Tung Chung Line Extension
Environmental Impact
Assessment Report
CONTENT
1.1 |
Project Background |
1.2 |
Site Location and History |
1.3 |
The Project |
1.4 |
EIA Study Brief |
1.5 |
Designated Projects |
1.6 |
Objectives of the EIA Study |
1.7 |
Structure of this EIA Report |
2.1 |
Purposes and Objectives of the Project |
2.2 |
Need of the Project |
2.3 |
Scenarios
"With" and "Without" the Project |
2.4 |
Environmental Benefits
of the Project |
2.5 |
Considerations of
Options |
2.6 |
Tackling Environmental
Challenges |
2.7 |
Proposed Design for the
Project |
2.8 |
Environmental
Initiatives |
2.9 |
Collating and Addressing
Public Views |
2.10 |
Tentative Implementation Programme |
2.11 |
Concurrent Projects |
2.12 |
Summary of Environmental Benefits and Environmental Achievements of the Project |
3.1 |
Legislation, Standards and Criteria |
3.2 |
Description of the Environment |
3.3 |
Representative Air Sensitive Receivers |
3.4 |
Identification of Pollution Sources and Emission
Inventory |
3.5 |
Key Representative Pollutants |
3.6 |
Assessment Methodology |
3.7 |
Assessment Results |
3.8 |
Good Site Practice and Recommended Mitigation
Measures |
3.9 |
Conclusion |
4.1 |
Relevant Legislation, Standards and Criteria |
4.2 |
Baseline Conditions |
4.3 |
Noise Sensitive Receivers |
4.4 |
Airborne Construction Noise Impact Assessment |
4.5 |
Groundborne Construction Noise Impact Assessment |
4.6 |
Airborne Rail Noise Assessment Impact Assessment |
4.7 |
Groundborne Rail Noise Impact Assessment |
4.8 |
Fixed Noise Sources Impact Assessment |
4.9 |
Conclusion |
5.1 |
Legislation, Standards, Guidelines and Criteria |
5.2 |
Baseline Conditions |
5.3 |
Representative Water Sensitive Receivers |
5.4 |
Assessment Methodology |
5.5 |
Identification and Evaluation of Environmental
Impacts |
5.6 |
Cumulative Impacts from Concurrent Project |
5.7 |
Mitigation Measures Recommendations |
5.8 |
Residual Impacts |
5.9 |
Environmental Monitoring and Audit (EM&A) |
5.10 |
Conclusion |
6.1 |
Legislation, Standards and Guidelines |
6.2 |
Construction Phase |
6.3 |
Operational Phase |
6.4 |
Conclusion |
7.1 |
Legislation, Standards and Guidelines |
7.2 |
Assessment Area |
7.3 |
Agreed Land Contamination Review Report |
7.4 |
Assessment Methodology |
7.5 |
Desktop Review |
7.6 |
Site Surveys |
7.7 |
Information from Relevant Government Departments |
7.8 |
Future Land Use |
7.9 |
Identification of Potentially Contaminated Area |
7.10 |
Conclusion |
8.1 |
Introduction |
8.2 |
Legislation, Standards and Guidelines |
8.3 |
Methodology |
8.4 |
Ecological Baseline Conditions |
8.5 |
Evaluation of Habitats and Species |
8.6 |
Impact Identification and Prediction |
8.7 |
Impact Evaluation |
8.8 |
Cumulative Impacts from Concurrent Projects |
8.9 |
Avoidance / Minimisation / Mitigation Measures |
8.10 |
Residual Impacts |
8.11 |
Environmental Monitoring and Audit (EM&A) |
8.12 |
Conclusion |
8.13 |
Reference |
9.1 |
Legislation, Standards and Guidelines |
9.2 |
Methodology for Baseline Establishment and Impact
Assessment |
9.3 |
Fisheries Baseline Conditions |
9.4 |
Impact Identification and Evaluation |
9.5 |
Cumulative Impacts |
9.6 |
Mitigation Measures |
9.7 |
Environmental Monitoring and Audit Requirement |
9.8 |
Residual Impacts |
9.9 |
Conclusion |
9.10 |
Reference |
10.1 |
Legislation, Standards and Guidelines |
10.2 |
Landscape Impact Assessment Methodology |
10.3 |
Visual Impact Assessment Methodology |
10.4 |
Review of Planning and Development Control
Framework |
10.5 |
Landscape Baseline Study |
10.6 |
Visual Baseline Study |
10.7 |
Landscape and Visual Impact Assessment before
Mitigation |
10.8 |
