construction Phase |
Table 10.1 |
Relationship between Receptor Sensitivity
and Magnitude of Change in Defining Impact Significance |
Table 10.2 |
Landscape Resources |
Table 10.3 |
Sensitivity of Landscape Resources |
Table 10.4 |
Landscape Character Areas |
Table 10.5 |
Sensitivity of Landscape Character Areas |
Table 10.6 |
Key Visually Sensitive Receivers (VSRs) |
Table 10.7 |
Magnitude of Landscape Change during the
Construction and Operation Phases before Mitigation |
Table 10.8 |
Proposed Construction Phase Landscape and
Visual Mitigation Measures |
Table 10.9 |
Proposed Operation Phase Landscape and
Visual Mitigation Measures |
Table 10.10 |
Significance of Landscape Impacts in
Construction and Operation Phases (Adverse Impacts unless otherwise stated) |
Table 10.11 |
Magnitude of Visual Change during the
Construction and Operation Phases before Mitigation |
Table 10.12 |
Significance of Visual Impacts in
Construction and Operation Phases |
Table 10.13 |
Summary of Visual Impacts of VPs at
Photomontage Viewpoints |
Table 12.1 |
Summary of Key Environmental Problems
Avoided and Sensitive Areas Protected |
Table 12.2 |
Key Recommended Mitigation Measures and
Associated Environmental Benefits |
LIST OF APPENDICES (VOLUME 2)
Engineering Drawings Drawing No. 400171/LAY/001 Drawing No. 400171/LAY/002 Drawing No. 400171/LAY/003 Drawing No. 400171/LAY/004 Drawing No. 400171/LAY/101 Drawing No. 400171/LAY/102 Drawing No. 400171/LAY/201 Drawing No. 400171/LAY/202 Drawing No. 400171/LAY/402 Drawing No. 400171/LAY/501 Drawing No. 400171/LAY/502 Drawing No. 400171/LAY/601 |
|
Flood Extent Maps of ¡§Without Project
Scenario¡¨ |
|
Flood Extent Maps of ¡§With Project
Scenario¡¨ |
|
Comparison Table of the Proposed Layouts |
|
Visual Illustration and Indicative
Details of Conceptual Operation Modes |
|
Public Comments on Project Profile |
|
Construction Programme |
|
Plant Inventory |
|
Noise Calculation for Predicted Façade
Noise Levels During Daytime Period |
|
Plant Inventory |
|
Calculation for Mitigated Noise Levels at
the Representative NSRs |
|
Noise Calculation for Predicted Noise
Levels at All the Representative NSRs |
|
Baseline Noise Measurement Locations |
|
Locations of Identified Representative
NSRs |
|
Schematic Configuration of Movable Noise
Barrier |
|
Noise Insulating Sheet |
|
Sediment Sampling & Testing Plan |
|
CEDD¡¦s memo on Rationale for Sediment
Removal |
|
Sediment Quality Report |
|
Historical Aerial Photos |
|
Existing Site Conditions |
|
Relevant Correspondences with FSD and EPD |
|
Ecological Baseline Report |
|
Graded Historic Buildings Catalogue |
|
Not-Graded and Nil-Grade Built Heritage
Catalogue |
|
Fung Shui Woodlands Catalogue |
|
Broad Brush Tree Survey |
|
Implementation Schedule of Environmental
Protection Measures for the Project |
|
Summary of Environmental Impacts
Associated with the Project |
|
Key Assessment Assumptions and
Limitations of Assessment Methodologies |
LIST OF FIGURES (VOLUME 3)
Location Plan of
Sensitive Receivers and Area of Conservation Importance |
|
Air Sensitive Receivers
(Key Plan) |
|
Air Sensitive Receivers |
|
Air Sensitive Receivers |
|
Air Sensitive Receivers |
|
Air Sensitive Receivers |
|
Air Sensitive Receivers |
|
Noise Sensitive
Receivers and Proposed Works Areas (Key Plan) |
|
Noise Sensitive
Receivers and Proposed Works Areas |
|
Noise Sensitive
Receivers and Proposed Works Areas |
|
Noise Sensitive
Receivers and Proposed Works Areas |
|
Noise Sensitive
Receivers and Proposed Works Areas |
|
Noise Sensitive
Receivers and Proposed Works Areas |
|
EPD¡¦s Marine Water
Quality Monitoring Station |
|
Water Sensitive
Receivers |
|
Arrangement of Works
within Yuen Long Nullah |
|
General Arrangement of
Energy Dissipators |
|
Sampling Location Plan |
|
Proposed Layout of the
Barrage overlaid with Habitat Map |
|
Location of Oyster
Culture Area in Deep Bay |
|
Active and Inactive
Fishponds in the Assessment Area |
|
Location of Heritage
Resources within the Built Heritage Survey Study Area |
|
Built Heritage Resources
in Lung Tin Tsuen |
|
Built Heritage Resources
in Ko Po Tsuen |
|
Built Heritage Resources
in Sham Chung Tsuen |
|
