LIST OF FIGURES
Proposed TME alignment |
|
Proposed Works Areas and Works Sites (Sheet 1 of 2) |
|
Proposed Works Areas and Works Sites (Sheet 2 of 2) |
|
Alignment Options |
|
Locations of Concurrent Projects |
|
Locations of Representative Air Quality Sensitive Receivers (Sheet 1 of 2) |
|
Locations of Representative Air Quality Sensitive Receivers (Sheet 2 of 2) |
|
Contour of Predicted Maximum Cumulative Hourly TSP Concentration at 1.5 mAG (µg/m3) (Scenario 1) |
|
Contour of Predicted 10th Highest Cumulative Daily RSP Concentration at 1.5 mAG (µg/m3) (Scenario 1) |
|
Contour of Predicted Cumulative Annual RSP Concentration at 1.5 mAG (µg/m3) (Scenario 1) |
|
Contour of Predicted 36th Highest Cumulative Daily FSP Concentration at 1.5 mAG (µg/m3) (Scenario 1) |
|
Contour of Predicted Cumulative Annual FSP Concentration 1.5mAG (µg/m3) (Scenario 1) |
|
Contour of Predicted Maximum Cumulative Hourly TSP Concentration at 1.5 mAG (µg/m3) (Scenario 2) |
|
Contour of Predicted 10th Highest Cumulative Daily RSP Concentration at 1.5 mAG (µg/m3) (Scenario 2) |
|
Contour of Predicted Cumulative Annual RSP Concentration at 1.5 mAG (µg/m3) (Scenario 2) |
|
Contour of Predicted 36th Highest Cumulative Daily FSP Concentration at 1.5 mAG (µg/m3) (Scenario 2) |
|
Contour of Predicted Cumulative Annual FSP Concentration 1.5mAG (µg/m3) (Scenario 2) |
|
Locations of Prevailing Background Noise Measurement |
|
Locations of Noise Sensitive Receivers (Sheet 1 of 2) |
|
Locations of Noise Sensitive Receivers (Sheet 2 of 2) |
|
Locations of the Representative Noise Assessment Points (Construction Noise) (Sheet 1 of 3) |
|
Locations of the Representative Noise Assessment Points (Construction Noise) (Sheet 2 of 3) |
|
Locations of the Representative Noise Assessment Points (Construction Noise) (Sheet 3 of 3) |
|
Locations of the Representative Noise Assessment Points (Railway Noise) (Sheet 1 of 3) |
|
Locations of the Representative Noise Assessment Points (Railway Noise) (Sheet 2 of 3) |
|
Locations of the Representative Noise Assessment Points (Railway Noise) (Sheet 3 of 3) |
|
Locations of the Representative Noise Assessment Points (Fixed Plant Noise) (Sheet 1 of 2) |
|
Locations of the Representative Noise Assessment Points (Fixed Plant Noise) (Sheet 2 of 2) |
|
Mitigation Measures for Railway Noise (Sheet 1 of 3) |
|
Mitigation Measures for Railway Noise (Sheet 2 of 3) |
|
Mitigation Measures for Railway Noise (Sheet 3 of 3) |
|
Locations of Water Sensitive Receivers and Water Quality Monitoring Stations (Sheet 1 of 2) |
|
Locations of Water Sensitive Receivers and Water Quality Monitoring Stations (Sheet 2 of 2) |
|
The Proposed Sediment Sampling Locations for Land-based Sediment and the Preferred Alignment |
|
The Proposed Sediment Sampling Locations for River-based Sediment and the Preferred Alignment |
|
As-built Sediment Sampling Locations for Land-based Sediment |
|
As-built Sediment Sampling Locations for River-based Sediment |
|
Assessment Area for Terrestrial Ecology and Site of Conservation Importance |
|
Habitat Map and Locations of Species of Conservation Importance |
|
Locations of Ardeid Foraging and Roosting Areas |
|
Flight Lines of Ardeids in Tuen Mun Egretry |
|
Representative Flight Lines of Night Roosting Ardeids |
|
Permanent and Temporary Loss of Habitats within the Project Footprint |
|
Key Ecological Resources within the Assessment Area for Mong Wing Street Offsite Works Area |
|
Location of Proposed Panel for Ardeid Night Roost |
|
Landscape and Visual Impact Study Boundary |
|
Existing Planning & Development Framework (OZP) within the Study Area |
|
Landscape Resources |
|
Photographs of Landscape Resources (Sheet 1 of 2) |
|
Photographs of Landscape Resources (Sheet 2 of 2) |
|
Landscape Character Areas |
|
Photographs of Landscape Character Areas |
|
Key Visually Sensitive Receivers |
|
Photomontage Viewpoint Locations |
|
Key Landscape Master Plan |
|
Landscape Mitigation Plan (Sheet 1 of 5) |
|
Landscape Mitigation Plan (Sheet 2 of 5) |
|
Landscape Mitigation Plan (Sheet 3 of 5) |
|
Landscape Mitigation Plan (Sheet 4 of 5) |
|
Landscape Mitigation Plan (Sheet 5 of 5) |
|
Implementation of Mitigation Measures - Section (Sheet 1 of 4) |
|
Implementation of Mitigation Measures - Section (Sheet 2 of 4) |
|
Implementation of Mitigation Measures - Section (Sheet 3 of 4) |
|
Implementation of Mitigation Measures - Section (Sheet 4 of 4) |
|
Photomontage - VP1 |
|
Photomontage - VP2 |
|
Photomontage - VP3 |
|
Photomontage - VP4 |
|
Photomontage - VP5 |
|
Photomontage - VP6 |
|
Photomontage - VP7 |
|
Photomontage - VP8 |
|
Photomontage - VP9 |
|
Existing Planning & Development Framework (OZP) within the Study Boundary (Off-site Works Area) |
|
Landscape Resources (Off-site Works Area) |
|
Photographs of Landscape Resources (Off-site Works Area) |
|
Landscape Character Areas (Off-site Works Area) |
|
Key Visual Sensitive Receivers (Off-site Works Area) |
|
Locations of Cultural Heritage Resources |
|
Assessment Area and the Historical Aerial
Photographs (1963) |
|
Assessment Area and the Historical Aerial Photographs of Proposed Temporary Works Area (1984) |
|
Proposed Alignment and the Location of PHI |