LIST OF FIGURES

C1502/C/TME/ACM/M50/101

Proposed TME alignment

C1502/C/TME/ACM/M50/102

Proposed Works Areas and Works Sites (Sheet 1 of 2)

C1502/C/TME/ACM/M50/103

Proposed Works Areas and Works Sites (Sheet 2 of 2)

C1502/C/TME/ACM/M50/104

Alignment Options

C1502/C/TME/ACM/M50/105

Locations of Concurrent Projects

C1502/C/TME/ACM/M51/101

Locations of Representative Air Quality Sensitive Receivers (Sheet 1 of 2)

C1502/C/TME/ACM/M51/102

Locations of Representative Air Quality Sensitive Receivers (Sheet 2 of 2)

C1502/C/TME/ACM/M51/103

Contour of Predicted Maximum Cumulative Hourly TSP Concentration at 1.5 mAG (µg/m3) (Scenario 1)

C1502/C/TME/ACM/M51/104

Contour of Predicted 10th Highest Cumulative Daily RSP Concentration at 1.5 mAG (µg/m3) (Scenario 1)

C1502/C/TME/ACM/M51/105

Contour of Predicted Cumulative Annual RSP Concentration at 1.5 mAG (µg/m3) (Scenario 1)

C1502/C/TME/ACM/M51/106

Contour of Predicted 36th Highest Cumulative Daily FSP Concentration at 1.5 mAG (µg/m3) (Scenario 1)

C1502/C/TME/ACM/M51/107

Contour of Predicted Cumulative Annual FSP Concentration 1.5mAG (µg/m3) (Scenario 1)

C1502/C/TME/ACM/M51/108

Contour of Predicted Maximum Cumulative Hourly TSP Concentration at 1.5 mAG (µg/m3) (Scenario 2)

C1502/C/TME/ACM/M51/109

Contour of Predicted 10th Highest Cumulative Daily RSP Concentration at 1.5 mAG (µg/m3) (Scenario 2)

C1502/C/TME/ACM/M51/110

Contour of Predicted Cumulative Annual RSP Concentration at 1.5 mAG (µg/m3) (Scenario 2)

C1502/C/TME/ACM/M51/111

Contour of Predicted 36th Highest Cumulative Daily FSP Concentration at 1.5 mAG (µg/m3) (Scenario 2)

C1502/C/TME/ACM/M51/112

Contour of Predicted Cumulative Annual FSP Concentration 1.5mAG (µg/m3) (Scenario 2)

C1502/C/TME/ACM/M52/101

Locations of Prevailing Background Noise Measurement

C1502/C/TME/ACM/M52/102

Locations of Noise Sensitive Receivers (Sheet 1 of 2)

C1502/C/TME/ACM/M52/103

Locations of Noise Sensitive Receivers (Sheet 2 of 2)

C1502/C/TME/ACM/M52/104

Locations of the Representative Noise Assessment Points (Construction Noise) (Sheet 1 of 3)

C1502/C/TME/ACM/M52/105

Locations of the Representative Noise Assessment Points (Construction Noise) (Sheet 2 of 3)

C1502/C/TME/ACM/M52/106

Locations of the Representative Noise Assessment Points (Construction Noise) (Sheet 3 of 3)

C1502/C/TME/ACM/M52/107

Locations of the Representative Noise Assessment Points (Railway Noise) (Sheet 1 of 3)

C1502/C/TME/ACM/M52/108

Locations of the Representative Noise Assessment Points (Railway Noise) (Sheet 2 of 3)

C1502/C/TME/ACM/M52/109

Locations of the Representative Noise Assessment Points (Railway Noise) (Sheet 3 of 3)

C1502/C/TME/ACM/M52/110

Locations of the Representative Noise Assessment Points (Fixed Plant Noise) (Sheet 1 of 2)

C1502/C/TME/ACM/M52/111

Locations of the Representative Noise Assessment Points (Fixed Plant Noise) (Sheet 2 of 2)

C1502/C/TME/ACM/M52/112

Mitigation Measures for Railway Noise (Sheet 1 of 3)

C1502/C/TME/ACM/M52/113

Mitigation Measures for Railway Noise (Sheet 2 of 3)

C1502/C/TME/ACM/M52/114

Mitigation Measures for Railway Noise (Sheet 3 of 3)

C1502/C/TME/ACM/M53/101

Locations of Water Sensitive Receivers and Water Quality Monitoring Stations (Sheet 1 of 2)

C1502/C/TME/ACM/M53/102

Locations of Water Sensitive Receivers and Water Quality Monitoring Stations (Sheet 2 of 2)

C1502/C/TME/ACM/M54/101

The Proposed Sediment Sampling Locations for Land-based Sediment and the Preferred Alignment