Landscape and Visual Mitigation Measures |
10.9 |
Residual Landscape and Visual Impact upon
Mitigation |
10.10 |
Cumulative Impact |
10.11 |
Conclusion |
11.1 |
Legislation, Standards and Guidelines |
11.2 |
Overview of Construction Works |
11.3 |
Assessment Area |
11.4 |
Baseline Conditions |
11.5 |
Archaeological Impact Assessment |
11.6 |
Built Heritage Impact Assessment |
11.7 |
Conclusion |
11.8 |
Reference |
12.1 |
Legislation, Standards and Guidelines |
12.2 |
Review of Hazard Identifications |
12.3 |
Hazard Impact Evaluation |
12.4 |
Conclusion |
13.1 |
Introduction |
13.2 |
Project Organization |
13.3 |
EM&A Manual |
13.4 |
Environmental Mitigation Implementation Schedule |
13.5 |
EM&A Programme |
14.1 |
General |
14.2 |
Environmentally Friendly Options Considered and Incorporated to Avoid and Minimise Environmental Impact |
14.3 |
Estimated Population Protected from Various Environmental Impacts |
14.4 |
Environmental Benefits of Environmental Protection Measures Recommended |
15.1 |
General |
15.2 |
Air Quality |
15.3 |
Noise |
15.4 |
Water Quality |
15.5 |
Waste Management |
15.6 |
Land Contamination |
15.7 |
Ecology |
15.8 |
Fisheries |
15.9 |
Landscape and Visual |
15.10 |
Cultural Heritage |
15.11 |
Hazard to life |
Figures
Latest Alignment and Key Elements |
|
TBM Launching Shaft Options, Alignment
Options and EAP/ EEP Options |
|
Concurrent Projects |
|
Locations of Concerned PATH Grids |
|
Locations of Representative Air
Sensitive Receiver |
|
Extent of Road Network |
|
Locations of PTIs |
|
Locations of Major Chimneys and Marine
Route |
|
Mitigated Cumulative Maximum 1-hour TSP
Concentrations at 1.5m above Ground (Year 2023) |
|
Mitigated Cumulative 10th highest
24-hour RSP Concentrations at 1.5m above Ground (Year 2023) |
|
Mitigated Cumulative Annual RSP
Concentrations at 1.5m above Ground (Year 2023) |
|
Mitigated Cumulative 36th highest
24-hour FSP Concentrations at 1.5m above Ground (Year 2023) |
|
Mitigated Cumulative Annual FSP
Concentrations at 1.5m above Ground (Year 2023) |
|
Mitigated Cumulative Maximum 1-hour TSP
Concentrations at 1.5m above Ground (Year 2027) |
|
Mitigated Cumulative 10th highest
24-hour RSP Concentrations at 1.5m above Ground (Year 2027) |
|
Mitigated Cumulative Annual RSP
Concentrations at 1.5m above Ground (Year 2027) |
|
Mitigated Cumulative 36th highest
24-hour FSP Concentrations at 1.5m above Ground (Year 2027) |
|
Mitigated Cumulative Annual FSP
Concentrations at 1.5m above Ground (Year 2027) |
|
Prevailing Noise Measurement Locations |
|
Existing and Planned Noise Sources |
|
Locations of Representative Noise
Sensitive Receivers |
|
Locations of Representative Noise
Assessment Points (Airborne Construction Noise) |
|
Locations of Representative Noise
Assessment Points (Groundborne Construction Noise) |
|
Locations of Representative Noise
Assessment Points (Airborne Rail Noise) |
|
Locations of Representative Noise
Assessment Points (Groundborne Rail Noise) |
|
Locations of Representative Noise
Assessment Points (Fixed Noise Sources) |
|
Location of the Noise Barrier at Ma Wan
Chung |
|
Proposed Rail Noise Mitigation Measures
for Scenario A |
|
Proposed Rail Noise Mitigation Measures
for Scenario B |
|
Proposed Rail Noise Mitigation Measures
for Scenario C |
|
Proposed Rail Noise Mitigation Measures
for Scenario D |
|
Location of Water Sensitive Receiver and
Monitoring Location for Baseline Conditions |
|
Location of Additional Precautionary
Measures at TCW Area |
|
Location of the Project |
|
Location of Assessment Area |
|
Boundary of the TCNTE PDAs and Locations
of the 13 Sites with Industrial Land Uses Identified in the TCNTE EIA Study |
