LIST OF APPENDICES

Appendix 3.3

Summary of Vehicular Emission Factors of 18 Vehicle Classes

Appendix 3.4

Emission Inventory of Vehicular Emission Source

Appendix 3.5

Calculation of Emissions Associated with Bus and Minibus Termini

Appendix 3.6

Calculation of Marine Emission Source

Appendix 3.7

Emission Inventory of Industrial Chimney

Appendix 3.8

Emission Inventory of Concurrent Projects

Appendix 3.9

Determination of Surface Characteristics

Appendix 3.10

Detailed Prediction Result (Construction Phase, Scenario 1, Unmitigated)

Appendix 3.11

Detailed Prediction Result (Construction Phase, Scenario 2, Unmitigated)

Appendix 3.12

Detailed Prediction Result (Construction Phase, Scenario 1, Mitigated)

Appendix 3.13

Detailed Prediction Result (Construction Phase, Scenario 2, Mitigated)

Appendix 4.1

Proposed Fixed Plant Noise Criteria for NSRs

Appendix 4.1A

Prevailing Background Noise Measurement

Appendix 4.2

Photographs of Selected Representative Noise Sensitive Receivers

Appendix 4.3

Plant Inventory (Unmitigated Scenario)

Appendix 4.4

Locations of Works areas and Distance to Notional Sources

Appendix 4.5

SWL of PME

Appendix 4.6

Construction Noise Assessment during Non-Restricted Hours (Unmitigated Scenario)

Appendix 4.7

Predicted Construction Noise Levels at Representative Floor Levels (Unmitigated Scenario)

Appendix 4.8

Plant Inventory (Mitigated Scenario)

Appendix 4.8a

Typical Arrangement of Movable Noise Barrier

Appendix 4.9

Construction Noise Assessment during Non-Restricted Hours (Mitigated Scenario)

Appendix 4.10

Predicted Construction Noise Levels at Representative Floor Levels (Mitigated Scenario)

Appendix 4.11

Construction Noise Assessment during Non-Restricted Hours (with Further Mitigated Measures)

Appendix 4.12

Cumulative Construction Noise Assessment during Non-Restricted Hours

Appendix 4.13

Fixed Plan Noise Calculation (A16 Station)

Appendix 4.14

Fixed Plan Noise Calculation (TMS Station)

Appendix 4.15A

Modelling Assumptions and Calculation Methodology

Appendix 4.15B

Speed Profile

Appendix 4.16

Operational Noise of LRT at Tuen Mun South Area

Appendix 4.17

Summary of Unmitigated Railway Noise Levels

Appendix 4.18

Rail Noise Contour, Leq 30min (Unmitigated Scenario)

Appendix 4.19

Rail Noise Contour, Lmax (Unmitigated Scenario)

Appendix 4.20

Summary of Mitigated Railway Noise Levels

Appendix 4.21

Rail Noise Contour, Leq 30min (Mitigated Scenario)

Appendix 4.22A

Calculation of Operational Noise Impact (Unmitigated Scenario)

Appendix 4.22B

Calculation of Operational Noise Impact (Mitigated Scenario)