Appendices

Appendix 4-1

Photo Record of Existing Noise Sensitive Receivers

Appendix 4-2

Proposed Construction Plant Inventory - Unmitigated

Appendix 4-3

Predicted Construction Noise Levels (Unmitigated Scenario)

Appendix 4-4A

Proposed Construction Plant Inventory - with Mitigation Measures

Appendix 4-4B

Proposed Construction Plant Inventory - with Mitigation Measures (For NAP N027 and N050)

Appendix 4-4C

Proposed Construction Plant Inventory - with Mitigation Measures (For NAP N002, N005, N006, N010, N013, N014A and N016B)

Appendix 4-4D

Proposed Construction Plant Inventory - with Mitigation Measures (For NAP N012B (G/F))

Appendix 4-4E

Proposed Construction Plant Inventory – with Mitigation Measures (For NAP N007 (1/F to 19/F) and N012B (1/F and 2/F))

Appendix 4-4F

Proposed Construction Plant Inventory - with Mitigation Measures (For NAP N016A and N017A)

Appendix 4-4G

Proposed Construction Plant Inventory - with Mitigation Measures (For NAP N007 (G/F and UG/F) and N015A)

Appendix 4-4H

Proposed Construction Plant Inventory - with Mitigation Measures (For NAP N030)

Appendix 4-5A

Predicted Construction Noise Levels (Mitigated Scenario)

Appendix 4-5B

Predicted Construction Noise Levels (Further Mitigated Scenario)

Appendix 4-6

Schematic Diagram for Typical Construction Noise Barrier and Noise Enclosure

Appendix 5-1

Water Quality Impact Assessment Methodology

Appendix 5-2

Water Quality Sampling and Testing Report

Appendix 5-3

Elutriate Test Results