|
Site Survey Photographs – Index |
|
Ecological Impact Assessment Area,
Ecological Survey Transects and Sampling Locations |
|
Recongised Sites of Conservation Importance |
|
Habitat Map and Location of Species of
Conservation Importance (Overview) |
|
Habitat Map and Location of Species of
Conservation Importance (Western) |
|
Habitat Map and Location of Species of
Conservation Importance (Eastern) |
|
Representative Photos of Habitats(Sheet
1 of 4) |
|
Representative Photos of Habitats(Sheet
2 of 4) |
|
Representative Photos of Habitats(Sheet
3 of 4) |
|
Representative Photos of Habitats(Sheet
4 of 4) |
|
Representative Photos of Species of
Conservation Importance(Sheet 1 of 4) |
|
Representative Photos of Species of
Conservation Importance(Sheet 2 of 4) |
|
Representative Photos of Species of
Conservation Importance(Sheet 3 of 4) |
|
Representative Photos of Species of
Conservation Importance(Sheet 4 of 4) |
|
Sites of Fisheries Importance |
|
Location of Home Ports of Local Fishing
Vessels (Source: AFCD Port Survey 2016/2017) |
|
Distribution of Fishing Operations –
Overall (Source: AFCD Port Survey 2016/2017) |
|
Distribution of Fishing Operations –
Sampan (Source: AFCD Port Survey 2016/2017) |
|
Distribution of Fishing Operations –
Other Types of Fishing Vessels (Source: AFCD Port Survey 2016/2017) |
|
Distribution of Fisheries Production –
Overall (Source: AFCD Port Survey 2016/2017) |
|
Distribution of Fisheries Production –
Sampan (Source: AFCD Port Survey 2016/2017) |
|
Distribution of Fisheries Production –
Other Types of Fishing Vessels (Source: AFCD Port Survey 2016/2017) |
|
Fisheries Sampling Locations of Tung
Chung New Town Extension EIA |
|
Aerial Photo |
|
Outline Zoning Plan |
|
Landscape Resources Plan |
|
Photographs of Landscape Resources
(Sheet 1 of 5) |
|
Photographs of Landscape Resources
(Sheet 2 of 5) |
|
Photographs of Landscape Resources
(Sheet 3 of 5) |
|
Photographs of Landscape Resources
(Sheet 4 of 5) |
|
Photographs of Landscape Resources
(Sheet 5 of 5) |
|
Landscape Character Plan |
|
Photographs of Landscape Character Area
(Sheet 1 of 4) |
|
Photographs of Landscape Character Area
(Sheet 2 of 4) |
|
Photographs of Landscape Character Area
(Sheet 3 of 4) |
|
Photographs of Landscape Character Area
(Sheet 4 of 4) |
|
Visually Sensitive Receivers Plan with
Vantage Envelope |
|
View of Visually Sensitive Receivers
(Sheet 1 of 6) |
|
View of Visually Sensitive Receivers
(Sheet 2 of 6) |
|
View of Visually Sensitive Receivers
(Sheet 3 of 6) |
|
View of Visually Sensitive Receivers
(Sheet 4 of 6) |
|
View of Visually Sensitive Receivers
(Sheet 5 of 6) |
|
View of Visually Sensitive Receivers
(Sheet 6 of 6) |
|
Locations of Construction Areas |
|
Photomontages – VSR 2 |
|
Photomontages – VSR 3 |
|
Photomontages – VSR 10 |
|
Photomontages – VSR 16 |
|
Project Area and Assessment Area |
|
Geological Map |
|
Previous Archaeological Investigation at
TCW |
|
Previous Archaeological Investigation at
TCE |
|
Locations of Declared Monuments and
Built Heritages |
|
Locations of As-built Test Pits and
Auger Holes |
|
Archaeological Potential to the North of
the TCW Station |
|
Tentative Locations of Recommended
Further Testing for Archaeological Mitigation Measures |
Appendices
Implementation Phases of At-grade Tracks
|
|
Designated Landbased
Transportation Routes |
|
Heavy Construction Areas |
|
Tentative Construction Programme |
|
Implementation Phases of TCE and TCW
under TCNTE |
|
Dust Emission Inventory and Source
Location for the Project |
|
Surface Characteristics Parameters |
|
Dust Emission Inventory and Source
Locations for Concurrent Sources |