C1502/C/TME/ACM/M54/102

The Proposed Sediment Sampling Locations for River-based Sediment and the Preferred Alignment

C1502/C/TME/ACM/M54/103

As-built Sediment Sampling Locations for Land-based Sediment

C1502/C/TME/ACM/M54/104

As-built Sediment Sampling Locations for River-based Sediment

C1502/C/TME/ACM/M56/101

Assessment Area for Terrestrial Ecology and Site of Conservation Importance

C1502/C/TME/ACM/M56/102

Habitat Map and Locations of Species of Conservation Importance

C1502/C/TME/ACM/M56/103

Locations of Ardeid Foraging and Roosting Areas

C1502/C/TME/ACM/M56/104

Flight Lines of Ardeids in Tuen Mun Egretry

C1502/C/TME/ACM/M56/105

Representative Flight Lines of Night Roosting Ardeids

C1502/C/TME/ACM/M56/106

Permanent and Temporary Loss of Habitats within the Project Footprint

C1502/C/TME/ACM/M56/107

Key Ecological Resources within the Assessment Area for Mong Wing Street Offsite Works Area

C1502/C/TME/ACM/M56/108

Location of Proposed Panel for Ardeid Night Roost

C1502/C/TME/ACM/M57/101

Landscape and Visual Impact Study Boundary

C1502/C/TME/ACM/M57/102

Existing Planning & Development Framework (OZP) within the Study Area

C1502/C/TME/ACM/M57/103

Landscape Resources

C1502/C/TME/ACM/M57/104

Photographs of Landscape Resources (Sheet 1 of 2)

C1502/C/TME/ACM/M57/105

Photographs of Landscape Resources (Sheet 2 of 2)

C1502/C/TME/ACM/M57/106

Landscape Character Areas

C1502/C/TME/ACM/M57/107

Photographs of Landscape Character Areas

C1502/C/TME/ACM/M57/108

Key Visually Sensitive Receivers

C1502/C/TME/ACM/M57/109

Photomontage Viewpoint Locations

C1502/C/TME/ACM/M57/111

Key Landscape Master Plan

C1502/C/TME/ACM/M57/112

Landscape Mitigation Plan (Sheet 1 of 5)

C1502/C/TME/ACM/M57/113

Landscape Mitigation Plan (Sheet 2 of 5)

C1502/C/TME/ACM/M57/114

Landscape Mitigation Plan (Sheet 3 of 5)

C1502/C/TME/ACM/M57/115

Landscape Mitigation Plan (Sheet 4 of 5)

C1502/C/TME/ACM/M57/116

Landscape Mitigation Plan (Sheet 5 of 5)

C1502/C/TME/ACM/M57/117

Implementation of Mitigation Measures - Section (Sheet 1 of 4)

C1502/C/TME/ACM/M57/118

Implementation of Mitigation Measures - Section (Sheet 2 of 4)

C1502/C/TME/ACM/M57/119

Implementation of Mitigation Measures - Section (Sheet 3 of 4)

C1502/C/TME/ACM/M57/120

Implementation of Mitigation Measures - Section (Sheet 4 of 4)

C1502/C/TME/ACM/M57/121

Photomontage - VP1

C1502/C/TME/ACM/M57/122

Photomontage - VP2

C1502/C/TME/ACM/M57/123

Photomontage - VP3

C1502/C/TME/ACM/M57/124

Photomontage - VP4

C1502/C/TME/ACM/M57/125

Photomontage - VP5

C1502/C/TME/ACM/M57/126

Photomontage - VP6

C1502/C/TME/ACM/M57/127

Photomontage - VP7

C1502/C/TME/ACM/M57/128

Photomontage - VP8

C1502/C/TME/ACM/M57/129

Photomontage - VP9

C1502/C/TME/ACM/M57/141

Existing Planning & Development Framework (OZP) within the Study Boundary (Off-site Works Area)

C1502/C/TME/ACM/M57/142

Landscape Resources (Off-site Works Area)

C1502/C/TME/ACM/M57/143

Photographs of Landscape Resources (Off-site Works Area)

C1502/C/TME/ACM/M57/144

Landscape Character Areas (Off-site Works Area)

C1502/C/TME/ACM/M57/145

Key Visual Sensitive Receivers (Off-site Works Area)

C1502/C/TME/ACM/M58/101

Locations of Cultural Heritage Resources

C1502/C/TME/ACM/M58/102

Assessment Area and the Historical Aerial Photographs (1963)

C1502/C/TME/ACM/M58/103

Assessment Area and the Historical Aerial Photographs of Proposed Temporary Works Area (1984)

C1502/C/TME/ACM/M59/101

Proposed Alignment and the Location of PHI