Built Heritage Resources
in Tin Liu Tsuen |
|
Built Heritage Resources
in Ma Tin Tsuen |
|
Built Heritage Resources
in Tai Kiu |
|
Built Heritage Resources
in Wang Chau Tung Tau Wai |
|
Built Heritage Resources
in Wang Chau Lam Uk Tsuen and Yeung Uk Tsuen |
|
Built Heritage Resources
in Shan Pui Chung Hau Tsuen North |
|
Built Heritage Resources
in Shan Pui Chung Hau Tsuen South |
|
Aerial Photograph ¡V Yuen
Long Barrage Scheme |
|
Aerial Photograph - Kam
Tin River Parapet Modifications |
|
Site Layout Plan ¡V Yuen
Long Barrage Scheme |
|
Site Layout Plan ¡V Kam
Tin River Parapet Modifications |
|
Review of Planning and
Development Control Framework |
|
Landscape Resources (Sheet
1 of 4) |
|
Landscape Resources
(Sheet 2 of 4) |
|
Landscape Resources
(Sheet 3 of 4) |
|
Landscape Resources
(Sheet 4 of 4) |
|
Landscape Resources
Photographs (Sheet 1 of 3) |
|
Landscape Resources Photographs
(Sheet 2 of 3) |
|
Landscape Resources
Photographs (Sheet 3 of 3) |
|
Residual Impacts on Landscape
Resources with Mitigation Year10 (Sheet 1 of 4) |
|
Residual Impacts on
Landscape Resources with Mitigation Year10 (Sheet 2 of 4) |
|
Residual Impacts on
Landscape Resources with Mitigation Year10 (Sheet 3 of 4) |
|
Residual Impacts on
Landscape Resources with Mitigation Year10 (Sheet 4 of 4) |
|
Landscape Character
Areas (Sheet 1 of 2) |
|
Landscape Character
Areas (Sheet 2 of 2) |
|
Landscape Character
Areas Photographs (Sheet 1 of 2) |
|
Landscape Character
Areas Photographs (Sheet 2 of 2) |
|
Residual Impacts on Landscape
Character Areas (Sheet 1 of 2) |
|
Residual Impacts on
Landscape Character Areas (Sheet 2 of 2) |
|
Key Visual Elements and
Photomontage Viewpoints |
|
Zone of Visual
Influence, Key VSRs and Photomontages Viewpoints (Sheet 1 of 4) |
|
Zone of Visual
Influence, Key VSRs and Photomontages Viewpoints (Sheet 2 of 4) |
|
Zone of Visual
Influence, Key VSRs and Photomontages Viewpoints (Sheet 3 of 4) |
|
Zone of Visual
Influence, Key VSRs and Photomontages Viewpoints (Sheet 4 of 4) |
|
Photographs of VSRs
(Sheet 1 of 6) |
|
Photographs of VSRs
(Sheet 2 of 6) |
|
Photographs of VSRs
(Sheet 3 of 6) |
|
Photographs of VSRs
(Sheet 4 of 6) |
|
Photographs of VSRs
(Sheet 5 of 6) |
|
Photographs of VSRs (Sheet
6 of 6) |
|
Residual Impacts on VSRs
with Mitigation Year10 (Sheet 1 of 4) |
|
Residual Impacts on VSRs
with Mitigation Year10 (Sheet 2 of 4) |
|
Residual Impacts on VSRs
with Mitigation Year10 (Sheet 3 of 4) |
|
Residual Impacts on VSRs
with Mitigation Year10 (Sheet 4 of 4) |
|
Photomontages ¡V VP1
(Sheet 1 of 2) |
|
Photomontages ¡V VP1
(Sheet 2 of 2) |
|
Photomontages ¡V VP2
(Sheet 1 of 2) |
|
Photomontages ¡V VP2
(Sheet 2 of 2) |
|
Photomontages ¡V VP3
(Sheet 1 of 2) |
|
Photomontages ¡V VP3
(Sheet 2 of 2) |
|
Photomontages ¡V VP4
(Sheet 1 of 2) |
|
Photomontages ¡V VP4
(Sheet 2 of 2) |
|
Photomontages ¡V VP5
(Sheet 1 of 2) |
|
Photomontages ¡V VP5
(Sheet 2 of 2) |
|
Photomontages ¡V VP6
(Sheet 1 of 2) |
|
Photomontages ¡V VP6
(Sheet 2 of 2) |
|
Photomontages ¡V VP7
(Sheet 1 of 2) |
|
Photomontages ¡V VP7
(Sheet 2 of 2) |
|
Photomontages ¡V VP8
(Sheet 1 of 2) |
|
Photomontages ¡V VP8
(Sheet 2 of 2) |
|
Photomontages ¡V VP9
(Sheet 1 of 2) |
|
Photomontages ¡V VP9
(Sheet 2 of 2) |
|
Photomontages ¡V VP10
(Sheet 1 of 2) |
|
Photomontages ¡V VP10
(Sheet 2 of 2) |
|
Photomontages ¡V VP11
(Sheet 1 of 2) |
|
Photomontages ¡V VP11
(Sheet 2 of 2) |
|
Landscape & Visual
Mitigation Measures Plan (Sheet 1 of 2) |
|
Landscape & Visual
Mitigation Measures Plan (Sheet 2 of 2) |
|
Barrage Mitigation ¡V
Plan |
|
Barrage Mitigation ¡V
Elevation A - Northwest |
|
Barrage Mitigation ¡V
Elevation B - Southwest |
|
Barrage Mitigation ¡V
Elevation C - Northeast |
|
Landscape Resources ¡V
Existing & Affected Trees (Sheet 1 of 4) |
|
Landscape Resources ¡V
Existing & Affected Trees (Sheet 2 of 4) |
|
Landscape Resources ¡V
Existing & Affected Trees (Sheet 3 of 4) |
|
Landscape Resources ¡V
Existing & Affected Trees (Sheet 4 of 4) |
|
Typical Nullah
Mitigation ¡VSection A |
|
Typical Nullah
Mitigation ¡VSection B |
|
Typical Nullah
Mitigation ¡VSection C |
|
Typical Nullah
Mitigation ¡VSection D |
|
Typical Vertical
Greening Detail |