|
Traffic Department Endorsement |
|
Traffic Forecast |
|
Temperature and Humidity Profile adopted
for EMFAC and PTI calculation |
|
Estimation of Trips for Local and Rural
Roads |
|
Hourly Composite Vehicular Emission
Factor |
|
Emission Inventory and Source Locations
for PTIs |
|
Emission Inventory and Source Locations
for Industrial Emissions |
|
Emission Inventory and Source Locations
for Marine Emission |
|
Detailed Construction Dust Assessment
Results |
|
Prevailing Noise Measurement Results |
|
Photos of Representative Existing NSRs |
|
Area Sensitivity Ratings of the Representative NSRs
for Rail Noise and Fixed Noise Sources Assessment |
|
SWLs of PMEs |
|
Detailed PME Inventory |
|
Locations of Workfronts
for Construction |
|
Unmitigated Construction Noise Impacts |
|
Sketch of Typical Temporary Noise
Barrier & Enclosure and 3-side Temporary Movable Enclosure |
|
Mitigated Construction Noise Impacts |
|
Point Source Response (PSR) and Line
Source Response (LSR) Measurement |
|
Correction Factor for Groundborne Noise Calculation |
|
Predicted Groundborne
Construction Noise Results |
|
Rail Noise Source Term |
|
At-receiver Mitigation Measures proposed
in approved AEIAR-196/2016 and TC New Town Extension (East) – Design and
Construction (Ref. PI16-01) |
|
Unmitigated Rail Noise Results |
|
Unmitigated Rail Noise contour (Leq) |
|
Unmitigated Rail Noise contour (Lmax) |
|
Noise Barrier Section Drawings |
|
Mitigated Rail Noise Results |
|
Mitigated Rail Noise contour (Leq) |
|
Mitigated Rail Noise contour (Lmax) |
|
Trackform Insertion Loss |
|
Force Density Level (FDL) Measurement |
|
Predicted Groundborne
Rail Noise Results |
|
Geological Profile |
|
Predicted Noise Levels from the Fixed
Noise Sources |
|
|
|
Approved SSTP |
|
Summary of Chemical Screening Test
Results |
|
Actual Sediment Sampling Locations |
|
Estimated Volume of Land-based Marine
Sediment to be Generated |
|
Updated Excavation Area and Location of
Marine Sediment |
|
Agreed LCR Report |
|
Plant Species Recorded within the 500m
Assessment Area |
|
Mammal Species Recorded within the 500m
Assessment Area |
|
Bird Species Recorded within the 500m
Assessment Area |
|
Butterfly Species Recorded within the
500m Assessment Area |
|
Odonate Species Recorded within the 500m Assessment Area |
|
Reptile Species Recorded within the 500m
Assessment Area |
|
Amphibian Species Recorded within the
500m Assessment Area |
|
Aquatic Species Recorded within the 500m
Assessment Area |
|
Intertidal Organisms Recorded in the
Qualitative Survey within the 500m Assessment Area |
|
Intertidal Organisms Recorded in the
Quantitative Survey within the 500m Assessment Area |
|
Results of Coastal Fish Survey |
|
Abundance of Subtidal Benthic Species
Recorded at each Sampling Location within the Assessment Area (replicates of
sub-stations are pooled together) |
|
Biomass (g) of Subtidal Benthic Species
Recorded at each Sampling Location within the Assessment Area (replicates of
sub-stations are pooled together) |
|
Prediction of Visual Impact Based on Field
of View |
|
Broad Bush Tree Survey (Tung Chung
East and Tung Chung West) |
|
Proposed Landscape Treatment Plan |
|
Conceptual Plans of the Proposed
Development with Mitigation Measures |
|
Photos of Non-Graded Buildings and
Structures and Additional Historic Buildings |
|
Aerial Photograph Taken in 1996 of the
Study Area |
|
Aerial Photograph Taken in 1998 of the
Study Area |
|
Societal Risk
Guidelines |
|
Cross-Sectional Drawings |
|
Key Assessment Assumptions and
Limitation of Assessment Methodologies |
|
Summary
of Environmental Impacts Associated with the Project |